EOW work scope Page 1
 Ocean Yatzy
Subsea End of Well Report 
EOW – 182­0325
TO: Carlos De Souza
CC: Anderson Almeida, Scotty Boyington, Paul Hobart, Bobby Vandegevel, Yatzy OIM, Yatzy Rig Supt
Report Date: 24/October/2013
From: Molina
% Complete
# LCE­PM Number Description Today To Date
1 182­630­1­7­R1 INSPECT RAMS AND PACKERS 100% 100%
2 182­630­1­7­R2 INSPECT RAM BORE, CAVITIES,BONNET SEALING 
SURFACES & SEALS
100% 100%
3 182­630­1­7­R3 TEST HYDRAULIC SYSTEM & INSPECT RAM SHAFTS & 
RAM CHANGE PISTONS
100% 100%
4 182­630­1­7­R4 TEST BALANCE CHAMBERS & WEDGE LOCKS 100% 100%
5 182­630­1­7­R6 INSPECT BOP GUIDE FRAME 100% 100%
6 182­631­2­1­R1 INSPECT ANNULAR BORE & PACKER ELEMENTS 100% 100%
7 182­631­2­1­R2 INSPECT & TEST HYDRAULIC SYST. PRESS. TEST 
BORE/CONDUCT DRIFT TEST
100% 100%
8 182­632­1­1­R1 INSPECT AND TEST HOSES 100% 100%
9 182­632­1­1­R2 INSPECT AND TEST SHUTTLE VALVES 100% 100%
10 182­632­1­1­R3 INSPECT AND TEST ALL ACCUMULATORS AND SURGE 
BOTTLES
100% 100%
11 182­632­1­1­R4 FAILSAFE VALVE ACCUMULATOR INSPECTION 100% 100%
12 182­633­1­1­R1 INSPECT POD MOUNTED ACCUMULATORS AND POD 
LOCKS
100% 100%
13 182­633­1­1­R2 INSPECT AND TEST STINGERS 100% 100%
14 182­633­1­1­R3 INSPECT AND TEST POD VALVES 100% 100%
15 182­633­1­1­R4 INS/TEST POD STINGER, REGULATORS, ANODES, 
BLEEDERS, POD TUBING
100% 100%
17 182­633­1­1­R6 FUNCTION TEST PODS TO BE REUSED & POD 
ACCUMULATOR
100% 100%
18 182­633­1­1­R7 INSPECT AND LUBRICATE POD REELS 100% 100%
19 182­633­1­1­R8 INSPECT CONDUIT VALVE PKG, BLUE AND YELLOW 
(TRI­VALVE INSP.)
100% 100%
20 182­633­1­1­R9 INSPECT POD HOSE JUNCTION BOXES AND PLATES 100% 100%
21 182­634­1­1­R1 CLEANING & GREASING OF H4 CONNECTOR 100% 100%
22 182­634­1­1­R2 INSPECT / TEST VX GASKET, SEALING SURFACE & HYD 
RETAINERS
100% 100%
23 182­634­1­1­R3 ACTUATION TEST 100% 100%
24 182­634­1­1­R4 SEAL LEAKAGE TEST & INDICATOR ROD INSPECTION 100% 100%
182­634­3­1­R1 CLEANING & GREASING OF TYPE 70 COLLET 
  
EOW work scope Page 2
25 CONNECTOR 100% 100%
26 182­634­2­1­R2 INSPECT / TEST AX GASKET SEALING SURFACE & HYD 
RETAINERS
100% 100%
27 182­634­3­1­R3 CHECK ACTUATION AND MEASURE AMOUNT OF 
ACTUATOR RING STROKE
100% 100%
28 182­634­2­1­R4 SEAL LEAKAGE TEST & INDICATOR ROD INSPECTION 100% 100%
29 182­635­4­1­R1 DISASSEMBLE / INSPECT AND TEST FAILSAFE VALVES 100% 100%
30 182­635­4­1­R2 TEST AND LUBRICATE STACK VALVES 100% 100%
31 182­635­4­1­R3 INSPECT AND TEST CHOKE AND KILL STAB AND 
RECEPTACLES
100% 100%
32 182­637­5­2­R1 CLEAN AND INSPECT FLEX JOINT 100% 100%
33 182­637­5­2­R2 CLEAN INSPECT AND GREASE RISER ADAPTER 100% 100%
34 182­638­5­1­R1 INSPECT RISER  100% 100%
35 182­638­5­1­R2 INSPECT CHOKE AND KILL LINES 100% 100%
36 182­638­5­1­R3 INSPECT RISER HANDLING TOOLS 100% 100%
37 182­638­5­1­R4 INSPECT RISER FLOATATION MODULES 100% 100%
38 182­639­1­1­R1 INSPECT DIVERTER ASSEMBLY 100% 100%
39 182­640­5­1­R1 INSPECT SLIP JOINT 100% 100%
40 182­640­5­1­R2 INSPECT SLIP JOINT LOCKING MECHANISM 100% 100%
41 182­641­4­1­R1 INSPECT HYDRAULIC CHOKES 100% 100%
42 182­642­7­1­R1 INSPECT BOP TEST UNIT 100% 100%
43 182­642­7­1­R2 CHECK AND CORRECT ACCUMULATOR PRECHARGE 100% 100%
44 182­642­7­1­R3 TEST BOP HYDRAULIC CONTROL UNIT 100% 100%
45 182­642­7­1­R4 TEST PUSH AND HOLD BUTTONS­REMOTE PANELS 100% 100%
46 182­643­5­1­R1 CHECK OIL LEVEL, GAUGE SHEAVES AND INSPECT 
WIRE ROPE
100% 100%
47 182­643­5­1­R2 INSPECT AIR SYSTEM, PISTON AND ROD PACKING, 
AND POSITION INDICATOR
100% 100%
48 182­643­5­1­R3 INSPECT TENSIONER CONTROL PANELS 100% 100%
49 182­645­4­1­R1 INSPECT CROWN BLOCK / ROCKER ARMS, CONTROL 
VALVE BOX, HYD PWR UNIT
HYD 
ENG
HYD 
ENG
50 182­645­4­1­R2 INSPECT AIR SYSTEM HYD 
ENG
HYD 
ENG
51 182­645­4­1­R3 INSPECT CONTROL CONSOLE AND TRACK ROLLERS HYD 
ENG
HYD 
ENG
52 182­645­4­1­R4 INSPECT THE DSC CYLINDER AND ACCUMULATOR OIL 
LEVELS
HYD 
ENG
HYD 
ENG
53 182­646­1­1­R1 INSPECT HIGH PRESSURE CONNECTIONS 100% 100%
54 182­646­1­1­R2 INSPECT TORQUE EQUIPMENT 100% 100%
56 182­648­0­4­R1 INSPECT BOP HANDLING SYSTEM 100% 100%
58 182­655­0­0­R1 INSPECT AND TEST THE EDS POD 100% 100%
  
EOW work scope Page 3
Unscheduled Work 
­ Tab 380 Check turn­down sheave retainer plate/bolts – retaining plate bolts 
quote has arrived (May, 16th
 2013) place the order for 112 bolts and 112 lock washers FR#182­
037729 PO due date Aug, 8th
 (asked storekeeper to get a feedback on it)
­ EDS solenoid valves sequence #2, on order FR#182­037026 (15% rotation plan)
­ Koomey Room HPU unit solenoid sequence #1 we have only 3 on hand  were used 
to replace the ones with air leak
­ Rebuild auto shear trigger valve repair kits are on FR# 182­036957 Dec, 21st 2012
­ Replace or rebuild fill up valve (under RKB) 
­ Replace bearing house on triplex pump #1 FR#182­037281
­ Install new EDS pod – parts were ordered (pressure switch, solenoid valve and 
coils)
­ Replace upper annular (expired since 25/July/2012), upper annular is available on 
upper deck, decision was made to issue an MOC and after pulling BOPs concluding next 
well, upper annular will be replaced)
 
Work­scope Accomplished Last 24 Hours
­ Read Handover notes
­ Assisted Rig Manager with information on risers, slip joint, flex joint and diverter
­ Assisted Anderson Almeida with ANP/DUM report
­ Performed BOP function tests on main panel and toolpusher’s panel (blue and 
yellow pod)
­ Left yellow pod energized to check for leaks
­ Worked with storekeeper on opened FRs x material/equipment traceability  
Discrepancy / Recommendations / Components 24 Hr Forecast
­ Finish up with BOP function tests on driller’s panel
­ Perform EDS/Autoshear and acoustic test
­ Get BOP monthly samples to be send x analysis
­ PM triplex pumps and get oil samples
­ PM BOP fluid mixing unit system
­ Replace some anodes on BOP stack

More Related Content

Viewers also liked

Kassandra figueroa
Kassandra figueroaKassandra figueroa
Kassandra figueroakass051214
 
Verification Letter
Verification LetterVerification Letter
Verification LetterJose Daniel
 
Derecho Penal especial
Derecho Penal especial Derecho Penal especial
Derecho Penal especial oskarlyamr
 
Texting 4 Sexual Health
Texting 4 Sexual HealthTexting 4 Sexual Health
Texting 4 Sexual HealthYTH
 
Plan de gestion uso de tic
Plan de gestion uso de ticPlan de gestion uso de tic
Plan de gestion uso de ticletijuli
 
LA COMUNIDAD, LOS COMUNEROS Y SUS DEBERES Y DERECHOS.
LA COMUNIDAD, LOS COMUNEROS Y SUS DEBERES Y DERECHOS.LA COMUNIDAD, LOS COMUNEROS Y SUS DEBERES Y DERECHOS.
LA COMUNIDAD, LOS COMUNEROS Y SUS DEBERES Y DERECHOS.cesaroribio3
 
Clasificación de las lesiones.
Clasificación de las lesiones.Clasificación de las lesiones.
Clasificación de las lesiones.Maria Parra
 

Viewers also liked (12)

Kassandra figueroa
Kassandra figueroaKassandra figueroa
Kassandra figueroa
 
Verification Letter
Verification LetterVerification Letter
Verification Letter
 
Drink Digital Updates Jan 2017
Drink Digital Updates Jan 2017Drink Digital Updates Jan 2017
Drink Digital Updates Jan 2017
 
Primarymarkets
PrimarymarketsPrimarymarkets
Primarymarkets
 
Derecho Penal especial
Derecho Penal especial Derecho Penal especial
Derecho Penal especial
 
Mapa conceptual
Mapa conceptualMapa conceptual
Mapa conceptual
 
Texting 4 Sexual Health
Texting 4 Sexual HealthTexting 4 Sexual Health
Texting 4 Sexual Health
 
Plan de gestion uso de tic
Plan de gestion uso de ticPlan de gestion uso de tic
Plan de gestion uso de tic
 
LA COMUNIDAD, LOS COMUNEROS Y SUS DEBERES Y DERECHOS.
LA COMUNIDAD, LOS COMUNEROS Y SUS DEBERES Y DERECHOS.LA COMUNIDAD, LOS COMUNEROS Y SUS DEBERES Y DERECHOS.
LA COMUNIDAD, LOS COMUNEROS Y SUS DEBERES Y DERECHOS.
 
CLASIFICACION DE LESIONES
CLASIFICACION DE LESIONESCLASIFICACION DE LESIONES
CLASIFICACION DE LESIONES
 
Good touch bad touch ppt
Good touch bad touch pptGood touch bad touch ppt
Good touch bad touch ppt
 
Clasificación de las lesiones.
Clasificación de las lesiones.Clasificación de las lesiones.
Clasificación de las lesiones.
 

Similar to Relatório de Fim de Poço - DODI

final-herbst-ogp-05-01-14.pptx
final-herbst-ogp-05-01-14.pptxfinal-herbst-ogp-05-01-14.pptx
final-herbst-ogp-05-01-14.pptxAnithaDas6
 
11 projects on well top testing and remidiation of annular integrity loss (1)
11 projects on well top testing and remidiation of annular integrity loss (1)11 projects on well top testing and remidiation of annular integrity loss (1)
11 projects on well top testing and remidiation of annular integrity loss (1)Sigve Hamilton Aspelund
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama MerahHami Asma'i
 
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 3
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 3ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 3
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 3Dimitris Kareklidis
 
BP and Exxon Comparative Financial Analysis Jan 2011
BP and Exxon Comparative Financial Analysis Jan 2011BP and Exxon Comparative Financial Analysis Jan 2011
BP and Exxon Comparative Financial Analysis Jan 2011Damon Gjording
 
DUG 2010 Technical Workshop Presentation
DUG 2010 Technical Workshop PresentationDUG 2010 Technical Workshop Presentation
DUG 2010 Technical Workshop PresentationHarbisonFischer
 
6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdf
6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdf6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdf
6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdfMaanMrabet1
 
slope stability and seepage by slide software (Teton dam)
slope stability and seepage by slide software (Teton dam)slope stability and seepage by slide software (Teton dam)
slope stability and seepage by slide software (Teton dam)AbdullahKhan798
 
15811-55S00.pdf
15811-55S00.pdf15811-55S00.pdf
15811-55S00.pdfMian Majid
 
Joshua Matz Portfolio 2014
Joshua Matz Portfolio 2014Joshua Matz Portfolio 2014
Joshua Matz Portfolio 2014Joshua Matz
 
mh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymohamed saad
 
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 2
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 2 ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 2
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 2 Dimitris Kareklidis
 
Arctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-BriefingArctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-BriefingKevin Rahardjo
 
CONSTRUCTION_ENG - on home w_0 Watermar logo
CONSTRUCTION_ENG - on home w_0 Watermar logoCONSTRUCTION_ENG - on home w_0 Watermar logo
CONSTRUCTION_ENG - on home w_0 Watermar logoDRP Joint
 
Offshore acronyms
Offshore acronymsOffshore acronyms
Offshore acronymskumarchand1
 
Tracer Experiment using Hetch-Hetchy Water
Tracer Experiment using Hetch-Hetchy WaterTracer Experiment using Hetch-Hetchy Water
Tracer Experiment using Hetch-Hetchy WaterVicMadrid
 
Pump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyPump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyInfocengrs63
 
Ul12 12 Bateria sellada 12 voltios 12 amperios
Ul12 12 Bateria sellada 12 voltios 12 amperiosUl12 12 Bateria sellada 12 voltios 12 amperios
Ul12 12 Bateria sellada 12 voltios 12 amperioslcdtcorp
 

Similar to Relatório de Fim de Poço - DODI (20)

final-herbst-ogp-05-01-14.pptx
final-herbst-ogp-05-01-14.pptxfinal-herbst-ogp-05-01-14.pptx
final-herbst-ogp-05-01-14.pptx
 
11 projects on well top testing and remidiation of annular integrity loss (1)
11 projects on well top testing and remidiation of annular integrity loss (1)11 projects on well top testing and remidiation of annular integrity loss (1)
11 projects on well top testing and remidiation of annular integrity loss (1)
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama Merah
 
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 3
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 3ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 3
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 3
 
BP and Exxon Comparative Financial Analysis Jan 2011
BP and Exxon Comparative Financial Analysis Jan 2011BP and Exxon Comparative Financial Analysis Jan 2011
BP and Exxon Comparative Financial Analysis Jan 2011
 
DUG 2010 Technical Workshop Presentation
DUG 2010 Technical Workshop PresentationDUG 2010 Technical Workshop Presentation
DUG 2010 Technical Workshop Presentation
 
6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdf
6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdf6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdf
6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdf
 
slope stability and seepage by slide software (Teton dam)
slope stability and seepage by slide software (Teton dam)slope stability and seepage by slide software (Teton dam)
slope stability and seepage by slide software (Teton dam)
 
15811-55S00.pdf
15811-55S00.pdf15811-55S00.pdf
15811-55S00.pdf
 
Joshua Matz Portfolio 2014
Joshua Matz Portfolio 2014Joshua Matz Portfolio 2014
Joshua Matz Portfolio 2014
 
mh_saad_resume (2) - Copy
mh_saad_resume (2) - Copymh_saad_resume (2) - Copy
mh_saad_resume (2) - Copy
 
LINN Linkedin
LINN LinkedinLINN Linkedin
LINN Linkedin
 
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 2
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 2 ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 2
ΑΠΟΤΕΛΕΣΜΑΤΑ ΜΕΤΡΗΣΕΩΝ ΕΠΙΤΡΟΠΗΣ ΠΟΛΙΤΩΝ 2
 
Arctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-BriefingArctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-Briefing
 
Inspection of-pressure-vessels
Inspection of-pressure-vesselsInspection of-pressure-vessels
Inspection of-pressure-vessels
 
CONSTRUCTION_ENG - on home w_0 Watermar logo
CONSTRUCTION_ENG - on home w_0 Watermar logoCONSTRUCTION_ENG - on home w_0 Watermar logo
CONSTRUCTION_ENG - on home w_0 Watermar logo
 
Offshore acronyms
Offshore acronymsOffshore acronyms
Offshore acronyms
 
Tracer Experiment using Hetch-Hetchy Water
Tracer Experiment using Hetch-Hetchy WaterTracer Experiment using Hetch-Hetchy Water
Tracer Experiment using Hetch-Hetchy Water
 
Pump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyPump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case study
 
Ul12 12 Bateria sellada 12 voltios 12 amperios
Ul12 12 Bateria sellada 12 voltios 12 amperiosUl12 12 Bateria sellada 12 voltios 12 amperios
Ul12 12 Bateria sellada 12 voltios 12 amperios
 

Relatório de Fim de Poço - DODI

  • 1.    EOW work scope Page 1  Ocean Yatzy Subsea End of Well Report  EOW – 182­0325 TO: Carlos De Souza CC: Anderson Almeida, Scotty Boyington, Paul Hobart, Bobby Vandegevel, Yatzy OIM, Yatzy Rig Supt Report Date: 24/October/2013 From: Molina % Complete # LCE­PM Number Description Today To Date 1 182­630­1­7­R1 INSPECT RAMS AND PACKERS 100% 100% 2 182­630­1­7­R2 INSPECT RAM BORE, CAVITIES,BONNET SEALING  SURFACES & SEALS 100% 100% 3 182­630­1­7­R3 TEST HYDRAULIC SYSTEM & INSPECT RAM SHAFTS &  RAM CHANGE PISTONS 100% 100% 4 182­630­1­7­R4 TEST BALANCE CHAMBERS & WEDGE LOCKS 100% 100% 5 182­630­1­7­R6 INSPECT BOP GUIDE FRAME 100% 100% 6 182­631­2­1­R1 INSPECT ANNULAR BORE & PACKER ELEMENTS 100% 100% 7 182­631­2­1­R2 INSPECT & TEST HYDRAULIC SYST. PRESS. TEST  BORE/CONDUCT DRIFT TEST 100% 100% 8 182­632­1­1­R1 INSPECT AND TEST HOSES 100% 100% 9 182­632­1­1­R2 INSPECT AND TEST SHUTTLE VALVES 100% 100% 10 182­632­1­1­R3 INSPECT AND TEST ALL ACCUMULATORS AND SURGE  BOTTLES 100% 100% 11 182­632­1­1­R4 FAILSAFE VALVE ACCUMULATOR INSPECTION 100% 100% 12 182­633­1­1­R1 INSPECT POD MOUNTED ACCUMULATORS AND POD  LOCKS 100% 100% 13 182­633­1­1­R2 INSPECT AND TEST STINGERS 100% 100% 14 182­633­1­1­R3 INSPECT AND TEST POD VALVES 100% 100% 15 182­633­1­1­R4 INS/TEST POD STINGER, REGULATORS, ANODES,  BLEEDERS, POD TUBING 100% 100% 17 182­633­1­1­R6 FUNCTION TEST PODS TO BE REUSED & POD  ACCUMULATOR 100% 100% 18 182­633­1­1­R7 INSPECT AND LUBRICATE POD REELS 100% 100% 19 182­633­1­1­R8 INSPECT CONDUIT VALVE PKG, BLUE AND YELLOW  (TRI­VALVE INSP.) 100% 100% 20 182­633­1­1­R9 INSPECT POD HOSE JUNCTION BOXES AND PLATES 100% 100% 21 182­634­1­1­R1 CLEANING & GREASING OF H4 CONNECTOR 100% 100% 22 182­634­1­1­R2 INSPECT / TEST VX GASKET, SEALING SURFACE & HYD  RETAINERS 100% 100% 23 182­634­1­1­R3 ACTUATION TEST 100% 100% 24 182­634­1­1­R4 SEAL LEAKAGE TEST & INDICATOR ROD INSPECTION 100% 100% 182­634­3­1­R1 CLEANING & GREASING OF TYPE 70 COLLET 
  • 2.    EOW work scope Page 2 25 CONNECTOR 100% 100% 26 182­634­2­1­R2 INSPECT / TEST AX GASKET SEALING SURFACE & HYD  RETAINERS 100% 100% 27 182­634­3­1­R3 CHECK ACTUATION AND MEASURE AMOUNT OF  ACTUATOR RING STROKE 100% 100% 28 182­634­2­1­R4 SEAL LEAKAGE TEST & INDICATOR ROD INSPECTION 100% 100% 29 182­635­4­1­R1 DISASSEMBLE / INSPECT AND TEST FAILSAFE VALVES 100% 100% 30 182­635­4­1­R2 TEST AND LUBRICATE STACK VALVES 100% 100% 31 182­635­4­1­R3 INSPECT AND TEST CHOKE AND KILL STAB AND  RECEPTACLES 100% 100% 32 182­637­5­2­R1 CLEAN AND INSPECT FLEX JOINT 100% 100% 33 182­637­5­2­R2 CLEAN INSPECT AND GREASE RISER ADAPTER 100% 100% 34 182­638­5­1­R1 INSPECT RISER  100% 100% 35 182­638­5­1­R2 INSPECT CHOKE AND KILL LINES 100% 100% 36 182­638­5­1­R3 INSPECT RISER HANDLING TOOLS 100% 100% 37 182­638­5­1­R4 INSPECT RISER FLOATATION MODULES 100% 100% 38 182­639­1­1­R1 INSPECT DIVERTER ASSEMBLY 100% 100% 39 182­640­5­1­R1 INSPECT SLIP JOINT 100% 100% 40 182­640­5­1­R2 INSPECT SLIP JOINT LOCKING MECHANISM 100% 100% 41 182­641­4­1­R1 INSPECT HYDRAULIC CHOKES 100% 100% 42 182­642­7­1­R1 INSPECT BOP TEST UNIT 100% 100% 43 182­642­7­1­R2 CHECK AND CORRECT ACCUMULATOR PRECHARGE 100% 100% 44 182­642­7­1­R3 TEST BOP HYDRAULIC CONTROL UNIT 100% 100% 45 182­642­7­1­R4 TEST PUSH AND HOLD BUTTONS­REMOTE PANELS 100% 100% 46 182­643­5­1­R1 CHECK OIL LEVEL, GAUGE SHEAVES AND INSPECT  WIRE ROPE 100% 100% 47 182­643­5­1­R2 INSPECT AIR SYSTEM, PISTON AND ROD PACKING,  AND POSITION INDICATOR 100% 100% 48 182­643­5­1­R3 INSPECT TENSIONER CONTROL PANELS 100% 100% 49 182­645­4­1­R1 INSPECT CROWN BLOCK / ROCKER ARMS, CONTROL  VALVE BOX, HYD PWR UNIT HYD  ENG HYD  ENG 50 182­645­4­1­R2 INSPECT AIR SYSTEM HYD  ENG HYD  ENG 51 182­645­4­1­R3 INSPECT CONTROL CONSOLE AND TRACK ROLLERS HYD  ENG HYD  ENG 52 182­645­4­1­R4 INSPECT THE DSC CYLINDER AND ACCUMULATOR OIL  LEVELS HYD  ENG HYD  ENG 53 182­646­1­1­R1 INSPECT HIGH PRESSURE CONNECTIONS 100% 100% 54 182­646­1­1­R2 INSPECT TORQUE EQUIPMENT 100% 100% 56 182­648­0­4­R1 INSPECT BOP HANDLING SYSTEM 100% 100% 58 182­655­0­0­R1 INSPECT AND TEST THE EDS POD 100% 100%
  • 3.    EOW work scope Page 3 Unscheduled Work  ­ Tab 380 Check turn­down sheave retainer plate/bolts – retaining plate bolts  quote has arrived (May, 16th  2013) place the order for 112 bolts and 112 lock washers FR#182­ 037729 PO due date Aug, 8th  (asked storekeeper to get a feedback on it) ­ EDS solenoid valves sequence #2, on order FR#182­037026 (15% rotation plan) ­ Koomey Room HPU unit solenoid sequence #1 we have only 3 on hand  were used  to replace the ones with air leak ­ Rebuild auto shear trigger valve repair kits are on FR# 182­036957 Dec, 21st 2012 ­ Replace or rebuild fill up valve (under RKB)  ­ Replace bearing house on triplex pump #1 FR#182­037281 ­ Install new EDS pod – parts were ordered (pressure switch, solenoid valve and  coils) ­ Replace upper annular (expired since 25/July/2012), upper annular is available on  upper deck, decision was made to issue an MOC and after pulling BOPs concluding next  well, upper annular will be replaced)   Work­scope Accomplished Last 24 Hours ­ Read Handover notes ­ Assisted Rig Manager with information on risers, slip joint, flex joint and diverter ­ Assisted Anderson Almeida with ANP/DUM report ­ Performed BOP function tests on main panel and toolpusher’s panel (blue and  yellow pod) ­ Left yellow pod energized to check for leaks ­ Worked with storekeeper on opened FRs x material/equipment traceability   Discrepancy / Recommendations / Components 24 Hr Forecast ­ Finish up with BOP function tests on driller’s panel ­ Perform EDS/Autoshear and acoustic test ­ Get BOP monthly samples to be send x analysis ­ PM triplex pumps and get oil samples ­ PM BOP fluid mixing unit system ­ Replace some anodes on BOP stack