SlideShare a Scribd company logo
1 of 24
Download to read offline
INTEGRATED PRODUCTION
ENVIRONMENT
Enterprise is the latest software from Metamation - it is a feature packed module
designed to help optimize your front end by helping reduce repetitive tasks from
importing / tooling / nesting and bending operations while giving you the added
benefits with revision and shop control, new operator kiosk screens to reduce the
paper flow, real time information with planning which is all packed together in a
highly visual, easy to use database driven system.
ENTERPRISE
Why use Enterprise?
Enterprise focuses on tools to save TIME and MONEY in your organization. Each feature
developed has been carefully designed to address bottlenecks and improve efficiency
while providing stakeholders with better visibility across their organization.
Who can benefit from Enterprise?
Enterprise is designed for small, medium and large organizations who have sheet metal
CNC machines - it does not matter if the company has just 1 or 10 machines, Enterprise
has several features that benefit companies of different sizes.
Batch Import Manual Programming
ERP/MRP/MES
Production
Order
InformationPlanning
Manual
Nesting
Engineering
► Enterprise can be used by the estimator or sales department to quickly program parts and
estimate the cutting time, material used and setup time needed for a job.
► The Enterprise server will program parts that need to be estimated automatically and
provide the user estimates for varying lot sizes - all this with a single click of a button.
► Create accurate quote reports that can be used in your ERP/MRP system or sent to your
customer to win business.
ESTIMATE
MetaCAM Enterprise - Quote
Customer:
Quote # 1 Machines: VIP367-58ST-2AI, 5085 (SX, 6-Axis)
IMM
Parts
Due Date: 11/6/2014
Expires On: 11/29/2014
Sheets: IMM
Lot 1
Profit (%): 5
Rejection (%):
Include skeleton cost: Settings...
5
Estimate
Save
Close
F4-3569
1006
1040
S0-1144
Material
STEEL#14
STEEL#12
STEEL#12
STEEL#12
Size (W x H)
34.75 x 44.75
4.41 x 2.28
4.81 x 3.31
20 x 12
Margin (L,T,R,B) Efficiency
-default-
-default-
-default-
-default-
Total:
Quantity
1
1
1
1
4
Material Cost
$746.39
$2.42
$3.82
$57.60
$810.22
Fixed Cost
$5.00
$5.00
$5.00
$5.00
$20.00
Cutting
$27.90
$13.10
$6.90
$32.80
$80.70
Process Cost
$32.90
$18.10
$11.90
$37.80
$100.70
Profit
$38.96
$1.03
$0.79
$4.77
$45.55
Total Cost
$818.25
$21.54
$16.51
$100.17
$956.47
Cost/Part
$818.25
$21.54
$16.51
$100.17
$239.12
Required Qty.
Produced Qty.
Material Cost
Process Cost (fixed)
Process Cost (Variable)
Profit
Total Cost
Avg. Part Cost
Lot 1
5
5
$4051.10
$100.00
$403.50
$227.70
$4782.30
$239.10
Lot 2
10
10
$8102.20
$100.00
$807.00
$450.50
$9459.70
$236.50
Lot 3
20
21
$17041.70
$100.00
$1694.70
$940.50
$19749.80
$246.90
Lot 4
50
52
$42131.60
$100.00
$4196.40
$2321.40
$48749.40
$243.70
Lot 5
100
105
$85073.40
$100.00
$8473.50
$4682.30
$98329.20
$245.80
Summary
MetaCAM Enterprise - Quote
480 Lively Blvd, Elk Grove Village, IL 60007
P: 775 826 1717 | F: 775 826 1723
E: sales@metamation.com
W: www.metamation.com
Quote no
Quote Date
Quote Expires
Sales Person
Terms
Bill To :
Sheet Metal Fabricators
1465 Terminal Way
Reno NV 89502
#1015
01 November 2014
15 November 2014
Andrew Magna
Net 30
All prices quoted in US Dollars. Price does not include taxes unless otherwise specified.
Please sign below and fax to (775) 826-1723
Total $544.47
Authorized Signature / Purchase Order # / Date
Part Name
F4_3569
1006
1040
SO_1144
Material Cost
$364.05
$1.18
$1.86
$28.09
Setup Cost
$2.50
$2.50
$2.50
$2.50
Process Cost
$30.40
$15.60
$9.40
$35.30
Over head Cost
$39.44
$1.68
$1.13
$6.34
Total Cost
$436.39
$20.96
$14.89
$72.23
Quantity
10
10
10
10
# No.
1
2
3
4
DESIGN
► Utilising Enterprise your engineering and programming departments have the ability to
batch Import multiple file formats including DXF, Step, Iges and SolidWorks directly from
Enterprise or utilise MetaCAD 2D or 3D to quickly construct you parts.
► Files are analysed for problems and anything that cannot be automatically resolved is clearly
highlighted giving the programming team more focus with working on items that need
attention.
► Save additional time and money for your business with running prototype ‘s of your parts
through bend and profile cutting operations before instigating physical production.
► Track part revisions and see the physical changes with this intuitive revision control module.
MetaCAM Enterprise
Lists
For Review
Information
Operations
New
Upload
Hotfolders
Preferences
Upload documents : 8
Inch
D:
Bend_Mc_Tools
CO14_Data
Parts_Lib
Enterprise
MCAM_Data
Name Modified Size Type Status
F1_0085
G9_0096
J8_1166
K0_7258
R4_0303
S7_1406
26 hours
now
12 hours
now
15 minutes
8 minutes
128k
88k
45k
26k
45k
60k
igs
pdg
step
psm
dxf
3D
MetaCAM Enterprise
Lists
For Review
Information
Operations
CAD Files
Tooled Parts to Review : 7
Name Modified Material Machine State Error-code
Models
Master Parts
Tooled Parts
Layouts
Name Search by name
Machine-material combination invalid
2012-6.pdg 27 hours GALV,0.06 TC L3030 Invalid Tooling Machine-material combination invalid
One or more slugs detected
1040-1.pdg 26 hours STEEL#12 VIP367-558ST Tooling Problem One or more slugs detected
Some polylines remain un-tooled
1006-1.pdg
1113-1.pdg
26 hours
28 hours
STEEL#12
STEEL#7
VIP367-58ST
VIP367-58ST
Tooling Problem
Tooling Problem
Some polylines remain un-tooled
Some polylines remain un-tooled
Some tools are not mounted or are mounted at incorrect angle
1113-4.pdg
4009-4.pdg
3030-4.pdg
27 hours
27 hours
27 hours
STEEL#7
STEEL#10
STEEL#7
TruPunch5000
TruPunch5000
TruPunch5000
Tooling Problem
Tooling Problem
Tooling Problem
Some tools are not mounted or mounted at
incorrect angle
Some tools are not mounted or mounted at
incorrect angle
Some tools are not mounted or mounted at
incorrect angle
MetaCAM Enterprise : Parts Revision : SO_1144.pdf
CAD File
Part
Rev. Comments Author Date
3 Grove Slots Added - John Handler 2 minutes
2 Design Change - Slot Model Handler 4 minutes
Close
View
Diff
Rollback
Reset
Tooled part
Tooled part
Tooled part
Tooled part
INTEGRATE
► Connect to your ERP / MRP / MES software to pass in work orders, due date, quantities for
production.
► Automatically create nest jobs, program parts and produce nests and avoid having to pass
manual stacks of printed orders to the programming office.
► Go directly from assemblies to nest jobs using our Solidworks and Inventor Plugins that can
transfer CAD files directly into Enterprise.
MetaCAM Enterprise
Lists
For Review
Information
Operations
Quotations
Assemblies : 5
Name Modified Author Description
Assembly BOM
Name Revisior Quantity Description
Part Library
Jobs
Assemblies
All Files
Name Search by name
Main Panel.masm
Bought Out Item.masm
Diffuser Plate Assembly.masm
Control Panel Assembly.masm
Base Plate Assembly.masm
now
1 minute
2 minutes
7 minutes
4 minutes
G. Smith
G. Smith
G. Smith
G. Smith
G. Smith
New Edit Release for Production Pieces1
MetaCAM Enterprise : New Job 28
Job ID:
Basic Job Fields
IMM
Customer Ref:
Job ID: 28
Due Date:
Flags:
11/6/2014
Parts
Support diff
Don’t nest Edit custom fields....
Spreadsheet settings... Import Settings...
Parts Modified Material Machine State
Add starred Remove
Select a sheet :
Spreadsheet preview : Senario_1.csv
First row is header
Scenario_1#csv
Skip past first rows. Select row0
Part Name Material Due Date Quantity
1
2
3
4
MO_2590
M1_4198
MO_9154
MO_8521
ALUM#10
STEEL#10
GALV#12
ALUM#10
10/25/14
10/25/14
10/25/14
10/30/14
100
100
125
145
Part name : AddPart Name
Due date : Due Date
Quantity : Quantity
Column Mapping
Add / Remove fields... OK Cancel
MetaCAM Enterprise : Configure Spreadsheet
PROGRAM
► Enterprise primary tooling system is now handled remotely by the server saving front end
time on repetitive tasks.
► The system will tool the parts not just for one machine but every machine you have available
including press brakes and will give you complete visual part status and flexibility across your
manufacturing operations.
“How Long will it take you to switch work from a machine that goes down or is over capacity?”
► Any features that could not be automatically tooled or if the machine is not capable of
producing the part is clearly highlighted and put on hold for review.
► Utilising Hot Folders you can drag and drop you engineering files and the system will
automatically import them.
Information
MetaCAM Enterprise
Lists
For Review
Operations
Quotations
Part Library : 68
Name Modified
Part Library
Jobs
Assemblies
All Files
Name Search by name
1006.pdg
3030.pdg
3025.pdg
2002.pdg
B313.pdg
5 minutes
6 minutes
7 minutes
7 minutes
2 months
Width
2.2”
3.32”
14.27”
8.46”
40.29”
Height
1.14”
2.35”
3.83”
4.67”
28.28”
Weight
0 lb
0.1 lb
1.5 lb
0.3 lb
6.5 lb
Material
STEEL#12
STEEL#7
STEEL#10
GALV,0.06
STEEL#12
Rev.
1
1
1
1
2
State
Cutting Bending
OK
Tooling review in progress
OK
Waiting for tooling review
OK
Bystar3015
TCL3030
TruPunch5000
VIP367-585ST
5085(SX,6-Axis)
5085_Delem
OK Suppressed for processing Auto-tooling results need review Bend-tooling results need review Machine, material combination not found
1006.pdg
Estimate
Edit
View
Print
New
Settings
Re-Tool
Check Tooling
Author
Checked-out
Created
Customer
Grain
Height
Legacy-part
Material
Modified
Out-of-date
Part-name
Revision
Size
User-edited
Weight
Width
Handler
-
8 minutes
Unknown
None
1.14”
False
STEEL#12
8 minutes
-
1006
1
22K
-
0 lb
2.2”
General fields
Tooled instances (6)
Parent(s) (1)
Search
Search
Laser
1006_2.pdg
1006_6.pdg
Bystar 3015
TC L3030
OK
OK
Punch
1006_1.pdg
1006_4.pdg
VIP367_585ST
TruPunch 5000
Tooling problem
Tooling inactive
Bending
1006_7.3d
1006_8.3d
1006.3d OK
5085 (SX, 6-Axis)
5085_Delem
Tooling problem
Tooling inactive
Some polylines remain un-tooled
Name Machine State Error Code
Name State Error Code
MetaCAM Enterprise
Lists
For Review
Information
Operations
New
Upload
Hotfolders
Preferences
Hot Folders
PROCESS AUTO TOOLING FOR
ALL MACHINES
PROCESS AUTO TOOLING FOR
PUNCH MACHINES
PROCESS AUTO TOOLING FOR
LASER MACHINES
PROCESS AUTO TOOLING FOR
BENDING MACHINES
JOB CREATION THROUGH
SPREADSHEET
JOB CREATION FROM MIS/ERP
SPREADSHEET
SCHEDULING &
PRODUCTION
► Once you have jobs in the system it is a simple click to schedule and release direct to the
nesting engine.
► Enterprise will show you a list of available machines along with a capacity indication to decide
which machine to schedule the parts on. From there it is a simple click to nest parts on the
server - which does not keep the user waiting, he can move on to the next task.
► If you want to maximise your machine productivity and material utilisation you can also
merge jobs together which will then be batch processed. Features like "Intelligent Nest
Repacking" and "Filler Jobs" allow you to draw the last bits from the nesting system.
► All nests are validated against machine parameters for any potential problems along with
incorporating minimum acceptable yield - any nests below this value are put in an approval
queue for review.
► Production is automatically prioritized by the due-dates and priorities imported from the
ERP/MRP system. The automatic priority can be overridden with various 'batch scheduling
tools' available in Enterprise.
MetaCAM Enterprise
Lists
For Review
Information
Operations
CAD Files
Layouts to Review : 4
Name Sheet Machine Pattern Q Packing State Error-code
Models
Master Parts
Tooled Parts
Layouts
Name Search by name
Saved layout : Some parts of tooling, traverse-path or reposition is out of machine stroke
P123.lyt Steel#14 : 95x48 TruPunch 5000 5 39.1% Bad Layout Some parts of tooling, traverse path or reposition is.....
P119.lyt Steel#10 : 72x36* VIP367_58ST 1 20.4% Bad Layout Sheet is not held by sufficient number of clamps
Saved layout : Sheet is not held by sufficient number of clamps
P113.lyt
P114.lyt
Steel#12 : 120x48
Steel#12 : 120x48
Bystar 3015
Bystar 3015
1
1
44.5%
46.7%
Waiting for approval
Waiting for approval
Saved layout : Waiting for approval
P113.lyt
Delete
Edit
View
Print
Re-validate
Reject
Approve
Regenerate-code
Print labels
Run interactive nesting
VIP367_58ST_2AI (6 parts)
Job ID : 28
STEEL#14 (2 parts)
STEEL#14 : 48 x 98 (99)
STEEL#14 : 96 x 48 (70)
STEEL#14 : 120 x 48 (100)
STEEL#16 (1 parts)
STEEL#16 : 72 x 36* (99)
STEEL#16 : 96 x 48* (100)
STEEL#16 : 120 x 48* (99)
GALV#10 (1 parts)
GALV#10 : 96 x 48 (98)
GALV#12 (1 parts)
STEEL#12 (1 parts)
Bystar 3015 (5 parts)
Tru Punch 5000 (6 parts)
TC L3030 (6 parts)
Search in Library.....
Custom processing.....
Run interactive nestingJob ID : 27
Bystar 3015 (13 parts)
VIP367_58ST_2AI (13 parts)
Tru Punch 5000 (13 parts)
TC L3030 (13 parts)
Search in Library.....
Custom processing.....
4.8 hrs
Run interactive nestingJob ID : 27
5.6 hrs
5 hrs
4.4 hrs
3.9 hrs
3.3 hrs
167 mins
133 mins
100 mins
67 mins
33 mis
0
VIP367
58ST
2AI
CINCIN
NATI
CL_7
Tru
PUNCH
5000
Bystar
3015
TCL
3030
3015LV
P40CFX
Total runtime by Machine, Material
ALUM#10
GALV#10
STEEL#10
STEEL#11
STEEL#7
STEEL#16
STEEL#14
STEEL#12
GALV#12
GALV#14
CUSTOMIZE &
MANAGE
► Centralized Microsoft SQL server database to store all your data - search, sort, group and
track data with a few mouse clicks.
► Enterprise is setup with individual user accounts that can track the history of operations on
each part and control access to files.
► Automatic Backup base on a defined schedule ensures that all is safely backed up for easy
recovery.
► Meeting the lean manufacturing principals, Enterprise can easily turn into a pull based
system where jobs are pulled and scheduled 'on-production-demand' from the shopfloor.
► Most frequent jobs can be captured into ready-to-go 'static-nests' making it possible to
release them immediately when required.
MetaCAM Enterprise
Lists
For Review
Information
Operations
Search
Shopfloor
Search
Charts
Reports
Recent.... (Ctl + R)
About
Machine Tru Punch 5000
Material STEEL#12
Customer Proteck
Parts Query Results3
Width
Height
Weight
Hit count
Cut length
Run time
Tool
Name
B6_7301_4.pdg
C7_9650_4.pdg
B3_0013_4.pdg
Machine
Tru Punch 5000
Tru Punch 5000
Tru Punch 5000
Material
STEEL#12
STEEL#12
STEEL#12
Customer
Proteck
Proteck
Proteck
Weight
21.3 lb
1 lb
6.5 lb
Run time
148 sec
64 sec
117 sec
MetaCAM Enterprise
Lists
For Review
Information
Operations
Quotations
Part Library : 69
Part Library
Jobs
Assemblies
All Files
Name Search by name
Modified
Width
Height
Weight
Material
Revision
26 hours
4.41”
2.28”
0 lb
STEEL#12
1
Modified
Width
Height
Weight
Material
Revision
26 hours
4.81”
3.31”
0.1 lb
STEEL#12
1
Modified
Width
Height
Weight
Material
Revision
26 hours
34.75”
44.75”
10.8 lb
STEEL#12
2
Modified
Width
Height
Weight
Material
Revision
27 hours
20”
12”
0.7 lb
STEEL#12
3
Backup
Please browse to a backup location and click on Start button to start the backup :
D:Metamation_BackUp2014Nov14_FD
C:Metamation
Browse
Browse
Test Save
Close
Start
Enable Scheduled BackUp
BackUp Schedule :
BackUp Locations :
Daily
Weekday :
Weekly Monthly
Database Authentication :
SQL
Windows
Friday
Time : 20:00 hrs.
Login : Admin
Password : *************
1006.pdg 1040.pdg
F4_3596.pdg SO_1144.pdg
OPERATOR KIOSK
► The Enterprise Operator Kiosk is designed as a simple to use yet informative screen for shop
floor operators to receive and acknowledge production requirements whilst reducing the
typical word of mouth and paper trail.
► The kiosk displays highly visual graphics and information about the nests along with built in
tools for setting and production time tracking. They also have a very clear and intuitive punch
turret tracker which monitors the tool load in the machine and as new nests are selected will
inform the of operators tools to remove and add. This feature removes the need for offline
paper charts and potential miscommunication between production shifts.
► Prioritize nests to minimize tool changes
MetaCAM Enterprise : Schedule Priority
Name
P64.lyt
P63.lyt
P62.lyt
P61.lyt
P59.lyt
P58.lyt
Job Priority
Normal
Normal
Normal
Normal
Normal
Normal
Job Due-Date
10 days
12 days
14 days
10 days
10 days
10 days
Material Used
GALV#14
STEEL#14
STEEL#14
STEEL#14
STEEL#11
STEEL#12
Tool Changes
3/8
1/6
0/6
0/7
0/5
0/5
Sort
Settings
Tool Changes : 4
CancelSave
Job Priority
Job Due-Date
Material Used
Too Changes
Nest Sequence
Actual Weight
Estimated Time
Packing
Pattern Qty
Rect Packing
Sheet
Sheet Weight
User-Edited
Color Sequence
MetaCAM Enterprise : Schedule Parameters
CancelOK
Layout Fields
Job Fields
Now Processing Scheduled Next Waiting In Queue
Tru Punch 5000 G_Smith
00:42
Sheet Done
Put on Hold
Upload Code
Reports Details
Sheet 1 of 1
P105
Job ID:
Sheet:
Packing:
26
STEEL#12 : 120 x 48
47.3%
No.
1
2
3
Part
1006
1040
SO_1144
Total
183
31
18
Done
0
0
0
Rejected
15
1
1
REPORT
Everything that happens in Enterprise is available for reporting. You can easily create
simple charts or a rolling dashboard to see the metrics that matter the most to you.
► Template based reports enable you to prepare smart reports to bring the Engineering
and Operations data on a single sheet.
► A single report can adapt the content according to the machine technology making it
highly reusable for laser, punch or combo users.
► The report extensibility ensures that you can import and attach external reports to the
Parts and print them with the native Enterprise reports.
► If you are working remotely you can use the Enterprise App for Android related systems
to get up to date information on job and machine status.
MetaCAM Enterprise : Reports
Von
Strohm
GruberHelgaSmall
hausen
Flick
Total Production Time by Operator
34 hrs.
0
5.6 hrs.
11 hrs.
17 hrs.
22 hrs.
28 hrs.
33 hrs.
39 hrs.
44 hrs.
2.1 days
2.3 days
20 hrs.
27 hrs.
35 hrs.
Part Rejected by Machine
6
8
25
12
29
VIP367_58ST_2A (Default)
Bystar 3015_2 (Default)
CINCINNATI CL_7 (Default)
3015LVP_40CFX (Default)
TC L3030 (Default)
MetaCAM Enterprise : Reports
CO_1460
Proteck
3days
1 of 1
STEEL#12
2.05
4.98”x 45.9”
CO_1460
Proteck
3days
1 of 1
STEEL#12
2.05
4.98”x 45.9”
C1_7076
Proteck
3days
1 of 1
STEEL#12
2.09
3.62”x 61.75”
Proteck
3days
1 of 1
STEEL#12
2.09
3.62”x 61.75”
C1_7076
F1_6092
Proteck
3days
1 of 1
STEEL#12
2.05
4.98”x 45.9”
F1_6092
Proteck
3days
1 of 1
STEEL#12
2.05
4.98”x 45.9”
F1_6092
Proteck
3days
1 of 1
STEEL#12
2.09
3.62”x 61.75”
Proteck
3days
1 of 1
STEEL#12
2.09
3.62”x 61.75”
F5_6679
480 Lively Blvd, Elk Grove Village, IL 60007
P: 775 826 1717 | F: 775 826 1723
E: sales@metamation.com | W: www.metamation.com
DATA MINING
All Enterprise activities are tracked and kept ready for data mining making it possible to
identify the bottlenecks, opportunities in the factory workflow. Operation managers can
use dashboard charts/graphs to track live Machine loads, Material requirements, tools
usage etc. Production history data can be used to check the machine and operator
efficiencies or nesting yields over a specified duration.
TESTIMONIALS
“Enterprise has helped us better manage our parts and revisions across multiple
programmers - we can save both the tooling and the CAD for all previous versions
which is a huge time saver for reruns.”
- Pinion Adams, South Africa
“We have been using MetaCAM for around 18 months and over that time we have
had very good results from the existing software. We had impressive results in terms
of reduced scrappage and large productivity improvements, thus the upgrade to
Enterprise became a natural progression for us to move forward with Metamation.”
- Contracts Engineering, United Kingdom
“Scheduling jobs and monitoring productivity on the machines has become that
much easier.”
- Monarch Metal, CO
“Drop in a DXF and Enterprise will immediately give you the cutting time and price
estimate that helps us quickly quote jobs with confidence.”
- Yarbrough Industries, MO
“We can batch program hundreds of parts through Enterprise in a less than 10
minutes, this helps us check the effect of changing a tool, previously we had no way
to do so.”
- Eaton Cooper, GA
“We can easily switch jobs from one machine to another, every part is programmed
for all machines and this helps us better prepare for a situation if a machine goes
down. ”
- Carter Hoffman, IL
www.metamation.com
Scan the above QR Code to view Metamation Software demo videos on YouTube
or visit us at http://www.youtube.com/user/MetamationProducts
© Metamation, 2014
Copyright Notice : This document is copyrighted with all rights reserved. No part of this document may be reproduced, transcribed, transmitted, stored,
in an electronic retrieval system, or translated into any language in any form by any means without the prior written permission of Metamation.
Metamation makes no warranties, express or implied in this document. In no event shall Metamation be liable for damages of any kind arising out of use of
this document or the information contained within.
Inner pages images sourced from Dreamstime.com | Cover Page Image : Shutterstock.com | Typeset using Lato Font Family, a font by tyPOLAND.
Illustrations used for representation purpose only. Actual product may vary. This document is subject to changes without prior notice.
USA
Metamation Inc.
West Coast Office: Mid West Office:
1465 Terminal Way, Ste 2 480 Lively Blvd
Reno NV 89502 Elk Grove Village, IL 60007
P: 775 826 1717 F: 775 826 1723
E: sales@metamation.com
EUROPE
Metamation Europe
The Business Centre, Edward Street
Redditch, Worcestershire
United Kingdom, B97 6HA
P: +44 (0)1527 916578
E: sales@metamation.com
Your local Metamation representative:

More Related Content

Viewers also liked

비아그라판매コ■GOM88ㆍNET■え사정지연제판매hj3
비아그라판매コ■GOM88ㆍNET■え사정지연제판매hj3 비아그라판매コ■GOM88ㆍNET■え사정지연제판매hj3
비아그라판매コ■GOM88ㆍNET■え사정지연제판매hj3 ghkdtkdaus
 
Ficha de actalización de infrestructura 2012
Ficha de actalización de infrestructura 2012Ficha de actalización de infrestructura 2012
Ficha de actalización de infrestructura 2012juan aquino
 
Bikini đan móc - Thời trang bikini handmade gợi cảm uy tính tại tphcm
Bikini đan móc - Thời trang bikini handmade gợi cảm uy tính tại tphcmBikini đan móc - Thời trang bikini handmade gợi cảm uy tính tại tphcm
Bikini đan móc - Thời trang bikini handmade gợi cảm uy tính tại tphcmBach Nguyen
 
simulacro de examen de nombramiento y contrata docente ( fuente- grupo maestr...
simulacro de examen de nombramiento y contrata docente ( fuente- grupo maestr...simulacro de examen de nombramiento y contrata docente ( fuente- grupo maestr...
simulacro de examen de nombramiento y contrata docente ( fuente- grupo maestr...juan aquino
 

Viewers also liked (9)

비아그라판매コ■GOM88ㆍNET■え사정지연제판매hj3
비아그라판매コ■GOM88ㆍNET■え사정지연제판매hj3 비아그라판매コ■GOM88ㆍNET■え사정지연제판매hj3
비아그라판매コ■GOM88ㆍNET■え사정지연제판매hj3
 
Ficha de actalización de infrestructura 2012
Ficha de actalización de infrestructura 2012Ficha de actalización de infrestructura 2012
Ficha de actalización de infrestructura 2012
 
Portfólio rods
Portfólio rodsPortfólio rods
Portfólio rods
 
Resume
ResumeResume
Resume
 
Resumen semana 3 entrada 7
Resumen semana 3 entrada 7Resumen semana 3 entrada 7
Resumen semana 3 entrada 7
 
Bcom Degree- Attested Side (Back)
Bcom Degree- Attested Side (Back)Bcom Degree- Attested Side (Back)
Bcom Degree- Attested Side (Back)
 
ISO Certificate-Accor
ISO Certificate-AccorISO Certificate-Accor
ISO Certificate-Accor
 
Bikini đan móc - Thời trang bikini handmade gợi cảm uy tính tại tphcm
Bikini đan móc - Thời trang bikini handmade gợi cảm uy tính tại tphcmBikini đan móc - Thời trang bikini handmade gợi cảm uy tính tại tphcm
Bikini đan móc - Thời trang bikini handmade gợi cảm uy tính tại tphcm
 
simulacro de examen de nombramiento y contrata docente ( fuente- grupo maestr...
simulacro de examen de nombramiento y contrata docente ( fuente- grupo maestr...simulacro de examen de nombramiento y contrata docente ( fuente- grupo maestr...
simulacro de examen de nombramiento y contrata docente ( fuente- grupo maestr...
 

Similar to Enterprise

Course project ie6560 group 10_presentation
Course project ie6560 group 10_presentationCourse project ie6560 group 10_presentation
Course project ie6560 group 10_presentationNishant Pathak
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1Nice Tech Co.,Ltd.
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET Journal
 
Procedure of Proactively Designing Products by Design for Manufacturability (...
Procedure of Proactively Designing Products by Design for Manufacturability (...Procedure of Proactively Designing Products by Design for Manufacturability (...
Procedure of Proactively Designing Products by Design for Manufacturability (...VayoInfo
 
Making Use of a Knowledgeable Design by Design for Manufacturing
Making Use of a Knowledgeable Design by Design for ManufacturingMaking Use of a Knowledgeable Design by Design for Manufacturing
Making Use of a Knowledgeable Design by Design for ManufacturingVayoInfo
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessW3 Group Canada Inc.
 
H0432045055
H0432045055H0432045055
H0432045055theijes
 
PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223Carl Briggs
 
Overstated role of_capital
Overstated role of_capitalOverstated role of_capital
Overstated role of_capitalPriyanka Divekar
 
Meloche Group
Meloche GroupMeloche Group
Meloche Grouphmeloche
 

Similar to Enterprise (20)

Course project ie6560 group 10_presentation
Course project ie6560 group 10_presentationCourse project ie6560 group 10_presentation
Course project ie6560 group 10_presentation
 
Haeger Profit Center
Haeger Profit CenterHaeger Profit Center
Haeger Profit Center
 
Bed Rail Report
Bed Rail ReportBed Rail Report
Bed Rail Report
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Machine toolindustry en
Machine toolindustry enMachine toolindustry en
Machine toolindustry en
 
Dfa
DfaDfa
Dfa
 
Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1Nice tech co.ltd. company introduction ver 5.1
Nice tech co.ltd. company introduction ver 5.1
 
Precinmac
PrecinmacPrecinmac
Precinmac
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
Procedure of Proactively Designing Products by Design for Manufacturability (...
Procedure of Proactively Designing Products by Design for Manufacturability (...Procedure of Proactively Designing Products by Design for Manufacturability (...
Procedure of Proactively Designing Products by Design for Manufacturability (...
 
Making Use of a Knowledgeable Design by Design for Manufacturing
Making Use of a Knowledgeable Design by Design for ManufacturingMaking Use of a Knowledgeable Design by Design for Manufacturing
Making Use of a Knowledgeable Design by Design for Manufacturing
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
om
omom
om
 
H0432045055
H0432045055H0432045055
H0432045055
 
PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223
 
Overstated role of_capital
Overstated role of_capitalOverstated role of_capital
Overstated role of_capital
 
Meloche Group
Meloche GroupMeloche Group
Meloche Group
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 

Enterprise

  • 2. Enterprise is the latest software from Metamation - it is a feature packed module designed to help optimize your front end by helping reduce repetitive tasks from importing / tooling / nesting and bending operations while giving you the added benefits with revision and shop control, new operator kiosk screens to reduce the paper flow, real time information with planning which is all packed together in a highly visual, easy to use database driven system. ENTERPRISE
  • 3. Why use Enterprise? Enterprise focuses on tools to save TIME and MONEY in your organization. Each feature developed has been carefully designed to address bottlenecks and improve efficiency while providing stakeholders with better visibility across their organization. Who can benefit from Enterprise? Enterprise is designed for small, medium and large organizations who have sheet metal CNC machines - it does not matter if the company has just 1 or 10 machines, Enterprise has several features that benefit companies of different sizes. Batch Import Manual Programming ERP/MRP/MES Production Order InformationPlanning Manual Nesting Engineering
  • 4. ► Enterprise can be used by the estimator or sales department to quickly program parts and estimate the cutting time, material used and setup time needed for a job. ► The Enterprise server will program parts that need to be estimated automatically and provide the user estimates for varying lot sizes - all this with a single click of a button. ► Create accurate quote reports that can be used in your ERP/MRP system or sent to your customer to win business. ESTIMATE
  • 5. MetaCAM Enterprise - Quote Customer: Quote # 1 Machines: VIP367-58ST-2AI, 5085 (SX, 6-Axis) IMM Parts Due Date: 11/6/2014 Expires On: 11/29/2014 Sheets: IMM Lot 1 Profit (%): 5 Rejection (%): Include skeleton cost: Settings... 5 Estimate Save Close F4-3569 1006 1040 S0-1144 Material STEEL#14 STEEL#12 STEEL#12 STEEL#12 Size (W x H) 34.75 x 44.75 4.41 x 2.28 4.81 x 3.31 20 x 12 Margin (L,T,R,B) Efficiency -default- -default- -default- -default- Total: Quantity 1 1 1 1 4 Material Cost $746.39 $2.42 $3.82 $57.60 $810.22 Fixed Cost $5.00 $5.00 $5.00 $5.00 $20.00 Cutting $27.90 $13.10 $6.90 $32.80 $80.70 Process Cost $32.90 $18.10 $11.90 $37.80 $100.70 Profit $38.96 $1.03 $0.79 $4.77 $45.55 Total Cost $818.25 $21.54 $16.51 $100.17 $956.47 Cost/Part $818.25 $21.54 $16.51 $100.17 $239.12 Required Qty. Produced Qty. Material Cost Process Cost (fixed) Process Cost (Variable) Profit Total Cost Avg. Part Cost Lot 1 5 5 $4051.10 $100.00 $403.50 $227.70 $4782.30 $239.10 Lot 2 10 10 $8102.20 $100.00 $807.00 $450.50 $9459.70 $236.50 Lot 3 20 21 $17041.70 $100.00 $1694.70 $940.50 $19749.80 $246.90 Lot 4 50 52 $42131.60 $100.00 $4196.40 $2321.40 $48749.40 $243.70 Lot 5 100 105 $85073.40 $100.00 $8473.50 $4682.30 $98329.20 $245.80 Summary MetaCAM Enterprise - Quote 480 Lively Blvd, Elk Grove Village, IL 60007 P: 775 826 1717 | F: 775 826 1723 E: sales@metamation.com W: www.metamation.com Quote no Quote Date Quote Expires Sales Person Terms Bill To : Sheet Metal Fabricators 1465 Terminal Way Reno NV 89502 #1015 01 November 2014 15 November 2014 Andrew Magna Net 30 All prices quoted in US Dollars. Price does not include taxes unless otherwise specified. Please sign below and fax to (775) 826-1723 Total $544.47 Authorized Signature / Purchase Order # / Date Part Name F4_3569 1006 1040 SO_1144 Material Cost $364.05 $1.18 $1.86 $28.09 Setup Cost $2.50 $2.50 $2.50 $2.50 Process Cost $30.40 $15.60 $9.40 $35.30 Over head Cost $39.44 $1.68 $1.13 $6.34 Total Cost $436.39 $20.96 $14.89 $72.23 Quantity 10 10 10 10 # No. 1 2 3 4
  • 6. DESIGN ► Utilising Enterprise your engineering and programming departments have the ability to batch Import multiple file formats including DXF, Step, Iges and SolidWorks directly from Enterprise or utilise MetaCAD 2D or 3D to quickly construct you parts. ► Files are analysed for problems and anything that cannot be automatically resolved is clearly highlighted giving the programming team more focus with working on items that need attention. ► Save additional time and money for your business with running prototype ‘s of your parts through bend and profile cutting operations before instigating physical production. ► Track part revisions and see the physical changes with this intuitive revision control module.
  • 7. MetaCAM Enterprise Lists For Review Information Operations New Upload Hotfolders Preferences Upload documents : 8 Inch D: Bend_Mc_Tools CO14_Data Parts_Lib Enterprise MCAM_Data Name Modified Size Type Status F1_0085 G9_0096 J8_1166 K0_7258 R4_0303 S7_1406 26 hours now 12 hours now 15 minutes 8 minutes 128k 88k 45k 26k 45k 60k igs pdg step psm dxf 3D MetaCAM Enterprise Lists For Review Information Operations CAD Files Tooled Parts to Review : 7 Name Modified Material Machine State Error-code Models Master Parts Tooled Parts Layouts Name Search by name Machine-material combination invalid 2012-6.pdg 27 hours GALV,0.06 TC L3030 Invalid Tooling Machine-material combination invalid One or more slugs detected 1040-1.pdg 26 hours STEEL#12 VIP367-558ST Tooling Problem One or more slugs detected Some polylines remain un-tooled 1006-1.pdg 1113-1.pdg 26 hours 28 hours STEEL#12 STEEL#7 VIP367-58ST VIP367-58ST Tooling Problem Tooling Problem Some polylines remain un-tooled Some polylines remain un-tooled Some tools are not mounted or are mounted at incorrect angle 1113-4.pdg 4009-4.pdg 3030-4.pdg 27 hours 27 hours 27 hours STEEL#7 STEEL#10 STEEL#7 TruPunch5000 TruPunch5000 TruPunch5000 Tooling Problem Tooling Problem Tooling Problem Some tools are not mounted or mounted at incorrect angle Some tools are not mounted or mounted at incorrect angle Some tools are not mounted or mounted at incorrect angle MetaCAM Enterprise : Parts Revision : SO_1144.pdf CAD File Part Rev. Comments Author Date 3 Grove Slots Added - John Handler 2 minutes 2 Design Change - Slot Model Handler 4 minutes Close View Diff Rollback Reset Tooled part Tooled part Tooled part Tooled part
  • 8. INTEGRATE ► Connect to your ERP / MRP / MES software to pass in work orders, due date, quantities for production. ► Automatically create nest jobs, program parts and produce nests and avoid having to pass manual stacks of printed orders to the programming office. ► Go directly from assemblies to nest jobs using our Solidworks and Inventor Plugins that can transfer CAD files directly into Enterprise.
  • 9. MetaCAM Enterprise Lists For Review Information Operations Quotations Assemblies : 5 Name Modified Author Description Assembly BOM Name Revisior Quantity Description Part Library Jobs Assemblies All Files Name Search by name Main Panel.masm Bought Out Item.masm Diffuser Plate Assembly.masm Control Panel Assembly.masm Base Plate Assembly.masm now 1 minute 2 minutes 7 minutes 4 minutes G. Smith G. Smith G. Smith G. Smith G. Smith New Edit Release for Production Pieces1 MetaCAM Enterprise : New Job 28 Job ID: Basic Job Fields IMM Customer Ref: Job ID: 28 Due Date: Flags: 11/6/2014 Parts Support diff Don’t nest Edit custom fields.... Spreadsheet settings... Import Settings... Parts Modified Material Machine State Add starred Remove Select a sheet : Spreadsheet preview : Senario_1.csv First row is header Scenario_1#csv Skip past first rows. Select row0 Part Name Material Due Date Quantity 1 2 3 4 MO_2590 M1_4198 MO_9154 MO_8521 ALUM#10 STEEL#10 GALV#12 ALUM#10 10/25/14 10/25/14 10/25/14 10/30/14 100 100 125 145 Part name : AddPart Name Due date : Due Date Quantity : Quantity Column Mapping Add / Remove fields... OK Cancel MetaCAM Enterprise : Configure Spreadsheet
  • 10. PROGRAM ► Enterprise primary tooling system is now handled remotely by the server saving front end time on repetitive tasks. ► The system will tool the parts not just for one machine but every machine you have available including press brakes and will give you complete visual part status and flexibility across your manufacturing operations. “How Long will it take you to switch work from a machine that goes down or is over capacity?” ► Any features that could not be automatically tooled or if the machine is not capable of producing the part is clearly highlighted and put on hold for review. ► Utilising Hot Folders you can drag and drop you engineering files and the system will automatically import them.
  • 11. Information MetaCAM Enterprise Lists For Review Operations Quotations Part Library : 68 Name Modified Part Library Jobs Assemblies All Files Name Search by name 1006.pdg 3030.pdg 3025.pdg 2002.pdg B313.pdg 5 minutes 6 minutes 7 minutes 7 minutes 2 months Width 2.2” 3.32” 14.27” 8.46” 40.29” Height 1.14” 2.35” 3.83” 4.67” 28.28” Weight 0 lb 0.1 lb 1.5 lb 0.3 lb 6.5 lb Material STEEL#12 STEEL#7 STEEL#10 GALV,0.06 STEEL#12 Rev. 1 1 1 1 2 State Cutting Bending OK Tooling review in progress OK Waiting for tooling review OK Bystar3015 TCL3030 TruPunch5000 VIP367-585ST 5085(SX,6-Axis) 5085_Delem OK Suppressed for processing Auto-tooling results need review Bend-tooling results need review Machine, material combination not found 1006.pdg Estimate Edit View Print New Settings Re-Tool Check Tooling Author Checked-out Created Customer Grain Height Legacy-part Material Modified Out-of-date Part-name Revision Size User-edited Weight Width Handler - 8 minutes Unknown None 1.14” False STEEL#12 8 minutes - 1006 1 22K - 0 lb 2.2” General fields Tooled instances (6) Parent(s) (1) Search Search Laser 1006_2.pdg 1006_6.pdg Bystar 3015 TC L3030 OK OK Punch 1006_1.pdg 1006_4.pdg VIP367_585ST TruPunch 5000 Tooling problem Tooling inactive Bending 1006_7.3d 1006_8.3d 1006.3d OK 5085 (SX, 6-Axis) 5085_Delem Tooling problem Tooling inactive Some polylines remain un-tooled Name Machine State Error Code Name State Error Code MetaCAM Enterprise Lists For Review Information Operations New Upload Hotfolders Preferences Hot Folders PROCESS AUTO TOOLING FOR ALL MACHINES PROCESS AUTO TOOLING FOR PUNCH MACHINES PROCESS AUTO TOOLING FOR LASER MACHINES PROCESS AUTO TOOLING FOR BENDING MACHINES JOB CREATION THROUGH SPREADSHEET JOB CREATION FROM MIS/ERP SPREADSHEET
  • 12. SCHEDULING & PRODUCTION ► Once you have jobs in the system it is a simple click to schedule and release direct to the nesting engine. ► Enterprise will show you a list of available machines along with a capacity indication to decide which machine to schedule the parts on. From there it is a simple click to nest parts on the server - which does not keep the user waiting, he can move on to the next task. ► If you want to maximise your machine productivity and material utilisation you can also merge jobs together which will then be batch processed. Features like "Intelligent Nest Repacking" and "Filler Jobs" allow you to draw the last bits from the nesting system. ► All nests are validated against machine parameters for any potential problems along with incorporating minimum acceptable yield - any nests below this value are put in an approval queue for review. ► Production is automatically prioritized by the due-dates and priorities imported from the ERP/MRP system. The automatic priority can be overridden with various 'batch scheduling tools' available in Enterprise.
  • 13. MetaCAM Enterprise Lists For Review Information Operations CAD Files Layouts to Review : 4 Name Sheet Machine Pattern Q Packing State Error-code Models Master Parts Tooled Parts Layouts Name Search by name Saved layout : Some parts of tooling, traverse-path or reposition is out of machine stroke P123.lyt Steel#14 : 95x48 TruPunch 5000 5 39.1% Bad Layout Some parts of tooling, traverse path or reposition is..... P119.lyt Steel#10 : 72x36* VIP367_58ST 1 20.4% Bad Layout Sheet is not held by sufficient number of clamps Saved layout : Sheet is not held by sufficient number of clamps P113.lyt P114.lyt Steel#12 : 120x48 Steel#12 : 120x48 Bystar 3015 Bystar 3015 1 1 44.5% 46.7% Waiting for approval Waiting for approval Saved layout : Waiting for approval P113.lyt Delete Edit View Print Re-validate Reject Approve Regenerate-code Print labels Run interactive nesting VIP367_58ST_2AI (6 parts) Job ID : 28 STEEL#14 (2 parts) STEEL#14 : 48 x 98 (99) STEEL#14 : 96 x 48 (70) STEEL#14 : 120 x 48 (100) STEEL#16 (1 parts) STEEL#16 : 72 x 36* (99) STEEL#16 : 96 x 48* (100) STEEL#16 : 120 x 48* (99) GALV#10 (1 parts) GALV#10 : 96 x 48 (98) GALV#12 (1 parts) STEEL#12 (1 parts) Bystar 3015 (5 parts) Tru Punch 5000 (6 parts) TC L3030 (6 parts) Search in Library..... Custom processing..... Run interactive nestingJob ID : 27 Bystar 3015 (13 parts) VIP367_58ST_2AI (13 parts) Tru Punch 5000 (13 parts) TC L3030 (13 parts) Search in Library..... Custom processing..... 4.8 hrs Run interactive nestingJob ID : 27 5.6 hrs 5 hrs 4.4 hrs 3.9 hrs 3.3 hrs 167 mins 133 mins 100 mins 67 mins 33 mis 0 VIP367 58ST 2AI CINCIN NATI CL_7 Tru PUNCH 5000 Bystar 3015 TCL 3030 3015LV P40CFX Total runtime by Machine, Material ALUM#10 GALV#10 STEEL#10 STEEL#11 STEEL#7 STEEL#16 STEEL#14 STEEL#12 GALV#12 GALV#14
  • 14. CUSTOMIZE & MANAGE ► Centralized Microsoft SQL server database to store all your data - search, sort, group and track data with a few mouse clicks. ► Enterprise is setup with individual user accounts that can track the history of operations on each part and control access to files. ► Automatic Backup base on a defined schedule ensures that all is safely backed up for easy recovery. ► Meeting the lean manufacturing principals, Enterprise can easily turn into a pull based system where jobs are pulled and scheduled 'on-production-demand' from the shopfloor. ► Most frequent jobs can be captured into ready-to-go 'static-nests' making it possible to release them immediately when required.
  • 15. MetaCAM Enterprise Lists For Review Information Operations Search Shopfloor Search Charts Reports Recent.... (Ctl + R) About Machine Tru Punch 5000 Material STEEL#12 Customer Proteck Parts Query Results3 Width Height Weight Hit count Cut length Run time Tool Name B6_7301_4.pdg C7_9650_4.pdg B3_0013_4.pdg Machine Tru Punch 5000 Tru Punch 5000 Tru Punch 5000 Material STEEL#12 STEEL#12 STEEL#12 Customer Proteck Proteck Proteck Weight 21.3 lb 1 lb 6.5 lb Run time 148 sec 64 sec 117 sec MetaCAM Enterprise Lists For Review Information Operations Quotations Part Library : 69 Part Library Jobs Assemblies All Files Name Search by name Modified Width Height Weight Material Revision 26 hours 4.41” 2.28” 0 lb STEEL#12 1 Modified Width Height Weight Material Revision 26 hours 4.81” 3.31” 0.1 lb STEEL#12 1 Modified Width Height Weight Material Revision 26 hours 34.75” 44.75” 10.8 lb STEEL#12 2 Modified Width Height Weight Material Revision 27 hours 20” 12” 0.7 lb STEEL#12 3 Backup Please browse to a backup location and click on Start button to start the backup : D:Metamation_BackUp2014Nov14_FD C:Metamation Browse Browse Test Save Close Start Enable Scheduled BackUp BackUp Schedule : BackUp Locations : Daily Weekday : Weekly Monthly Database Authentication : SQL Windows Friday Time : 20:00 hrs. Login : Admin Password : ************* 1006.pdg 1040.pdg F4_3596.pdg SO_1144.pdg
  • 16. OPERATOR KIOSK ► The Enterprise Operator Kiosk is designed as a simple to use yet informative screen for shop floor operators to receive and acknowledge production requirements whilst reducing the typical word of mouth and paper trail. ► The kiosk displays highly visual graphics and information about the nests along with built in tools for setting and production time tracking. They also have a very clear and intuitive punch turret tracker which monitors the tool load in the machine and as new nests are selected will inform the of operators tools to remove and add. This feature removes the need for offline paper charts and potential miscommunication between production shifts. ► Prioritize nests to minimize tool changes
  • 17. MetaCAM Enterprise : Schedule Priority Name P64.lyt P63.lyt P62.lyt P61.lyt P59.lyt P58.lyt Job Priority Normal Normal Normal Normal Normal Normal Job Due-Date 10 days 12 days 14 days 10 days 10 days 10 days Material Used GALV#14 STEEL#14 STEEL#14 STEEL#14 STEEL#11 STEEL#12 Tool Changes 3/8 1/6 0/6 0/7 0/5 0/5 Sort Settings Tool Changes : 4 CancelSave Job Priority Job Due-Date Material Used Too Changes Nest Sequence Actual Weight Estimated Time Packing Pattern Qty Rect Packing Sheet Sheet Weight User-Edited Color Sequence MetaCAM Enterprise : Schedule Parameters CancelOK Layout Fields Job Fields Now Processing Scheduled Next Waiting In Queue Tru Punch 5000 G_Smith 00:42 Sheet Done Put on Hold Upload Code Reports Details Sheet 1 of 1 P105 Job ID: Sheet: Packing: 26 STEEL#12 : 120 x 48 47.3% No. 1 2 3 Part 1006 1040 SO_1144 Total 183 31 18 Done 0 0 0 Rejected 15 1 1
  • 18. REPORT Everything that happens in Enterprise is available for reporting. You can easily create simple charts or a rolling dashboard to see the metrics that matter the most to you. ► Template based reports enable you to prepare smart reports to bring the Engineering and Operations data on a single sheet. ► A single report can adapt the content according to the machine technology making it highly reusable for laser, punch or combo users. ► The report extensibility ensures that you can import and attach external reports to the Parts and print them with the native Enterprise reports. ► If you are working remotely you can use the Enterprise App for Android related systems to get up to date information on job and machine status.
  • 19. MetaCAM Enterprise : Reports Von Strohm GruberHelgaSmall hausen Flick Total Production Time by Operator 34 hrs. 0 5.6 hrs. 11 hrs. 17 hrs. 22 hrs. 28 hrs. 33 hrs. 39 hrs. 44 hrs. 2.1 days 2.3 days 20 hrs. 27 hrs. 35 hrs. Part Rejected by Machine 6 8 25 12 29 VIP367_58ST_2A (Default) Bystar 3015_2 (Default) CINCINNATI CL_7 (Default) 3015LVP_40CFX (Default) TC L3030 (Default) MetaCAM Enterprise : Reports CO_1460 Proteck 3days 1 of 1 STEEL#12 2.05 4.98”x 45.9” CO_1460 Proteck 3days 1 of 1 STEEL#12 2.05 4.98”x 45.9” C1_7076 Proteck 3days 1 of 1 STEEL#12 2.09 3.62”x 61.75” Proteck 3days 1 of 1 STEEL#12 2.09 3.62”x 61.75” C1_7076 F1_6092 Proteck 3days 1 of 1 STEEL#12 2.05 4.98”x 45.9” F1_6092 Proteck 3days 1 of 1 STEEL#12 2.05 4.98”x 45.9” F1_6092 Proteck 3days 1 of 1 STEEL#12 2.09 3.62”x 61.75” Proteck 3days 1 of 1 STEEL#12 2.09 3.62”x 61.75” F5_6679 480 Lively Blvd, Elk Grove Village, IL 60007 P: 775 826 1717 | F: 775 826 1723 E: sales@metamation.com | W: www.metamation.com
  • 20. DATA MINING All Enterprise activities are tracked and kept ready for data mining making it possible to identify the bottlenecks, opportunities in the factory workflow. Operation managers can use dashboard charts/graphs to track live Machine loads, Material requirements, tools usage etc. Production history data can be used to check the machine and operator efficiencies or nesting yields over a specified duration.
  • 21.
  • 23. “Enterprise has helped us better manage our parts and revisions across multiple programmers - we can save both the tooling and the CAD for all previous versions which is a huge time saver for reruns.” - Pinion Adams, South Africa “We have been using MetaCAM for around 18 months and over that time we have had very good results from the existing software. We had impressive results in terms of reduced scrappage and large productivity improvements, thus the upgrade to Enterprise became a natural progression for us to move forward with Metamation.” - Contracts Engineering, United Kingdom “Scheduling jobs and monitoring productivity on the machines has become that much easier.” - Monarch Metal, CO “Drop in a DXF and Enterprise will immediately give you the cutting time and price estimate that helps us quickly quote jobs with confidence.” - Yarbrough Industries, MO “We can batch program hundreds of parts through Enterprise in a less than 10 minutes, this helps us check the effect of changing a tool, previously we had no way to do so.” - Eaton Cooper, GA “We can easily switch jobs from one machine to another, every part is programmed for all machines and this helps us better prepare for a situation if a machine goes down. ” - Carter Hoffman, IL
  • 24. www.metamation.com Scan the above QR Code to view Metamation Software demo videos on YouTube or visit us at http://www.youtube.com/user/MetamationProducts © Metamation, 2014 Copyright Notice : This document is copyrighted with all rights reserved. No part of this document may be reproduced, transcribed, transmitted, stored, in an electronic retrieval system, or translated into any language in any form by any means without the prior written permission of Metamation. Metamation makes no warranties, express or implied in this document. In no event shall Metamation be liable for damages of any kind arising out of use of this document or the information contained within. Inner pages images sourced from Dreamstime.com | Cover Page Image : Shutterstock.com | Typeset using Lato Font Family, a font by tyPOLAND. Illustrations used for representation purpose only. Actual product may vary. This document is subject to changes without prior notice. USA Metamation Inc. West Coast Office: Mid West Office: 1465 Terminal Way, Ste 2 480 Lively Blvd Reno NV 89502 Elk Grove Village, IL 60007 P: 775 826 1717 F: 775 826 1723 E: sales@metamation.com EUROPE Metamation Europe The Business Centre, Edward Street Redditch, Worcestershire United Kingdom, B97 6HA P: +44 (0)1527 916578 E: sales@metamation.com Your local Metamation representative: