CARNIVAL – JALSA
Liaison Department
Rajesh Makwana
Manager - Relationship Management
LIAISON PRESENTATION
This presentation is prepared taking into consideration that all the work
forces are going in same direction to achieve the common goal of the
organization. This presentation will also resolve the issue pertaining to
the liaison across the country which is faced during the course of
procurement of the permissions / licenses by an individual or group of
people at different stages of permissions / licenses in various states…
Before we start the project we should have
the details of the concerned people of the
various departments to whom we interact
every time are as follows
Who is the concerned person from
- Owner / Developer
- Architect (Developer)
- Designer (Carnival Cinemas)
- Area Manager (Carnival Cinemas)
- Project Head (Carnival Cinemas)
- Manager Set Ups (Carnival Cinemas)
- Civil Engineer (Carnival Cinemas)
Documents required from Owner
- Copy of Property Card
- Copy of Power of Attorney (If the Property Card is not in his / her
name
- Allotment letter & approved plan from concerned authority for
building the cinema (Building permission from Corporation)
- Letter of Intent (LOI) for Tax exemption (If applicable)
- Authority letter from Owner / Developer for making various
application to government authorities (If applicable)
Pre Construction:
Under the scope of Owner / Builder / Architect
Initial NOC required from the following which are to be submitted to the
licensing Authority
- Chief Fire Officer
- Initial Approved plan & Commencement Certificate from Corporation
- Traffic Dept.
- Health Dept.
Once we submit the above NOC’s the following permission is obtained
Location clearance & Construction NOC from the Licensing Authority
Post Construction:
Under the scope of Carnival Cinemas(Operator)
Final NOC required from the following which are to be submitted to
Licensing Authority
- Completion Certificate from PWD / R&B
- CFO for running the Multiplex / Cinema
- Occupation Certificate along with the Approved Plan (Corporation)
- Structural Stability Certificate from Structural Engineer
- Electrical
- Health
- Traffic
- PWD / R & B with Approved Plan
- Certificate from Telephone Operator (MTNL / BSNL)
- Lightning Conductor Test Certificate
- Certificate for Approved Films (INR)
- List of Managers / Projector Operator / Electrician with Date of Birth &
Residence address
- Agreement between Carnival Cinemas & Owner of the property
After submitting these all NOC / Permission we receive following
Licenses
- Cinema License
- Ticket Selling License
- Entertainment Tax Dept permission
- Eligibility Certificate for Tax Exemption (If applicable)
Other than the above we have to obtain following permissions
- Shop & Establishment
- Cafeteria License from Health, Food & Drugs and Police department
- Film Storage License from Corporation
- Show Tax intimation
- Neon Sign & Hoarding License
- Video Games License from Licensing Authority (if applicable)
List of Plans required for entire process
- Approved Municipal Corporation Plan (Blue Print) with Commencement
Certificate from Owner / Developer / Local Architect
- Our Architects plan for obtaining NOC from PWD / R & B and Health
- Electrical drawings (Internal Fit outs) with test certificate
- Lightning Arrestors installation with test certificate
- Fire Fighting installation drawing with delivery challan of each and every
fire fighting equipment installed
List of Documents required for entire process
- Structural Stability Certificate from structural engineer
- List of Directors / Managers / Projector Operator & Electricians with their
Date of Birth & Residence proof
- Memorandum & Article of Association
- Conducting Agreement between Carnival Cinemas & Owner of the property
- Telephone Certificate
- Occupancy Certificate
- Lightning Arrestor Certificate
- INR (Approved Films) Certificate
Thank You

More Related Content

What's hot

Pilot project proposal for ngo's
Pilot project proposal for ngo'sPilot project proposal for ngo's
Pilot project proposal for ngo's
vshanit
 

What's hot (18)

Land acquisition procedure in Gujarat State
Land acquisition procedure in Gujarat StateLand acquisition procedure in Gujarat State
Land acquisition procedure in Gujarat State
 
Presentation on the right to fair compensation and
Presentation on the right to fair compensation andPresentation on the right to fair compensation and
Presentation on the right to fair compensation and
 
Dsp thrissur ch14
Dsp thrissur ch14Dsp thrissur ch14
Dsp thrissur ch14
 
Housing finance in India
Housing finance in IndiaHousing finance in India
Housing finance in India
 
1. New Land Acquisition Act Process Flow
1. New Land Acquisition Act Process Flow1. New Land Acquisition Act Process Flow
1. New Land Acquisition Act Process Flow
 
Pilot project proposal for ngo's
Pilot project proposal for ngo'sPilot project proposal for ngo's
Pilot project proposal for ngo's
 
Urban Planning & Development Act, 1973
Urban Planning & Development Act, 1973Urban Planning & Development Act, 1973
Urban Planning & Development Act, 1973
 
Land acquisition
Land acquisitionLand acquisition
Land acquisition
 
JNnURM
JNnURMJNnURM
JNnURM
 
Uttar Pradesh Urban Planning and Development Act- 1973
Uttar Pradesh Urban Planning and Development Act- 1973Uttar Pradesh Urban Planning and Development Act- 1973
Uttar Pradesh Urban Planning and Development Act- 1973
 
National Street vendor policy, 2009 and Street Vendors Act 2014
National Street vendor policy, 2009 and Street Vendors Act 2014National Street vendor policy, 2009 and Street Vendors Act 2014
National Street vendor policy, 2009 and Street Vendors Act 2014
 
City Development Plan Solapur 2041
City Development Plan Solapur 2041City Development Plan Solapur 2041
City Development Plan Solapur 2041
 
Smart village
Smart village Smart village
Smart village
 
The slum areas (improvement and clearance) ACT1956+Rent control
The slum areas (improvement and clearance) ACT1956+Rent control The slum areas (improvement and clearance) ACT1956+Rent control
The slum areas (improvement and clearance) ACT1956+Rent control
 
Real Estate (Regulation and Development) Act 2016
Real Estate (Regulation  and Development) Act 2016Real Estate (Regulation  and Development) Act 2016
Real Estate (Regulation and Development) Act 2016
 
Housing Sector In India
Housing Sector In IndiaHousing Sector In India
Housing Sector In India
 
Up state hosuing policies-01
Up state hosuing policies-01Up state hosuing policies-01
Up state hosuing policies-01
 
Assistenza Sanitaria Integrativa: come funziona il FASIE e cosa è cambiato
Assistenza Sanitaria Integrativa: come funziona il FASIE e cosa è cambiatoAssistenza Sanitaria Integrativa: come funziona il FASIE e cosa è cambiato
Assistenza Sanitaria Integrativa: come funziona il FASIE e cosa è cambiato
 

Similar to Presentation Liaison (7)

Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...
 
Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02
 
PROJ CONSULTANCY- agreement - general-010415
PROJ CONSULTANCY- agreement - general-010415PROJ CONSULTANCY- agreement - general-010415
PROJ CONSULTANCY- agreement - general-010415
 
Ar ramlipastyearpaper
Ar ramlipastyearpaperAr ramlipastyearpaper
Ar ramlipastyearpaper
 
PROJECT_STEPS
PROJECT_STEPSPROJECT_STEPS
PROJECT_STEPS
 
160319-M.Noman CV
160319-M.Noman CV160319-M.Noman CV
160319-M.Noman CV
 
E way-bill
E way-billE way-bill
E way-bill
 

Presentation Liaison

  • 1. CARNIVAL – JALSA Liaison Department Rajesh Makwana Manager - Relationship Management
  • 2. LIAISON PRESENTATION This presentation is prepared taking into consideration that all the work forces are going in same direction to achieve the common goal of the organization. This presentation will also resolve the issue pertaining to the liaison across the country which is faced during the course of procurement of the permissions / licenses by an individual or group of people at different stages of permissions / licenses in various states…
  • 3. Before we start the project we should have the details of the concerned people of the various departments to whom we interact every time are as follows Who is the concerned person from - Owner / Developer - Architect (Developer) - Designer (Carnival Cinemas) - Area Manager (Carnival Cinemas) - Project Head (Carnival Cinemas) - Manager Set Ups (Carnival Cinemas) - Civil Engineer (Carnival Cinemas)
  • 4. Documents required from Owner - Copy of Property Card - Copy of Power of Attorney (If the Property Card is not in his / her name - Allotment letter & approved plan from concerned authority for building the cinema (Building permission from Corporation) - Letter of Intent (LOI) for Tax exemption (If applicable) - Authority letter from Owner / Developer for making various application to government authorities (If applicable)
  • 5. Pre Construction: Under the scope of Owner / Builder / Architect Initial NOC required from the following which are to be submitted to the licensing Authority - Chief Fire Officer - Initial Approved plan & Commencement Certificate from Corporation - Traffic Dept. - Health Dept. Once we submit the above NOC’s the following permission is obtained Location clearance & Construction NOC from the Licensing Authority
  • 6. Post Construction: Under the scope of Carnival Cinemas(Operator) Final NOC required from the following which are to be submitted to Licensing Authority - Completion Certificate from PWD / R&B - CFO for running the Multiplex / Cinema - Occupation Certificate along with the Approved Plan (Corporation) - Structural Stability Certificate from Structural Engineer - Electrical - Health - Traffic - PWD / R & B with Approved Plan - Certificate from Telephone Operator (MTNL / BSNL) - Lightning Conductor Test Certificate - Certificate for Approved Films (INR) - List of Managers / Projector Operator / Electrician with Date of Birth & Residence address - Agreement between Carnival Cinemas & Owner of the property
  • 7. After submitting these all NOC / Permission we receive following Licenses - Cinema License - Ticket Selling License - Entertainment Tax Dept permission - Eligibility Certificate for Tax Exemption (If applicable) Other than the above we have to obtain following permissions - Shop & Establishment - Cafeteria License from Health, Food & Drugs and Police department - Film Storage License from Corporation - Show Tax intimation - Neon Sign & Hoarding License - Video Games License from Licensing Authority (if applicable)
  • 8. List of Plans required for entire process - Approved Municipal Corporation Plan (Blue Print) with Commencement Certificate from Owner / Developer / Local Architect - Our Architects plan for obtaining NOC from PWD / R & B and Health - Electrical drawings (Internal Fit outs) with test certificate - Lightning Arrestors installation with test certificate - Fire Fighting installation drawing with delivery challan of each and every fire fighting equipment installed List of Documents required for entire process - Structural Stability Certificate from structural engineer - List of Directors / Managers / Projector Operator & Electricians with their Date of Birth & Residence proof - Memorandum & Article of Association - Conducting Agreement between Carnival Cinemas & Owner of the property - Telephone Certificate - Occupancy Certificate - Lightning Arrestor Certificate - INR (Approved Films) Certificate