Marko Johannes Pätäri has over 30 years of experience in electrical and automation engineering. He received a B.Sc. in Automation Engineering in 1990. Since then, he has held several roles with increasing responsibility in automation and maintenance for various pulp and paper, glass, and energy companies. He has extensive experience planning and implementing automation systems and solutions using PLCs, DCS, SCADA, and fieldbus technologies. Currently, he works as a service and maintenance engineer for electrical and automation systems at Loiste Karhu Voima Oy.
1. JP-SUUNNITTELU OY
Curriculum Vitae 07.09.2011 1/8
MARKO JOHANNES PÄTÄRI
(birth 9.2.1966)
Education Automation engineer B.Sc., 1990
Language skills finnish, english, swedish, german
Previous occupations JP-Suunnittelu Oy 1990 – 1995
Automation engineer
Ahlstrom Glassfibre Oy 1995 – 2007
Section manager – electrical and automation department
Kotkan Käämityö Oy and Kotkan Sähkötyö Oy 2008 – 2010
Technical / Financial director
Stora Enso Oyj Sunila Mill 2010 - 2011
Maintenance supervisor – electrical and automation department
Empower Oy Sunila Mill 2011 – 2013
Maintenance manager – electrical and automation
Present occupation Loiste Karhu Voima Oy 2013 –
Service and maintenance engineer – electrical and automation
Advanced training Siemens Simatic-course
CAD-course and CADS-course
Alcont 2-controlling and Logic-course
Artturi-maintenance software- course
Alcont/Interbus-S fieldbus- course
Expertune controller tuning- course
Intouch-control software- course
InSQL- course
Machine directives- course (safety of machinery, EU- directives)
ATEX-course
Performance dialogue training
Metso DNA basics and planning –courses
SAP-maintenance software- course
Siemens S7 programming- course
Siemens S7 CFC/SCL-course
2. JP-SUUNNITTELU OY
Curriculum Vitae 07.09.2011 2/8
Anti-Trust and Crisis Management
Electrical safety regulations 1 and S1 licence
Safety work and Fire work courses
Business training course
ABB electric distribution Protection relay courses
ABB Micro SCADA courses
SPEK fire alarm and information devices course
Project references in JP-Suunnittelu Oy
1990 Kalso-Teollisuus Oy, Vuohijärvi
Chipping line conveyor system; Automation planning, PLC configuration
(Siemens S5) start-up and training
1990 Kaukas Oy, Voikkaa
Barking plant wood conveyor system start-up
1990-91 Kaukas Oy, Lappeenranta
Evaporation plant and soda recovery unit Alcont DCS-system configuration
and start-up
1993 Kaukas Oy, Lappeenranta
Sawmills slab picking system
1991-93 Enocell Oy, Uimaharju
Washing, classifying, oxygen bleaching and bleaching; Alcont DCS-system
configuration and start-up
1993 Enocell Oy, Uimaharju
Cooking department, lye filter 3; software configuration, testing and start-up
1993-94 Enocell Oy, Uimaharju
General maintenance all of below
Alcont 2; soda recovery unit, evaporation plant, processing of evaporation
residue, lime reburning, cooking department, fibre lines 1 and 2, waste water,
bark boiler, sootblowers, dryer machine 1 and 2, barking plant, reporting
Alcont 1; chemical station of bleaching
3. JP-SUUNNITTELU OY
Curriculum Vitae 07.09.2011 3/8
1994 Enocell Oy, Uimaharju
Fibre lines 1 and 2 defoaming system, software configuration and start-up
1994 Enocell Oy, Uimaharju
Fibre line 1, washing and classifying modifications, software configuration,
testing and start-up
1994 Enso-Gutzeit Oy, Sachsen Papier, Eilenburg
De-inking plant and PM software configuration (ABB DCS-system)
1995 Maoming, P.R. China Pyroflow-boiler
Logic diagrams: oil pumps, sootblowers,bottom ash, oilshale, bedlances, oil to
bedlances and start -up burners, bottom ash air, bed temperatures, flue gas,
limestone filling and boiler safety logic
1994-95 Aylesford Ltd, Newsprint
Aylesford, Kent, U.K.
PM 14, newsprint-project; DCS-system configuration, testing and start up
(MX-Open DCS-system)
Project references in Ahlstrom Glassfibre Oy
1995 Glassfurnace 3 DCS-system (Alcont 3000x) start-up and maintenance
1996 Alcont 1 <–> Alcont 3000x data transmission link start-up and maintenance
1995 Via Unix user interface (VxA) data transmission link from Alcont 3000x to
each personal computers (PC) with Reflection X or Exceed terminal emulator
software
1995-98 Winder machines (88 pcs) maintenance and developing, Omron C200HS
PLC system
1996 Glassfurnace 1 DCS system design, programming, testing and start-up
4. JP-SUUNNITTELU OY
Curriculum Vitae 07.09.2011 4/8
(Alcont 3000x)
1996 Alcont 1 – Alcont 3000x data transmission link to glassfurnace 1
1997 Drying ovens (6 pcs) joining to the glassfurnace 1 DCS-system, system
expanding, planning, programming, testing and start-up
1995-98 Glassfurnaces 1-3 reporting developing and execution with Alcont 3000x
reporting system (RxM)
1996-97 Emulsion department modernization and automation, 7 Batch lines, PLC-
system Omron C200HS + Intouch-controlling and monitoring system
1997 4M-glasstissue line DCS-system (Alcont TPS) and drives modernization
(Siemens 135 U + Interbus S + lenze)
1997-98 4M-glasstissue line raporting system (Honeywell Info Center)
1997-98 4M-glasstissue line QCS and WIS projects
1995-98 All kind of DCS-systems maintenance works
1996-98 The whole mills maintenance and preliminary service program planning and
implementation (Artturi-maintenance program)
1998-99 Straw strand machine rebuilding project, Electrification, DCS-system (Alcont
TPS) and drives modernization (Simatic 135 U + Lenze)
1999 4m-glasstissue line KARHU-project; New Symsizer, Optidozer, Air dryer and
POPE-type reel up; Electrification, programming, Interbus S-fieldbus
configuration and start-up
1999 Glassfurnace 3 recuperator change, electrical and automation responsibility
2000 Glassfurnace 3 extra bushings 6 pcs, electrical and automation responsibility
and start-up
5. JP-SUUNNITTELU OY
Curriculum Vitae 07.09.2011 5/8
2000 Sahaniemi test line DCS-system build up (Total Plant Alcont) and Interbus-S
fieldbus configuration
2001 Glassfurnace 3 eletcric boosting system modernization and bushings reserve
power system build-up
2001 2m-glasstissue line QCS-system, configuration and start-up
2001 Glassfurnace 2 rebuild-project, Metso DNA DCS-system configuration and
electrical and automation responsibility
2001 Raw material batch processing DCS-system modernization, PLC-system
Siemens S7 400 and the old system modification as a back-up device
2001 4m glasstissue machine; coating kitchen DCS- system TPS Alcont with
Interbus-S fieldbus
2002 Glassfurnace 1 oxygen burning equipments control system planning,
programming and start-up
2002 6 kV switchboard modernisation and mainternance
2003 Glassfurnace 1 recuperator change, electrical and automation responsibility
2002 Glassfurnace 3 cold repair, electrical and automation responsibility
2002 Straw strand machine dust removal system automation and start-up
2004 Electrical precipitator dust re-using project, electrical and automation
responsibility
2003 Drying owen 7 project. Electrical, automation and PLC responsibility (
Siemens S7 + Profibus fieldbus)
6. JP-SUUNNITTELU OY
Curriculum Vitae 07.09.2011 6/8
2003 Critical electrical centres of glass melting control voltage UPS-project. Project
responsibility
2003 Drying owens 1-6 modernisation and capacity modification project. Electrical
and automation responsibility (DCS-system and Profibus fieldbus system)
2003-04 Roving packeting and winding automatisation project. Automation
responsibility (Delivery BCI France)
2005 Glassfurnace 1 cold repair, electrical and automation responsibility
2005 4m glasstissue machine second drying owen. Electrical, automation and
DCS-system + Profibus fieldbus responsibility. (Delivery Spooner ltd UK)
2005 4m glasstissue machine sectional drives and winder project, Project
responsibility (Vacon transformers and Profibus fieldbus)
2005 4m glasstissue machine automatic packeting line. Electrical, automation and
DCS-system responsibility
2006 Second line of Raw material batch processing project. Electrical, automation
and DCS-system responsibility (Delivery Raute Precision Lahti)
2006 4m glasstissue machine fibre feeding modernisation project. Electrical,
automation and DCS-system responsibility
2006 4m glasstissue machine and straw strand machine machine hall ventilation
project. Electrical and automation responsibility
2006-07 4m glasstissue machine building project, Redkino Tver Russia. Electrical,
automation and DCS-system responsibility
2006-07 Straw strand machine winder project. Project responsibility (Delivery Trima
Czech Republic)
2007 Glassfurnace 2 cold repair, electrical and automation responsibility
7. JP-SUUNNITTELU OY
Curriculum Vitae 07.09.2011 7/8
Project references in Kotkan Käämityö Oy and Kotkan Sähkötyö Oy
Our main article is electrical, instrumentation and automation installation works in
following branches; wood, paper, glass and food industry, building sectory, power
plants, harbours etc etc.
We make also motor maintenance, winding and installation works.
We have also maintenance co-operation contracts with several industrial plants in
south-east Finland.
The most important project preferences:
2008 Kotkan Tilapalvelut Oy, Datariina building extension electrification
2008 WSAB, Havesa and UPM Kaukas drying plant electrification and
automation
2008 Vaasan & Vaasan Oy, 3-machine section automation
2008 Kastek Kiinteistöt / Kotkan Keskussairaala, UPS-system
2008 Kastek Kiinteistöt / Kotkan Keskussairaala, CT-device electrification
2008 Cursor Oy, Eagle 3 building extension electrification
2008 Rakennuspartio, Ekami Hamina Metal department restructuring
electrification
2009 Ruotsinsalmen Rakennus Oy, Ekami Kotka Marine institute restructuring
electrification
2008 Danisco Sweeteners Oy, Separation plant lightning
2008 Sunila Oy, Camera control
2008 Ahlstrom Glassfibre Oy, rying owen electrification
2009 Vaasa Engineering Oy, Metsä Botnia Joutseno sectional drives
electrification
2009 Sunila Oy, Railway gate electrification and gas analyzer installations
2009 Ahlstrom Glassfibre Oy, Glassfurnace 3 motor cabling and lightning
2009 Kotkan tilapalvelut Oy, Swimming hall of Karhula rebuilding electrification
2009 OKA Oy Automarket Prisma parking garage electrification
2009 Ekami Kotka, Marine institute electrical distribution modernization
2009 OK-Ympyrä Hamina, S-market cooling system electrification
2009 Rakennuspartio Oy, As Oy Eevankulma Hamina appartment
electrification
8. JP-SUUNNITTELU OY
Curriculum Vitae 07.09.2011 8/8
Project references at Sunila Mill in Stora Enso Oyj and Empower Oy
In my responsibility have been all kind of electrical and automation maintenance work
which has been in area of Sunila Mill.
I have also been in charge of the whole mill electric distribution and electricity
generation.
I am also administrator of electrical work in Sunila Mill.