SlideShare a Scribd company logo
1 of 27
Download to read offline
SOLID PORTFOLIO. SOLID FUTURE.
Bank of America Merrill Lynch
Global Metals, Mining & Steel
Conference 2015
Tony Jensen
President and Chief Executive Officer
May 2015
May 2015 2
Cautionary Statement
This presentation contains certain forward‐looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward‐
looking statements involve known and unknown risks, uncertainties, and other factors that could cause actual results to differ materially from the
projections and estimates contained herein and include, but are not limited to: production and mine life estimates from the operators of the Company’s
properties; the ramp‐up of the Mount Milligan mine; construction progress at the Phoenix Gold Project; anticipated growth in the volume of metals
subject to the Company’s royalty interests; and statements or estimates from operators of properties where we have royalty interests regarding
projected steady, increasing or decreasing production from our other developments at operating properties, and the timing of commencement and
ramp‐up of production at development properties. Factors that could cause actual results to differ materially from these forward‐looking statements
include, among others: the risks inherent in construction, development and operation of mining properties, including those specific to a new mine being
developed and operated by a base metals company; changes in gold, silver, copper, nickel and other metals prices; performance of and production at
the Company’s royalty properties; decisions and activities of the Company’s management; unexpected operating costs; decisions and activities of the
operators of the Company’s royalty and stream properties; changes in operators’ mining and processing techniques or royalty calculation
methodologies; resolution of regulatory and legal proceedings (including with Vale regarding Voisey’s Bay); unanticipated grade, geological,
metallurgical, environmental, processing or other problems at the properties; inaccuracies in technical reports and reserve estimates; revisions by
operators of reserves, mineralization or production estimates; changes in project parameters as plans of the operators are refined; the results of current
or planned exploration activities; discontinuance of exploration activities by operators; economic and market conditions; operations on lands subject to
First Nations or Native American jurisdiction in Canada and the United States; the ability of operators to bring non‐producing and not yet in
development projects into production and operate in accordance with feasibility studies; challenges to the Company’s royalty interests, or title and
other defects in the Company’s royalty properties; errors or disputes in calculating royalty payments, or payments not made in accordance with royalty
agreements; future financial needs of the Company; the impact of future acquisitions and royalty and streaming financing transactions; adverse changes
in applicable laws and regulations; litigation; and risks associated with conducting business in foreign countries, including application of foreign laws to
contract and other disputes, environmental laws, enforcement and uncertain political and economic environments. These risks and other factors are
discussed in more detail in the Company’s public filings with the Securities and Exchange Commission. Statements made herein are as of the date hereof
and should not be relied upon as of any subsequent date. The Company’s past performance is not necessarily indicative of its future performance. The
Company disclaims any obligation to update any forward‐looking statements.
The Company and its affiliates, agents, directors and employees accept no liability whatsoever for any loss or damage of any kind arising out of the use of
all or any part of this material.
Endnotes located on page 19.
3
What Makes Royal Gold Unique
May 2015
Mount Milligan is proving transformational and
providing an excellent platform for growth
High quality properties, counterparties and
jurisdictions and record of strong returns
We have approximately $1.4 billion in liquidity
and are balancing growth with return of capital
Opportunity
Quality
Growth
4
An Excellent Platform for Growth
Recent Financial Results compared to prior year quarter:
Record volume of 60,832 Gold Equivalent Ounces (GEO’s), up 36%1
Revenue of $74.1 million, up 28%
Adjusted EBITDA1 of $57.7 million, up 16%
$14.3 million in dividends paid, up 5%
Operating cash flow of $65.9 million, up 47%
Catalysts for the remainder of 2015:
Strengthening production at Peñasquito
Continued ramp‐up at Mount Milligan
Startup of production at the Phoenix Gold Project
Catalysts for the next 2‐3 years:
Progress towards production at Euromax’s Ilovtiza project
Development of Barrick’s Crossroads deposit
Pascua‐Lama redevelopment
May 2015
Already our largest contributor, generating 26% of Royal Gold’s March quarterly
revenue (net of stream payments)
Record sales in March, progressing towards quarterly run rate at design capacity
Average daily mill throughput of 50k to 54k tonnes per day (tpd) during the last
half of the March quarter, objective to reach 60ktpd by calendar year‐end
5
Growth
Mount Milligan – Thompson Creek Metals
May 2015
6
Growth
Contributed 10% of Royal Gold’s March quarterly revenue
Peñasquito 2015 production volume expected to increase 20‐30%
Metallurgical Enhancement Process (MEP) feasibility study at Peñasquito could
extend mine life by five years
Community engagement and consultation underway at El Morro
May 2015
Peñasquito – Goldcorp1
RGLD 1.4% NSR Gold/Copper on ~30%
of El Morro
RGLD 2% NSR, Gold/Silver/Lead/Zinc at
Peñasquito
7
Growth
Royal Gold commitment fully funded
Expected to become one of Royal Gold’s top 10 revenue sources
Mill commissioning process has commenced
Rubicon will deliver 6.3% of the gold from the Phoenix Gold Project until 135,000 ounces have
been delivered, then 3.15% thereafter
Royal gold will pay 25% of spot at time of delivery
Average estimated annual production of 165,300 ounces based on a 13 year mine life
Remains on schedule for projected initial production in mid‐2015
May 2015
Phoenix Gold Project – Rubicon Minerals1
8
Growth
May 2015
Wassa, Bogoso and Prestea – Golden Star Resources
Royal Gold to provide $130 million stream financing and a $20 million loan in stages to fund
underground development projects at Wassa and Prestea,
Gold streams will be on Wassa, Bogoso and Prestea and will apply to all production from April 1, 2015;
estimated 15,000‐20,000 gross gold ounces per year
Golden Star will deliver to Royal Gold 8.5% of gold produced until 185,000 ounces have been
delivered, 5.0% until an additional 22,500 have been delivered, and 3.0% thereafter
Royal Gold will pay 20% of spot until 207,500 ounces delivered, 30% of spot thereafter
Proven and probable reserves of 1.9 million gold ounces across both deposits, and measured and
indicated resources of 3.5 million ounces at Wassa and 3.1 million ounces at Bogoso and Prestea
Experienced management team with 15 years’ production history in Ghana
9
Growth
May 2015
Pre‐feasibility study envisions a conventional open pit mine using large scale fleet for a planned 10
million tonne per year mill operation
Former European Goldfields’ management team
Current reserve of 2.45 million ounces of gold and 905 million pounds of copper, 23 year mine life1
Stream calls for physical gold equal to 25% of gold produced from the Ilovitza project until 525,000
ounces have been delivered, and 12.5% thereafter. Royal Gold’s purchase price per ounce will be
25% of the spot price at time of delivery
Good local infrastructure and proximity to the Pirdop Smelter provides low transportation costs and
financing alternatives utilizing the support of the (German Government) UFK Loan Guarantee
Ilovitza – Euromax Resources
10
Quality
56% of our FY2014 revenues from
investment‐grade rated companies1Counterparty
Over 92% of our reserves from S&P
“A” or higher rated countries1
Place
Weighted average cash cost ~$591/GEO,
gross margin of 52% for underlying
properties in CY20142
Project
Focused investment criteria yields a world class portfolio
Andacollo, Peñasquito,
Voisey’s Bay, Mount Milligan,
Cortez, Goldstrike
May 2015
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Cash Margin by Operating Property
Calendar Year 2014
11
Quality
The operators of our royalties and streams
recognized an average 52% gross margin in the
calendar year 2014, which is an average cash cost
of $591 per gold equivalent ounce, on properties
subject to our interests.
52%
average
May 2015
12
Quality
May 2015
Royalty: 2.0% NSR on all metals
Reserves5,6: 10.6M oz (Au), 611M oz (Ag)
Estimated Mine Life5: 11 Years
Royalty3: 75% of Au production (NSR)
Reserves4: 1.6M oz (Au)
Estimated Mine Life: 20+ Years
Andacollo
11% or
$9.5M
Peñasquito
10% or
$7.2M
Voisey’s Bay
2.5% or
$1.9M
Mt. Milligan
40% or
$29.7M
(gross basis;
26% net)
Royalty7: 2.7% NSR
Reserves4: 0.9B lbs (Ni); 0.5B lbs (Cu)
Estimated Mine Life: 20+ Years8
Stream: 52.25% of payable gold1
Reserves2: 6.2M oz (Au)
Estimated Mine Life: 20+ Years
Contribution to
FY2015 Q3 revenue
Contribution to
FY2015 Q3 revenue
Contribution to
FY2015 Q3 revenue
Contribution to
FY2015 Q3 revenue
World class, long lived portfolio
0
5
10
15
20
25
$‐
$100
$200
$300
$400
$500
$600
$700
$800
$900
$1,000
$Millions
Initial investment
Cumulative net revenue through December 31, 2014
Estimated remaining mine life
13
Quality
Long mine lives amongst largest investments
EstimatedYearsofRemainingMineLife
1
May 2015
$180M
$370M
converts due
2019
*
$760M Working Capital
Capital to invest…
Over $1.4 billion available at a time when royalty/stream financing is
needed
* Includes current commitments outstanding for Goldrush ($6M), and Peak Gold ($5M)
** Conditional commitments for Ilovitza ($167.5M), Peak Gold ($25M) and Golden Star ($150M)
$US millions
$1,410.0 Working capital & undrawn credit at 4‐30‐15
‐$6.0 Goldrush
‐$5.0 Peak Gold Joint Venture payment
$1,399.0
Estimated liquidity balance
before conditional commitments
‐$167.5
Ilovitza 2nd payment
and construction payments
‐$25.0 Peak Gold Joint Venture payment
‐$150.0 Golden Star Advance Payment & Loan
$1,056.5
Estimated liquidity balance inclusive of
conditional commitments
Net of future commitments ($m)
Current
commitments
Conditional
commitments
Opportunity
$650M
Revolver
May 2015 14
**
15
Opportunity
Positive Market Acceptance of our Streaming Product
Share Price Performance at Announcement1
+35.0%
+3.0%
Attractive cost of capital with
advantageous NPV/share or
cash flow/share basis
Lower financing risk with no
fixed amortization schedule,
no hedging requirements and
very limited covenants
Aligns partners—both benefit
from improved gold price and
production profile
Counterparty Shareholder Benefits
Average 2015 bought deal has been sold at a 8.16% discount plus fees of ~4%
May 2015
+4.1%
+27.29%
16
Opportunity
May 2015
17
What Makes Royal Gold Unique
May 2015
Mount Milligan is proving transformational and
providing an excellent platform for growth
High quality properties, counterparties and
jurisdictions and record of strong returns
We have approximately $1.4 billion in liquidity
and are balancing growth with return of capital
Opportunity
Quality
Growth
SOLID PORTFOLIO. SOLID FUTURE.
Endnotes
PAGE 4 GROWTH: AN EXCELLENT PLATFORM FOR GROWTH
1. On a gross basis. Net of stream payments GEO’s were approximately 52,327.
PAGE 6 GROWTH: PENASQUITO ‐ GOLDCORP
1.Source is Goldcorp’s investor day presentation, April 9, 2015. The Company only has interests in Peñasquito and El Morro and does not have interests in the other projects listed.
PAGE 7 GROWTH: PHOENIX GOLD PROJECT – RUBICON MINERALS
1. Source is Rubicon Minerals’ press release dated April 27, 2015.
PAGE 8 QUALITY: WASSA, BOGOSO AND PRESTEA – GOLDEN STAR RESOURCES
1.Source is Royal Gold’s press release dated May 7, 2015 and Golden Star Resources presentation dated March 26, 2015.
PAGE 9 QUALITY: ILOVITZA – EUROMAX RESOURCES
1.Source is Euromax’s November 2014 Corporate Presentation.
PAGE 10 QUALITY: FOCUSED INVESTMENT CRITERIA YIELDS A WORLD CLASS PORTFOLIO
1.Source is S&P CapitaliQ September 10, 2014 for credit ratings and sovereign ratings.
2.Gross margin calculated by subtracting the operators’ reported operating cost per unit of production from the relevant metal’s average price per unit during the first three calendar
quarters of 2014. Only operators reporting operating costs are included.
PAGE 12 QUALITY: WORLD CLASS, LONG LIVED PORTFOLIO
1.This is a metal stream whereby the purchase price for gold ounces delivered is $435 per ounce, or the prevailing market price of gold, if lower; no inflation adjustment.
2.Updated proven and probable reserves reported by Thompson Creek Metals on January 21, 2015 in their technical report.
3.75% of payable gold until 910,000 payable ounces; 50% thereafter. There have been approximately 248,000 cumulative payable ounces produced as of March 31, 2015. Gold is produced
as a by‐product of copper.
4.Reserves as of December 31, 2014, as reported by the operator.
5.Reserves as of December 31,2014 as reported by the operator.
6.Reserves also include 3.7 billion pounds of lead and 9.0 billion pounds of zinc.
7.Vale reports that the ramp‐up of its new Long Harbour Processing Plant is underway with the plant producing over 500 tonnes of finished nickel in 1Q15. The plant is currently operating
on a blend of nickel matte from its Indonesian operations and Voisey’s Bay concentrate and will process only Voisey’s Bay concentrate as of the end of 2015. Anticipating this transition,
the Company has engaged in discussions with Vale concerning calculation of the royalty once Voisey’s Bay nickel concentrates are processed at Long Harbour. While the Company may
continue to engage in these discussions, there is no assurance that the Company and Vale will reach agreement on the proper calculation under the terms of the royalty agreement. For
further information, see Royal Gold’s Annual Report on Form 10‐K, filed with the Securities and Exchange Commission on August 7, 2014, and Royal Gold’s third quarter 2015 10‐Q, filed
with the Securities and Exchange Commission on April 30, 2015.
8.Per BoAML 2008 Vale Inco EIS.
PAGE 13 QUALITY: LONG MINE LIVES AMONGST LARGEST INVESTMENTS
1.Royal Gold’s royalty on the Mulatos mine is capped at 2 million ounces, remaining mine life reflects estimated mine life until the cap is reached.
PAGE 15 OPPORTUNITY: POSITIVE MARKET ACCEPTANCE OF OUR STREAMING PRODUCT
1.Closing price on the date following announcement of the stream financing. Source is Ycharts.
19
Endnotes
Many of the matters in these endnotes and the accompanying slides constitute forward looking statements and are subject to numerous risks, which
could cause actual results to differ. See complete Cautionary Statement on page 2.
May 2015
SOLID PORTFOLIO. SOLID FUTURE.
Appendix A:
Background
Longevity – in business since 1981
Near‐term Growth – already bought and paid
for
No cost inflation concerns
Quality assets/reputable partners
~80% of Revenue => EBITDA
$2.1 billion in investments on the balance
sheet and 5.6Moz gold reserves subject to
our interest = a portfolio of gold ounces
purchased at ~$375/oz
with exploration upside
$1.4 billion in liquidity to invest
21
Royal Gold
The Quality Royalty / Streaming Name to Own
Risk
Return
ETF
Physical Gold
Index Funds
Major Operators
Intermediate Operators
Exploration
Junior Operators
May 2015
In addition to the current reserve life depicted above, every incremental dollar of cash flow from exploration upside will be spread
across a larger number of shareholders in the equity and convert scenarios than in the stream case above.
22
Alignment with Counterparties
Hypothetical example estimate for illustrative purposes only:
200koz/year gold project expansion, 2 year development, 12 yr mine life
Equity Stream
Current market cap $300,000,000 $300,000,000
Shares outstanding 200,000,000 200,000,000
Share price $1.50 $1.50
Financing sought $150,000,000 $150,000,000
Equity discount or conversion premium on the debt 12% 0%
New shares issued or fully diluted shares outstanding net of new converts 113,636,364 0
LOM average diluted shares outstanding 313,636,364 200,000,000
Operating cash flow post financing $680,000,000 $549,200,000
Operating cash flow post financing per share, life of mine $2.17 $2.75
May 2015
23
Alignment with Counterparties
Repayment Management
Time
StructureShareholder
Returns
Repayment Management
Time
StructureShareholder
Returns
Return of investment based
on production
No principal amortization or
maturity date
Deliveries can match key
smelter terms
No upfront/commitment
fees or interest during
construction
Higher shareholder dividends
due to life of mine investment return
Each party pays its own costs
No joint venture involvement
Royal Gold provides additional
investor exposure
4‐6 week due diligence
Simplified reporting
No financial covenants
No debt service reserve
accounts
No completion guarantees and tests
Relatively short documentation
May 2015
24
Alignment with Counterparties
Capital Consuming Capital Generating
Multiple Investment Entry Points1
1 For illustrative purposes only
May 2015
SOLID PORTFOLIO. SOLID FUTURE.
Appendix B:
Property Portfolio
26
Property Portfolio
May 2015
SOLID PORTFOLIO. SOLID FUTURE.
1660 Wynkoop Street, #1000
Denver, CO 80202‐1132
303.573.1660
info@royalgold.com
www.royalgold.com

More Related Content

What's hot

Investor Presentation April 2012
Investor Presentation April 2012Investor Presentation April 2012
Investor Presentation April 2012
PetroMagdalena
 

What's hot (19)

Denver Gold Forum presentation - Royal Gold
Denver Gold Forum presentation - Royal GoldDenver Gold Forum presentation - Royal Gold
Denver Gold Forum presentation - Royal Gold
 
Rbc royalty-and-stream-conference-final
Rbc royalty-and-stream-conference-finalRbc royalty-and-stream-conference-final
Rbc royalty-and-stream-conference-final
 
Royal Gold's 2015 Annual Meeting
Royal Gold's 2015 Annual MeetingRoyal Gold's 2015 Annual Meeting
Royal Gold's 2015 Annual Meeting
 
NAP Investor Presentation June 2014
NAP Investor Presentation June 2014NAP Investor Presentation June 2014
NAP Investor Presentation June 2014
 
Annual meeting final nov 11, 2015
Annual meeting final nov 11, 2015Annual meeting final nov 11, 2015
Annual meeting final nov 11, 2015
 
Royal Gold's 2015 Annual Meeting presentation
Royal Gold's 2015 Annual Meeting presentationRoyal Gold's 2015 Annual Meeting presentation
Royal Gold's 2015 Annual Meeting presentation
 
European gold forum, screen apr 2016 (royal gold)
European gold forum, screen apr 2016 (royal gold)European gold forum, screen apr 2016 (royal gold)
European gold forum, screen apr 2016 (royal gold)
 
Nap investor presentation march 2014
Nap investor presentation march 2014Nap investor presentation march 2014
Nap investor presentation march 2014
 
September Investor Presentation
September Investor PresentationSeptember Investor Presentation
September Investor Presentation
 
Investor Presentation April 2012
Investor Presentation April 2012Investor Presentation April 2012
Investor Presentation April 2012
 
Scotiabank mining presentation dec 2014
Scotiabank mining presentation   dec 2014Scotiabank mining presentation   dec 2014
Scotiabank mining presentation dec 2014
 
October presentation (cibc) october 2014
October presentation   (cibc) october 2014October presentation   (cibc) october 2014
October presentation (cibc) october 2014
 
Cibc whistler-conference-jan-2016-final-website
Cibc whistler-conference-jan-2016-final-websiteCibc whistler-conference-jan-2016-final-website
Cibc whistler-conference-jan-2016-final-website
 
December 2016 - Corporate Presentation
December 2016 - Corporate PresentationDecember 2016 - Corporate Presentation
December 2016 - Corporate Presentation
 
17 07-04 wpm presentation final
17 07-04 wpm presentation final17 07-04 wpm presentation final
17 07-04 wpm presentation final
 
Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)Royal gold stream on mount milligan update final (v5)
Royal gold stream on mount milligan update final (v5)
 
Q2 fy17 earnings presentation final3
Q2 fy17 earnings presentation   final3Q2 fy17 earnings presentation   final3
Q2 fy17 earnings presentation final3
 
Denver gold forum rgld final for screen 2
Denver gold forum rgld final for screen   2Denver gold forum rgld final for screen   2
Denver gold forum rgld final for screen 2
 
Investor Presentation August 2013
Investor Presentation August 2013Investor Presentation August 2013
Investor Presentation August 2013
 

Viewers also liked (10)

Raymond James Texas Gold Investor Forum
Raymond James Texas Gold Investor ForumRaymond James Texas Gold Investor Forum
Raymond James Texas Gold Investor Forum
 
Q2 fiscal 2016 slides final
Q2 fiscal 2016 slides   finalQ2 fiscal 2016 slides   final
Q2 fiscal 2016 slides final
 
Cibc whistler conference (website) jan 2013
Cibc whistler conference (website)   jan 2013Cibc whistler conference (website)   jan 2013
Cibc whistler conference (website) jan 2013
 
Second Quarter Fiscal 2015 Results
Second Quarter Fiscal 2015 ResultsSecond Quarter Fiscal 2015 Results
Second Quarter Fiscal 2015 Results
 
Goldman Sachs Metals & Mining Conference
Goldman Sachs Metals & Mining ConferenceGoldman Sachs Metals & Mining Conference
Goldman Sachs Metals & Mining Conference
 
Q1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalQ1 fiscal 2016 slides final
Q1 fiscal 2016 slides final
 
Denver Gold Forum Presentation 2015
Denver Gold Forum Presentation 2015Denver Gold Forum Presentation 2015
Denver Gold Forum Presentation 2015
 
Macquarie Triple M Presentation, June 2015
Macquarie Triple M Presentation, June 2015Macquarie Triple M Presentation, June 2015
Macquarie Triple M Presentation, June 2015
 
Morgan Stanley Wealth Management Presentation
Morgan Stanley Wealth Management PresentationMorgan Stanley Wealth Management Presentation
Morgan Stanley Wealth Management Presentation
 
CIBC Whistler Institutional Investor Conference
CIBC Whistler Institutional Investor ConferenceCIBC Whistler Institutional Investor Conference
CIBC Whistler Institutional Investor Conference
 

Similar to Baml v2 barcelona revised screen may 2015

CIBC Royalties Conference
CIBC Royalties ConferenceCIBC Royalties Conference
CIBC Royalties Conference
RoyalGold
 
Screen (v2) royal gold june 2014 - cibc royalties conference
Screen (v2)  royal gold june 2014 - cibc royalties conferenceScreen (v2)  royal gold june 2014 - cibc royalties conference
Screen (v2) royal gold june 2014 - cibc royalties conference
RoyalGold
 

Similar to Baml v2 barcelona revised screen may 2015 (16)

Macquarie Triple M Presentation, June 2015
Macquarie Triple M Presentation, June 2015Macquarie Triple M Presentation, June 2015
Macquarie Triple M Presentation, June 2015
 
2014 website tj annual meeting final nov 14 2014
2014 website tj annual meeting final nov 14 20142014 website tj annual meeting final nov 14 2014
2014 website tj annual meeting final nov 14 2014
 
Royal Gold - October 2014 Presentation
Royal Gold - October 2014 PresentationRoyal Gold - October 2014 Presentation
Royal Gold - October 2014 Presentation
 
Denver gold forum final (v2)
Denver gold forum final (v2)Denver gold forum final (v2)
Denver gold forum final (v2)
 
Raymond James Texas Gold Investor Forum - October 2014
Raymond James Texas Gold Investor Forum - October 2014Raymond James Texas Gold Investor Forum - October 2014
Raymond James Texas Gold Investor Forum - October 2014
 
Td securities screen mining conference jan 2016 final, jan 2016
Td securities screen mining conference jan 2016 final, jan 2016Td securities screen mining conference jan 2016 final, jan 2016
Td securities screen mining conference jan 2016 final, jan 2016
 
Goldman presentation nov 2014 final screen
Goldman presentation nov 2014 final screenGoldman presentation nov 2014 final screen
Goldman presentation nov 2014 final screen
 
Cibc whistler conf jan 2015 final
Cibc whistler conf   jan 2015 finalCibc whistler conf   jan 2015 final
Cibc whistler conf jan 2015 final
 
July Presentation - Royal Gold, Inc.
July Presentation - Royal Gold, Inc.July Presentation - Royal Gold, Inc.
July Presentation - Royal Gold, Inc.
 
July 2014 presentation (for website)
July 2014 presentation (for website)July 2014 presentation (for website)
July 2014 presentation (for website)
 
Scotiabank Mining Conference - December 2015
Scotiabank Mining Conference - December 2015Scotiabank Mining Conference - December 2015
Scotiabank Mining Conference - December 2015
 
Scotiabank mining conference, website, toronto, dec 2015
Scotiabank mining conference, website, toronto, dec 2015Scotiabank mining conference, website, toronto, dec 2015
Scotiabank mining conference, website, toronto, dec 2015
 
CIBC Royalties Conference
CIBC Royalties ConferenceCIBC Royalties Conference
CIBC Royalties Conference
 
Screen (v2) royal gold june 2014 - cibc royalties conference
Screen (v2)  royal gold june 2014 - cibc royalties conferenceScreen (v2)  royal gold june 2014 - cibc royalties conference
Screen (v2) royal gold june 2014 - cibc royalties conference
 
Royal gold, egf presentation (ka), may 2014
Royal gold, egf presentation (ka), may 2014Royal gold, egf presentation (ka), may 2014
Royal gold, egf presentation (ka), may 2014
 
Rgld annual meeting 2016 final2
Rgld annual meeting 2016 final2Rgld annual meeting 2016 final2
Rgld annual meeting 2016 final2
 

More from RoyalGold

More from RoyalGold (20)

Rgld john tumazos revised screen, june 2018
Rgld john tumazos revised screen, june 2018Rgld john tumazos revised screen, june 2018
Rgld john tumazos revised screen, june 2018
 
Rbc final website june 2018
Rbc final website june 2018Rbc final website june 2018
Rbc final website june 2018
 
Scotiabank final, june 2018
Scotiabank final, june 2018Scotiabank final, june 2018
Scotiabank final, june 2018
 
Scotiabank final-june-2018
Scotiabank final-june-2018Scotiabank final-june-2018
Scotiabank final-june-2018
 
Scotiabank final, june 2018
Scotiabank final, june 2018Scotiabank final, june 2018
Scotiabank final, june 2018
 
Bof aml website final (v3.1) handouts may 2018
Bof aml website final (v3.1) handouts may 2018Bof aml website final (v3.1) handouts may 2018
Bof aml website final (v3.1) handouts may 2018
 
Q3 final fiscal year 2018 earnings presentation may 3 2018
Q3 final fiscal year 2018 earnings presentation may 3 2018Q3 final fiscal year 2018 earnings presentation may 3 2018
Q3 final fiscal year 2018 earnings presentation may 3 2018
 
Webcast royal gold revised (standard size) animation (final) egf presentation...
Webcast royal gold revised (standard size) animation (final) egf presentation...Webcast royal gold revised (standard size) animation (final) egf presentation...
Webcast royal gold revised (standard size) animation (final) egf presentation...
 
Royal gold revised cibc gold forum presentation, apr 2018
Royal gold revised cibc gold forum presentation, apr 2018Royal gold revised cibc gold forum presentation, apr 2018
Royal gold revised cibc gold forum presentation, apr 2018
 
Bmo conference 2018 final screen
Bmo conference 2018 final screenBmo conference 2018 final screen
Bmo conference 2018 final screen
 
Gsa conference final screen
Gsa conference final screenGsa conference final screen
Gsa conference final screen
 
Q2 fiscal year 2018 earnings presentation feb 8 2018 final (v2)
Q2 fiscal year 2018 earnings presentation feb 8 2018 final (v2)Q2 fiscal year 2018 earnings presentation feb 8 2018 final (v2)
Q2 fiscal year 2018 earnings presentation feb 8 2018 final (v2)
 
Rgld cibc screen presentation final2
Rgld cibc screen presentation final2Rgld cibc screen presentation final2
Rgld cibc screen presentation final2
 
Aema presentation december 2017 final
Aema presentation december 2017 finalAema presentation december 2017 final
Aema presentation december 2017 final
 
Gs presentation-books-in-room-(final).-pptx
Gs presentation-books-in-room-(final).-pptxGs presentation-books-in-room-(final).-pptx
Gs presentation-books-in-room-(final).-pptx
 
Q1 fiscal year 2018 earnings presentation nov 2 2017 final
Q1 fiscal year 2018 earnings presentation nov 2 2017 finalQ1 fiscal year 2018 earnings presentation nov 2 2017 final
Q1 fiscal year 2018 earnings presentation nov 2 2017 final
 
Denver gold forum screen final
Denver gold forum screen finalDenver gold forum screen final
Denver gold forum screen final
 
Rgld baml presentation sep 2017 final
Rgld baml presentation sep 2017 finalRgld baml presentation sep 2017 final
Rgld baml presentation sep 2017 final
 
Rgld baml presentation sep 2017 (final)
Rgld baml presentation sep 2017 (final)Rgld baml presentation sep 2017 (final)
Rgld baml presentation sep 2017 (final)
 
Q4 fy17 earnings presentation final (v3)
Q4 fy17 earnings presentation final (v3)Q4 fy17 earnings presentation final (v3)
Q4 fy17 earnings presentation final (v3)
 

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Bankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
Bankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service AvailableBankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
Bankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
 
PITHAMPUR 💋 Call Girl 9827461493 Call Girls in Escort service book now
PITHAMPUR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPITHAMPUR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PITHAMPUR 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableSolan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Solan Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTSJHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 

Baml v2 barcelona revised screen may 2015

  • 1. SOLID PORTFOLIO. SOLID FUTURE. Bank of America Merrill Lynch Global Metals, Mining & Steel Conference 2015 Tony Jensen President and Chief Executive Officer May 2015
  • 2. May 2015 2 Cautionary Statement This presentation contains certain forward‐looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward‐ looking statements involve known and unknown risks, uncertainties, and other factors that could cause actual results to differ materially from the projections and estimates contained herein and include, but are not limited to: production and mine life estimates from the operators of the Company’s properties; the ramp‐up of the Mount Milligan mine; construction progress at the Phoenix Gold Project; anticipated growth in the volume of metals subject to the Company’s royalty interests; and statements or estimates from operators of properties where we have royalty interests regarding projected steady, increasing or decreasing production from our other developments at operating properties, and the timing of commencement and ramp‐up of production at development properties. Factors that could cause actual results to differ materially from these forward‐looking statements include, among others: the risks inherent in construction, development and operation of mining properties, including those specific to a new mine being developed and operated by a base metals company; changes in gold, silver, copper, nickel and other metals prices; performance of and production at the Company’s royalty properties; decisions and activities of the Company’s management; unexpected operating costs; decisions and activities of the operators of the Company’s royalty and stream properties; changes in operators’ mining and processing techniques or royalty calculation methodologies; resolution of regulatory and legal proceedings (including with Vale regarding Voisey’s Bay); unanticipated grade, geological, metallurgical, environmental, processing or other problems at the properties; inaccuracies in technical reports and reserve estimates; revisions by operators of reserves, mineralization or production estimates; changes in project parameters as plans of the operators are refined; the results of current or planned exploration activities; discontinuance of exploration activities by operators; economic and market conditions; operations on lands subject to First Nations or Native American jurisdiction in Canada and the United States; the ability of operators to bring non‐producing and not yet in development projects into production and operate in accordance with feasibility studies; challenges to the Company’s royalty interests, or title and other defects in the Company’s royalty properties; errors or disputes in calculating royalty payments, or payments not made in accordance with royalty agreements; future financial needs of the Company; the impact of future acquisitions and royalty and streaming financing transactions; adverse changes in applicable laws and regulations; litigation; and risks associated with conducting business in foreign countries, including application of foreign laws to contract and other disputes, environmental laws, enforcement and uncertain political and economic environments. These risks and other factors are discussed in more detail in the Company’s public filings with the Securities and Exchange Commission. Statements made herein are as of the date hereof and should not be relied upon as of any subsequent date. The Company’s past performance is not necessarily indicative of its future performance. The Company disclaims any obligation to update any forward‐looking statements. The Company and its affiliates, agents, directors and employees accept no liability whatsoever for any loss or damage of any kind arising out of the use of all or any part of this material. Endnotes located on page 19.
  • 3. 3 What Makes Royal Gold Unique May 2015 Mount Milligan is proving transformational and providing an excellent platform for growth High quality properties, counterparties and jurisdictions and record of strong returns We have approximately $1.4 billion in liquidity and are balancing growth with return of capital Opportunity Quality Growth
  • 4. 4 An Excellent Platform for Growth Recent Financial Results compared to prior year quarter: Record volume of 60,832 Gold Equivalent Ounces (GEO’s), up 36%1 Revenue of $74.1 million, up 28% Adjusted EBITDA1 of $57.7 million, up 16% $14.3 million in dividends paid, up 5% Operating cash flow of $65.9 million, up 47% Catalysts for the remainder of 2015: Strengthening production at Peñasquito Continued ramp‐up at Mount Milligan Startup of production at the Phoenix Gold Project Catalysts for the next 2‐3 years: Progress towards production at Euromax’s Ilovtiza project Development of Barrick’s Crossroads deposit Pascua‐Lama redevelopment May 2015
  • 5. Already our largest contributor, generating 26% of Royal Gold’s March quarterly revenue (net of stream payments) Record sales in March, progressing towards quarterly run rate at design capacity Average daily mill throughput of 50k to 54k tonnes per day (tpd) during the last half of the March quarter, objective to reach 60ktpd by calendar year‐end 5 Growth Mount Milligan – Thompson Creek Metals May 2015
  • 6. 6 Growth Contributed 10% of Royal Gold’s March quarterly revenue Peñasquito 2015 production volume expected to increase 20‐30% Metallurgical Enhancement Process (MEP) feasibility study at Peñasquito could extend mine life by five years Community engagement and consultation underway at El Morro May 2015 Peñasquito – Goldcorp1 RGLD 1.4% NSR Gold/Copper on ~30% of El Morro RGLD 2% NSR, Gold/Silver/Lead/Zinc at Peñasquito
  • 7. 7 Growth Royal Gold commitment fully funded Expected to become one of Royal Gold’s top 10 revenue sources Mill commissioning process has commenced Rubicon will deliver 6.3% of the gold from the Phoenix Gold Project until 135,000 ounces have been delivered, then 3.15% thereafter Royal gold will pay 25% of spot at time of delivery Average estimated annual production of 165,300 ounces based on a 13 year mine life Remains on schedule for projected initial production in mid‐2015 May 2015 Phoenix Gold Project – Rubicon Minerals1
  • 8. 8 Growth May 2015 Wassa, Bogoso and Prestea – Golden Star Resources Royal Gold to provide $130 million stream financing and a $20 million loan in stages to fund underground development projects at Wassa and Prestea, Gold streams will be on Wassa, Bogoso and Prestea and will apply to all production from April 1, 2015; estimated 15,000‐20,000 gross gold ounces per year Golden Star will deliver to Royal Gold 8.5% of gold produced until 185,000 ounces have been delivered, 5.0% until an additional 22,500 have been delivered, and 3.0% thereafter Royal Gold will pay 20% of spot until 207,500 ounces delivered, 30% of spot thereafter Proven and probable reserves of 1.9 million gold ounces across both deposits, and measured and indicated resources of 3.5 million ounces at Wassa and 3.1 million ounces at Bogoso and Prestea Experienced management team with 15 years’ production history in Ghana
  • 9. 9 Growth May 2015 Pre‐feasibility study envisions a conventional open pit mine using large scale fleet for a planned 10 million tonne per year mill operation Former European Goldfields’ management team Current reserve of 2.45 million ounces of gold and 905 million pounds of copper, 23 year mine life1 Stream calls for physical gold equal to 25% of gold produced from the Ilovitza project until 525,000 ounces have been delivered, and 12.5% thereafter. Royal Gold’s purchase price per ounce will be 25% of the spot price at time of delivery Good local infrastructure and proximity to the Pirdop Smelter provides low transportation costs and financing alternatives utilizing the support of the (German Government) UFK Loan Guarantee Ilovitza – Euromax Resources
  • 10. 10 Quality 56% of our FY2014 revenues from investment‐grade rated companies1Counterparty Over 92% of our reserves from S&P “A” or higher rated countries1 Place Weighted average cash cost ~$591/GEO, gross margin of 52% for underlying properties in CY20142 Project Focused investment criteria yields a world class portfolio Andacollo, Peñasquito, Voisey’s Bay, Mount Milligan, Cortez, Goldstrike May 2015
  • 11. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% Cash Margin by Operating Property Calendar Year 2014 11 Quality The operators of our royalties and streams recognized an average 52% gross margin in the calendar year 2014, which is an average cash cost of $591 per gold equivalent ounce, on properties subject to our interests. 52% average May 2015
  • 12. 12 Quality May 2015 Royalty: 2.0% NSR on all metals Reserves5,6: 10.6M oz (Au), 611M oz (Ag) Estimated Mine Life5: 11 Years Royalty3: 75% of Au production (NSR) Reserves4: 1.6M oz (Au) Estimated Mine Life: 20+ Years Andacollo 11% or $9.5M Peñasquito 10% or $7.2M Voisey’s Bay 2.5% or $1.9M Mt. Milligan 40% or $29.7M (gross basis; 26% net) Royalty7: 2.7% NSR Reserves4: 0.9B lbs (Ni); 0.5B lbs (Cu) Estimated Mine Life: 20+ Years8 Stream: 52.25% of payable gold1 Reserves2: 6.2M oz (Au) Estimated Mine Life: 20+ Years Contribution to FY2015 Q3 revenue Contribution to FY2015 Q3 revenue Contribution to FY2015 Q3 revenue Contribution to FY2015 Q3 revenue World class, long lived portfolio
  • 13. 0 5 10 15 20 25 $‐ $100 $200 $300 $400 $500 $600 $700 $800 $900 $1,000 $Millions Initial investment Cumulative net revenue through December 31, 2014 Estimated remaining mine life 13 Quality Long mine lives amongst largest investments EstimatedYearsofRemainingMineLife 1 May 2015
  • 14. $180M $370M converts due 2019 * $760M Working Capital Capital to invest… Over $1.4 billion available at a time when royalty/stream financing is needed * Includes current commitments outstanding for Goldrush ($6M), and Peak Gold ($5M) ** Conditional commitments for Ilovitza ($167.5M), Peak Gold ($25M) and Golden Star ($150M) $US millions $1,410.0 Working capital & undrawn credit at 4‐30‐15 ‐$6.0 Goldrush ‐$5.0 Peak Gold Joint Venture payment $1,399.0 Estimated liquidity balance before conditional commitments ‐$167.5 Ilovitza 2nd payment and construction payments ‐$25.0 Peak Gold Joint Venture payment ‐$150.0 Golden Star Advance Payment & Loan $1,056.5 Estimated liquidity balance inclusive of conditional commitments Net of future commitments ($m) Current commitments Conditional commitments Opportunity $650M Revolver May 2015 14 **
  • 15. 15 Opportunity Positive Market Acceptance of our Streaming Product Share Price Performance at Announcement1 +35.0% +3.0% Attractive cost of capital with advantageous NPV/share or cash flow/share basis Lower financing risk with no fixed amortization schedule, no hedging requirements and very limited covenants Aligns partners—both benefit from improved gold price and production profile Counterparty Shareholder Benefits Average 2015 bought deal has been sold at a 8.16% discount plus fees of ~4% May 2015 +4.1% +27.29%
  • 17. 17 What Makes Royal Gold Unique May 2015 Mount Milligan is proving transformational and providing an excellent platform for growth High quality properties, counterparties and jurisdictions and record of strong returns We have approximately $1.4 billion in liquidity and are balancing growth with return of capital Opportunity Quality Growth
  • 18. SOLID PORTFOLIO. SOLID FUTURE. Endnotes
  • 19. PAGE 4 GROWTH: AN EXCELLENT PLATFORM FOR GROWTH 1. On a gross basis. Net of stream payments GEO’s were approximately 52,327. PAGE 6 GROWTH: PENASQUITO ‐ GOLDCORP 1.Source is Goldcorp’s investor day presentation, April 9, 2015. The Company only has interests in Peñasquito and El Morro and does not have interests in the other projects listed. PAGE 7 GROWTH: PHOENIX GOLD PROJECT – RUBICON MINERALS 1. Source is Rubicon Minerals’ press release dated April 27, 2015. PAGE 8 QUALITY: WASSA, BOGOSO AND PRESTEA – GOLDEN STAR RESOURCES 1.Source is Royal Gold’s press release dated May 7, 2015 and Golden Star Resources presentation dated March 26, 2015. PAGE 9 QUALITY: ILOVITZA – EUROMAX RESOURCES 1.Source is Euromax’s November 2014 Corporate Presentation. PAGE 10 QUALITY: FOCUSED INVESTMENT CRITERIA YIELDS A WORLD CLASS PORTFOLIO 1.Source is S&P CapitaliQ September 10, 2014 for credit ratings and sovereign ratings. 2.Gross margin calculated by subtracting the operators’ reported operating cost per unit of production from the relevant metal’s average price per unit during the first three calendar quarters of 2014. Only operators reporting operating costs are included. PAGE 12 QUALITY: WORLD CLASS, LONG LIVED PORTFOLIO 1.This is a metal stream whereby the purchase price for gold ounces delivered is $435 per ounce, or the prevailing market price of gold, if lower; no inflation adjustment. 2.Updated proven and probable reserves reported by Thompson Creek Metals on January 21, 2015 in their technical report. 3.75% of payable gold until 910,000 payable ounces; 50% thereafter. There have been approximately 248,000 cumulative payable ounces produced as of March 31, 2015. Gold is produced as a by‐product of copper. 4.Reserves as of December 31, 2014, as reported by the operator. 5.Reserves as of December 31,2014 as reported by the operator. 6.Reserves also include 3.7 billion pounds of lead and 9.0 billion pounds of zinc. 7.Vale reports that the ramp‐up of its new Long Harbour Processing Plant is underway with the plant producing over 500 tonnes of finished nickel in 1Q15. The plant is currently operating on a blend of nickel matte from its Indonesian operations and Voisey’s Bay concentrate and will process only Voisey’s Bay concentrate as of the end of 2015. Anticipating this transition, the Company has engaged in discussions with Vale concerning calculation of the royalty once Voisey’s Bay nickel concentrates are processed at Long Harbour. While the Company may continue to engage in these discussions, there is no assurance that the Company and Vale will reach agreement on the proper calculation under the terms of the royalty agreement. For further information, see Royal Gold’s Annual Report on Form 10‐K, filed with the Securities and Exchange Commission on August 7, 2014, and Royal Gold’s third quarter 2015 10‐Q, filed with the Securities and Exchange Commission on April 30, 2015. 8.Per BoAML 2008 Vale Inco EIS. PAGE 13 QUALITY: LONG MINE LIVES AMONGST LARGEST INVESTMENTS 1.Royal Gold’s royalty on the Mulatos mine is capped at 2 million ounces, remaining mine life reflects estimated mine life until the cap is reached. PAGE 15 OPPORTUNITY: POSITIVE MARKET ACCEPTANCE OF OUR STREAMING PRODUCT 1.Closing price on the date following announcement of the stream financing. Source is Ycharts. 19 Endnotes Many of the matters in these endnotes and the accompanying slides constitute forward looking statements and are subject to numerous risks, which could cause actual results to differ. See complete Cautionary Statement on page 2. May 2015
  • 20. SOLID PORTFOLIO. SOLID FUTURE. Appendix A: Background
  • 21. Longevity – in business since 1981 Near‐term Growth – already bought and paid for No cost inflation concerns Quality assets/reputable partners ~80% of Revenue => EBITDA $2.1 billion in investments on the balance sheet and 5.6Moz gold reserves subject to our interest = a portfolio of gold ounces purchased at ~$375/oz with exploration upside $1.4 billion in liquidity to invest 21 Royal Gold The Quality Royalty / Streaming Name to Own Risk Return ETF Physical Gold Index Funds Major Operators Intermediate Operators Exploration Junior Operators May 2015
  • 22. In addition to the current reserve life depicted above, every incremental dollar of cash flow from exploration upside will be spread across a larger number of shareholders in the equity and convert scenarios than in the stream case above. 22 Alignment with Counterparties Hypothetical example estimate for illustrative purposes only: 200koz/year gold project expansion, 2 year development, 12 yr mine life Equity Stream Current market cap $300,000,000 $300,000,000 Shares outstanding 200,000,000 200,000,000 Share price $1.50 $1.50 Financing sought $150,000,000 $150,000,000 Equity discount or conversion premium on the debt 12% 0% New shares issued or fully diluted shares outstanding net of new converts 113,636,364 0 LOM average diluted shares outstanding 313,636,364 200,000,000 Operating cash flow post financing $680,000,000 $549,200,000 Operating cash flow post financing per share, life of mine $2.17 $2.75 May 2015
  • 23. 23 Alignment with Counterparties Repayment Management Time StructureShareholder Returns Repayment Management Time StructureShareholder Returns Return of investment based on production No principal amortization or maturity date Deliveries can match key smelter terms No upfront/commitment fees or interest during construction Higher shareholder dividends due to life of mine investment return Each party pays its own costs No joint venture involvement Royal Gold provides additional investor exposure 4‐6 week due diligence Simplified reporting No financial covenants No debt service reserve accounts No completion guarantees and tests Relatively short documentation May 2015
  • 24. 24 Alignment with Counterparties Capital Consuming Capital Generating Multiple Investment Entry Points1 1 For illustrative purposes only May 2015
  • 25. SOLID PORTFOLIO. SOLID FUTURE. Appendix B: Property Portfolio
  • 27. SOLID PORTFOLIO. SOLID FUTURE. 1660 Wynkoop Street, #1000 Denver, CO 80202‐1132 303.573.1660 info@royalgold.com www.royalgold.com