1. Position : IT Project Manager
REYNALDO V. CRUZ, JR.
#12B Malaruhat Street
Amparo Village, Novaliches, Caloocan City Philippines
Landline : 442-4674
Cel. Nbr : 0921-6547699
Email address : reycruzjr03@yahoo.com
More than 30 years in the field of IT with Division/Department/Project management experience.
Systems analysis and programming experience in COBOL, INFORMIX-4gl, POWERHOUSE-4gl,
SPEEDWARE-4gl, NEAT-3, FORTRAN and ASSEMBLER languages. Used also MS word, MS
project, Powerpoint and Excel. I’m using RUP (Rational Unified Process) and best practices from
CMMI and Agile2 methodologies to aid my Project management.
EDUCATION:
Bachelor of Science in Mechanical Engineering (1983)
MAPUA INSTITUTE OF TECHNOLOGY
MAJOR ASSIGNMENTS:
Sep’14 – Dec’14 77 Global Services Incorporated
Project Manager The Orient Square Bldg. Ortigas
Worked as consultant and tasked to handle 3 projects for client “Globe Telecoms” :
1) TURISMO project : Change of hardware for HO and 4 sites from Ericson to Huawei.
Status : IMPLEMENTED
2) COUNTRY project : Auto renewal of postpaid plans.
Status : IMPLEMENTED
3) RIB-EYE project : Tracking application for new plans with phones.
Status : IMPLEMENTED
Basic Duties and Responsibilities as Project Manager:
- Acts as liaison between clients and technical team.
- Develops and manages business process lifecycle from strategy, design and transition
to implementation.
- Manages development teams and tracks progress reports.
- Ensures completeness and consistency of projects.
- Participates in QA and maintenance processes.
- Manages technical issues by working with IT technical leads to identify functional and
technical solutions.
- Ensures project effectiveness and evaluate risks related to requirements in all stages of the project.
- Develops and manages customer project requirements documentation.
2. Apr’13 – Jul’14 Dev-Touch Incorporated
Sr.Project Manager Union Bank Building, Ortigas
Tasked to insure that all developments for Web, IOS and Android applications
be implemented as scheduled.
Jul ’11- Mar’13 Asiagate Networks Inc.
Project Manager Rada St. Makati City
Worked as Project manager tasked to manage 3 major projects :
1) DOH Project – Expenditures Tracking System
(Web-Based :PHP under Linux OS : Database : Oracle-9i)
Status : IMPLEMENTED
2) DOF Project – Local Government Unit system
(Web-Based :Java under Linux OS : Database is Oracle-9i)
Status : IMPLEMENTED
3) AGB Nielsen – Office Automation
(Web-Based :Java under Unix OS : Database is MySql)
Status : IMPLEMENTED
Jul ’09- Aug’10 IzoneTech Inc.
Project Manager Ortigas
Worked as Project manager tasked to manage new system developments and maintain/enhance
WebBased systems (Used in Call Center - CRM), POS, DataWarehousing/BI systems.
Implemented new ITD policies and procedures. These are WebBased systems using Java/PHP
and Visual Basic.net under Linux operating system.
Jul ’06- Dec’08 COCOLIFE Corporation
Project Manager Cocolife Bldg, Ayala Ave. Makati City
Worked as Project manager tasked to lead the QA testing and implementation of the CIS
(Comprehensive Life Insurance system) and to manage the system development for the new
HMO system (CUSTOMERCARE, CLAIMS, BILLBACK, CASH MANAGEMENT modules).
HMO system was implemented last March 5,2007. Headed also the clearing of errors and QA
testing of the MASS MARKETING system.
Other projects :
S T A T U S
1) HMO ORALINK project : Main objective of this project
is to modify all HMO system programs to access Oracle
tables instead of SQL tables : Implemented
2) HMO DENTAL claims module : Implemented
3) HMO PROVIDER claims processing module : Implemented
4) Conversion of VB programs to ASP.net : Implemented
5) GROUPLIFE module : Implemented
6) HMO COLLECTION and CREDITING module : Parallel testing on-hold
7) Hospital / Clinic claims processing (New module) Queued
8) DataWarehousing /BI
(With pre-defined management reports) Implemented
3. Apr ’04- Apr ’06 PETPLANS Inc.
AVP/IT Division Head 114 Aguirre St. Legaspi Village, Makati City
I’ve worked as AVP/Division Head for IT operations and was given the task to put directions to
1)INFRASTRUCTURE 2) DATA CENTER 3)SOFTWARE DEVELOPMENT departments of
the IT Division. The software development department worked on a number of projects which
definitely enhanced the current pre-need systems plus the fact that we’ve also developed the Web
Branch Cashiering system for the Data center department. Have implemented new system
development methodology (Based on Rational Unified Process) and documentation standards.
Introduced the “expert-by-module” method in handling the program bugs. 100% of the pre
defined bugs have already been corrected. In the infrastructure department, was able to reduce
server usage from 8 to 3 servers.
Mar ‘04- Apr ’04 INGENIUM Inc.
Project Manager Legaspi Village, Makati Metro Manila
INGENIUM is a software development company that’s basically focused on pre-need insurance
system and also Life insurance system using ORACLE and JAVA. I’ve worked as Project
Manager and given the task to manage the COCOLIFE, PACIFIC PLANS, FIRSTLIFE and
PIONEER LIFE projects.
After only 4 weeks, the chairman (Mr. Larry Ocampo) asked me to transfer to PetPlans Inc to
head its IT division. Mr. Larry Ocampo is also the president of Petplans Incorporated.
May ‘99- Oct ‘03 FCI Singapore
Project Manager FRAMATONE Connectors Inc. SINGAPORE
FCI is a French company engaged in the manufacture of computer, Automotive and industrial
connectors.
I’ve worked as Project Manager/User support team leader/Analyst tasked to maintain all
company systems and design /develop the new BARCODING system. System was
completed/implemented August 1999. System runs in the HP3000 environment using
POWERHOUSE-4gl, FOXPRO and COBOL languages. FOXPRO programs were developed by
a software house to translate data from scanner to screen display. I was also tasked to head the
USER SUPPORT team that works on the problems, system requests/enhancements by users
and the PROJECT MANAGEMENT group.
Duties / Responsibilities Includes:
1. Maintains / enhances systems currently operational in the company
2. Coordinates with department managers / users as to how they can maximize the usage
of company systems
3. Conducts regular meetings with IT personnel regarding work status and pending jobs
4. Monitors all FCI projects
5. Conducts regular meetings with users to get comments and suggestions regarding
system usage
6. Prepares system and program specifications
7. Monitors the proper utilization of IT resources
8. Conducts system training
9. Prepares system and user manuals
10. Prepares procedures on how to work/handle source and object code
4. Nov `94- Aug `98 PHIL. TRIDENT INFOTECH INC.
Team Leader/Analyst 4th flr. NOLTOWERS
Commerce Avenue, Madrigal Business Park
Ayala Alabang, Muntinlupa City
PTII is a subsidiary of Neptune Orient Lines (NOL), a Singapore based group of companies
engaged in shipping business. PTII serves as NOL’s data center and is directly linked to its
mother company in Singapore. I’ve worked as Team Leader/System analyst for the Equipment
Management System group which runs in HP3000 environment using POWERHOUSE-4gl and
COBOL II.
Responsible in the Maintenance of four systems namely:
(a) Equipment Tracking System
(b) Detention System
(c) Maintenance and Repair System
(d) Port Operation System
I was the head of the task force that modified core programs for the Network environment under
w/c all subsidiaries can transmit and receive data via the Frame Relay concept w/c have been
implemented on all agents (28 countries). I was also given the task to conduct user trainings in
INDIA regarding Detention system and Maintenance/repair system.
May ’89 – May ‘93 ABV ROCK GROUP (KB)
Riyadh, Kingdom of Saudi Arabia
Analyst/programmer
A Swedish construction company tasked by the kingdom to work on several multi-million dollar
projects within the kingdom. I’ve worked as senior analyst/programmer tasked to develop the
PROCUREMENT system then was re-hired to develop the DOCUMENTATION system. Last
September 2001, ABV asked me to work again with the company as project manager to maintain
all the systems operational within the company. Mentioned systems were developed using
INFORMIX-4gl and COBOL
programs under UNIX operating system (HP3000 and HP9000).
Jul ’88 – Sep ’88 NCR Corporation
NCR building, Ayala avenue, Makati City
Analyst/programmer(Contractual)
Company is basically engaged in the distribution of NCR computers and software development
business. I’ve worked as system analyst/programmer tasked to maintain the SELF-EMPLOYED
and VOLUNTARY MEMBER systems using COBOL and NEAT-3 programs under NCR-8500
mainframe computers.
5. Sep ’87 – Jun ’88 MULTINATIONAL COMPUTER AND COMMUNICATIONS
Programmer PBCOMBuilding, Ayala Avenue, Makati City
(Contractual)
A Filipino owned company whose business is focused in software development. I’ve worked as
programmer tasked to develop programs using COBOL and NEAT-3 languages for NCR 8500
mainframe computers.
Apr ’85 – Dec ’86 DATAWARE CORPORATION
Programmer Jeddah, Kingdom of Saudi Arabia
A Filipino owned software house based in Jeddah engaged in the development of computer systems.
Worked as programmer and used VRX /ITX COBOL in developing computer systems under
NCR TOWER computer.
Aug ’80 – Feb ’85 NCR Corporation
NCR building, Ayala avenue, Makati City
Analyst/programmer
Company is basically engaged in the distribution of NCR computers and software development
business. I’ve worked as system analyst/programmer tasked to maintain the SELF-EMPLOYED
and VOLUNTARY MEMBER systems using COBOL and NEAT-3 programs under NCR-8500
mainframe computers.
Jan ’80 – Jun ’80 CONSTABULARYCOMPUTER CENTER
Programmer Trainee Camp Crame, Quezon City
Worked as programmer trainee and developed programs using ASSEMBLER and COBOL
languages. Was rehired to develop the FIREARMS system using Interactive COBOL.
TRAININGS AND SEMINARS :
SUBJECT HELD AT
POWERHOUSE-4GL PTII (Manila)
MPE Operating system PTII (Manila)
INFORMIX-4GL ABV ROCK GROUP (K.S.A.)
UNIX Operating system ABV ROCK GROUP (K.S.A.)
SPEEDWARE-4GL Saudi Information Technology (K.S.A.)
NEAT-3 Language NCR Corporation (Manila)
VRX/ITX COBOL NCR Corporation (Manila)
Systems Design and Analysis NCR Corporation (Manila)
ASSEMBLER Language NCR Corporation (Manila)
Project Management/RUP FCI, Singapore
Project Management/Six Sigma Self study
People Management Germany
6. PERSONAL DATA:
Date of birth : May 27, 1960
Place of Birth : Manila
Civil Status : Married
Height : 5’8”
Weight : 172 lbs.
Religion : Catholic
Nationality : Filipino