SCM NPI Process Improvements
Completed in FY'12
Item
No.
Process Improvements -- FY'12
SCM NPI Team
Remarks
ECO#
Outcome
Primary
Beneficiaries
1 DFX Scorecard
Comprehensive and detailed
checklist for scoring product DFX
11147436
ECO 609551
Created a tool for
scoring DFX on any
product
SCM Eng
PLM / PSG
MT
Procurement,
Finance
2 M Milestone Review Template
Charts to be provided by the NPI PM
to provide a common set of data for
project reviews at M milestones
na
Defined a powerpoint
template for common
breadth, depth, look &
feel of review
SCM
PLM / PSG
MT
3 3 Year Cost Reduction Template
Excel spread sheet to capture plans
made to take product cost down in
the first 3 years after release to
production
na
Established a tool for
identifying projected cost
reductions for 3 years
after product relase
SCM Eng
PLM / PSG
MT
Procurement,
Finance
4 New Product RS Requirements
Excel spread sheet with 58 SCM
requirements for New Product, and a
risk assessment performed
input to TFS
Established a baseline
for SCM DFX
expectations with the
New Product PSG
SCM Eng
PLM / PSG
Procurement,
Planning,
Service
5 NPI Guideline Update -- DFX Only
DFX requirements from PLP Rev 08
included in the NPI guideline
10438316
ECO 552243
Updated and clarified the
expectations for NPI
SCM Eng
PLM Eng / PSG
Procurement
OM, OF
SCM NPI Process Improvements
Completed in FY'13
Item
No.
Process Improvements -- FY'13
SCM NPI Team
Remarks
ECO#
Outcome
Primary
Beneficiaries
1 NPI Guideline -- Major Update
Major update of the NPI process
guideline with added expectations for
NPI
10438316
ECO 592005
Updated and clarified the
expectations for NPI
SCM Eng
PLM Eng / PSG
Procurement
OM, OF
2
NPI Project Plan Template -- Major
Update
Major update of the NPI project plan
template with added expectations for
the NPI plan
10438316
ECO 592005
Increased the scope and
content of the project
plan for broader
application
SCM
PLM Eng / PSG
3
NPI Microsft Project Scheduling
Template
Definition of hardware project
requirements with typical lead times
and dependencies in MS Project
format
na
Established a tool for
estimating project
timeframes to perform
specific tasks
SCM Eng
PLM Eng / PSG
Procurement
4 NPI R & M Milestone Checklist
Major checklist update for NPI
engineering to confirm readiness for
each R and M milestone
na
Created a tool for NPI
Engineers to evaluate
project readiness
SCM
PLM/ PSG
OM
5 System IVK Upgrades (S1/2/3)
Create processing upgrades for S-
Family system IVK from one level to
the next
10040935
ECO 583685
Provided methodology
for the OF to follow
SCM Eng
PSG
OF
Service
SCM NPI Process Improvements
Completed in FY'14
Item
No.
Process Improvements -- FY'14 Remarks
ECO#
Outcome
Primary
Beneficiaries
1
M290 First Customer Ship Procedure
and First Customer Ship Plan
Definition of M290 requirements
10854012
ECO 601759
Original document
PSG, PLM, SCM,
Marketing, Sales,
Ultrasound
2 Validation Process and 5 templates
New validation process and a series
of templates to support the process
7282453
ECO 610893
Coordinated MVIS and
SUSKO approach
PSG, PLM, SCM,
QRE, OF,
Ultrasound
3
Price Book Improvement -- SCM
engagement
Defined pricebook review meeting for
SCM activities
10855670
ECO 594905
Quarterly meeting
between SCMand price
book team
OM, OF,
NPI,
PSG, PLM
4 NRP Order Processing
Defines NRP PO & IVK requirements,
as well as sale restrictions
11147655
ECO 611033
Communicates order
needs and transaction
requirements
Marketing,
OM, OF,
NPI
5 Country of Origin
Defined process for COO
management
10855959,
ECO 608907
Capability created
PLM,
Procurement,
Ultrasound
6
M Milestone Goal Management
Guideline and Checklist
Defined SCM owners and actions to
drive M Milestone goal setting and
execution
PN 11147268,
ECO 607660
Clarified methodology SCM
7
M400 MT Template and Update to SCM
Checklist
Defined SCM M400 planning &
execution tasks
na Checklist through M400
PSG, OF, OM,
Procurement,
Finance
8
DFX Scorecard Modification and Work
Instruction
Provided details on how to score &
added reliability line items
PN 609551,
ECO 609551
Reliability added to
DFX scorecard
SCM,
Ultrasound
9 OF Serialization Data Entry CAPA Support for BG
ECO 610450 Trained BG for
serialization
OF
SCM NPI Process Improvements
Completed in FY'15
Item
No.
Process Improvements -- FY'15
SCM NPI Team
Remarks
ECO#
Outcome
Primary
Beneficiaries
1
Reports for Missing SAP PB Item Set-
Up Data
SAP quick view reports for missing
SAP source list and info records,
hazardous materials, etc
SAP Price Book 3
Report, Legal
Control Report
Piloted on P500 release -
- OM was very smooth
NPI,
OM, OF,
Planning
2
Manual Print Location Move to RR
Donnelly
Cost reduction opportunity for SP
11149744
ECO 630214
Validation complete --
change announced
Strategic
Purchasing
3 ECO Early Communication Process
Improved tool set for ECO release
communications
Pilot completed --
tools implemented
Pilot completed -- no
need for a continuing
meeting
Service,
Procurement,
Finance
4 SCM RS Guideline for NPI
Guideline for SCM RS development
and list of RS examples
11148822
ECO 629313
Tool for NPI project
RS initiation
SCM Eng,
OM, OF,
Planning
5
Transducer DFX Scorecard Update
with SUSKO
Modifed to fit the transducer process
better -- SUSKO engineering inputs
11147436
ECO 625164
Improved transducer
scorecards
Transducers,
Planning,
OM, OF
6 Rebooking Process and Template
Modifed to provide better inputs and
outputs to smooth out the flow
11149816
ECO 627830
Released and trained
NPI,
OM,
OF
7 IVK Structuring Requirement
Implemented for Leo and Leo Elite
(NX3) to improve IVK structuring
11147654
ECO 610958
Released and trained
OF,
Service
8 Procedure for Barcode Label Printing
Improvement to confirm that the label
printed is the latest one.
7691228
ECO 630717
Released and trained
OF,
Service
9
Procedure for Used Part in SO
Shipment
Response to QRE and external
auditors to document these rare
occasions
11149333
ECO 623172
Auditable method
established
Procurement,
OM, OF

More Related Content

What's hot

MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...Aravind NC
 
IT Services Management
IT Services ManagementIT Services Management
IT Services ManagementChetan Goenka
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction EngineersAmit Kumar Senapati, PMP®
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysGlen Alleman
 
Epm dimensys introductie gvk
Epm dimensys introductie gvkEpm dimensys introductie gvk
Epm dimensys introductie gvkGlenn Van_kooijk
 
EPA Project - Andy Smith
EPA Project - Andy SmithEPA Project - Andy Smith
EPA Project - Andy SmithAndy Smith
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)Giselle Duran
 
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)Pamela Garrett
 
Intern presentation
Intern presentationIntern presentation
Intern presentationEric Hill
 
205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)p6academy
 
Safe, Reliable, Available, High‒Integrity, and Fault Tolerant Embedded Softwa...
Safe, Reliable, Available, High‒Integrity, and Fault Tolerant Embedded Softwa...Safe, Reliable, Available, High‒Integrity, and Fault Tolerant Embedded Softwa...
Safe, Reliable, Available, High‒Integrity, and Fault Tolerant Embedded Softwa...Glen Alleman
 
Gas Service Excellence Presentation 20 May 2010 Ms Final
Gas Service Excellence Presentation   20 May 2010   Ms   FinalGas Service Excellence Presentation   20 May 2010   Ms   Final
Gas Service Excellence Presentation 20 May 2010 Ms Finalmseaborn
 
How to build a credible performance measurement baseline (v5)
How to build a credible performance measurement baseline (v5)How to build a credible performance measurement baseline (v5)
How to build a credible performance measurement baseline (v5)Glen Alleman
 

What's hot (17)

MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
 
005 benchmarking-kpi's
005 benchmarking-kpi's005 benchmarking-kpi's
005 benchmarking-kpi's
 
IT Services Management
IT Services ManagementIT Services Management
IT Services Management
 
Softexpert apqp ppap
Softexpert apqp ppapSoftexpert apqp ppap
Softexpert apqp ppap
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction Engineers
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two Days
 
Epm dimensys introductie gvk
Epm dimensys introductie gvkEpm dimensys introductie gvk
Epm dimensys introductie gvk
 
11 Pdd
11 Pdd11 Pdd
11 Pdd
 
EPA Project - Andy Smith
EPA Project - Andy SmithEPA Project - Andy Smith
EPA Project - Andy Smith
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
 
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
Intern presentation
Intern presentationIntern presentation
Intern presentation
 
205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)
 
Safe, Reliable, Available, High‒Integrity, and Fault Tolerant Embedded Softwa...
Safe, Reliable, Available, High‒Integrity, and Fault Tolerant Embedded Softwa...Safe, Reliable, Available, High‒Integrity, and Fault Tolerant Embedded Softwa...
Safe, Reliable, Available, High‒Integrity, and Fault Tolerant Embedded Softwa...
 
Gas Service Excellence Presentation 20 May 2010 Ms Final
Gas Service Excellence Presentation   20 May 2010   Ms   FinalGas Service Excellence Presentation   20 May 2010   Ms   Final
Gas Service Excellence Presentation 20 May 2010 Ms Final
 
How to build a credible performance measurement baseline (v5)
How to build a credible performance measurement baseline (v5)How to build a credible performance measurement baseline (v5)
How to build a credible performance measurement baseline (v5)
 

Similar to Process Improvement Summary External

Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control PlanJavier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control PlanJ. García - Verdugo
 
Business process manual overview
Business process manual overviewBusiness process manual overview
Business process manual overviewsgetchel
 
Building Workflows For Digitisation and Digital Preservation –A Case Study: ...
Building Workflows For Digitisation and Digital Preservation –A Case Study:  ...Building Workflows For Digitisation and Digital Preservation –A Case Study:  ...
Building Workflows For Digitisation and Digital Preservation –A Case Study: ...PrestoCentre
 
Advanced Product Quality Planning Reference Model
Advanced Product Quality Planning Reference ModelAdvanced Product Quality Planning Reference Model
Advanced Product Quality Planning Reference ModelAurélien Chassagne
 
Practical usage of fpa and automatic code review piotr popovski
Practical usage of fpa and automatic code review   piotr popovskiPractical usage of fpa and automatic code review   piotr popovski
Practical usage of fpa and automatic code review piotr popovskiIWSM Mensura
 
Example-Business Project Sponsor Meeting
Example-Business Project Sponsor MeetingExample-Business Project Sponsor Meeting
Example-Business Project Sponsor MeetingPeter Zhou
 
Process Improvement in High Maturity Environments Improving the Efficiency ...
Process Improvement in High Maturity Environments   Improving the Efficiency ...Process Improvement in High Maturity Environments   Improving the Efficiency ...
Process Improvement in High Maturity Environments Improving the Efficiency ...Andre Ferreira
 
Quick Look Video 01 29 11 Ws
Quick Look Video 01 29 11 WsQuick Look Video 01 29 11 Ws
Quick Look Video 01 29 11 WsJohnHoke
 
Pilkington N.A Ops Review 02-11-00
Pilkington N.A Ops Review 02-11-00Pilkington N.A Ops Review 02-11-00
Pilkington N.A Ops Review 02-11-00Bob Sloma
 
edSe275 ms project-assignment
edSe275 ms project-assignmentedSe275 ms project-assignment
edSe275 ms project-assignmentharinathinfotech
 
Cmmi bp-aids
Cmmi bp-aidsCmmi bp-aids
Cmmi bp-aidsjmaal49
 
Defining Quality Models for Agile Projects
Defining Quality Models for Agile ProjectsDefining Quality Models for Agile Projects
Defining Quality Models for Agile Projectsuqasar
 
Sudheer_SAP_ABAP_Resume
Sudheer_SAP_ABAP_ResumeSudheer_SAP_ABAP_Resume
Sudheer_SAP_ABAP_ResumeSudheer babu
 
Arpo presentation enu
Arpo presentation enuArpo presentation enu
Arpo presentation enuTITANSLIDE
 
"Erp implementation at Tata Steel" XIMB
"Erp implementation at Tata Steel" XIMB"Erp implementation at Tata Steel" XIMB
"Erp implementation at Tata Steel" XIMBRahul Singh Chauhan
 

Similar to Process Improvement Summary External (20)

Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control PlanJavier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
 
Business process manual overview
Business process manual overviewBusiness process manual overview
Business process manual overview
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Building Workflows For Digitisation and Digital Preservation –A Case Study: ...
Building Workflows For Digitisation and Digital Preservation –A Case Study:  ...Building Workflows For Digitisation and Digital Preservation –A Case Study:  ...
Building Workflows For Digitisation and Digital Preservation –A Case Study: ...
 
Advanced Product Quality Planning Reference Model
Advanced Product Quality Planning Reference ModelAdvanced Product Quality Planning Reference Model
Advanced Product Quality Planning Reference Model
 
Practical usage of fpa and automatic code review piotr popovski
Practical usage of fpa and automatic code review   piotr popovskiPractical usage of fpa and automatic code review   piotr popovski
Practical usage of fpa and automatic code review piotr popovski
 
Example-Business Project Sponsor Meeting
Example-Business Project Sponsor MeetingExample-Business Project Sponsor Meeting
Example-Business Project Sponsor Meeting
 
Resume
ResumeResume
Resume
 
Process Improvement in High Maturity Environments Improving the Efficiency ...
Process Improvement in High Maturity Environments   Improving the Efficiency ...Process Improvement in High Maturity Environments   Improving the Efficiency ...
Process Improvement in High Maturity Environments Improving the Efficiency ...
 
Quick Look Video 01 29 11 Ws
Quick Look Video 01 29 11 WsQuick Look Video 01 29 11 Ws
Quick Look Video 01 29 11 Ws
 
Pilkington N.A Ops Review 02-11-00
Pilkington N.A Ops Review 02-11-00Pilkington N.A Ops Review 02-11-00
Pilkington N.A Ops Review 02-11-00
 
edSe275 ms project-assignment
edSe275 ms project-assignmentedSe275 ms project-assignment
edSe275 ms project-assignment
 
Cmmi bp-aids
Cmmi bp-aidsCmmi bp-aids
Cmmi bp-aids
 
Defining Quality Models for Agile Projects
Defining Quality Models for Agile ProjectsDefining Quality Models for Agile Projects
Defining Quality Models for Agile Projects
 
Sudheer_SAP_ABAP_Resume
Sudheer_SAP_ABAP_ResumeSudheer_SAP_ABAP_Resume
Sudheer_SAP_ABAP_Resume
 
Arpo presentation enu
Arpo presentation enuArpo presentation enu
Arpo presentation enu
 
En Portfolio Caps 2009
En Portfolio Caps 2009En Portfolio Caps 2009
En Portfolio Caps 2009
 
"Erp implementation at Tata Steel" XIMB
"Erp implementation at Tata Steel" XIMB"Erp implementation at Tata Steel" XIMB
"Erp implementation at Tata Steel" XIMB
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
sodalia framework
sodalia frameworksodalia framework
sodalia framework
 

Process Improvement Summary External

  • 1. SCM NPI Process Improvements Completed in FY'12 Item No. Process Improvements -- FY'12 SCM NPI Team Remarks ECO# Outcome Primary Beneficiaries 1 DFX Scorecard Comprehensive and detailed checklist for scoring product DFX 11147436 ECO 609551 Created a tool for scoring DFX on any product SCM Eng PLM / PSG MT Procurement, Finance 2 M Milestone Review Template Charts to be provided by the NPI PM to provide a common set of data for project reviews at M milestones na Defined a powerpoint template for common breadth, depth, look & feel of review SCM PLM / PSG MT 3 3 Year Cost Reduction Template Excel spread sheet to capture plans made to take product cost down in the first 3 years after release to production na Established a tool for identifying projected cost reductions for 3 years after product relase SCM Eng PLM / PSG MT Procurement, Finance 4 New Product RS Requirements Excel spread sheet with 58 SCM requirements for New Product, and a risk assessment performed input to TFS Established a baseline for SCM DFX expectations with the New Product PSG SCM Eng PLM / PSG Procurement, Planning, Service 5 NPI Guideline Update -- DFX Only DFX requirements from PLP Rev 08 included in the NPI guideline 10438316 ECO 552243 Updated and clarified the expectations for NPI SCM Eng PLM Eng / PSG Procurement OM, OF
  • 2. SCM NPI Process Improvements Completed in FY'13 Item No. Process Improvements -- FY'13 SCM NPI Team Remarks ECO# Outcome Primary Beneficiaries 1 NPI Guideline -- Major Update Major update of the NPI process guideline with added expectations for NPI 10438316 ECO 592005 Updated and clarified the expectations for NPI SCM Eng PLM Eng / PSG Procurement OM, OF 2 NPI Project Plan Template -- Major Update Major update of the NPI project plan template with added expectations for the NPI plan 10438316 ECO 592005 Increased the scope and content of the project plan for broader application SCM PLM Eng / PSG 3 NPI Microsft Project Scheduling Template Definition of hardware project requirements with typical lead times and dependencies in MS Project format na Established a tool for estimating project timeframes to perform specific tasks SCM Eng PLM Eng / PSG Procurement 4 NPI R & M Milestone Checklist Major checklist update for NPI engineering to confirm readiness for each R and M milestone na Created a tool for NPI Engineers to evaluate project readiness SCM PLM/ PSG OM 5 System IVK Upgrades (S1/2/3) Create processing upgrades for S- Family system IVK from one level to the next 10040935 ECO 583685 Provided methodology for the OF to follow SCM Eng PSG OF Service
  • 3. SCM NPI Process Improvements Completed in FY'14 Item No. Process Improvements -- FY'14 Remarks ECO# Outcome Primary Beneficiaries 1 M290 First Customer Ship Procedure and First Customer Ship Plan Definition of M290 requirements 10854012 ECO 601759 Original document PSG, PLM, SCM, Marketing, Sales, Ultrasound 2 Validation Process and 5 templates New validation process and a series of templates to support the process 7282453 ECO 610893 Coordinated MVIS and SUSKO approach PSG, PLM, SCM, QRE, OF, Ultrasound 3 Price Book Improvement -- SCM engagement Defined pricebook review meeting for SCM activities 10855670 ECO 594905 Quarterly meeting between SCMand price book team OM, OF, NPI, PSG, PLM 4 NRP Order Processing Defines NRP PO & IVK requirements, as well as sale restrictions 11147655 ECO 611033 Communicates order needs and transaction requirements Marketing, OM, OF, NPI 5 Country of Origin Defined process for COO management 10855959, ECO 608907 Capability created PLM, Procurement, Ultrasound 6 M Milestone Goal Management Guideline and Checklist Defined SCM owners and actions to drive M Milestone goal setting and execution PN 11147268, ECO 607660 Clarified methodology SCM 7 M400 MT Template and Update to SCM Checklist Defined SCM M400 planning & execution tasks na Checklist through M400 PSG, OF, OM, Procurement, Finance 8 DFX Scorecard Modification and Work Instruction Provided details on how to score & added reliability line items PN 609551, ECO 609551 Reliability added to DFX scorecard SCM, Ultrasound 9 OF Serialization Data Entry CAPA Support for BG ECO 610450 Trained BG for serialization OF
  • 4. SCM NPI Process Improvements Completed in FY'15 Item No. Process Improvements -- FY'15 SCM NPI Team Remarks ECO# Outcome Primary Beneficiaries 1 Reports for Missing SAP PB Item Set- Up Data SAP quick view reports for missing SAP source list and info records, hazardous materials, etc SAP Price Book 3 Report, Legal Control Report Piloted on P500 release - - OM was very smooth NPI, OM, OF, Planning 2 Manual Print Location Move to RR Donnelly Cost reduction opportunity for SP 11149744 ECO 630214 Validation complete -- change announced Strategic Purchasing 3 ECO Early Communication Process Improved tool set for ECO release communications Pilot completed -- tools implemented Pilot completed -- no need for a continuing meeting Service, Procurement, Finance 4 SCM RS Guideline for NPI Guideline for SCM RS development and list of RS examples 11148822 ECO 629313 Tool for NPI project RS initiation SCM Eng, OM, OF, Planning 5 Transducer DFX Scorecard Update with SUSKO Modifed to fit the transducer process better -- SUSKO engineering inputs 11147436 ECO 625164 Improved transducer scorecards Transducers, Planning, OM, OF 6 Rebooking Process and Template Modifed to provide better inputs and outputs to smooth out the flow 11149816 ECO 627830 Released and trained NPI, OM, OF 7 IVK Structuring Requirement Implemented for Leo and Leo Elite (NX3) to improve IVK structuring 11147654 ECO 610958 Released and trained OF, Service 8 Procedure for Barcode Label Printing Improvement to confirm that the label printed is the latest one. 7691228 ECO 630717 Released and trained OF, Service 9 Procedure for Used Part in SO Shipment Response to QRE and external auditors to document these rare occasions 11149333 ECO 623172 Auditable method established Procurement, OM, OF