SlideShare a Scribd company logo
1 of 160
Download to read offline
1
Global Headquarters Project
03 June 2014
2
AGENDA
1.	 INTRODUCTION
2.	 CITI DISCOVERY
3.	 THE CITI CITY
4.	 PROJECT DELIVERY
5.	 CASE STUDIES
6.	 PROJECT IMAGERY
7.	 WHY US?
3
whoarewe?
1.	 INTRODUCTION
2.	 CITI DISCOVERY
3.	 THE CITI CITY
4.	 PROJECT DELIVERY
5.	 CASE STUDIES
6.	 PROJECT IMAGERY
7.	 WHY US?
4
the team
Carl Ordemann, AIA
Principal and Executive Director
Principal-in-Charge
Heather Bensko, LEED AP
ID + C
Associate Design Leader
Lead Designer and Branding
Connor Glass
Sr. Associate
Sr. Designer
Damian Besculides, AIA
Associate Principal
Cost and Schedule Manager
Robert Pizzano, RA
Principal
Project Manager
Tamar Moy
Associate
Programming/ Workplace
Specialist
5
13
offices
8 domestic
5 international
founded in
1981 200awards for
design
excellence
	 ADA Analysis § Architecture § Area calculations § Benchmark
analysis § Block and stacking plans § Building design consultation §
Building evaluation/selection § Design and Contract Documents §
Code research/variance § Construction administration § Construction
documents § Consulting § Custom furniture/millwork design §
Engineering services coordination § Facilities management assistance §
Furniture selection and procurement § Graphic and signage standards
§ Identity/branding § Interior architecture/design § Landscape
architecture § Lease/workletter consultation § Leasing log/charts §
Material and finish selections § Perspective renderings § Programming §
Project tracking analysis § Real estate and transportation planning services
§ Space planning § Strategic occupancy planning § Tenant standard
specifications § Test-fit space plans § Workplace standards/
procedures development
750staff
worldwide
commercial
healthcare
education
civic
corporate interiors
housing
mixed-use
urban design
the firm
6
clients
7
Our Point of View
Integrated User Experience
INTROSPECTION IS TRENDING
Perkins Eastman’s process is client-centric. Our
approach is never one-size fits all, and the user
experience is integral.
Organizations are looking for meaningful and
enduring workplace design solutions that reflect their
unique DNA.
Leaders are increasingly willing to look inward to
explore management style and guiding principles to
develop strategies crafted for their culture, values,
and business goals.
CLIENT
PRO
JEC
T
M
AN
AG
EM
EN
T
D
ESIG
N
W
O
RKPLAC
E
STRATEG
IES
IM
PLEM
EN
T-
ATIO
N
8
Drawing on the Breadth of our
Practice Area Expertise
THE LEARNING CONTINUUM
Life is an evolutionary experience set in a continuum
of learning spaces.
These settings — education, workplace, healthcare,
or other — share fundamental values like
collaboration, performance, knowledge-sharing,
and efficiency.
Corresponding design trends such as transparency
and active design are shared between space types,
and often initiated in the professional workplace,
trickleling down to other sectors.
KNOW
LEDGE
EXCHA
N
GE
EDUCATION
COM
M
UNITY
HEALTH-
CARE
I
N
TEGRATED USE
R
EXPERIENCE
WORK-
PLACE
Integrated
Technology
Focus Work
Innovation
Wellness
Communica-
tion
Balance Team
& Individual
Socializing
Efficient/
Smart
Sustainability
Mentoring
9
whoareyou?
1.	 INTRODUCTION
2.	 CITI DISCOVERY
3.	 THE CITI CITY
4.	 PROJECT DELIVERY
L
5.	 CASE STUDIES
6.	 PROJECT IMAGERY
7.	 WHY US?
1 0
What We Know About Citi So Far...
Comments
1 1
What’s Citi’s Aspirational Word Cloud?
RESPONSIBLE
FINANCE
CONNECTION
PRODUCT
EXPERTISE
SUSTAIN-
ABILITY
LEADERSHIP
DIVERSE
MERITOCRACY
COMMON
PURPOSE
EMERGING
MARKETS
EFFICIENCY NETWORK
SOCIAL
RESPONS-
IBILITY
GLOBAL-
IZATION
DIGITIZATION
CLIENT
RELATIONSHIP
EXCELLENCE
INITIATIVE
COURAGE INGENUITY
VIRTUAL
TEAM
SERVICE
DRIVEN
RESULTS
DRIVEN
SIMPLE PERFORMANCE CREATIVITY
GLOBAL
GUIDELINES
TRANSPARENT
BEST IN CLASS
PRODUCTS
INNOVATION
WORLD-CLASS
BRAND
1 2
Common Workplace Themes for Financial Services
Organizational
Goals
parti place-making
THE WORKPLACE
OF CHOICE
CONNECTION
TRANSPARENCY
HEALTH & WELLNESS
Active design, fitness centers, meditation
rooms, day care, connection to nature,
sustainability, desk sharing/ mobility
strategy, flex work schedules
MILLENNIAL PRIORITIES
Smart technology integration, workforce
diversity, branding, more casual environment
FLEXIBILITY
Reconfigurable seating arrangements that
change with team structure
COLLABORATIVE WORK SETTINGS
Lounges, cafes, team rooms, coffee bars, open
plan with focus spaces
INTEGRATED SMART TECHNOLOGY
Connecting virtual, often global, teams
BREAK DOWN SILOS
Glass walls, open plan, digitized storage/
archive library, connect to community with
public spaces
BRAND MESSAGE
Clearly articulated and celebrated
brand message and corporate values for
employees and visitors
ATTRACT & RETAIN TOP TALENT
Desirable recruits increasingly joining faster
growing industries such as technology &
telecommunications
Millenials looking for less demanding jobs
with “more meaningful work” and a better
work-life balance
BRIDGE ACROSS DEPARTMENTS
Integrated teams provide better cross checks
Cross-departmental teams are seated
together, and front- and back- offices are
increasingly blended
Communication, collaboration, and creative
thinking improve performance
BE FISCALLY RESPONSIBLE
Banks are choosing to specialize in a smaller
range of product and service offerings
A safer place to work, with less risk
More focus on community and environmental
responsibility
1 3
Citi’s Roadmap
Organizational
Goals
parti place-making
1 4
theciticity
1.	 INTRODUCTION
2.	 CITI DISCOVERY
3.	 THE CITI CITY
4.	 PROJECT DELIVERY
5.	 CASE STUDIES
6.	 PROJECT IMAGERY
7.	 WHY US?
1 5
BUILDIING PROFILE I SOCIAL MEDIA
1 6
75%
13,500 Work points
64,000,000 square feet
25%
388 GREENWICH
AGILE
GLOBAL
390 GREENWICH
LIQUID SPACE
	
	 Citi’s Mission:
	 Enabling Progress
	 Common Purpose
	 Responsible Finance
	 Ingenuity
	 Leadership
Borderless enterprise I The City Campus
1 7
EXECUTIVE
MEETING
COLLABORATION
WORK POINTS
AMENITY
vertical integration I Smart Stacking
EQUAL DISTRIBTUTION
1 8
knowledge marketplace I place making
S E M I - E N C L O S E D
S H A R E D T E A M
C O L L A B O R AT I V E / G AT H E R I N G
F O O D / B E V E R A G E
reception
W O R K S PA C E
C I R C U L AT I O N
F O C U S
LOUNGE /
PANTRY
ARRIVAL
S E M I - E N C L O S E D
W O R K / M E E T I N G
S E M I - E N -
C L O S E D
W O R K /
M E E T I N G
W O R K S PA C E
W O R K -
S PA C E
ARRIVAL
FOCUS
FOCUS
SHARED
TEAM
C O L L A B O R AT I V E /
G AT H E R I N G
SHARED
TEAM
SHARED
TEAM
SHARED
TEAM
W O R K S PA C Eformal meeting
W O R K -
S PA C E
C O L L A B O R A -
1 9
a
d
b
e
c
f
flexibility +modularity I defining the kit of parts
2 0
5 0 % f o c u s e d w o r k at d e s k
3 0 % s c h e d u l e d m e e t i n g s
2 0 % s p o n ta n e o u s c o l l a b o r at i o n
* R e q u i r e s v a r i e d u n i n t e rr u p t e d
w o r k s pa n o f 2 - 3 h o u r s
* N e e d s f r e q u e n t f a c e t o f a c e
a c c e s s t o c o l l e a g u e s f o r
k n o w l e d g e s h a r i n g
* M A Y B E TETHE R ED B Y TECHNOLOG Y O R
SECU R IT Y P R OTOCALS
4 0 % f o c u s e d w o r k at d e s k
3 0 % s c h e d u l e d m e e t i n g s
3 0 % s p o n ta n e o u s c o l l a b o r at i o n
* R e q u i r e s v a r i e d u n i n t e rr u p t e d
w o r k s pa n S o f 1 - 2 h o u r s
* M o v e s f r e q u e n t ly a r o u n d t h e
w o r k p l a c e o r b e t w e e n b u i l d i n g s
f o r f a c e t o f a c e m e e t i n g s w i t h
c o l l e a g u e s
* CO M PLEATELY UNTETHE R ED + M o b i l e
6 0 % f o c u s e d w o r k at d e s k
3 5 % s c h e d u l e d m e e t i n g s
5 % s p o n ta n e o u s c o l l a b o r at i o n
* R e q u i r e s v a r i e d u n i n t e rr u p t e d
w o r k s pa n S DEPENDIN G ON TASK
* W o r k S m a i n ly o f f s i t e t r a v e l i n g
o r f r o m h o m e
* C OMPLEATELY UNTETHE R ED + M o b i l e
RESI D ENT A G ILE REM O TE
flexibility +modularity I defining workspace typologies
2 1
63% 78% 20% 3/4
Manager’s
work day spent
in meetings
Scheduled
meetings
between 2-4
people
Time spent out
of the office
People more
likely to engage
colleagues in face
to face interac-
tions if they have
visual access first
flexibility +modularity I defining workspace typologies
2 2
integrated user experience I discovering User PersonasINTEGRATED USER EXPERIENCE I DEFINING USER TYPOLOGIES
MOBILE RESIDENT CLIENT CONSULTANT
2 3
• Merges work and personal life
• F o c u s e s f o r 6 0 - 9 0 m i n u t e s a t
a t i m e
• W o r k s a t o d d h o u r s
• W a n t s p e r s o n a l c o n t r o l o f
s u r r o u n d i n g s
• S t a y s m o t i v a t e d b y c h a n g i n g
a c t i v i t y o r s u r r o u n d i n g s
• Separates work and personal life
• F o c u s e s f o r 3 - 4 h o u r s o n
o n e a c t i v i t y
• N e e d s q u i e t t o b e a b l e t o
c o n c e n t r a t e
• S t a y s m o t i v a t e d b y b e i n g
“a l o n e t o g e t h e r ”
• F e e l s o v e r w o r k e d a n d
i s o l a t e d w h e n e x t e n s i v e ly
w o r k i n g f r o m h o m e
• Separates work and personal life
• F o c u s e s f o r 6 0 m i n u t e s o r
m o r e
• S t a y s m o t i v a t e d t h r o u g h
c o n s t a n t ly c h a n g i n g
s u r r o u n d i n g s
• P r e f e r s e a s y a c c e ss t o f o o d /
d r i n k
• F e e l s o v e r w o r k e d a n d
i s o l a t e d w h e n e x t e n s i v e ly
w o r k i n g f r o m h o m e
SOLO ALONE TOGETHER BUZZ BUILDER
integrated user experience I supporting varied work styles
2 4
integrated user experience I Day in the Life
8:00 AM
CONNECT
2 5
8:00 AM
CONNECT
FOCUS
10:00 AM
2 6
8:00 AM
CONNECT
FOCUS
REGROUP
10:00 AM 1:00 PM
2 7
8:00 AM
CONNECT
FOCUS
REGROUP
REPORT
10:00 AM 1:00 PM 3:00 PM
2 8
8:00 AM
CONNECT
FOCUS
REGROUP
REPORT
RESPOND
10:00 AM 1:00 PM 3:00 PM 5:00 PM
2 9
1.	 INTRODUCTION
2.	 CITI DISCOVERY
3.	 THE CITI CITY
4.	 PROJECT DELIVERY
5.	 CASE STUDIES
6.	 PROJECT IMAGERY
7.	 WHY US?
projectdelivery
3 0
Project Management
FACILITIES MANAGEMENT SERVICE
PERKINS EASTMAN PROJECT TEAM
AND TECHNICAL STAFF
PROJECT
MANAGER’S
ROLE
Real Estate
Legal
MEP Engineer
Structural Engineer
Audio/Visual
Acoustical
Lighting
Food Service
Tele/Data
LEED
CONSULTANTS
Construction Manager
General Contractor
Sub contractors
Furniture
IT Services
Security
Tele/Data
Movers
VENDORS / SUPPLIERS
3 1
Project management roles
•	Single Point of Contact
•	Schedule Master
•	Project Financial Planning (Budgeting)
•	Risk Mitigator (Advanced Warnings)
•	Coordinating Consultants
•	Goals Oriented
•	Accountable
•	Driver of Results
ON TIME/ ON BUDGET
HHC - 350,000SF
1 Month Early, Within 2%
3 2
Project management toolkit
PROJECT TRAX
•	Project Directory
•	Responsibilities Checklist
•	Task Outlines
•	Sets/ Runs Meetings
•	Minutes/ Agendas
•	Quality Assurance Checklinst
•	Coordinating Consultants
•	New Forma (Online Tool)
•	Revit
3 3
Citi - Global Headquarters Project
Project Schedule as Provided by Citi in RFP
May 30, 2014
Item #
Phase/
Task Project Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
1 Phase I - A Concept Design 1 2 3 4
2 Phase I - B Schematic Design 1 2 3
3 Phase II - A Design Development 1 2 3 4
4 Phase II - B Construction Documents 1 2 3 4 5
5 Phase II - C Permiting / Bidding 1 2
6 Phase II - D Construction Administration 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
Citi - Global Headquarters Project
Perkins Eastman Preliminary Project Schedule as recommended by PE
May 30, 2014
Item #
Phase/
Task Project Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
1 Key Milestone Dates u Kick Off
2 $ u 4th month Concept / Programming Complete
3 $ u 7th month Schematic Design Complete
4 $ u 11th month Design Development Complete
5 $ $ u 16th month Construction Documents Complete
6 $ u 18th month Bidding and Filing Complete
7 $ u Move 1 u Move 2 u Move 3 u Move 4
8 u Move 5
9 u Move 6
10 u Move 7 u Move 8 u Move 9 u Move 10 u Move 11
11 Phase I - A Concept Design/Plannning Confirmation 1 2 3 4 m Client Approval
12 3 Team kick-off meeting
13 Field Survery 3 Arch and Engineering field inspections
14 r Submit Arch Field Reports and Issue existing conditions backgrounds
15 r Issue MEP equipment evaluation reports
16 Programming Confirmation 3 Interview Citi Business Groups to develop Programming Report
17 3 Confirm Citi Programming Report with Business Groups
18 3 Issue Program
19 m Client Review and comment
20 m Program Validation and Approval
21 Blocking Stacking Plans Review r Issue Blocking Stacking Plans
22 m Client Review and comment
23 Phase I - B Schematic Design 1 2 3 m Client Approval
24 Space Planning/Design r Confirm and Issue Preliminary Space Plans
25 m Client Review and comment
26 r Issue Preliminary Finishes and Materials
27 m Client review and comment
28 Engineering/IT Design Concepts/Narratives r Issue Preliminary Concept Plans/conduit pathways/Narratives
29 m Client Review and comment
30 r Issue Preliminary MEP/IT space requirements
31 r IT equipment room layouts
32 r Issue preliminary conduit runs
33 m Client Review and comment
34 Security/AV r Issue assesment and recommendations
35 m Client Review and comment
36 Phase II - A Design Development 1 2 3 4 m Client Approval
37 Furniture Planning r Issue Furniture Plans
38 Planning r Issue Preliminary Tel/Data and Ceiling/Lighting Plans
39 m Client Review and comment
40 r Design Presentation - Finishes and Materials
41 m Client Review and comment
42 r Final Design Presentation - Finishes and Materials
43 m Client Review and comment
44 Engineering/IT Design r Single Line MEP equipment design/IT equipment room layouts/ conduit runs
45 r Finalize MEP equipment/IT equipment room layouts/ conduit runs
46 Security/AV r Issue equipment requirements and specs
47 Phase II - B Construction Documents 1 2 3 4 5 m Client Approval
48 r Issue Final Tel/Data and Ceiling/Lighting Plans
49 r Issue 50% CDs for Estimate and Coordination
50 r Issue 80% CDs for Coordination, Red Line by Client
51 Phase II - C Bidding / Filing r Issue CDs for Bid and Filing
52 Bidding / Contract Award 1 2 m Award Project
53 File With the DOB 1 2 m Permit In Hand
Phase II - D Construction Administration
54 Phase II - D1 - Executive Floors (by others)
55 Phase II - D2 - Pre Con Work
56 Phase II - D3 - Floors 37-32 1 2 3 4 388 Floors 37-32
57 1 Move / Post Occ. Study
PhaseII-B/CConstruction
DocumentsandFiling
Executive Floors (By others)
Make Ready / Pre Con Work
MilestoneScheduleDatesandBudgetReviewsPhaseI-AConceptDesign/SiteSurvey/ProgrammingPhaseI-BSchematicDesign(AllFloorsAllAreas)PhaseII-ADesignDevelopment(AllFloorsAllAreas)
3 4
50 r Issue 80% CDs for Coordination, Red Line by Client
51 Phase II - C Bidding / Filing r Issue CDs for Bid and Filing
52 Bidding / Contract Award 1 2 m Award Project
53 File With the DOB 1 2 m Permit In Hand
Phase II - D Construction Administration
54 Phase II - D1 - Executive Floors (by others)
55 Phase II - D2 - Pre Con Work
56 Phase II - D3 - Floors 37-32 1 2 3 4 388 Floors 37-32
57 1 Move / Post Occ. Study
58 Phase II - D4 - Floors 31-28, 26-25 1 2 3 4 388 Floors 31-28, 26-25
59 1 Move / Post Occ. Study
60 Phase II - D5 - Floors 24-19 1 2 3 4 388 Floors 24-19
61 1 Move / Post Occ. Study
62 Phase II - D6 - Floors 18-13 1 2 3 4 388 Floors 18-13
63 1 Move / Post Occ. Study
64 Phase II - D7 - Floors 12-6 (7 tot) 1 2 3 4 388 Floors 12-6
65 1 Move / Post Occ. Study
66 Phase II - D - Façade / Atrium (by others) 1 2 3 4 5 6 7 8 9 10 11 12 Facades / Atrium (by Others)
67
68 Phase II - D8 - Amentity Floors 5 thru 1 - Await façade 1 2 3 4 5 6 388 Floors 5-1
69 Atrium / Entry completion 1 Move / Post Occ. Study
70 Phase II - D9 - Floors 8-6 1 2 3 4 5 6 7 8 390 Floors 8 - 6
71 1 Move / Post Occ. Study
72 Phase II - D10 - Data Center 1 2 3 4 5 6 7 390 Data Center Floors 8 & 6
73 1 Move / Post Occ. Study
74 Phase II - D11 - Trading - 5th Floor 1 2 3 4 5 6 7 390 Trading 5th Floor
75 1 Move / Post Occ. Study
76 Phase II - D12 - Trading - 4th Floor 1 2 3 4 5 6 7 390 Trading 4th Floor
77 1 Move / Post Occ. Study
78 Phase II - D13 - Trading - 3rd Floor 1 2 3 4 5 6 7 390 Trading 3rd Floor
79 1 Move / Post Occ. Study
80 Phase II - D14 - Trading - 2nd Floor 1 2 3 4 5 6 7 390 Trading 2nd Floor
81 1 Move / Post Occ. Study
82 Phase II - D15 - Trading - 1st Floor 1 2 3 4 5 6 7 390 Trading 1st Floor
83 1 Move / Post Occ. Study
TIME SAVINGS
Legend: Concept SD DD CD BN CA PO Time Save (9 Months Overall) u Key Mile Stone Event $ Budget Approval m Approval/Completion r Drawing Issue 3 Work Start u Citi Schedule
PhaseII-B/C
Documents
PhaseII-DConstructionAdministration
Closeout
Phase Executive Floors (By others)
Make Ready / Pre Con Work
measuring success
of projects delivered on time
of projects delivered within
5% of original budget
of business from repeat clients
3 6
180 Maiden Lane
731 lexington avenue
Bridgewater
FedERAL Reserve BANK OF NEW YORK
casestudies
1.	 INTRODUCTION
2.	 CITI DISCOVERY
3.	 THE CITI CITY
4.	 PROJECT DELIVERY
5.	 CASE STUDIES
6.	 PROJECT IMAGERY
7.	 WHY US?
3 7
REIMAGINE AND REVITALIZE.
Transform arrival experience
Revitalize interior public spaces
Amenity rich spaces to attract new tenants
Protection against weather events
Leverage connection to emerging waterfront
180
MAIDEN LANE
3 8
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Available
Leased
14’- 21’ slab height
54,477 sq.ft.
95,206 sq.ft.
264,444 sq.ft.
329,374 sq.ft.
Auditorium
Fitness Center and Cafeteria
22,459
32,018
32,239
32,149
32,149
30,908
16,323
30,438
10,207
31,080
31,080
31,080
31,080
30,907
30,907
30,917
30,136
30,077
30,040
30,040
29,951
29,950
29,902
29,902
29,878
29,878
29,878
29,878
18,832
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
17,257
STACKING PLAN
Lease Expires 2014
STACKING PLAN + PROJECT METRICS
3 9
2013-06-21
4 0
BUILDING ENTRANCE
4 1
4 2
4 3
4 4
4 5
200 person capacity auditorium200 PERSON AUDITORIUM
4 6
260 seats | operated by restaurant associates | south street seaport/ river views |
recently renovated | 3 private dining rooms | updated restrooms
full service cafeteriaFULL SERVICE CAFETERIA
4 7
country club locker rooms | full assortment of cardio equipment
including cycling machines, stairmasters, elliptical machines and
treadmills | free weights and weight machines
fully equipped fitness centerFITNESS CENTER
4 8
FITNESS CENTERFITNESS CENTER
4 9
H.C.
H.C.H.C.
Legend
Conference
Large Office
Office
Workstation
Floor Support
SUPPORT
OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE
SUPPORT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PHONE RMPHONE RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE ECIFFOECIFFOECIFFO
OFFICE
OFFICE
OFFICE
RECEPTIONELEVATOR LOBBY
PANTRY
8 PERSON
CONFERENCE RM
8 PERSON
CONFERENCE RM
4 PERSON
MEETING RM
14 PERSON
CONFERENCE RM
16 PERSON
CONFERENCE RM
OFFICE
OFFICE
OFFICE
OFFICE
TROPPUSTROPPUSFDITROPPUS
12' - 2"
20'-0"5'-0"5'-0"
6' - 0"
10'-0"
COATS
COATS
© 2012
8.10.2012Progressive Workplace Firm (Financial Service)
180 Maiden Lane, 24th Floor
L GREEN
Office + Workstation Spaces - 24th Floor
Room Space Count Head Count
Large Office
44'21x'02,eciffO
4
Office
2222'21x'01,eciffO
22
Workstation
Workstation, 5' x 6' 140 140
140
661latotdnarG
Conference Spaces - 24th Floor
Room Space Count Seat Count
Conference
4 Person Conference Room 1 4
8 Person Conference Room 2 16
14 Person Conference Room 1 14
16 Person Conference Room 1 16
50
05latotdnarG
Office to Workstation Ratio 15:85
Conference Room Seats to Staff 1:3.3
RSF 31,080 sf
RSF/Person 187 sf
USF 22,689 sf
USF/Person 137 sf
Legend
Conference
Large Office
Office
Workstation
Floor Support
South
Street
Pine
Street
M
aiden
Lane
FrontStreet
OFFICE AND WOrkStAtION SPACES
rOOM SPACE COUNt HEAD COUNt
Large Office
Office, 20’ x 12’ 4 4
4
Office
Office, 10’ x 12’ 22 22
22
Workstation
Workstation, 5’ x 6’ 140 140
140
Grand total 166
CONFErENCE AND PrACtICE ArEA SUPPOrt
rOOM SPACE COUNt HEAD COUNt
Conference
4 person Conference Room 1 4
8 person Conference Room 2 16
14 Person Conference Room 1 14
16 Person Conference Room 1 16
50
Grand total 50
Office to Workstation ratio 15:85
Conference Room Seats to Staff 1:3.3
RSF/Person 187 sf
USF 22,689 sf
USF/Person 137 sf
TYPICAL TOWER FLOOR - FINANCIAL SERVICES
31,080 SF
TYPICAL TOWER FLOOR - FINANCIAL SERVICES
31,080 SF
5 0
TYPICAL TOWER FLOOR - TECHNOLOGY/MEDIA FIRM
31,080 SF
tECHNOLOGY/MEDIA FIrM - PrACtICE ArEA
rOOM SPACE COUNt HEAD COUNt
Office
Office, 10’ x 11’ 11 11
11
Workstation
Workstation, Bench 172 172
172
Grand total 183
CONFErENCE AND tEAM MEEtING
rOOM SPACE COUNt HEAD COUNt
Conference
12 person Conference Room 1 12
16 person Conference Room 1 16
28
Staff Support
4 Person Team Rm 1 4
5 Person Team Rm 2 10
6 Person Team Rm 2 12
8 Person Team Rm 2 16
3 Person Open Team Area 2 6
5 Person Open Team Area 2 10
12 Person Open Team Area
Grand total
2 24
82
110
Office to Workstation ratio 6:94
Conference Room Seats to Staff 1:1.6
RSF/Person 170 sf
USF 22,689 sf
USF/Person 124 sf
H.C.
H.C.H.C.
Legend
Conference
Office
Staff Workstation
Team Room
Open Collaboration
General Support
6 PERSON
TEAM RM
OFFICE OFFICE
LOCKERS
16 PERSON
CONFERENCE
ROOM
RECEPTION
12 PERSON
CONFERENCE
ROOM
LOCKERS
ELEVATOR
LOBBY
STAIR A
WOMENMEN
SERVICE
ELEVATOR
LOBBY
STAIR B
OFFICE
SUPPORT
OFFICE
IDF
8 PERSON
TEAM RM
8 PERSON
TEAM RMSUPPORT
OFFICE
SUPPORT
OFFICE
5 PERSON
TEAM RM
5 PERSON
TEAM RM
PANTRY
4 PERSON
TEAM RM
PHONE RM
OFFICEOFFICE
6 PERSON
TEAM RM
(3 PPL) OPEN
COLLABORATION
(5 PPL) OPEN
COLLABORATION
(12 PPL) OPEN
COLLABORATION
(3 PPL) OPEN
COLLABORATION
(5 PPL) OPEN
COLLABORATION
(12 PPL) OPEN
COLLABORATION
2' - 6" 2' - 6"
5'-6"
10' - 0"
11'-7"
PANTRY/
COFFEE BAR
PHONE RM
COATS
OFFICE
SUPPORT
SUPPORT
OFFICE
COATS
OFFICE
© 2012
8.10.2012Technology/Media Firm
180 Maiden Lane, 24th Floor
SL GREEN
Technology/Media Firm - Practice Area - 24th Floor
Room Space Count Head Count
Office
1111'11x'01,eciffO
11
Workstation
Workstation, Bench 172 172
172
381latotdnarG
Conference + Team Meeting - 24th Floor
Room Space Count Seat Count
Conference
12 Person Conference Room 1 12
16 Person Conference Room 1 16
28
Staff Support
41mRmaeTnosreP4
012mRmaeTnosreP5
212mRmaeTnosreP6
612mRmaeTnosreP8
3 Person Open Team Area 2 6
5 Person Open Team Area 2 10
12 Person Open Team Area 2 24
82
011latotdnarG
Office to Workstation Ratio 6:94
Conference Room Seats TO Staff 1:1.6
RSF 31,080 sf
RSF/Person 170 sf
USF 22,689 sf
USF/Person 124 sf
South
Street
Pine
Street
M
aiden
Lane
FrontStreet
Legend
Conference
Large Office
Office
Workstation
Floor Support
TYPICAL TOWER FLOOR - TECHNOLOGY / MEDIA FIRM
31,080 SF
5 1
OCCUPANCY ANALYSIS PER FLOOR
					Current 			 Financial 		 Media / Tech		 Mix
					Occupancy		Institution		Firms	 	 		
Executive Floor		56 people			66 people			66 people			66 people
(22,459rsf)	 		 400 rsf / person		 340 rsf / person		 340 rsf / person		 340 rsf / person
	
Tower Floors (27)		 3,340 people			4,482 people			4,941 people			4,698 people
(839,160rsf)			 250 rsf/ person		 187 rsf / person		 169 rsf / person		 178 rsf / person
	
Low Rise Floors(10)	1,195 people			1,550 people			1,670 people			1,610 people
(298,780rsf)			 250 rsf / person		 192 rsf / person		 178 rsf / person		 185 rsf / person
Total
1,160,399rsf		 4,591 people		 6,098 people		 6,677 people		 6,374 people
					 252 rsf / person		 190 rsf / person		 173 rsf / person		 182 rsf / person	
Net Increase		 0 people			 1,507 people		 2,086 people		 1,783 people
										25% more efficient	32% more efficient	28% more efficient
5 2
731 lexington
5 3
RESEARCH: WHAT WE DID
UX PARTICIPANTS
•	 (6) Focus Groups - Designer, Prototyper,
Usability Analyst (25 Participants)
R&D PARTICIPANTS
•	 (4) Focus Groups: Software Eng, Snr Software
Eng, Team Lead & Technical Architects (29
Participants)
FOCUS GROUPS
GOALS
•	 What aspects of the workplace ENABLE high
performance currently?
•	 What aspects of the workplace INHIBIT high
performance currently?
LEADERSHIP INTERVIEWS
GOALS
•	 Understand FUTURE vision for collaboration
between UX and R&D
•	 Discuss opportunities for improvements to
future workplace
QUESTIONNAIRES
GOALS
•	 Quantify findings from the focus groups
•	 Document work processes
•	 Ensure all stakeholders are represented
UX PARTICIPANTS
•	 Leadership Focus Group (Manager & Direct
Reports)
R&D PARTICIPANTS
•	 1-on-1 Interviews (Manager’s Direct Reports)
UX PARTICIPANTS
•	 30 Respondents
R&D PARTICIPANTS
•	 28 Respondents
5 4
RESEARCH | PORTFOLIO ASSESSMENT
SPACE IS A FINITE RESOURCE. SOMETHING’S GOT TO GIVE.
HOW CAN THE SUPPORTED OPEN PLAN MODEL BE ACCOMMODATED IN AN ALREADY OVERSUBSCRIBED BUILDING?
•	 Understand the regional, long term, strategic
real estate plan:
•	 Departmental growth projections
•	 Change in organizational structure/
business model
•	 Ideal departmental adjacencies within and
between building stacks
•	 Conduct utilization studies to identify
“underutilized” spaces (copy rooms, coat
rooms, lower level, Fl 6)
•	 Is there an appetite for a more robust work from
home program?
•	 Is de-densification even an option?
•	 Understand the regional, long term, strategic
real estate plan:
•	 Available additional space at Location A and
Location B. Other new regional/ satellite offices?
•	 Study getting “creative” with space use
•	 Multi-purpose rooms serve double/ tripple duty
•	 Co-ed bathrooms (or sink areas)
•	 Smaller individual desks (stack 27” monitors?)
•	 Are laptops for all a real possibility? When?
ASSESS THE SUPPLY ASSESS THE DEMAND
Location A Location B
Strategic Workplace Tools:
Short-term Master Plan
Long-term Master Plan
New Workplace Strategy
Mockup/ Case Study Rollout
Best Practices Study
Change Management
Communication Strategy
5 5
RESEARCH | R&D LEADERSHIP INTERVIEWS
100%		 of R&D Leaders Agree...
TOP 5 BIGGEST CHALLENGES TO WORKPLACE PERFORMANCE
1. SPACE SHORTAGE
2. LIMITED TOOLS
3. RIGID ADJACENCIES
4. BUILDING INFRASTRUCTURE
5. NO FLEXIBILITY
•	 Not enough meeting rooms, teaming v. focus work
•	 Need Laptops | whiteboard in teaming areas
•	 Seats can not accommodate changes & adds to teams
•	 Challenging circulation, shortage of restrooms
•	 People feel they don’t have control over their environment.
PHYSICAL
SPACE
WORKPLACE ELEMENTS MODEL
“The Workplace”
is comprised of 3
Elements.
Disatisfiers in any
Element will hinder
overall workplace
satisfaction.
PEOPLE
TECH-
NOLOGY
1. Casual conversations promote team unity
2. Quick interactions at desks
3. Accessibility to all, including managers
4. Quickly find anyone you need
5. Energetic buzz
TOP 5 STRENGTHS TO OPEN PLAN IN WORKPLACE PERFORMANCE
5 6
RESEARCH | R&D FOCUS GROUPS | SWOT
25% 50% 75% 100% 25% 50% 75% 100%
Open plan collaboration Dispersed teams
Accessibility of all Noise distractions
Knowledge sharing among neighbors Poor move coordination process
Pantries - informal collaboration, snacks R&D sits away from product & support teams
Bright space/ natural light Lack of meeting rooms
Ample desk size Lack of focus space/ no ability to concentrate
No touch-down space/ shared space to work
Poor ergonomics/ adjustability
Sub par elevator recall system
Not enough men's restrooms
Lack of informal team areas
No vacant desks
Little leg room under desks
No storage for boxes/ personal items
Not enough desk space for CTO equipment
"Trading" bench layout ineffective
Rules against personalization/ display
Lack of technology in collaboration spaces
Conference room technology maintenance
Overbooking conference rooms
Whiteboards are not "smart"
Mobile meeting apps need upgrading
Poor remote desktop access
EXISTING WORKPLACE STRENGTHS EXISTING WORKPLACE WEAKNESSES
TODAY:
The benefits of the open
plan- accessibility, ease
of collaboration- result in
distractions at the desk.
There is not enough space for
supporting amenities to allow
people to effectively work away
from the desks.
THE FUTURE:
Provide more & better tools,
amenities, and flexibility to allow
people to be more agile in their
workplace.
Don’t “take away”, give back.
100% 25% 50% 75% 100%
Dispersed teams
Noise distractions
Poor move coordination process
R&D sits away from product & support teams
Lack of meeting rooms
Lack of focus space/ no ability to concentrate
No touch-down space/ shared space to work
Poor ergonomics/ adjustability
Sub par elevator recall system
Not enough men's restrooms
Lack of informal team areas
No vacant desks
Little leg room under desks
No storage for boxes/ personal items
Not enough desk space for CTO equipment
"Trading" bench layout ineffective
Rules against personalization/ display
Lack of technology in collaboration spaces
Conference room technology maintenance
Overbooking conference rooms
Whiteboards are not "smart"
Mobile meeting apps need upgrading
Poor remote desktop access
EXISTING WORKPLACE WEAKNESSES
25% 50% 75% 100%
Product and support teams next to R&D
Open lounges with whiteboards & terminals (also used for lunch)
Mobile desks on wheels so people can "wheel up to team"
More collaborative desk arrangements (no more benches)
Small team rooms that are unreservable Do
Quiet space (library, lounge, sections of a floor, focus room)
Standing height/ adjustable desk options
Provide more conference rooms Ke
Non-reservable quiet/ focus spaces studies/ libraries
Repurpose coat rooms into meeting rooms Poor ci
Variety of collaboration spaces for different needs/ styles Produ
"Transparent noise barrier" between teams- break up open plan
More whiteboards by desks
Temporary/ visitor desks
Bar
More desks at perimeter/ maximize light and views
Access to better coffee/ espresso
Gym/ fitness center
Showers for those who ride bikes to work
Unisex bathrooms (or shared sink areas only?)
Upgrade elevator recall system
Laptops with docking stations make moving around easier
Improved access to video conferencing
Communication & display between groups (wall projection)
25-hour Movi wall in pantry connect to other offices real time
FUTURE OPPORTUNITIES
25% 50% 75% 100% 25% 50% 75% 100%
Product and support teams next to R&D Don’t replace 'start up' vibe with 'corporate vibe'
Open lounges with whiteboards & terminals (also used for lunch) Disconnect between floors is hard for cross-floor teaming
Mobile desks on wheels so people can "wheel up to team" Employee turnover if unhappy in work environment
More collaborative desk arrangements (no more benches) Don't put up walls/ keep openness and line of sight
Small team rooms that are unreservable Don't make open plan noise worse with open teaming areas
Quiet space (library, lounge, sections of a floor, focus room) Don't take away assigned desks
Standing height/ adjustable desk options Don't take away meeting space
Provide more conference rooms Keep "destination hubs" like pantries for informal interaction
Non-reservable quiet/ focus spaces studies/ libraries Don't make the floors more dense
Repurpose coat rooms into meeting rooms Poor cirulcation & flow through space/ don't use far away spaces
Variety of collaboration spaces for different needs/ styles Productivity lost due to time spent searching for meeting rooms
"Transparent noise barrier" between teams- break up open plan Productivity lost due to regular interruptions at desk
More whiteboards by desks Don't exclude remote offices
Temporary/ visitor desks Don't take away large monitors
FUTURE OPPORTUNITIES FUTURE THREATS
5 7
RESEARCH: WHAT WE FOUND
EXISTING WORKSPACE STRENGTHS
1.	 Open plan provides good access
2.	 Knowledge sharing among neighbors
3.	 Pantries, social interaction and snacks
4.	 Bright space and natural light
EXISTING WORKSPACE WEAKNESSES
	 1. Lack of space for focus work
	 2. Informal teaming space required
	 3. Meeting rooms are too big
	 4. More shared whiteboards needed
	 5. Physically dispersed teams
RESEARCH OBJECTIVES
Validate & Quantify Existing Finding
Present New Insights
EXECUTIVE SUMMARY
The main benefit of the open plan-
ease of collaboration- results in
distractions at the desk.
There are not enough supporting
amenities to allow people to
effectively work away from desks.
The solution is The Next Generation
of “Supported Open Plan”, which
addresses each of the existing
workplace weaknesses/ key findings
with a scalable kit of parts.
5 8
DESIGN OPPORTUNITIES | “KIT-OF-PARTS”
COLLABORATION PODSLIDING WHITE
BOARDS
RIGHT-SIZED
CONFERENCE ROOMS
FOCUS ROOMS
The proposed solution to the existing workplace weaknesses is the “Supported Open Plan”, which addresses each of the key
findings with a scalable kit of parts. In addition to meeting rooms, we are proposing the following space typologies to add
additional opportunities for:
	 1. Physically dispersed teams
	 2. Lack of space for focus work
	 3. Informal teaming space required
	 4. Meeting rooms are too big
	 5. More shared whiteboards needed
A DB C
5 9
DESIGN OPPORTUNITY A | RIGHT SIZED CONFERENCE ROOMS
KEY PLAN
3D PLAN DETAIL PERSPECTIVE VIEW
SUPPORTS KEY FINDINGS
#3. MEETING ROOMS ARE TOO
BIG
Replaces 8 person room with 2-4
person meeting space and allows
for addition of (6) workpoints while
supporting user workstyle.
73% of meetings are
4 people or less
54% of meetings are
2 people or less
#4. MORE SHARED
WHITEBOARDS NEEDED
Provides writable whiteboard
surface for ideation & separation
from adjacent desks
SLIDING WHITE BOARD PANELS
EXISTING CONDITIONS
6 0
DESIGN OPPORTUNITY B | SLIDING WHITE BOARDS
KEY PLAN
3D PLAN DETAIL PERSPECTIVE VIEW
SUPPORTS KEY FINDINGS
#4. MORE SHARED WHITEBOARDS
NEEDED
Provides sliding writable whiteboard
surface for ideation & maximizes
board area surface
SLIDING WHITE BOARD PANELS
6 1
DESIGN OPPORTUNITY C | NON-BOOKABLE FOCUS ROOM
KEY PLAN PERSPECTIVE VIEW
SUPPORTS KEY FINDINGS
#1. LACK OF SPACE FOR FOCUS
WORK
Sliding door allows user controlled
separation for focused work and 2
person meetings
#2. INFORMAL TEAMING SPACE
REQUIRED
Provides areas for informal
interactions (room can be non-
reservable)
#5. PHYSICALLY DISPERSED
TEAMS
Provides work space for agile
collocation of team members
SCENARIO
The UX Manager and a Team
Lead work together for a number
of hours on a plan for a new
product strategy for senior
management.
They can focus and collaborate
uninterrupted but are still
accessible to the rest of the team
if necessary.
6 2
DESIGN OPPORTUNITY D | NON-BOOKABLE SKETCHING ROOM
SUPPORTS KEY FINDINGS
#1. LACK OF SPACE FOR FOCUS
WORK
Rotating acoustical panel allows user
controlled separation for focused
work and 2-4 person stand-up
meetings
#2. INFORMAL TEAMING SPACE
REQUIRED
Provides areas for ad-hoc interactions
#4. MORE SHARED WHITEBOARDS
NEEDED
Provides 2 sided writable whiteboard
surface for ideation & separation from
adjacent desks
Other:
HI + LOW FIDELITY
Incorporates standard Bloomberg
terminal for wire framing and viewing
of other digital information
PERSPECTIVE VIEWKEY PLAN
3D PLAN DETAIL
6 3
DESIGN CONCEPT | Flexible Collaboration | FLOOR 22
DESIGN INTERVENTIONS
RIGHT-SIZED CONFERENCE
ROOMS
SLIDING WHITE BOARDS
FOCUS ROOMS
COLLABORATION POD
pivoting collaboration pods with
sketching surfaces + terminals
EXISTING CONDITIONS
PROPOSED PLAN
PRINTER
A
B
C
D
		 PROPOSED
	 	 21	 (+1)
		 6 	 (-6)
		 4 	 (+4)
		 2 	 (+2)
KEY METRICS
EXISTING
Fixed Desk			 20
Meeting Seats		 12
Informal Collaboration 0
Focus Room Seats	 0
F
A
A
CD
B
B
B
BB
6 4
SUPPORTED OPEN PLAN | Workflow Scenario
EXISTING CONDITIONS
PROPOSED PLAN
10:05 am
The rest of the team go upstairs to the desk area
10:20am
A designer has a question about the UX standard for
Pop Ups. She contacts the standard owner and they go
to the collaboration pod to discuss.
11:00am
A UX Designer has a weekly meeting with their TL.
As the meeting is just with 2 people, they use the new
Right Sized conference room.
13:15pm
A Usability Analyst drops by to
discuss plans for User Testing with
a UX Designer. They move to the
Focus Room so they can collaborate
without disrupting those working at
their desks.
16:06 pm
The UX Manager and the Visual Design
Manager are preparing a management
presentation. It wouldn’t be possible to book
a room for 2 hours on short notice but now
they can collaborate in the Focus Room,
whilst still being accessible to their team.
15:36 pm
A Visual Designer wants to review her mocks with the UX
Designer. In the Collaboration Pod, they shows mocks on the
screen and sketch alternatives on the white board.
6 5
QUESTION | What is our Workplace of the Future? Can we create a distinctly **** workplace?
Can we leverage the mobility of the sales force to test a new workplace model?
SPEC
SALES
COPIER
5W5 MILAN
5W4 MADRID
5W2 BERLIN - 24/7
5W3 ZURICH
5W1 LONDON
5W10
5W9
5W8
5W7
5W6
IDF RM
COAT RM
COPY AREA
WOMEN
MEN
SERVICE
ELEVATOR
ELEVATOR
LOBBY
MEN
COAT RM
J.C.
COPY RM
STORAGE
ELECTRICAL
ELEC CL.
HVAC
ELEC.
TELE CL
MECH
STAIR
B
STAIR
A
STAIR
C
ELEC CL
SALES
FISH TANK
FIT API
PRODUCT
FXET
CAMS
CORE
CAMS











−























































−
−


























































−
−










−
−

−
−

−
−

−
−


’










−
−









































































−
−




−
−







−
−

−
−










−
−





























































−
−




−
−








































−
−

−
−







−
−




























−
−



































































−
−






















−
−

−
−








−






















−
−











































































































−
−







−
−









































−










−
−











































−
−








































−
−













−
−


























































−
−


































−
−










−
−





’
















−
−
















−
−

−
−






















−
−













−
−







−
−

−
−
















−
−
















−
−




−
−



















































−
−




























−
−




−
−




−
−







−




−
−




























−
−




−
−



















−
−






















−
−



















































−
−








−

−
−





































































−
−




−
−







−
−

−
−
















−
−






















−
−


































−
−




−
−

















’







−
−

























−
−







−
−




−
−




−
−







−
−

−
−























−
−

−
−















−
−

−
−













−
−










−
−













−
−


































−
−







−
−

































−





















−
−



















−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−

−
−

−
−

−
−

−
−

−
−

−
−

−
−

−
−

−
−
−
−
−
−
−
−

−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−

−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
−
CORE SALES GROUPS
ASSET / INDUSTRY
NE SELLSIDE
FOREIGN BANKS
DOMESTIC MAJORS
CAN / MEX
NY/CT HEDGE FUNDS
MID ATL / MID-WEST
NE BUYSIDE
SOUTHEAST
CROSS DISCIPLINE GROUPS
APP SPEC
FIT
PRODUCT
API
FXET
CORE
CAMS
OTHER
UNOCCUPIED WP
CONFERENCE
CAUSAL MEETING
5W OCCUPANTS
•	 CORE SALES is a good sample population
because of its inherent mobility
•	 OTHER OCCUPANT GROUPS support sales
and interact with the nine core sales groups.
APPROACH
•	 Gather and review qualitative input through a
series of interviews and workshops with focus
groups
•	 Gather and review quantitative data through
analysis of badge data and current floor plans
•	 Review findings and co-create aspirational
scenarios for the future
Existing Core Sales plan
6 6
FINDINGS | CURRENT MOBILITY OF 5W GROUPS
5W occupants can be viewed as “residents” and “travelers”.
•	 Core Sales teams can be viewed as “residents” and “travelers” (based on the location of
their clients); all are expected to visit with clients at least 40% of the time.
•	 APP SPEC | FIT | FXET groups mirror the Core Sales travel patterns. They are knowledge
leaders and travel in support of core sales staff. They have their own sales goals.
•	 Other groups, such as PROD have some travel time, but are predominantly residents of 5W.
•	 For the nine Core Sales Teams, occupancy rarely hits 100% , only a few days per month at
90% capacity.
•	 Badge data does not tell us the amount of time each occupant spends at their workstation,
or if they come and go throughout the day.
Highest badge-in for core sales over a
5 month period was Monday Jan 9th
with 374 or 93% capacity
(avg Monday is 86% capacity).
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th
50
100
150
200
250
300
350
400
AVG 287
322 11 15 348 319 237 248 319 6 10 360 286 258 271 287 10 6 15 333 252 237 287 8 14 362 272 234 232
FEBRUARY 2013 | CORE SALES DAILY BADGE-IN NUMBER
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th
CORE SALES GROUPS
FEBRUARY 2013 | % THAT BADGED IN BY GROUP
CANADA / MEXICO
ASSET / INDUSTRY
DOMESTIC MAJORS
FOREIGN BANKS
MID-ATL / MID-WEST
NORTHEAST BUYSIDE
NORTHEAST SELLSIDE
NY / CT HEDGE FUNDS
SOUTH / CARIBBEAN
“TRAVELERS”
“RESIDENTS”
Lowest badge-in for core sales over a
5 month period was Wednesday May 22nd
with 227 or 56% capacity
(average mid-week is 65% capacity).
BLP-SALES MOBILITY STUDY
T= travelers (badge in @731Lex less than 60% of workdays)
R=Residents (badge in @731Lex more than 60% of workdays)
based on January-May 2013 badge data
Perkin
GROUP NAME TEAM NAME SEQ ID
JAN #
DAYS
OUT
FEB #
DAYS
OUT
MARCH
# DAYS
OUT
APRIL #
DAYS
OUT
MAY #
DAYS
OUT
TOT #
DAYS
OUT
TOT
#WORK
DAYS
# DAYS
=40%
OUT
# DAYS
=30%
OUT R / T
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 20 4 8 8 9 2 31 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 122 4 3 3 7 1 18 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 135 1 6 6 4 4 21 104 14 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 217 3 1 1 3 1 9 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 383 10 3 8 4 9 34 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 33 9 4 9 9 7 38 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 60 0 1 4 1 7 13 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 65 6 9 5 9 7 36 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 70 9 7 9 6 12 43 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 127 6 8 5 14 6 39 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 4 8 12 44 17 13 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 276 3 2 11 5 3 24 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 300 7 7 6 9 10 39 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 361 9 11 9 6 10 45 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 371 8 8 9 9 9 43 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY CMDT 401 10 10 10 13 11 54 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 74 2 5 1 0 5 13 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 172 1 0 3 1 5 10 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 175 9 11 9 11 9 49 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 190 7 6 5 9 9 36 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 244 7 11 10 10 9 47 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 308 11 8 8 6 11 44 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Corporations 339 8 9 7 15 9 48 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 10 2 4 4 5 5 20 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 81 8 8 7 6 9 38 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 170 5 2 3 4 6 20 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 180 2 6 6 5 1 20 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 227 3 1 0 2 2 8 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 402 5 2 0 3 2 12 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 84 8 12 4 8 11 43 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 152 0 3 4 4 7 18 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 171 13 8 10 9 11 51 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 177 15 8 8 11 4 46 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 204 11 6 9 8 11 45 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 218 7 6 11 7 8 39 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 223 18 11 21 50 63 25 18 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 229 1 6 11 3 14 35 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 245 2 3 1 3 3 12 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 260 12 9 8 9 5 43 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 263 6 8 7 10 13 44 104 41 31 T
C-Sales NY Asset/Industry Grp C-Sales NY MORT 328 2 7 4 6 8 27 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 357 4 8 10 9 6 37 104 41 31 R
C-Sales NY Asset/Industry Grp C-Sales NY MORT 7 7 22 8 6 R
6 7
FINDINGS | CORE SALES TEAM USER TYPE PROFILES
5W occupants can be viewed as “Residents” and “Travelers”, each with distinct workplace profiles and needs.
CLIENT LOCATION
GROUPS
DESK TYPES
DESK ASSIGNMENT
IN-OFFICE PRIMARY
WORKMODE
CRITICAL WORKPLACE
TOOLS*
SEAT RATIO
MEETING AREA
SEAT RATIO
TIME SPENT IN OFFICE
RESIDENT TRAVELER
60% + <60%
1 : 4.5 ratio for conference seats;
1 : 7.5 ratio for casual meeting seats
1 : 4.5 ratio for conference seats;
1 : 7.5 ratio for casual meeting seats
Laptops & Thin Client Technology;
Personal storage lockers & mobile file cabinets
Laptops & Thin Client Technology;
Personal storage lockers & mobile file cabinets
Heads-down work;
Scheduled meetings;
Informal collaboration
Heads-down work, but if given laptops while
on the road as recommended, will likely come
to the office for collaboration more
Assigned benches for team & group leads;
Unassigned for others
Assigned benches for team & group leads;
Unassigned for others
1:1 4’w assigned for team & group leads;
1:1 4’w unassigned benches for others
1:1 4’w assigned for team & group leads;
1:0.6 4’w unassigned benches for others;
1:0.4 4’w unassigned benches for others
4’ wide benches along perimeter zone;
3’ wide high touchdown desks available to all
4’ wide benches in interior zone;
3’ wide high touchdown desks available to all
Foreign bank, Domesetic Majors, NY/ CT Hedge
Funds, NorthEast Sell Side
Asset/ Industry, Canada/ Mexico, NorthEast Buy
Side, South/ Carribean, Mid Atlantic/ Midwest,
NorthEast Sell Side
NY Metro Area Outside of NYC
PROTOCOL
•	 All must visit with clients at
least 40% of the time
•	 Badge data can categorize
users into Residents
& Travelers based on
number of days each
badges into HQ
•	 Travelers spend 40%+
days traveling (not
badging into HQ)
•	 Does not take into account
badging in for short
periods of time & leaving
•	 Over a period of 104
business days (January
- May 2013), 153/415,
badged in <60% of the
time (full days)
•	 218/415 badged in
<70% of the time
6 8
PLANNING GUIDELINES
Develop a workplace solution that promotes the following principles:
	 NEIGHBORHOOD SCALE
•	 Plan organized to support team-based groups of 40-50 people (a “Neighborhood”)
•	 Neighborhoods = Sales Group
•	 The sense of ‘coming home’ shifts to neighborhood from individual desk
•	 Neighborhood consists of resident & traveler desks adjacent to support & amenity
•	 Mobile desks provided for visitor and guest touchdown
	 VARIOUS WORK MODES
•	 Each neighborhood has close proximity & visual access to ample shared spaces
	 - Open collaborative space- idea sharing, learning & team building 	
	 - Quiet study spaces- focused individual work
	 - Dedicated & non-dedicated conference spaces- meeting
	 - Individual storage- personal needs
•	 Recommended ratio of 4.5 workpoint seats to 1 conference seat
•	 Varied height work areas for different modes & preferences
	 HIGH “BUZZ” LEVEL
•	 High energy atmosphere stems from organic idea exchange
•	 Workplace encourages “getting up” for intentional & unintentional information flow
•	 “Active buzz” spaces zoned separately from “quiet decompression” spaces
•	 Team leaders shift teammates around for better learning/mentoring
•	 Shared workpoint model results in fewer empty seats on travel days
OPEN
COLLAB-
ORATIVE
ENCLOSED
CONFERENCE
& QUIET
ZONE
NEIGHBORHOOD
(TEAM “HOME”)
NEIGHBORHOOD
(TEAM “HOME”)
NEIGHBORHOOD
(TEAM “HOME”)
NEIGHBORHOOD
(TEAM “HOME”)
Resident Workers
on Perimeter
Travelers
on Interior
Touchdown Desks on
Interior, Adjacent to
Support & Amenities
High-Energy Separate
from Quet Zones
Each Neighborhood
has Visual Access
to Ample Variety
of Shared Spaces
1
2
3
Planning Concept Diagram
6 9
perimeter workstations are retained
for resident workers and are shared
or “hot desks” for traveling workers
mix of mobile workpoints and benching for
varied worktypes along interior promote
movement and activity and help to create
and retain “buzz”
work surfaces at varied heights and sizes to
accomodate different work styles
reduced number of typ workstation
reduces empty seats on travel days
Library | Resource Center
place for AppSpec to hold
knowledge sessions and a place to
meet, work and share knowledge
increased number of
conference rooms for dedicated
and non-dedicated use
feedback from end users revealed that desks
were not viewed as precious- a comforatble
place to connect to their phones, computers
and team is more important
all end users expressed an interest in
learning from their colleagues both
in-group, across the department and
across the company - a greater, and
more direct connection to product
development was desired
a change of posture throughout
the day is desired while being
able to still have work continuity PLANNING GUIDELINES
having available meeting spaces
for ad hoc and scheduled
meetings was the #1 request by
end users
Core Sales Teams whether
residents or travelers are at
clients at least 40% of the
time
Team Leaders expressed
an interest in moving the
members of their team
around to promote learning
PLANNING GUIDELINES | FOR PILOT IMPLEMENTATION
seating is organized by
neighborhood / group
1
2
3
1
3
2
1
2
3
Neighborhood Scale
Various Work Modes
High Buzz Level
2
confidential client
WORKPLACE STRATEGY Parti
PARTI PLACE-MAKING
OF NATURE
FLEXIBLE
FOSTER
CULTURE | WAY OF
BEING
MEANINGFUL
CONNECTIONS
• Highlight what’s natural & genuine
• Connect residents with nature
• Integrate smart sustainable systems
• Be humble- not grandiose nor man made
• Create space that is easily adaptable
• Allow users to shape their environment
• Provide secure & robust infrastructure
• Foster Way of Being through design
• Create highly functional space to meet needs
• Create space for serendipitous connections
• Offer opportunities to build meaningful
relationships through work & play
• Balance intensity & activity with silence &void
• Create scale with neighborhoods
PRINCIPLES
• Harmony with nature & universe
• Simple, honest, timeless, integrated into
world
• Reality & truth
• Learning from mistakes
• Continuously adapt, improve, invent
• Self reflection
• Radical transparency & truth
• Base decisions on learning from
problems
• Independent thinking
• Meaningful work & relationships
• 1+1=3
• Constantly get in synch
• Assertive & open minded
• Thoughtful disagreement
Design Parti
align the
business | cultural
objectives of an
organization with
place-making
priniciples that
guide all
aspects of the
project.
WORKPLACE STRATEGY Current Workplace Standards as Benchmark
ASSESSMENT OF MOST RECENT & SUCCESSFUL BUILDOUT VALIDATES THE BEST
PRACTICE KEY METRICS & PLANNING GUIDELINES RECOMMENDED
FOR USE IN FUTURE DESIGNS.
PERKINS EASTMAN 5.19.14
SPACE CATEGORY
AREA
(USF)
QUANTI
TY
WORK-
POINT
TOTAL
AREA (USF)
%
WORKPOINTS (OFFICE / WORKSTATION) 496 41,007 44%
PO-A (Leadership Office) 300 0 0 -
PO-B (Typical Office) 150 27 27 4,050
SH-O-A (Shared 2-Person Office) 150 47 94 7,050
SH-O-B (Shared 3-Person Office) 150 23 69 3,450
SH-O-C (Shared 4-Person Office) 300 2 8 600
WSA (Typical Desk) 36 298 298 10,728
35% Circulation Factor 13,934 1 13,934
Planning Factor (3%) 1,194 1 1,194 44 Small
114 Medium
MEETING (FORMAL / INFORMAL) 13,865 15% 86 Large
Focus/ Phone Room 50 7 350 32 X-Large
Small Meeting Room (4p) 120 5 600 0 Board Rm
Small Meeting Room (6p) 150 4 600
Medium Meeting Room (8p) 240 8 1,920 276 Conf Seats
Medium Meeting Room (10p) 300 5 1,500
Large Meeting Room (12p) 360 6 2,160
Large Meeting Room (14p) 420 1 420
X-Large Meeting Room (16p) 480 2 960
Board Room (30p) 1,000 0 - * vs. workpoints
Informal Meeting Space / Lounge 200 0 -
Breakout Space 300 0 -
Project Space/ War Room/Ideation 240 1 240
35% Circulation Factor 4,712 1 4,712
Planning Factor (3%) 404 1 404
AMENITY 14,341 15%
Business Center/ Client Lounge/ Library 250 4 1,000
Training Room (30 pl) 1,000 0 -
Learning Lab/ Boot Camp/Think Tank 1000 1 1,000
Auditorium/ Multi-Purpose Space (60 pl) 2,200 1 2,200
Game/ Activity Room 500 0 -
Convenience Pantry 350 1 350
Coffee / Juice Bar (in connectors) 50 0 -
Café 650 0 -
Warming Kitchen (warming) 700 2 1,400
Dining Room 1,500 2 3,000
Fitness Center (spa,gym,locker rms,studio,Dr.) 6,500 0 -
Quiet/ Meditation Room 50 1 50
Reception 500 0 -
Wellness (Sick, Mother's) Room 50 1 50
35% Circulation Factor 4,873 1 4,873
Planning Factor (3%) 418 1 418
SUPPORT 24,203 26%
Support 7105 1 7,105
Copy/ Print 180 8 1,440
Files/ Printer Stations Throughout 9 107 963
Coat Closets 15 4 60
AV Room 2,548 1 2,548
IDF/MDF Rooms 1,579 2 3,158
35% Circulation Factor 8,224 1 8,224
Planning Factor (3%) 705 1 705
SUBTOTAL PROGRAM NUSF 93,416 100% NOTES:
* Does not include core space
TOTAL AVAILABLE NUSF IN BUILDING 93,807
BALANCE 391 - Does not include area in connectors
DRAFT
188 NUSF/ WORKPOINT*
0.6 CONFERENCE SEAT RATIO
20 WESTPORT 2ND FLOOR PROGRAM
EXISTING SPACE REQUIREMENTS KEY METRICS
496 WORKPOINTS
44%
15%
15%
26%
20 WESTPORT PROGRAM SPACE
ANALYSIS
0%
5%
23% SH-O60%
26%CLOSED PLAN
Glendinning
Planning Space Typology
CONFERENCE
ROOM SEATS
TO WORKPOINTS
NUSF/ WORKPOINT WORKPLACE AVERAGE
(128 nusf/ existing workplace workpoint)
.6 188
WORKPLACE STRATEGY
Floor 2NS
SINGLE
OFFICE
20 20
20 40
22 66
QUANTITY OCCUPANTS
DOUBLE
OFFICE
TRIPLE
OFFICE
QUAD
136
NO. OF CONFERENCE
SEATS
RATIO OF CONFERENCE
BOMA NUSF FLOOR: 47,750 SF
NUSF FLOOR WITHOUT
TECHNOLOGY: 44,784 SF
418 SF
2,548SF
BRIDGEWATER - 20 WESTPORT 2 NS
BENCHMARK
SINGLE
OFFICE
20 20
20 40
22 66
1 4
70 70
QUANTITY OCCUPANTS
DOUBLE
OFFICE
TRIPLE
OFFICE
QUAD
OFFICE
WORK-
STATIONS
200TOTAL
136
NO. OF CONFERENCE
SEATS
0.68
65/35
RATIO OF CONFERENCE
SEATS TO PERSONNEL
RATIO OF PERSONNEL IN
P.O. V WORKSTATIONS
239 SFNUSF/WP
BOMA NUSF FLOOR: 47,750 SF
NUSF FLOOR WITHOUT
TECHNOLOGY: 44,784 SF
418 SF
SINGLE
OFFICE
7 7
611 SF
550 SF
27 54
1 3
1 4
228 228
296
QUANTITY OCCUPANTS
DOUBLE
OFFICE
TRIPLE
OFFICE
QUAD
OFFICE
WORK-
STATIONS
TOTAL
145
NO. OF CONFERENCE
SEATS
0.5
23/77
RATIO OF CONFERENCE
SEATS TO PERSONNEL
RATIO OF PERSONNEL IN
P.O. V WORKSTATIONS
156 SFNUSF/WP
BOMA NUSF FLOOR: 46,057 SF
NUSF FLOOR WITHOUT
TECHNOLOGY: 44,896 SF
05..14
BRIDGEWATER - 20 WESTPORT 2 E
BENCHMARK
SINGLE
OFFICE
7 7
611 SF
27 54
1 3
1 4
228 228
296
QUANTITY OCCUPANTS
DOUBLE
OFFICE
TRIPLE
OFFICE
QUAD
OFFICE
WORK-
STATIONS
TOTAL
145
NO. OF CONFERENCE
SEATS
0.5
23/77
RATIO OF CONFERENCE
SEATS TO PERSONNEL
RATIO OF PERSONNEL IN
P.O. V WORKSTATIONS
156 SFNUSF/WP
BOMA NUSF FLOOR: 46,057 SF
NUSF FLOOR WITHOUT
TECHNOLOGY: 44,896 SF
BRIDGEWATER - 20 WESTPORT 2 E
BENCHMARK
Floor 2E
Current Workplace Standards as Benchmark
WORKPLACE STRATEGY
SCENARIO
SCENARIO 2
TRANSFORMATION
SCENARIO 3
TRANSFORMATION
FOR THE FUTURE
•	 3-5 year strategy
•	 Redistribute staff so
Campus A houses
Research during
Campus B renovation
•	 Improve client
experience and
infrastructure
•	 10-15 year strategy
•	 Establish Campus A as
a proper Headquarters
location
•	 Provide best practice
workplace experience
to staff and guests on a
more permanent basis
•	 15+ year strategy
•	 Expand and occupy
entire Campus A site
to accommodate future
growth
•	 Establish Campus A
as a HQ site with best
practice workplace
experience
•	 Option to add 20K SF Auxiliary space in 500
(including 6K basement space), and a full kitchen
•	 984 FTE
•	 (875 in existing leasehold +109 for aux space)
•	 2 workplace renovation options (complete vs partial)
•	 2 infrastructure upgrade options (build AV hub and
either upgrade rooms to standard or deviate from
standard)
•	 Renovate 400 Atrium
•	 Add Aux space/ basement in 500, add full kitchen
•	 Add 16K SF new space as amenity hub
•	 984 FTE
(875 in existing leasehold +109 for Aux space)
•	 Complete workplace floor renovations
•	 Complete infrastructure upgrade (future standard)
•	 Conduct site ugrades, option to reclad buildings
•	 Renovate 400 Atrium
•	 Add Aux space/ basement in 500, add full kitchen
•	 Add 16K SF new spce as amenity hub
•	 Add 48K SF Building 100 and 84K SF Building 200
(typical workplace floors) and Building 300 Cafeteria
•	 1,500 FTE
•	 Complete workplace floor renovations
•	 Complete infrastructure upgrade (future standard)
•	 Conduct site ugrades, connect campus, reclad option
100
100
100
NEW
NEW
NEW
SITE/ PLAZA
SITE/ PLAZA
SITE/ PLAZA
200
200
200
300
300
300
400
400
400
500
500
500
SCOPE
IN OUT (BW)
OUT (NON-BW)
OBJECTIVE DESCRIPTION/ ASSUMPTIONS
1B
500 ADD
1A1
Partial
Tech &
Arch
Reno
1A2
Full
Tech &
Arch
Reno
SCENARIO 1
IMPROVEMENT
1A
NO 500 ADD
1B1
Partial
Tech &
Arch
Reno
1B2
Full
Tech &
Arch
Reno
Campus Plan Scenarios
WORKPLACE STRATEGY
30%
19%
O 2
GE
ors)
05.19.14
AMP
CLIENT
EXPERIENCE
ZONE
E
SECOND FLOOR
OUT OF SCOPE -
BW SPACE
OUT OF SCOPE -
NON-BW SPACE
AMENITY
CONFERENCING
WORKPLACE
SUPPORT
BUILDING CORE
BARN*
200
500
100
300
400
500
RATION TBD
URBAN LIVING
ROOM
Master Plan Scenarios: Metrics
WORKPLACE STRATEGY Adjacency Diagrams
RESEARCH
ANALYTICS
RESEARCH
SYSTEMIZATION
RESEARCH
COOP
RESEARCH
TECHRESEARCH
IACO
RESEARCH
SEC
CORE
MNGMNT
CM
(GD)
CLIENT
SERVICES
RESEARCH
CLIENT
SERVICES
EXTERNAL
CLIENT
SERVICES
MNGMT/
COO
CLIENT
SERVICES
REPORTING
CLIENT
SERVICES
TECHNOLOGY
ASSTD
OPERATIONS/
SUPPORT
CLIENT
EXPERIENCE
ZONE
BOOT
CAMP
RECRUITING
CENTER
REPRO-
GRAPHICS
ROOM
WORKPLACE STRATEGY Departmental Program: Scenario 1A
BUILDING 300 386 SEATS 26% CLOSED 74% OPEN
NYALA FARMS
DEPARTMENTAL STACK DIAGRAM PO-A PO-B SH-O* WS-A Total DPT SEATS
OPTION 1A 300_2 Research Analytics 0 2 14 88 104 Research 252
300_2 Research Systemization 3 0 18 52 73 Core Mgt 99
300_2 Research COO Pillar 0 0 3 7 10 CS&M 258
300_2 Flex Seats 0 1 2 15 18 CM Tech 40
3 3 36 163 206 Asst Ops 41
Trading 115
Acct Mngt 82
PO-A PO-B SH-O* WS-A Total SUB TOTAL 887
300_1 Research Security 0 1 6 1 8 Gen Flex Seats 56
300_1 Research Research Tech 0 0 1 46 47 Trdng/AM Flex 111
300_1 Research IAC Office 0 0 2 7 9 TOTAL 1054
300_1 Core Management - 2 3 41 53 99 ACTUAL FIT 973
300_1 Flex Seats 0 1 2 14 17
2 5 52 121 180 GOAL 1042
OVER/UNDER 69
BUILDING 400 283 SEATS 25% CLOSED 75% OPEN -69
PO-A PO-B SH-O* WS-A Total NOTES:
400_2 CS&M Management/ COO 3 7 3 9 23 Provide 70 non-Trader/ AM "Flex Seats".
400_2 CS&M External Pillar 0 12 4 58 75 20% accommodated in focus rooms and
400_2 CS&M Reporting Pillar 0 3 1 16 20 other amenity spaces.
400_2 CS&M Research Pillar 0 12 4 49 66 80% (56) are office and workstation seats
400_2 Flex Seats 0 1 2 14 17
3 36 15 146 200 GOAL = 875 FTE + 56 non-Trading/
AM flex seats + 111 Trading/ AM flex
seats (existing)
PO-A PO-B SH-O* WS-A Total
400_1 CM Tech 0 4 4 32 40
400_1 Research 0 0 0 1 1
400_1 Miscellaneous 0 1 1 11 14
400_1 HR 0 0 0 1 1
400_1 Client Services 0 0 0 1 1
400_1 Security 0 1 1 5 6
400_1 IT 0 0 0 2 3
400_1 Facilities 0 2 2 12 15
400_1 Flex Seats 0 0 0 2 2
0 8 8 67 83
BUILDING 500 385 SEATS
PO-A PO-B SH-O* WS-A Total
500_2 CS&M Technology Pillar 0 9 3 63 75
500_2 Flex Seats 0 0 0 2 2
500_2 Trading 33
500_2 Account Mngmnt 65
500_2 Flex Seats 69
244
PO-A PO-B SH-O* WS-A Total
500_2 Trading Research Pillar 0 0 0 0 79
500_2 Account Mngmnt 17
Core To be Placed 500_2 Research 3
Out of Scope Assorted Operations 500_2 Flex Seats 42
Other Tenant CM Tech (from GD) 141
NYALA  300, 400 & 500 1054 SEATS
Seatcount- 2015 (+ 4% Growth)
Bldng_
Floor
Department Subgroup
Seatcount- 2015 (+ 4% Growth)
Subgroup
BUILDING 300
BUILDING 400
BUILDING 500
Bldng_
Floor
Department
Department Subgroup
Seatcount- 2015 (+ 4% Growth)
Bldng_
Floor
Department Subgroup
DEPARTMENT SUMMARY
2
1
BUILDING 300
BUILDING 400
BUILDING 500
Bldng_
Floor
Department Subgroup
Seatcount- 2015 (+ 4% Growth)
Bldng_
Floor
Department Subgroup
Seatcount- 2015 (+ 4% Growth)
Seatcount- 2015 (+ 4% Growth)
Bldng_
Floor
CORE MNGMT
PUBLIC AMENITY ZONE
PUBLIC AMENITY ZONE
PUBLIC AMENITY ZONE
RESEARCH TECH
RESEARCH 
IACO
RES
SEC
RESEARCH ANALYTICS
RESEARCH 
COOP
RESEARCH 
SYSTEMIZATION
CS&M 
EXTERNAL 
CS&M 
RESEARCH
CS&M 
REPORTING
CS&M
MNGMT/ COO
PUBLIC
AMENITY
ZONE
CS&M TECHNOLOGY
CAFETERIA
FITNESS
CENTER
BOOT
CAMP
TRADING/
ASSET 
MANAGEMENT
TRADING/
ASSET 
MANAGEMENT
KITCHEN/ RECEPTION
RECEPTION/
TOWN
HALL
RECRUIT
CENTER
CLIENT
EXPER.
ZONE
Perkins Eastman D R A F T   F O R   C O M M E N T 04.24.14
WORKPLACE STRATEGY
THE AGILE OFFICE FOOTPRINT
•	 Typical office can seat 1-4
•	 Private office, shared office, or team room
•	 Technology setup allows for easy change
of room function
•	 2-seat layout can be assigned to one
person with a flex seat for guests, team
members of future growth
•	 Increase density over time
THE AGILE KIT OF PARTS
•	 Planning module
•	 Balanced and robust mix of focus and
collaborative areas within view of desk
•	 When module remains intact, best practice
ratios met
•	 8-12 desks for every conference room, (2)
focus spaces, (2) small team zones
•	 Mirror pods for neighborhoods of 24-48
•	 Amenities outside of neighborhood serve
larger scale community needs
The Agile Workplace
THE AGILE OFFICE FOOTPRINT
THE AGILE KIT OF PARTS
20 30 40
80 80 80
0
20
40
60
80
100
120
140
Single Office 50/50 Mix Double Office
Total Workpoints for Agile
80/20 Plan With Range of Office Sharing
Workstations Office Seats
7 9
federal reserve bank
8 0
FISG’S CHANGE MANAGEMENT GOAL
The FISG workplace was reinvented to align with a new, more transparent and
collaborative, operating environment put in place in response to the Dodd-Frank Act.
The CM goal was to engage the staff in learning to work effectively in this new workplace paradigm.
FEDERAL RESERVE BAN K O F N EW YO RK FISG
CHANGE NETWORK STRUCTURE
Senior Leadership Team
Rep from
Pilot Group
Sponsor
Rep from
Pilot group
Rep from
Pilot group
Pilot
Teams
Pilot
Teams
Pilot
Teams
Pilot
Teams
Lateral
Communication
Top Down
Communication
Bottom Up
Communication
Senior Leadership Team Members
moving to pilot floors
Working Committee:
Change agents to be identified for each group
moving to the pilot floors (target- 12 to 15
people)
REPSONSIBILITIES:
Monitoring issues/rumors, informing team
members, developing guidelines for
technology/workplace usage, advising on
packing for move, assisting with questions
during move-in
COO
F EDERAL RES ERVE B ANK OF NEW YORK F IS G
MANAGING/S U PPORT ING CH ANGE
DEFINE THE GAP
between today’s culture/
behaviors & tomorrow’s
desired culture/ behaviors
CLOSE THE GAP
through change
management actions
MONITOR IMPACT
Refine the change
management actions to
achieve goals
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE

More Related Content

Viewers also liked

Charms - Final Journal Turn-In
Charms - Final Journal Turn-InCharms - Final Journal Turn-In
Charms - Final Journal Turn-In
landonlerwick
 
Bubble Narrative - Preston Teeter - A Narrative Perspective of Financial Spec...
Bubble Narrative - Preston Teeter - A Narrative Perspective of Financial Spec...Bubble Narrative - Preston Teeter - A Narrative Perspective of Financial Spec...
Bubble Narrative - Preston Teeter - A Narrative Perspective of Financial Spec...
Preston B Teeter
 

Viewers also liked (7)

Game engineering_Tappy plane - jiit13-14
Game engineering_Tappy plane - jiit13-14Game engineering_Tappy plane - jiit13-14
Game engineering_Tappy plane - jiit13-14
 
Charms - Final Journal Turn-In
Charms - Final Journal Turn-InCharms - Final Journal Turn-In
Charms - Final Journal Turn-In
 
Innoblue Kickoff Powerpoint
Innoblue Kickoff PowerpointInnoblue Kickoff Powerpoint
Innoblue Kickoff Powerpoint
 
ATOMOS Y ESPECIES QUIMICAS
ATOMOS Y ESPECIES QUIMICASATOMOS Y ESPECIES QUIMICAS
ATOMOS Y ESPECIES QUIMICAS
 
Data halo presentation from NHS Citizen Bristol Design Workshop
Data halo presentation from NHS Citizen Bristol Design WorkshopData halo presentation from NHS Citizen Bristol Design Workshop
Data halo presentation from NHS Citizen Bristol Design Workshop
 
Bubble Narrative - Preston Teeter - A Narrative Perspective of Financial Spec...
Bubble Narrative - Preston Teeter - A Narrative Perspective of Financial Spec...Bubble Narrative - Preston Teeter - A Narrative Perspective of Financial Spec...
Bubble Narrative - Preston Teeter - A Narrative Perspective of Financial Spec...
 
Simple
SimpleSimple
Simple
 

Similar to PE

From the right process to a solid cultural change
From the right process to a solid cultural changeFrom the right process to a solid cultural change
From the right process to a solid cultural change
Francesco Zaia
 
Practical Ontology: Collaborating and Communicating with Concept Maps
Practical Ontology: Collaborating and Communicating with Concept MapsPractical Ontology: Collaborating and Communicating with Concept Maps
Practical Ontology: Collaborating and Communicating with Concept Maps
Bluecadet
 
Africaleadersit
AfricaleadersitAfricaleadersit
Africaleadersit
LeadGroup
 
Introductionto projectmanagement
Introductionto projectmanagementIntroductionto projectmanagement
Introductionto projectmanagement
Sanjay Basu
 
Resume London V 2 compressed
Resume London V 2 compressedResume London V 2 compressed
Resume London V 2 compressed
Litin Purohit
 

Similar to PE (20)

Leadership and organisation for distributed teams
Leadership and organisation for distributed teamsLeadership and organisation for distributed teams
Leadership and organisation for distributed teams
 
Case studies and work samples from the portfolio of Michael Darius
Case studies and work samples from the portfolio of Michael DariusCase studies and work samples from the portfolio of Michael Darius
Case studies and work samples from the portfolio of Michael Darius
 
MVP-Style Influencer Programs for Fun & Profit
MVP-Style Influencer Programs for Fun & ProfitMVP-Style Influencer Programs for Fun & Profit
MVP-Style Influencer Programs for Fun & Profit
 
Growth Accelerator Programme_Programma Groeiversneller
Growth Accelerator Programme_Programma GroeiversnellerGrowth Accelerator Programme_Programma Groeiversneller
Growth Accelerator Programme_Programma Groeiversneller
 
From the right process to a solid cultural change
From the right process to a solid cultural changeFrom the right process to a solid cultural change
From the right process to a solid cultural change
 
Practical Ontology: Collaborating and Communicating with Concept Maps
Practical Ontology: Collaborating and Communicating with Concept MapsPractical Ontology: Collaborating and Communicating with Concept Maps
Practical Ontology: Collaborating and Communicating with Concept Maps
 
Navigating the Employee Lifecycle: Create Your Own Remote Culture
Navigating the Employee Lifecycle: Create Your Own Remote CultureNavigating the Employee Lifecycle: Create Your Own Remote Culture
Navigating the Employee Lifecycle: Create Your Own Remote Culture
 
SLTCC2017 The use of research and Interactive Digital Technology to inform te...
SLTCC2017 The use of research and Interactive Digital Technology to inform te...SLTCC2017 The use of research and Interactive Digital Technology to inform te...
SLTCC2017 The use of research and Interactive Digital Technology to inform te...
 
cofaso Presentation
cofaso Presentationcofaso Presentation
cofaso Presentation
 
Cloud benefits
Cloud benefitsCloud benefits
Cloud benefits
 
Can IT leaders deliver on the strategic potential of emerging IT?
Can IT leaders deliver on the strategic potential of emerging IT? Can IT leaders deliver on the strategic potential of emerging IT?
Can IT leaders deliver on the strategic potential of emerging IT?
 
Africaleadersit
AfricaleadersitAfricaleadersit
Africaleadersit
 
Introductionto projectmanagement
Introductionto projectmanagementIntroductionto projectmanagement
Introductionto projectmanagement
 
Introductionto projectmanagement
Introductionto projectmanagementIntroductionto projectmanagement
Introductionto projectmanagement
 
Shifting Habits Towards a User-Centered Culture
Shifting Habits Towards a User-Centered CultureShifting Habits Towards a User-Centered Culture
Shifting Habits Towards a User-Centered Culture
 
Actionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challengeActionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challenge
 
Resume London V 2 compressed
Resume London V 2 compressedResume London V 2 compressed
Resume London V 2 compressed
 
The Digital Transformation: A New World Order
The Digital Transformation: A New World OrderThe Digital Transformation: A New World Order
The Digital Transformation: A New World Order
 
Economic analysis-projects-principles-concepts-UPLOAD BY SABIR KHAN
Economic analysis-projects-principles-concepts-UPLOAD BY SABIR KHANEconomic analysis-projects-principles-concepts-UPLOAD BY SABIR KHAN
Economic analysis-projects-principles-concepts-UPLOAD BY SABIR KHAN
 
EA Benefits Realization in a Digital World
EA Benefits Realization in a Digital WorldEA Benefits Realization in a Digital World
EA Benefits Realization in a Digital World
 

PE

  • 2. 2 AGENDA 1. INTRODUCTION 2. CITI DISCOVERY 3. THE CITI CITY 4. PROJECT DELIVERY 5. CASE STUDIES 6. PROJECT IMAGERY 7. WHY US?
  • 3. 3 whoarewe? 1. INTRODUCTION 2. CITI DISCOVERY 3. THE CITI CITY 4. PROJECT DELIVERY 5. CASE STUDIES 6. PROJECT IMAGERY 7. WHY US?
  • 4. 4 the team Carl Ordemann, AIA Principal and Executive Director Principal-in-Charge Heather Bensko, LEED AP ID + C Associate Design Leader Lead Designer and Branding Connor Glass Sr. Associate Sr. Designer Damian Besculides, AIA Associate Principal Cost and Schedule Manager Robert Pizzano, RA Principal Project Manager Tamar Moy Associate Programming/ Workplace Specialist
  • 5. 5 13 offices 8 domestic 5 international founded in 1981 200awards for design excellence ADA Analysis § Architecture § Area calculations § Benchmark analysis § Block and stacking plans § Building design consultation § Building evaluation/selection § Design and Contract Documents § Code research/variance § Construction administration § Construction documents § Consulting § Custom furniture/millwork design § Engineering services coordination § Facilities management assistance § Furniture selection and procurement § Graphic and signage standards § Identity/branding § Interior architecture/design § Landscape architecture § Lease/workletter consultation § Leasing log/charts § Material and finish selections § Perspective renderings § Programming § Project tracking analysis § Real estate and transportation planning services § Space planning § Strategic occupancy planning § Tenant standard specifications § Test-fit space plans § Workplace standards/ procedures development 750staff worldwide commercial healthcare education civic corporate interiors housing mixed-use urban design the firm
  • 7. 7 Our Point of View Integrated User Experience INTROSPECTION IS TRENDING Perkins Eastman’s process is client-centric. Our approach is never one-size fits all, and the user experience is integral. Organizations are looking for meaningful and enduring workplace design solutions that reflect their unique DNA. Leaders are increasingly willing to look inward to explore management style and guiding principles to develop strategies crafted for their culture, values, and business goals. CLIENT PRO JEC T M AN AG EM EN T D ESIG N W O RKPLAC E STRATEG IES IM PLEM EN T- ATIO N
  • 8. 8 Drawing on the Breadth of our Practice Area Expertise THE LEARNING CONTINUUM Life is an evolutionary experience set in a continuum of learning spaces. These settings — education, workplace, healthcare, or other — share fundamental values like collaboration, performance, knowledge-sharing, and efficiency. Corresponding design trends such as transparency and active design are shared between space types, and often initiated in the professional workplace, trickleling down to other sectors. KNOW LEDGE EXCHA N GE EDUCATION COM M UNITY HEALTH- CARE I N TEGRATED USE R EXPERIENCE WORK- PLACE Integrated Technology Focus Work Innovation Wellness Communica- tion Balance Team & Individual Socializing Efficient/ Smart Sustainability Mentoring
  • 9. 9 whoareyou? 1. INTRODUCTION 2. CITI DISCOVERY 3. THE CITI CITY 4. PROJECT DELIVERY L 5. CASE STUDIES 6. PROJECT IMAGERY 7. WHY US?
  • 10. 1 0 What We Know About Citi So Far... Comments
  • 11. 1 1 What’s Citi’s Aspirational Word Cloud? RESPONSIBLE FINANCE CONNECTION PRODUCT EXPERTISE SUSTAIN- ABILITY LEADERSHIP DIVERSE MERITOCRACY COMMON PURPOSE EMERGING MARKETS EFFICIENCY NETWORK SOCIAL RESPONS- IBILITY GLOBAL- IZATION DIGITIZATION CLIENT RELATIONSHIP EXCELLENCE INITIATIVE COURAGE INGENUITY VIRTUAL TEAM SERVICE DRIVEN RESULTS DRIVEN SIMPLE PERFORMANCE CREATIVITY GLOBAL GUIDELINES TRANSPARENT BEST IN CLASS PRODUCTS INNOVATION WORLD-CLASS BRAND
  • 12. 1 2 Common Workplace Themes for Financial Services Organizational Goals parti place-making THE WORKPLACE OF CHOICE CONNECTION TRANSPARENCY HEALTH & WELLNESS Active design, fitness centers, meditation rooms, day care, connection to nature, sustainability, desk sharing/ mobility strategy, flex work schedules MILLENNIAL PRIORITIES Smart technology integration, workforce diversity, branding, more casual environment FLEXIBILITY Reconfigurable seating arrangements that change with team structure COLLABORATIVE WORK SETTINGS Lounges, cafes, team rooms, coffee bars, open plan with focus spaces INTEGRATED SMART TECHNOLOGY Connecting virtual, often global, teams BREAK DOWN SILOS Glass walls, open plan, digitized storage/ archive library, connect to community with public spaces BRAND MESSAGE Clearly articulated and celebrated brand message and corporate values for employees and visitors ATTRACT & RETAIN TOP TALENT Desirable recruits increasingly joining faster growing industries such as technology & telecommunications Millenials looking for less demanding jobs with “more meaningful work” and a better work-life balance BRIDGE ACROSS DEPARTMENTS Integrated teams provide better cross checks Cross-departmental teams are seated together, and front- and back- offices are increasingly blended Communication, collaboration, and creative thinking improve performance BE FISCALLY RESPONSIBLE Banks are choosing to specialize in a smaller range of product and service offerings A safer place to work, with less risk More focus on community and environmental responsibility
  • 14. 1 4 theciticity 1. INTRODUCTION 2. CITI DISCOVERY 3. THE CITI CITY 4. PROJECT DELIVERY 5. CASE STUDIES 6. PROJECT IMAGERY 7. WHY US?
  • 15. 1 5 BUILDIING PROFILE I SOCIAL MEDIA
  • 16. 1 6 75% 13,500 Work points 64,000,000 square feet 25% 388 GREENWICH AGILE GLOBAL 390 GREENWICH LIQUID SPACE Citi’s Mission: Enabling Progress Common Purpose Responsible Finance Ingenuity Leadership Borderless enterprise I The City Campus
  • 17. 1 7 EXECUTIVE MEETING COLLABORATION WORK POINTS AMENITY vertical integration I Smart Stacking EQUAL DISTRIBTUTION
  • 18. 1 8 knowledge marketplace I place making S E M I - E N C L O S E D S H A R E D T E A M C O L L A B O R AT I V E / G AT H E R I N G F O O D / B E V E R A G E reception W O R K S PA C E C I R C U L AT I O N F O C U S LOUNGE / PANTRY ARRIVAL S E M I - E N C L O S E D W O R K / M E E T I N G S E M I - E N - C L O S E D W O R K / M E E T I N G W O R K S PA C E W O R K - S PA C E ARRIVAL FOCUS FOCUS SHARED TEAM C O L L A B O R AT I V E / G AT H E R I N G SHARED TEAM SHARED TEAM SHARED TEAM W O R K S PA C Eformal meeting W O R K - S PA C E C O L L A B O R A -
  • 19. 1 9 a d b e c f flexibility +modularity I defining the kit of parts
  • 20. 2 0 5 0 % f o c u s e d w o r k at d e s k 3 0 % s c h e d u l e d m e e t i n g s 2 0 % s p o n ta n e o u s c o l l a b o r at i o n * R e q u i r e s v a r i e d u n i n t e rr u p t e d w o r k s pa n o f 2 - 3 h o u r s * N e e d s f r e q u e n t f a c e t o f a c e a c c e s s t o c o l l e a g u e s f o r k n o w l e d g e s h a r i n g * M A Y B E TETHE R ED B Y TECHNOLOG Y O R SECU R IT Y P R OTOCALS 4 0 % f o c u s e d w o r k at d e s k 3 0 % s c h e d u l e d m e e t i n g s 3 0 % s p o n ta n e o u s c o l l a b o r at i o n * R e q u i r e s v a r i e d u n i n t e rr u p t e d w o r k s pa n S o f 1 - 2 h o u r s * M o v e s f r e q u e n t ly a r o u n d t h e w o r k p l a c e o r b e t w e e n b u i l d i n g s f o r f a c e t o f a c e m e e t i n g s w i t h c o l l e a g u e s * CO M PLEATELY UNTETHE R ED + M o b i l e 6 0 % f o c u s e d w o r k at d e s k 3 5 % s c h e d u l e d m e e t i n g s 5 % s p o n ta n e o u s c o l l a b o r at i o n * R e q u i r e s v a r i e d u n i n t e rr u p t e d w o r k s pa n S DEPENDIN G ON TASK * W o r k S m a i n ly o f f s i t e t r a v e l i n g o r f r o m h o m e * C OMPLEATELY UNTETHE R ED + M o b i l e RESI D ENT A G ILE REM O TE flexibility +modularity I defining workspace typologies
  • 21. 2 1 63% 78% 20% 3/4 Manager’s work day spent in meetings Scheduled meetings between 2-4 people Time spent out of the office People more likely to engage colleagues in face to face interac- tions if they have visual access first flexibility +modularity I defining workspace typologies
  • 22. 2 2 integrated user experience I discovering User PersonasINTEGRATED USER EXPERIENCE I DEFINING USER TYPOLOGIES MOBILE RESIDENT CLIENT CONSULTANT
  • 23. 2 3 • Merges work and personal life • F o c u s e s f o r 6 0 - 9 0 m i n u t e s a t a t i m e • W o r k s a t o d d h o u r s • W a n t s p e r s o n a l c o n t r o l o f s u r r o u n d i n g s • S t a y s m o t i v a t e d b y c h a n g i n g a c t i v i t y o r s u r r o u n d i n g s • Separates work and personal life • F o c u s e s f o r 3 - 4 h o u r s o n o n e a c t i v i t y • N e e d s q u i e t t o b e a b l e t o c o n c e n t r a t e • S t a y s m o t i v a t e d b y b e i n g “a l o n e t o g e t h e r ” • F e e l s o v e r w o r k e d a n d i s o l a t e d w h e n e x t e n s i v e ly w o r k i n g f r o m h o m e • Separates work and personal life • F o c u s e s f o r 6 0 m i n u t e s o r m o r e • S t a y s m o t i v a t e d t h r o u g h c o n s t a n t ly c h a n g i n g s u r r o u n d i n g s • P r e f e r s e a s y a c c e ss t o f o o d / d r i n k • F e e l s o v e r w o r k e d a n d i s o l a t e d w h e n e x t e n s i v e ly w o r k i n g f r o m h o m e SOLO ALONE TOGETHER BUZZ BUILDER integrated user experience I supporting varied work styles
  • 24. 2 4 integrated user experience I Day in the Life 8:00 AM CONNECT
  • 29. 2 9 1. INTRODUCTION 2. CITI DISCOVERY 3. THE CITI CITY 4. PROJECT DELIVERY 5. CASE STUDIES 6. PROJECT IMAGERY 7. WHY US? projectdelivery
  • 30. 3 0 Project Management FACILITIES MANAGEMENT SERVICE PERKINS EASTMAN PROJECT TEAM AND TECHNICAL STAFF PROJECT MANAGER’S ROLE Real Estate Legal MEP Engineer Structural Engineer Audio/Visual Acoustical Lighting Food Service Tele/Data LEED CONSULTANTS Construction Manager General Contractor Sub contractors Furniture IT Services Security Tele/Data Movers VENDORS / SUPPLIERS
  • 31. 3 1 Project management roles • Single Point of Contact • Schedule Master • Project Financial Planning (Budgeting) • Risk Mitigator (Advanced Warnings) • Coordinating Consultants • Goals Oriented • Accountable • Driver of Results ON TIME/ ON BUDGET HHC - 350,000SF 1 Month Early, Within 2%
  • 32. 3 2 Project management toolkit PROJECT TRAX • Project Directory • Responsibilities Checklist • Task Outlines • Sets/ Runs Meetings • Minutes/ Agendas • Quality Assurance Checklinst • Coordinating Consultants • New Forma (Online Tool) • Revit
  • 33. 3 3 Citi - Global Headquarters Project Project Schedule as Provided by Citi in RFP May 30, 2014 Item # Phase/ Task Project Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 1 Phase I - A Concept Design 1 2 3 4 2 Phase I - B Schematic Design 1 2 3 3 Phase II - A Design Development 1 2 3 4 4 Phase II - B Construction Documents 1 2 3 4 5 5 Phase II - C Permiting / Bidding 1 2 6 Phase II - D Construction Administration 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 Citi - Global Headquarters Project Perkins Eastman Preliminary Project Schedule as recommended by PE May 30, 2014 Item # Phase/ Task Project Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 1 Key Milestone Dates u Kick Off 2 $ u 4th month Concept / Programming Complete 3 $ u 7th month Schematic Design Complete 4 $ u 11th month Design Development Complete 5 $ $ u 16th month Construction Documents Complete 6 $ u 18th month Bidding and Filing Complete 7 $ u Move 1 u Move 2 u Move 3 u Move 4 8 u Move 5 9 u Move 6 10 u Move 7 u Move 8 u Move 9 u Move 10 u Move 11 11 Phase I - A Concept Design/Plannning Confirmation 1 2 3 4 m Client Approval 12 3 Team kick-off meeting 13 Field Survery 3 Arch and Engineering field inspections 14 r Submit Arch Field Reports and Issue existing conditions backgrounds 15 r Issue MEP equipment evaluation reports 16 Programming Confirmation 3 Interview Citi Business Groups to develop Programming Report 17 3 Confirm Citi Programming Report with Business Groups 18 3 Issue Program 19 m Client Review and comment 20 m Program Validation and Approval 21 Blocking Stacking Plans Review r Issue Blocking Stacking Plans 22 m Client Review and comment 23 Phase I - B Schematic Design 1 2 3 m Client Approval 24 Space Planning/Design r Confirm and Issue Preliminary Space Plans 25 m Client Review and comment 26 r Issue Preliminary Finishes and Materials 27 m Client review and comment 28 Engineering/IT Design Concepts/Narratives r Issue Preliminary Concept Plans/conduit pathways/Narratives 29 m Client Review and comment 30 r Issue Preliminary MEP/IT space requirements 31 r IT equipment room layouts 32 r Issue preliminary conduit runs 33 m Client Review and comment 34 Security/AV r Issue assesment and recommendations 35 m Client Review and comment 36 Phase II - A Design Development 1 2 3 4 m Client Approval 37 Furniture Planning r Issue Furniture Plans 38 Planning r Issue Preliminary Tel/Data and Ceiling/Lighting Plans 39 m Client Review and comment 40 r Design Presentation - Finishes and Materials 41 m Client Review and comment 42 r Final Design Presentation - Finishes and Materials 43 m Client Review and comment 44 Engineering/IT Design r Single Line MEP equipment design/IT equipment room layouts/ conduit runs 45 r Finalize MEP equipment/IT equipment room layouts/ conduit runs 46 Security/AV r Issue equipment requirements and specs 47 Phase II - B Construction Documents 1 2 3 4 5 m Client Approval 48 r Issue Final Tel/Data and Ceiling/Lighting Plans 49 r Issue 50% CDs for Estimate and Coordination 50 r Issue 80% CDs for Coordination, Red Line by Client 51 Phase II - C Bidding / Filing r Issue CDs for Bid and Filing 52 Bidding / Contract Award 1 2 m Award Project 53 File With the DOB 1 2 m Permit In Hand Phase II - D Construction Administration 54 Phase II - D1 - Executive Floors (by others) 55 Phase II - D2 - Pre Con Work 56 Phase II - D3 - Floors 37-32 1 2 3 4 388 Floors 37-32 57 1 Move / Post Occ. Study PhaseII-B/CConstruction DocumentsandFiling Executive Floors (By others) Make Ready / Pre Con Work MilestoneScheduleDatesandBudgetReviewsPhaseI-AConceptDesign/SiteSurvey/ProgrammingPhaseI-BSchematicDesign(AllFloorsAllAreas)PhaseII-ADesignDevelopment(AllFloorsAllAreas)
  • 34. 3 4 50 r Issue 80% CDs for Coordination, Red Line by Client 51 Phase II - C Bidding / Filing r Issue CDs for Bid and Filing 52 Bidding / Contract Award 1 2 m Award Project 53 File With the DOB 1 2 m Permit In Hand Phase II - D Construction Administration 54 Phase II - D1 - Executive Floors (by others) 55 Phase II - D2 - Pre Con Work 56 Phase II - D3 - Floors 37-32 1 2 3 4 388 Floors 37-32 57 1 Move / Post Occ. Study 58 Phase II - D4 - Floors 31-28, 26-25 1 2 3 4 388 Floors 31-28, 26-25 59 1 Move / Post Occ. Study 60 Phase II - D5 - Floors 24-19 1 2 3 4 388 Floors 24-19 61 1 Move / Post Occ. Study 62 Phase II - D6 - Floors 18-13 1 2 3 4 388 Floors 18-13 63 1 Move / Post Occ. Study 64 Phase II - D7 - Floors 12-6 (7 tot) 1 2 3 4 388 Floors 12-6 65 1 Move / Post Occ. Study 66 Phase II - D - Façade / Atrium (by others) 1 2 3 4 5 6 7 8 9 10 11 12 Facades / Atrium (by Others) 67 68 Phase II - D8 - Amentity Floors 5 thru 1 - Await façade 1 2 3 4 5 6 388 Floors 5-1 69 Atrium / Entry completion 1 Move / Post Occ. Study 70 Phase II - D9 - Floors 8-6 1 2 3 4 5 6 7 8 390 Floors 8 - 6 71 1 Move / Post Occ. Study 72 Phase II - D10 - Data Center 1 2 3 4 5 6 7 390 Data Center Floors 8 & 6 73 1 Move / Post Occ. Study 74 Phase II - D11 - Trading - 5th Floor 1 2 3 4 5 6 7 390 Trading 5th Floor 75 1 Move / Post Occ. Study 76 Phase II - D12 - Trading - 4th Floor 1 2 3 4 5 6 7 390 Trading 4th Floor 77 1 Move / Post Occ. Study 78 Phase II - D13 - Trading - 3rd Floor 1 2 3 4 5 6 7 390 Trading 3rd Floor 79 1 Move / Post Occ. Study 80 Phase II - D14 - Trading - 2nd Floor 1 2 3 4 5 6 7 390 Trading 2nd Floor 81 1 Move / Post Occ. Study 82 Phase II - D15 - Trading - 1st Floor 1 2 3 4 5 6 7 390 Trading 1st Floor 83 1 Move / Post Occ. Study TIME SAVINGS Legend: Concept SD DD CD BN CA PO Time Save (9 Months Overall) u Key Mile Stone Event $ Budget Approval m Approval/Completion r Drawing Issue 3 Work Start u Citi Schedule PhaseII-B/C Documents PhaseII-DConstructionAdministration Closeout Phase Executive Floors (By others) Make Ready / Pre Con Work
  • 35. measuring success of projects delivered on time of projects delivered within 5% of original budget of business from repeat clients
  • 36. 3 6 180 Maiden Lane 731 lexington avenue Bridgewater FedERAL Reserve BANK OF NEW YORK casestudies 1. INTRODUCTION 2. CITI DISCOVERY 3. THE CITI CITY 4. PROJECT DELIVERY 5. CASE STUDIES 6. PROJECT IMAGERY 7. WHY US?
  • 37. 3 7 REIMAGINE AND REVITALIZE. Transform arrival experience Revitalize interior public spaces Amenity rich spaces to attract new tenants Protection against weather events Leverage connection to emerging waterfront 180 MAIDEN LANE
  • 38. 3 8 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Available Leased 14’- 21’ slab height 54,477 sq.ft. 95,206 sq.ft. 264,444 sq.ft. 329,374 sq.ft. Auditorium Fitness Center and Cafeteria 22,459 32,018 32,239 32,149 32,149 30,908 16,323 30,438 10,207 31,080 31,080 31,080 31,080 30,907 30,907 30,917 30,136 30,077 30,040 30,040 29,951 29,950 29,902 29,902 29,878 29,878 29,878 29,878 18,832 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 17,257 STACKING PLAN Lease Expires 2014 STACKING PLAN + PROJECT METRICS
  • 41. 4 1
  • 42. 4 2
  • 43. 4 3
  • 44. 4 4
  • 45. 4 5 200 person capacity auditorium200 PERSON AUDITORIUM
  • 46. 4 6 260 seats | operated by restaurant associates | south street seaport/ river views | recently renovated | 3 private dining rooms | updated restrooms full service cafeteriaFULL SERVICE CAFETERIA
  • 47. 4 7 country club locker rooms | full assortment of cardio equipment including cycling machines, stairmasters, elliptical machines and treadmills | free weights and weight machines fully equipped fitness centerFITNESS CENTER
  • 49. 4 9 H.C. H.C.H.C. Legend Conference Large Office Office Workstation Floor Support SUPPORT OFFICEOFFICEOFFICEOFFICEOFFICEOFFICE SUPPORT OFFICE OFFICE OFFICE OFFICE OFFICE PHONE RMPHONE RM OFFICE OFFICE OFFICE OFFICE OFFICE ECIFFOECIFFOECIFFO OFFICE OFFICE OFFICE RECEPTIONELEVATOR LOBBY PANTRY 8 PERSON CONFERENCE RM 8 PERSON CONFERENCE RM 4 PERSON MEETING RM 14 PERSON CONFERENCE RM 16 PERSON CONFERENCE RM OFFICE OFFICE OFFICE OFFICE TROPPUSTROPPUSFDITROPPUS 12' - 2" 20'-0"5'-0"5'-0" 6' - 0" 10'-0" COATS COATS © 2012 8.10.2012Progressive Workplace Firm (Financial Service) 180 Maiden Lane, 24th Floor L GREEN Office + Workstation Spaces - 24th Floor Room Space Count Head Count Large Office 44'21x'02,eciffO 4 Office 2222'21x'01,eciffO 22 Workstation Workstation, 5' x 6' 140 140 140 661latotdnarG Conference Spaces - 24th Floor Room Space Count Seat Count Conference 4 Person Conference Room 1 4 8 Person Conference Room 2 16 14 Person Conference Room 1 14 16 Person Conference Room 1 16 50 05latotdnarG Office to Workstation Ratio 15:85 Conference Room Seats to Staff 1:3.3 RSF 31,080 sf RSF/Person 187 sf USF 22,689 sf USF/Person 137 sf Legend Conference Large Office Office Workstation Floor Support South Street Pine Street M aiden Lane FrontStreet OFFICE AND WOrkStAtION SPACES rOOM SPACE COUNt HEAD COUNt Large Office Office, 20’ x 12’ 4 4 4 Office Office, 10’ x 12’ 22 22 22 Workstation Workstation, 5’ x 6’ 140 140 140 Grand total 166 CONFErENCE AND PrACtICE ArEA SUPPOrt rOOM SPACE COUNt HEAD COUNt Conference 4 person Conference Room 1 4 8 person Conference Room 2 16 14 Person Conference Room 1 14 16 Person Conference Room 1 16 50 Grand total 50 Office to Workstation ratio 15:85 Conference Room Seats to Staff 1:3.3 RSF/Person 187 sf USF 22,689 sf USF/Person 137 sf TYPICAL TOWER FLOOR - FINANCIAL SERVICES 31,080 SF TYPICAL TOWER FLOOR - FINANCIAL SERVICES 31,080 SF
  • 50. 5 0 TYPICAL TOWER FLOOR - TECHNOLOGY/MEDIA FIRM 31,080 SF tECHNOLOGY/MEDIA FIrM - PrACtICE ArEA rOOM SPACE COUNt HEAD COUNt Office Office, 10’ x 11’ 11 11 11 Workstation Workstation, Bench 172 172 172 Grand total 183 CONFErENCE AND tEAM MEEtING rOOM SPACE COUNt HEAD COUNt Conference 12 person Conference Room 1 12 16 person Conference Room 1 16 28 Staff Support 4 Person Team Rm 1 4 5 Person Team Rm 2 10 6 Person Team Rm 2 12 8 Person Team Rm 2 16 3 Person Open Team Area 2 6 5 Person Open Team Area 2 10 12 Person Open Team Area Grand total 2 24 82 110 Office to Workstation ratio 6:94 Conference Room Seats to Staff 1:1.6 RSF/Person 170 sf USF 22,689 sf USF/Person 124 sf H.C. H.C.H.C. Legend Conference Office Staff Workstation Team Room Open Collaboration General Support 6 PERSON TEAM RM OFFICE OFFICE LOCKERS 16 PERSON CONFERENCE ROOM RECEPTION 12 PERSON CONFERENCE ROOM LOCKERS ELEVATOR LOBBY STAIR A WOMENMEN SERVICE ELEVATOR LOBBY STAIR B OFFICE SUPPORT OFFICE IDF 8 PERSON TEAM RM 8 PERSON TEAM RMSUPPORT OFFICE SUPPORT OFFICE 5 PERSON TEAM RM 5 PERSON TEAM RM PANTRY 4 PERSON TEAM RM PHONE RM OFFICEOFFICE 6 PERSON TEAM RM (3 PPL) OPEN COLLABORATION (5 PPL) OPEN COLLABORATION (12 PPL) OPEN COLLABORATION (3 PPL) OPEN COLLABORATION (5 PPL) OPEN COLLABORATION (12 PPL) OPEN COLLABORATION 2' - 6" 2' - 6" 5'-6" 10' - 0" 11'-7" PANTRY/ COFFEE BAR PHONE RM COATS OFFICE SUPPORT SUPPORT OFFICE COATS OFFICE © 2012 8.10.2012Technology/Media Firm 180 Maiden Lane, 24th Floor SL GREEN Technology/Media Firm - Practice Area - 24th Floor Room Space Count Head Count Office 1111'11x'01,eciffO 11 Workstation Workstation, Bench 172 172 172 381latotdnarG Conference + Team Meeting - 24th Floor Room Space Count Seat Count Conference 12 Person Conference Room 1 12 16 Person Conference Room 1 16 28 Staff Support 41mRmaeTnosreP4 012mRmaeTnosreP5 212mRmaeTnosreP6 612mRmaeTnosreP8 3 Person Open Team Area 2 6 5 Person Open Team Area 2 10 12 Person Open Team Area 2 24 82 011latotdnarG Office to Workstation Ratio 6:94 Conference Room Seats TO Staff 1:1.6 RSF 31,080 sf RSF/Person 170 sf USF 22,689 sf USF/Person 124 sf South Street Pine Street M aiden Lane FrontStreet Legend Conference Large Office Office Workstation Floor Support TYPICAL TOWER FLOOR - TECHNOLOGY / MEDIA FIRM 31,080 SF
  • 51. 5 1 OCCUPANCY ANALYSIS PER FLOOR Current Financial Media / Tech Mix Occupancy Institution Firms Executive Floor 56 people 66 people 66 people 66 people (22,459rsf) 400 rsf / person 340 rsf / person 340 rsf / person 340 rsf / person Tower Floors (27) 3,340 people 4,482 people 4,941 people 4,698 people (839,160rsf) 250 rsf/ person 187 rsf / person 169 rsf / person 178 rsf / person Low Rise Floors(10) 1,195 people 1,550 people 1,670 people 1,610 people (298,780rsf) 250 rsf / person 192 rsf / person 178 rsf / person 185 rsf / person Total 1,160,399rsf 4,591 people 6,098 people 6,677 people 6,374 people 252 rsf / person 190 rsf / person 173 rsf / person 182 rsf / person Net Increase 0 people 1,507 people 2,086 people 1,783 people 25% more efficient 32% more efficient 28% more efficient
  • 53. 5 3 RESEARCH: WHAT WE DID UX PARTICIPANTS • (6) Focus Groups - Designer, Prototyper, Usability Analyst (25 Participants) R&D PARTICIPANTS • (4) Focus Groups: Software Eng, Snr Software Eng, Team Lead & Technical Architects (29 Participants) FOCUS GROUPS GOALS • What aspects of the workplace ENABLE high performance currently? • What aspects of the workplace INHIBIT high performance currently? LEADERSHIP INTERVIEWS GOALS • Understand FUTURE vision for collaboration between UX and R&D • Discuss opportunities for improvements to future workplace QUESTIONNAIRES GOALS • Quantify findings from the focus groups • Document work processes • Ensure all stakeholders are represented UX PARTICIPANTS • Leadership Focus Group (Manager & Direct Reports) R&D PARTICIPANTS • 1-on-1 Interviews (Manager’s Direct Reports) UX PARTICIPANTS • 30 Respondents R&D PARTICIPANTS • 28 Respondents
  • 54. 5 4 RESEARCH | PORTFOLIO ASSESSMENT SPACE IS A FINITE RESOURCE. SOMETHING’S GOT TO GIVE. HOW CAN THE SUPPORTED OPEN PLAN MODEL BE ACCOMMODATED IN AN ALREADY OVERSUBSCRIBED BUILDING? • Understand the regional, long term, strategic real estate plan: • Departmental growth projections • Change in organizational structure/ business model • Ideal departmental adjacencies within and between building stacks • Conduct utilization studies to identify “underutilized” spaces (copy rooms, coat rooms, lower level, Fl 6) • Is there an appetite for a more robust work from home program? • Is de-densification even an option? • Understand the regional, long term, strategic real estate plan: • Available additional space at Location A and Location B. Other new regional/ satellite offices? • Study getting “creative” with space use • Multi-purpose rooms serve double/ tripple duty • Co-ed bathrooms (or sink areas) • Smaller individual desks (stack 27” monitors?) • Are laptops for all a real possibility? When? ASSESS THE SUPPLY ASSESS THE DEMAND Location A Location B Strategic Workplace Tools: Short-term Master Plan Long-term Master Plan New Workplace Strategy Mockup/ Case Study Rollout Best Practices Study Change Management Communication Strategy
  • 55. 5 5 RESEARCH | R&D LEADERSHIP INTERVIEWS 100% of R&D Leaders Agree... TOP 5 BIGGEST CHALLENGES TO WORKPLACE PERFORMANCE 1. SPACE SHORTAGE 2. LIMITED TOOLS 3. RIGID ADJACENCIES 4. BUILDING INFRASTRUCTURE 5. NO FLEXIBILITY • Not enough meeting rooms, teaming v. focus work • Need Laptops | whiteboard in teaming areas • Seats can not accommodate changes & adds to teams • Challenging circulation, shortage of restrooms • People feel they don’t have control over their environment. PHYSICAL SPACE WORKPLACE ELEMENTS MODEL “The Workplace” is comprised of 3 Elements. Disatisfiers in any Element will hinder overall workplace satisfaction. PEOPLE TECH- NOLOGY 1. Casual conversations promote team unity 2. Quick interactions at desks 3. Accessibility to all, including managers 4. Quickly find anyone you need 5. Energetic buzz TOP 5 STRENGTHS TO OPEN PLAN IN WORKPLACE PERFORMANCE
  • 56. 5 6 RESEARCH | R&D FOCUS GROUPS | SWOT 25% 50% 75% 100% 25% 50% 75% 100% Open plan collaboration Dispersed teams Accessibility of all Noise distractions Knowledge sharing among neighbors Poor move coordination process Pantries - informal collaboration, snacks R&D sits away from product & support teams Bright space/ natural light Lack of meeting rooms Ample desk size Lack of focus space/ no ability to concentrate No touch-down space/ shared space to work Poor ergonomics/ adjustability Sub par elevator recall system Not enough men's restrooms Lack of informal team areas No vacant desks Little leg room under desks No storage for boxes/ personal items Not enough desk space for CTO equipment "Trading" bench layout ineffective Rules against personalization/ display Lack of technology in collaboration spaces Conference room technology maintenance Overbooking conference rooms Whiteboards are not "smart" Mobile meeting apps need upgrading Poor remote desktop access EXISTING WORKPLACE STRENGTHS EXISTING WORKPLACE WEAKNESSES TODAY: The benefits of the open plan- accessibility, ease of collaboration- result in distractions at the desk. There is not enough space for supporting amenities to allow people to effectively work away from the desks. THE FUTURE: Provide more & better tools, amenities, and flexibility to allow people to be more agile in their workplace. Don’t “take away”, give back. 100% 25% 50% 75% 100% Dispersed teams Noise distractions Poor move coordination process R&D sits away from product & support teams Lack of meeting rooms Lack of focus space/ no ability to concentrate No touch-down space/ shared space to work Poor ergonomics/ adjustability Sub par elevator recall system Not enough men's restrooms Lack of informal team areas No vacant desks Little leg room under desks No storage for boxes/ personal items Not enough desk space for CTO equipment "Trading" bench layout ineffective Rules against personalization/ display Lack of technology in collaboration spaces Conference room technology maintenance Overbooking conference rooms Whiteboards are not "smart" Mobile meeting apps need upgrading Poor remote desktop access EXISTING WORKPLACE WEAKNESSES 25% 50% 75% 100% Product and support teams next to R&D Open lounges with whiteboards & terminals (also used for lunch) Mobile desks on wheels so people can "wheel up to team" More collaborative desk arrangements (no more benches) Small team rooms that are unreservable Do Quiet space (library, lounge, sections of a floor, focus room) Standing height/ adjustable desk options Provide more conference rooms Ke Non-reservable quiet/ focus spaces studies/ libraries Repurpose coat rooms into meeting rooms Poor ci Variety of collaboration spaces for different needs/ styles Produ "Transparent noise barrier" between teams- break up open plan More whiteboards by desks Temporary/ visitor desks Bar More desks at perimeter/ maximize light and views Access to better coffee/ espresso Gym/ fitness center Showers for those who ride bikes to work Unisex bathrooms (or shared sink areas only?) Upgrade elevator recall system Laptops with docking stations make moving around easier Improved access to video conferencing Communication & display between groups (wall projection) 25-hour Movi wall in pantry connect to other offices real time FUTURE OPPORTUNITIES 25% 50% 75% 100% 25% 50% 75% 100% Product and support teams next to R&D Don’t replace 'start up' vibe with 'corporate vibe' Open lounges with whiteboards & terminals (also used for lunch) Disconnect between floors is hard for cross-floor teaming Mobile desks on wheels so people can "wheel up to team" Employee turnover if unhappy in work environment More collaborative desk arrangements (no more benches) Don't put up walls/ keep openness and line of sight Small team rooms that are unreservable Don't make open plan noise worse with open teaming areas Quiet space (library, lounge, sections of a floor, focus room) Don't take away assigned desks Standing height/ adjustable desk options Don't take away meeting space Provide more conference rooms Keep "destination hubs" like pantries for informal interaction Non-reservable quiet/ focus spaces studies/ libraries Don't make the floors more dense Repurpose coat rooms into meeting rooms Poor cirulcation & flow through space/ don't use far away spaces Variety of collaboration spaces for different needs/ styles Productivity lost due to time spent searching for meeting rooms "Transparent noise barrier" between teams- break up open plan Productivity lost due to regular interruptions at desk More whiteboards by desks Don't exclude remote offices Temporary/ visitor desks Don't take away large monitors FUTURE OPPORTUNITIES FUTURE THREATS
  • 57. 5 7 RESEARCH: WHAT WE FOUND EXISTING WORKSPACE STRENGTHS 1. Open plan provides good access 2. Knowledge sharing among neighbors 3. Pantries, social interaction and snacks 4. Bright space and natural light EXISTING WORKSPACE WEAKNESSES 1. Lack of space for focus work 2. Informal teaming space required 3. Meeting rooms are too big 4. More shared whiteboards needed 5. Physically dispersed teams RESEARCH OBJECTIVES Validate & Quantify Existing Finding Present New Insights EXECUTIVE SUMMARY The main benefit of the open plan- ease of collaboration- results in distractions at the desk. There are not enough supporting amenities to allow people to effectively work away from desks. The solution is The Next Generation of “Supported Open Plan”, which addresses each of the existing workplace weaknesses/ key findings with a scalable kit of parts.
  • 58. 5 8 DESIGN OPPORTUNITIES | “KIT-OF-PARTS” COLLABORATION PODSLIDING WHITE BOARDS RIGHT-SIZED CONFERENCE ROOMS FOCUS ROOMS The proposed solution to the existing workplace weaknesses is the “Supported Open Plan”, which addresses each of the key findings with a scalable kit of parts. In addition to meeting rooms, we are proposing the following space typologies to add additional opportunities for: 1. Physically dispersed teams 2. Lack of space for focus work 3. Informal teaming space required 4. Meeting rooms are too big 5. More shared whiteboards needed A DB C
  • 59. 5 9 DESIGN OPPORTUNITY A | RIGHT SIZED CONFERENCE ROOMS KEY PLAN 3D PLAN DETAIL PERSPECTIVE VIEW SUPPORTS KEY FINDINGS #3. MEETING ROOMS ARE TOO BIG Replaces 8 person room with 2-4 person meeting space and allows for addition of (6) workpoints while supporting user workstyle. 73% of meetings are 4 people or less 54% of meetings are 2 people or less #4. MORE SHARED WHITEBOARDS NEEDED Provides writable whiteboard surface for ideation & separation from adjacent desks SLIDING WHITE BOARD PANELS EXISTING CONDITIONS
  • 60. 6 0 DESIGN OPPORTUNITY B | SLIDING WHITE BOARDS KEY PLAN 3D PLAN DETAIL PERSPECTIVE VIEW SUPPORTS KEY FINDINGS #4. MORE SHARED WHITEBOARDS NEEDED Provides sliding writable whiteboard surface for ideation & maximizes board area surface SLIDING WHITE BOARD PANELS
  • 61. 6 1 DESIGN OPPORTUNITY C | NON-BOOKABLE FOCUS ROOM KEY PLAN PERSPECTIVE VIEW SUPPORTS KEY FINDINGS #1. LACK OF SPACE FOR FOCUS WORK Sliding door allows user controlled separation for focused work and 2 person meetings #2. INFORMAL TEAMING SPACE REQUIRED Provides areas for informal interactions (room can be non- reservable) #5. PHYSICALLY DISPERSED TEAMS Provides work space for agile collocation of team members SCENARIO The UX Manager and a Team Lead work together for a number of hours on a plan for a new product strategy for senior management. They can focus and collaborate uninterrupted but are still accessible to the rest of the team if necessary.
  • 62. 6 2 DESIGN OPPORTUNITY D | NON-BOOKABLE SKETCHING ROOM SUPPORTS KEY FINDINGS #1. LACK OF SPACE FOR FOCUS WORK Rotating acoustical panel allows user controlled separation for focused work and 2-4 person stand-up meetings #2. INFORMAL TEAMING SPACE REQUIRED Provides areas for ad-hoc interactions #4. MORE SHARED WHITEBOARDS NEEDED Provides 2 sided writable whiteboard surface for ideation & separation from adjacent desks Other: HI + LOW FIDELITY Incorporates standard Bloomberg terminal for wire framing and viewing of other digital information PERSPECTIVE VIEWKEY PLAN 3D PLAN DETAIL
  • 63. 6 3 DESIGN CONCEPT | Flexible Collaboration | FLOOR 22 DESIGN INTERVENTIONS RIGHT-SIZED CONFERENCE ROOMS SLIDING WHITE BOARDS FOCUS ROOMS COLLABORATION POD pivoting collaboration pods with sketching surfaces + terminals EXISTING CONDITIONS PROPOSED PLAN PRINTER A B C D PROPOSED 21 (+1) 6 (-6) 4 (+4) 2 (+2) KEY METRICS EXISTING Fixed Desk 20 Meeting Seats 12 Informal Collaboration 0 Focus Room Seats 0 F A A CD B B B BB
  • 64. 6 4 SUPPORTED OPEN PLAN | Workflow Scenario EXISTING CONDITIONS PROPOSED PLAN 10:05 am The rest of the team go upstairs to the desk area 10:20am A designer has a question about the UX standard for Pop Ups. She contacts the standard owner and they go to the collaboration pod to discuss. 11:00am A UX Designer has a weekly meeting with their TL. As the meeting is just with 2 people, they use the new Right Sized conference room. 13:15pm A Usability Analyst drops by to discuss plans for User Testing with a UX Designer. They move to the Focus Room so they can collaborate without disrupting those working at their desks. 16:06 pm The UX Manager and the Visual Design Manager are preparing a management presentation. It wouldn’t be possible to book a room for 2 hours on short notice but now they can collaborate in the Focus Room, whilst still being accessible to their team. 15:36 pm A Visual Designer wants to review her mocks with the UX Designer. In the Collaboration Pod, they shows mocks on the screen and sketch alternatives on the white board.
  • 65. 6 5 QUESTION | What is our Workplace of the Future? Can we create a distinctly **** workplace? Can we leverage the mobility of the sales force to test a new workplace model? SPEC SALES COPIER 5W5 MILAN 5W4 MADRID 5W2 BERLIN - 24/7 5W3 ZURICH 5W1 LONDON 5W10 5W9 5W8 5W7 5W6 IDF RM COAT RM COPY AREA WOMEN MEN SERVICE ELEVATOR ELEVATOR LOBBY MEN COAT RM J.C. COPY RM STORAGE ELECTRICAL ELEC CL. HVAC ELEC. TELE CL MECH STAIR B STAIR A STAIR C ELEC CL SALES FISH TANK FIT API PRODUCT FXET CAMS CORE CAMS            −                                                        − −                                                           − −           − −  − −  − −  − −   ’           − −                                                                          − −     − −        − −  − −           − −                                                              − −     − −                                         − −  − −        − −                             − −                                                                    − −                       − −  − −         −                       − −                                                                                                            − −        − −                                          −           − −                                            − −                                         − −              − −                                                           − −                                   − −           − −      ’                 − −                 − −  − −                       − −              − −        − −  − −                 − −                 − −     − −                                                    − −                             − −     − −     − −        −     − −                             − −     − −                    − −                       − −                                                    − −         −  − −                                                                      − −     − −        − −  − −                 − −                       − −                                   − −     − −                  ’        − −                          − −        − −     − −     − −        − −  − −                        − −  − −                − −  − −              − −           − −              − −                                   − −        − −                                  −                      − −                    − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − −  − −  − −  − −  − −  − −  − −  − −  − −  − − − − − − − −  − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − − −  − − − − − − − − − − − − − − − − − CORE SALES GROUPS ASSET / INDUSTRY NE SELLSIDE FOREIGN BANKS DOMESTIC MAJORS CAN / MEX NY/CT HEDGE FUNDS MID ATL / MID-WEST NE BUYSIDE SOUTHEAST CROSS DISCIPLINE GROUPS APP SPEC FIT PRODUCT API FXET CORE CAMS OTHER UNOCCUPIED WP CONFERENCE CAUSAL MEETING 5W OCCUPANTS • CORE SALES is a good sample population because of its inherent mobility • OTHER OCCUPANT GROUPS support sales and interact with the nine core sales groups. APPROACH • Gather and review qualitative input through a series of interviews and workshops with focus groups • Gather and review quantitative data through analysis of badge data and current floor plans • Review findings and co-create aspirational scenarios for the future Existing Core Sales plan
  • 66. 6 6 FINDINGS | CURRENT MOBILITY OF 5W GROUPS 5W occupants can be viewed as “residents” and “travelers”. • Core Sales teams can be viewed as “residents” and “travelers” (based on the location of their clients); all are expected to visit with clients at least 40% of the time. • APP SPEC | FIT | FXET groups mirror the Core Sales travel patterns. They are knowledge leaders and travel in support of core sales staff. They have their own sales goals. • Other groups, such as PROD have some travel time, but are predominantly residents of 5W. • For the nine Core Sales Teams, occupancy rarely hits 100% , only a few days per month at 90% capacity. • Badge data does not tell us the amount of time each occupant spends at their workstation, or if they come and go throughout the day. Highest badge-in for core sales over a 5 month period was Monday Jan 9th with 374 or 93% capacity (avg Monday is 86% capacity). 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th 50 100 150 200 250 300 350 400 AVG 287 322 11 15 348 319 237 248 319 6 10 360 286 258 271 287 10 6 15 333 252 237 287 8 14 362 272 234 232 FEBRUARY 2013 | CORE SALES DAILY BADGE-IN NUMBER 0 10 20 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th CORE SALES GROUPS FEBRUARY 2013 | % THAT BADGED IN BY GROUP CANADA / MEXICO ASSET / INDUSTRY DOMESTIC MAJORS FOREIGN BANKS MID-ATL / MID-WEST NORTHEAST BUYSIDE NORTHEAST SELLSIDE NY / CT HEDGE FUNDS SOUTH / CARIBBEAN “TRAVELERS” “RESIDENTS” Lowest badge-in for core sales over a 5 month period was Wednesday May 22nd with 227 or 56% capacity (average mid-week is 65% capacity). BLP-SALES MOBILITY STUDY T= travelers (badge in @731Lex less than 60% of workdays) R=Residents (badge in @731Lex more than 60% of workdays) based on January-May 2013 badge data Perkin GROUP NAME TEAM NAME SEQ ID JAN # DAYS OUT FEB # DAYS OUT MARCH # DAYS OUT APRIL # DAYS OUT MAY # DAYS OUT TOT # DAYS OUT TOT #WORK DAYS # DAYS =40% OUT # DAYS =30% OUT R / T C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 20 4 8 8 9 2 31 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 122 4 3 3 7 1 18 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 135 1 6 6 4 4 21 104 14 31 R C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 217 3 1 1 3 1 9 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Asset/Industry Grp 383 10 3 8 4 9 34 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY CMDT 33 9 4 9 9 7 38 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY CMDT 60 0 1 4 1 7 13 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY CMDT 65 6 9 5 9 7 36 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY CMDT 70 9 7 9 6 12 43 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY CMDT 127 6 8 5 14 6 39 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY CMDT 4 8 12 44 17 13 R C-Sales NY Asset/Industry Grp C-Sales NY CMDT 276 3 2 11 5 3 24 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY CMDT 300 7 7 6 9 10 39 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY CMDT 361 9 11 9 6 10 45 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY CMDT 371 8 8 9 9 9 43 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY CMDT 401 10 10 10 13 11 54 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY Corporations 74 2 5 1 0 5 13 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Corporations 172 1 0 3 1 5 10 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Corporations 175 9 11 9 11 9 49 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY Corporations 190 7 6 5 9 9 36 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Corporations 244 7 11 10 10 9 47 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY Corporations 308 11 8 8 6 11 44 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY Corporations 339 8 9 7 15 9 48 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 10 2 4 4 5 5 20 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 81 8 8 7 6 9 38 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 170 5 2 3 4 6 20 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 180 2 6 6 5 1 20 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 227 3 1 0 2 2 8 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY Inv Bank/Priv Eqty 402 5 2 0 3 2 12 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY MORT 84 8 12 4 8 11 43 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY MORT 152 0 3 4 4 7 18 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY MORT 171 13 8 10 9 11 51 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY MORT 177 15 8 8 11 4 46 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY MORT 204 11 6 9 8 11 45 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY MORT 218 7 6 11 7 8 39 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY MORT 223 18 11 21 50 63 25 18 T C-Sales NY Asset/Industry Grp C-Sales NY MORT 229 1 6 11 3 14 35 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY MORT 245 2 3 1 3 3 12 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY MORT 260 12 9 8 9 5 43 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY MORT 263 6 8 7 10 13 44 104 41 31 T C-Sales NY Asset/Industry Grp C-Sales NY MORT 328 2 7 4 6 8 27 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY MORT 357 4 8 10 9 6 37 104 41 31 R C-Sales NY Asset/Industry Grp C-Sales NY MORT 7 7 22 8 6 R
  • 67. 6 7 FINDINGS | CORE SALES TEAM USER TYPE PROFILES 5W occupants can be viewed as “Residents” and “Travelers”, each with distinct workplace profiles and needs. CLIENT LOCATION GROUPS DESK TYPES DESK ASSIGNMENT IN-OFFICE PRIMARY WORKMODE CRITICAL WORKPLACE TOOLS* SEAT RATIO MEETING AREA SEAT RATIO TIME SPENT IN OFFICE RESIDENT TRAVELER 60% + <60% 1 : 4.5 ratio for conference seats; 1 : 7.5 ratio for casual meeting seats 1 : 4.5 ratio for conference seats; 1 : 7.5 ratio for casual meeting seats Laptops & Thin Client Technology; Personal storage lockers & mobile file cabinets Laptops & Thin Client Technology; Personal storage lockers & mobile file cabinets Heads-down work; Scheduled meetings; Informal collaboration Heads-down work, but if given laptops while on the road as recommended, will likely come to the office for collaboration more Assigned benches for team & group leads; Unassigned for others Assigned benches for team & group leads; Unassigned for others 1:1 4’w assigned for team & group leads; 1:1 4’w unassigned benches for others 1:1 4’w assigned for team & group leads; 1:0.6 4’w unassigned benches for others; 1:0.4 4’w unassigned benches for others 4’ wide benches along perimeter zone; 3’ wide high touchdown desks available to all 4’ wide benches in interior zone; 3’ wide high touchdown desks available to all Foreign bank, Domesetic Majors, NY/ CT Hedge Funds, NorthEast Sell Side Asset/ Industry, Canada/ Mexico, NorthEast Buy Side, South/ Carribean, Mid Atlantic/ Midwest, NorthEast Sell Side NY Metro Area Outside of NYC PROTOCOL • All must visit with clients at least 40% of the time • Badge data can categorize users into Residents & Travelers based on number of days each badges into HQ • Travelers spend 40%+ days traveling (not badging into HQ) • Does not take into account badging in for short periods of time & leaving • Over a period of 104 business days (January - May 2013), 153/415, badged in <60% of the time (full days) • 218/415 badged in <70% of the time
  • 68. 6 8 PLANNING GUIDELINES Develop a workplace solution that promotes the following principles: NEIGHBORHOOD SCALE • Plan organized to support team-based groups of 40-50 people (a “Neighborhood”) • Neighborhoods = Sales Group • The sense of ‘coming home’ shifts to neighborhood from individual desk • Neighborhood consists of resident & traveler desks adjacent to support & amenity • Mobile desks provided for visitor and guest touchdown VARIOUS WORK MODES • Each neighborhood has close proximity & visual access to ample shared spaces - Open collaborative space- idea sharing, learning & team building - Quiet study spaces- focused individual work - Dedicated & non-dedicated conference spaces- meeting - Individual storage- personal needs • Recommended ratio of 4.5 workpoint seats to 1 conference seat • Varied height work areas for different modes & preferences HIGH “BUZZ” LEVEL • High energy atmosphere stems from organic idea exchange • Workplace encourages “getting up” for intentional & unintentional information flow • “Active buzz” spaces zoned separately from “quiet decompression” spaces • Team leaders shift teammates around for better learning/mentoring • Shared workpoint model results in fewer empty seats on travel days OPEN COLLAB- ORATIVE ENCLOSED CONFERENCE & QUIET ZONE NEIGHBORHOOD (TEAM “HOME”) NEIGHBORHOOD (TEAM “HOME”) NEIGHBORHOOD (TEAM “HOME”) NEIGHBORHOOD (TEAM “HOME”) Resident Workers on Perimeter Travelers on Interior Touchdown Desks on Interior, Adjacent to Support & Amenities High-Energy Separate from Quet Zones Each Neighborhood has Visual Access to Ample Variety of Shared Spaces 1 2 3 Planning Concept Diagram
  • 69. 6 9 perimeter workstations are retained for resident workers and are shared or “hot desks” for traveling workers mix of mobile workpoints and benching for varied worktypes along interior promote movement and activity and help to create and retain “buzz” work surfaces at varied heights and sizes to accomodate different work styles reduced number of typ workstation reduces empty seats on travel days Library | Resource Center place for AppSpec to hold knowledge sessions and a place to meet, work and share knowledge increased number of conference rooms for dedicated and non-dedicated use feedback from end users revealed that desks were not viewed as precious- a comforatble place to connect to their phones, computers and team is more important all end users expressed an interest in learning from their colleagues both in-group, across the department and across the company - a greater, and more direct connection to product development was desired a change of posture throughout the day is desired while being able to still have work continuity PLANNING GUIDELINES having available meeting spaces for ad hoc and scheduled meetings was the #1 request by end users Core Sales Teams whether residents or travelers are at clients at least 40% of the time Team Leaders expressed an interest in moving the members of their team around to promote learning PLANNING GUIDELINES | FOR PILOT IMPLEMENTATION seating is organized by neighborhood / group 1 2 3 1 3 2 1 2 3 Neighborhood Scale Various Work Modes High Buzz Level 2
  • 71. WORKPLACE STRATEGY Parti PARTI PLACE-MAKING OF NATURE FLEXIBLE FOSTER CULTURE | WAY OF BEING MEANINGFUL CONNECTIONS • Highlight what’s natural & genuine • Connect residents with nature • Integrate smart sustainable systems • Be humble- not grandiose nor man made • Create space that is easily adaptable • Allow users to shape their environment • Provide secure & robust infrastructure • Foster Way of Being through design • Create highly functional space to meet needs • Create space for serendipitous connections • Offer opportunities to build meaningful relationships through work & play • Balance intensity & activity with silence &void • Create scale with neighborhoods PRINCIPLES • Harmony with nature & universe • Simple, honest, timeless, integrated into world • Reality & truth • Learning from mistakes • Continuously adapt, improve, invent • Self reflection • Radical transparency & truth • Base decisions on learning from problems • Independent thinking • Meaningful work & relationships • 1+1=3 • Constantly get in synch • Assertive & open minded • Thoughtful disagreement Design Parti align the business | cultural objectives of an organization with place-making priniciples that guide all aspects of the project.
  • 72. WORKPLACE STRATEGY Current Workplace Standards as Benchmark ASSESSMENT OF MOST RECENT & SUCCESSFUL BUILDOUT VALIDATES THE BEST PRACTICE KEY METRICS & PLANNING GUIDELINES RECOMMENDED FOR USE IN FUTURE DESIGNS. PERKINS EASTMAN 5.19.14 SPACE CATEGORY AREA (USF) QUANTI TY WORK- POINT TOTAL AREA (USF) % WORKPOINTS (OFFICE / WORKSTATION) 496 41,007 44% PO-A (Leadership Office) 300 0 0 - PO-B (Typical Office) 150 27 27 4,050 SH-O-A (Shared 2-Person Office) 150 47 94 7,050 SH-O-B (Shared 3-Person Office) 150 23 69 3,450 SH-O-C (Shared 4-Person Office) 300 2 8 600 WSA (Typical Desk) 36 298 298 10,728 35% Circulation Factor 13,934 1 13,934 Planning Factor (3%) 1,194 1 1,194 44 Small 114 Medium MEETING (FORMAL / INFORMAL) 13,865 15% 86 Large Focus/ Phone Room 50 7 350 32 X-Large Small Meeting Room (4p) 120 5 600 0 Board Rm Small Meeting Room (6p) 150 4 600 Medium Meeting Room (8p) 240 8 1,920 276 Conf Seats Medium Meeting Room (10p) 300 5 1,500 Large Meeting Room (12p) 360 6 2,160 Large Meeting Room (14p) 420 1 420 X-Large Meeting Room (16p) 480 2 960 Board Room (30p) 1,000 0 - * vs. workpoints Informal Meeting Space / Lounge 200 0 - Breakout Space 300 0 - Project Space/ War Room/Ideation 240 1 240 35% Circulation Factor 4,712 1 4,712 Planning Factor (3%) 404 1 404 AMENITY 14,341 15% Business Center/ Client Lounge/ Library 250 4 1,000 Training Room (30 pl) 1,000 0 - Learning Lab/ Boot Camp/Think Tank 1000 1 1,000 Auditorium/ Multi-Purpose Space (60 pl) 2,200 1 2,200 Game/ Activity Room 500 0 - Convenience Pantry 350 1 350 Coffee / Juice Bar (in connectors) 50 0 - Café 650 0 - Warming Kitchen (warming) 700 2 1,400 Dining Room 1,500 2 3,000 Fitness Center (spa,gym,locker rms,studio,Dr.) 6,500 0 - Quiet/ Meditation Room 50 1 50 Reception 500 0 - Wellness (Sick, Mother's) Room 50 1 50 35% Circulation Factor 4,873 1 4,873 Planning Factor (3%) 418 1 418 SUPPORT 24,203 26% Support 7105 1 7,105 Copy/ Print 180 8 1,440 Files/ Printer Stations Throughout 9 107 963 Coat Closets 15 4 60 AV Room 2,548 1 2,548 IDF/MDF Rooms 1,579 2 3,158 35% Circulation Factor 8,224 1 8,224 Planning Factor (3%) 705 1 705 SUBTOTAL PROGRAM NUSF 93,416 100% NOTES: * Does not include core space TOTAL AVAILABLE NUSF IN BUILDING 93,807 BALANCE 391 - Does not include area in connectors DRAFT 188 NUSF/ WORKPOINT* 0.6 CONFERENCE SEAT RATIO 20 WESTPORT 2ND FLOOR PROGRAM EXISTING SPACE REQUIREMENTS KEY METRICS 496 WORKPOINTS 44% 15% 15% 26% 20 WESTPORT PROGRAM SPACE ANALYSIS 0% 5% 23% SH-O60% 26%CLOSED PLAN Glendinning Planning Space Typology CONFERENCE ROOM SEATS TO WORKPOINTS NUSF/ WORKPOINT WORKPLACE AVERAGE (128 nusf/ existing workplace workpoint) .6 188
  • 73. WORKPLACE STRATEGY Floor 2NS SINGLE OFFICE 20 20 20 40 22 66 QUANTITY OCCUPANTS DOUBLE OFFICE TRIPLE OFFICE QUAD 136 NO. OF CONFERENCE SEATS RATIO OF CONFERENCE BOMA NUSF FLOOR: 47,750 SF NUSF FLOOR WITHOUT TECHNOLOGY: 44,784 SF 418 SF 2,548SF BRIDGEWATER - 20 WESTPORT 2 NS BENCHMARK SINGLE OFFICE 20 20 20 40 22 66 1 4 70 70 QUANTITY OCCUPANTS DOUBLE OFFICE TRIPLE OFFICE QUAD OFFICE WORK- STATIONS 200TOTAL 136 NO. OF CONFERENCE SEATS 0.68 65/35 RATIO OF CONFERENCE SEATS TO PERSONNEL RATIO OF PERSONNEL IN P.O. V WORKSTATIONS 239 SFNUSF/WP BOMA NUSF FLOOR: 47,750 SF NUSF FLOOR WITHOUT TECHNOLOGY: 44,784 SF 418 SF SINGLE OFFICE 7 7 611 SF 550 SF 27 54 1 3 1 4 228 228 296 QUANTITY OCCUPANTS DOUBLE OFFICE TRIPLE OFFICE QUAD OFFICE WORK- STATIONS TOTAL 145 NO. OF CONFERENCE SEATS 0.5 23/77 RATIO OF CONFERENCE SEATS TO PERSONNEL RATIO OF PERSONNEL IN P.O. V WORKSTATIONS 156 SFNUSF/WP BOMA NUSF FLOOR: 46,057 SF NUSF FLOOR WITHOUT TECHNOLOGY: 44,896 SF 05..14 BRIDGEWATER - 20 WESTPORT 2 E BENCHMARK SINGLE OFFICE 7 7 611 SF 27 54 1 3 1 4 228 228 296 QUANTITY OCCUPANTS DOUBLE OFFICE TRIPLE OFFICE QUAD OFFICE WORK- STATIONS TOTAL 145 NO. OF CONFERENCE SEATS 0.5 23/77 RATIO OF CONFERENCE SEATS TO PERSONNEL RATIO OF PERSONNEL IN P.O. V WORKSTATIONS 156 SFNUSF/WP BOMA NUSF FLOOR: 46,057 SF NUSF FLOOR WITHOUT TECHNOLOGY: 44,896 SF BRIDGEWATER - 20 WESTPORT 2 E BENCHMARK Floor 2E Current Workplace Standards as Benchmark
  • 74. WORKPLACE STRATEGY SCENARIO SCENARIO 2 TRANSFORMATION SCENARIO 3 TRANSFORMATION FOR THE FUTURE • 3-5 year strategy • Redistribute staff so Campus A houses Research during Campus B renovation • Improve client experience and infrastructure • 10-15 year strategy • Establish Campus A as a proper Headquarters location • Provide best practice workplace experience to staff and guests on a more permanent basis • 15+ year strategy • Expand and occupy entire Campus A site to accommodate future growth • Establish Campus A as a HQ site with best practice workplace experience • Option to add 20K SF Auxiliary space in 500 (including 6K basement space), and a full kitchen • 984 FTE • (875 in existing leasehold +109 for aux space) • 2 workplace renovation options (complete vs partial) • 2 infrastructure upgrade options (build AV hub and either upgrade rooms to standard or deviate from standard) • Renovate 400 Atrium • Add Aux space/ basement in 500, add full kitchen • Add 16K SF new space as amenity hub • 984 FTE (875 in existing leasehold +109 for Aux space) • Complete workplace floor renovations • Complete infrastructure upgrade (future standard) • Conduct site ugrades, option to reclad buildings • Renovate 400 Atrium • Add Aux space/ basement in 500, add full kitchen • Add 16K SF new spce as amenity hub • Add 48K SF Building 100 and 84K SF Building 200 (typical workplace floors) and Building 300 Cafeteria • 1,500 FTE • Complete workplace floor renovations • Complete infrastructure upgrade (future standard) • Conduct site ugrades, connect campus, reclad option 100 100 100 NEW NEW NEW SITE/ PLAZA SITE/ PLAZA SITE/ PLAZA 200 200 200 300 300 300 400 400 400 500 500 500 SCOPE IN OUT (BW) OUT (NON-BW) OBJECTIVE DESCRIPTION/ ASSUMPTIONS 1B 500 ADD 1A1 Partial Tech & Arch Reno 1A2 Full Tech & Arch Reno SCENARIO 1 IMPROVEMENT 1A NO 500 ADD 1B1 Partial Tech & Arch Reno 1B2 Full Tech & Arch Reno Campus Plan Scenarios
  • 75. WORKPLACE STRATEGY 30% 19% O 2 GE ors) 05.19.14 AMP CLIENT EXPERIENCE ZONE E SECOND FLOOR OUT OF SCOPE - BW SPACE OUT OF SCOPE - NON-BW SPACE AMENITY CONFERENCING WORKPLACE SUPPORT BUILDING CORE BARN* 200 500 100 300 400 500 RATION TBD URBAN LIVING ROOM Master Plan Scenarios: Metrics
  • 76. WORKPLACE STRATEGY Adjacency Diagrams RESEARCH ANALYTICS RESEARCH SYSTEMIZATION RESEARCH COOP RESEARCH TECHRESEARCH IACO RESEARCH SEC CORE MNGMNT CM (GD) CLIENT SERVICES RESEARCH CLIENT SERVICES EXTERNAL CLIENT SERVICES MNGMT/ COO CLIENT SERVICES REPORTING CLIENT SERVICES TECHNOLOGY ASSTD OPERATIONS/ SUPPORT CLIENT EXPERIENCE ZONE BOOT CAMP RECRUITING CENTER REPRO- GRAPHICS ROOM
  • 77. WORKPLACE STRATEGY Departmental Program: Scenario 1A BUILDING 300 386 SEATS 26% CLOSED 74% OPEN NYALA FARMS DEPARTMENTAL STACK DIAGRAM PO-A PO-B SH-O* WS-A Total DPT SEATS OPTION 1A 300_2 Research Analytics 0 2 14 88 104 Research 252 300_2 Research Systemization 3 0 18 52 73 Core Mgt 99 300_2 Research COO Pillar 0 0 3 7 10 CS&M 258 300_2 Flex Seats 0 1 2 15 18 CM Tech 40 3 3 36 163 206 Asst Ops 41 Trading 115 Acct Mngt 82 PO-A PO-B SH-O* WS-A Total SUB TOTAL 887 300_1 Research Security 0 1 6 1 8 Gen Flex Seats 56 300_1 Research Research Tech 0 0 1 46 47 Trdng/AM Flex 111 300_1 Research IAC Office 0 0 2 7 9 TOTAL 1054 300_1 Core Management - 2 3 41 53 99 ACTUAL FIT 973 300_1 Flex Seats 0 1 2 14 17 2 5 52 121 180 GOAL 1042 OVER/UNDER 69 BUILDING 400 283 SEATS 25% CLOSED 75% OPEN -69 PO-A PO-B SH-O* WS-A Total NOTES: 400_2 CS&M Management/ COO 3 7 3 9 23 Provide 70 non-Trader/ AM "Flex Seats". 400_2 CS&M External Pillar 0 12 4 58 75 20% accommodated in focus rooms and 400_2 CS&M Reporting Pillar 0 3 1 16 20 other amenity spaces. 400_2 CS&M Research Pillar 0 12 4 49 66 80% (56) are office and workstation seats 400_2 Flex Seats 0 1 2 14 17 3 36 15 146 200 GOAL = 875 FTE + 56 non-Trading/ AM flex seats + 111 Trading/ AM flex seats (existing) PO-A PO-B SH-O* WS-A Total 400_1 CM Tech 0 4 4 32 40 400_1 Research 0 0 0 1 1 400_1 Miscellaneous 0 1 1 11 14 400_1 HR 0 0 0 1 1 400_1 Client Services 0 0 0 1 1 400_1 Security 0 1 1 5 6 400_1 IT 0 0 0 2 3 400_1 Facilities 0 2 2 12 15 400_1 Flex Seats 0 0 0 2 2 0 8 8 67 83 BUILDING 500 385 SEATS PO-A PO-B SH-O* WS-A Total 500_2 CS&M Technology Pillar 0 9 3 63 75 500_2 Flex Seats 0 0 0 2 2 500_2 Trading 33 500_2 Account Mngmnt 65 500_2 Flex Seats 69 244 PO-A PO-B SH-O* WS-A Total 500_2 Trading Research Pillar 0 0 0 0 79 500_2 Account Mngmnt 17 Core To be Placed 500_2 Research 3 Out of Scope Assorted Operations 500_2 Flex Seats 42 Other Tenant CM Tech (from GD) 141 NYALA  300, 400 & 500 1054 SEATS Seatcount- 2015 (+ 4% Growth) Bldng_ Floor Department Subgroup Seatcount- 2015 (+ 4% Growth) Subgroup BUILDING 300 BUILDING 400 BUILDING 500 Bldng_ Floor Department Department Subgroup Seatcount- 2015 (+ 4% Growth) Bldng_ Floor Department Subgroup DEPARTMENT SUMMARY 2 1 BUILDING 300 BUILDING 400 BUILDING 500 Bldng_ Floor Department Subgroup Seatcount- 2015 (+ 4% Growth) Bldng_ Floor Department Subgroup Seatcount- 2015 (+ 4% Growth) Seatcount- 2015 (+ 4% Growth) Bldng_ Floor CORE MNGMT PUBLIC AMENITY ZONE PUBLIC AMENITY ZONE PUBLIC AMENITY ZONE RESEARCH TECH RESEARCH  IACO RES SEC RESEARCH ANALYTICS RESEARCH  COOP RESEARCH  SYSTEMIZATION CS&M  EXTERNAL  CS&M  RESEARCH CS&M  REPORTING CS&M MNGMT/ COO PUBLIC AMENITY ZONE CS&M TECHNOLOGY CAFETERIA FITNESS CENTER BOOT CAMP TRADING/ ASSET  MANAGEMENT TRADING/ ASSET  MANAGEMENT KITCHEN/ RECEPTION RECEPTION/ TOWN HALL RECRUIT CENTER CLIENT EXPER. ZONE Perkins Eastman D R A F T   F O R   C O M M E N T 04.24.14
  • 78. WORKPLACE STRATEGY THE AGILE OFFICE FOOTPRINT • Typical office can seat 1-4 • Private office, shared office, or team room • Technology setup allows for easy change of room function • 2-seat layout can be assigned to one person with a flex seat for guests, team members of future growth • Increase density over time THE AGILE KIT OF PARTS • Planning module • Balanced and robust mix of focus and collaborative areas within view of desk • When module remains intact, best practice ratios met • 8-12 desks for every conference room, (2) focus spaces, (2) small team zones • Mirror pods for neighborhoods of 24-48 • Amenities outside of neighborhood serve larger scale community needs The Agile Workplace THE AGILE OFFICE FOOTPRINT THE AGILE KIT OF PARTS 20 30 40 80 80 80 0 20 40 60 80 100 120 140 Single Office 50/50 Mix Double Office Total Workpoints for Agile 80/20 Plan With Range of Office Sharing Workstations Office Seats
  • 80. 8 0 FISG’S CHANGE MANAGEMENT GOAL The FISG workplace was reinvented to align with a new, more transparent and collaborative, operating environment put in place in response to the Dodd-Frank Act. The CM goal was to engage the staff in learning to work effectively in this new workplace paradigm. FEDERAL RESERVE BAN K O F N EW YO RK FISG CHANGE NETWORK STRUCTURE Senior Leadership Team Rep from Pilot Group Sponsor Rep from Pilot group Rep from Pilot group Pilot Teams Pilot Teams Pilot Teams Pilot Teams Lateral Communication Top Down Communication Bottom Up Communication Senior Leadership Team Members moving to pilot floors Working Committee: Change agents to be identified for each group moving to the pilot floors (target- 12 to 15 people) REPSONSIBILITIES: Monitoring issues/rumors, informing team members, developing guidelines for technology/workplace usage, advising on packing for move, assisting with questions during move-in COO F EDERAL RES ERVE B ANK OF NEW YORK F IS G MANAGING/S U PPORT ING CH ANGE DEFINE THE GAP between today’s culture/ behaviors & tomorrow’s desired culture/ behaviors CLOSE THE GAP through change management actions MONITOR IMPACT Refine the change management actions to achieve goals