St.Johns Presentation
- 4. Rigid Scaffold frame for Towers
Flexible “Safe Span” for side span
Rigid mobile platform for main
span and side span.
- 7. West end deck removal, prep and coating stingers, installed “nelson studs”.
- 10. Spans 1-9 Rocker inspections
Inspection of main cable at splay
point and inspection of the anchor
chain plates