SlideShare a Scribd company logo
1 of 4
JOB OBJECTIVE
Seeking senior level assignments in Quantity Surveyor/ Construction Operations with an organisation of high repute,
preferably in Infrastructure/ Building.
SUMMARY
CIDB certified professional with over 17 years of Project Management & Construction Operations experience in
Infrastructure industry. Well versed with areas of Project Monitoring & Execution, Site Operations, Executing Maintenance A
strategic planner with expertise in contract pricing, drafting, administration, coordination for planning and scheduling in
multi-discipline projects. Expertise includes operating Excavator Machine (especially Hitachi Model).
Voluntarily worked as Quantity Surveyor with Malaysia NGOs part time (once a month) at Indonesia 2005-2011; Pakistan
2009-2011; Myanmar 2010-2014; Sri Lanka 2010-2014; Palestine 2009 & 2013; Philippines 2014 & Bosnia Herzegovina-
2014. Conversant with the procedures of drafting construction/ working drawings.
Strong negotiation & analytical skills with ability to network with Contractors, Suppliers, Consultants and Sub-Contractors. Adept in
working with AutoCAD Software & Microsoft Project. Good analytical, troubleshooting and inter-personal skills with proven
ability in driving numerous quality enhancement, process improvement and cost savings initiatives during the career span.
CORE COMPETENCIES
MANAGERIAL: Developing project baselines; monitoring and controlling projects with respect to cost, resource
deployment, time over-runs and quality compliance to ensure satisfactory execution of projects. Supervising the
construction process from the conceptual development stage through final construction, making sure that the project gets
done on time and within budget. Managing overall project activities from pre-contract, negotiation, post contract,
construction programming, claim and other miscellaneous.
FUNCTIONAL: Evaluating & determining appropriate construction delivery systems and the most cost-effective plan and
schedule for completing the project. Anchoring on-site construction activities to ensure completion of project within the time
& cost parameters and effective resource utilisation to maximize the output. Inspecting field sites to observe and evaluate
condition and operability of facilities and structures, and to collect field survey data and measurements.
ZULLAILI BIN ZAINAL ABIDIN
: 006012-5033494, 00605-6412878
: zza_67@yahoo.co.uk; zullabidin@gmail.com
: Lot 2809, LRG Baru, PRT 19, 36400, Hutan Melintang, Perak, West Malaysia
TECHNO-COMMERCIAL: Liaising with consultants, contractors, sub-contractors & external agencies for determining
technical specifications, approvals and obtaining statutory clearances. Conducting periodic review meeting with consultants
and contractors in order to meet project schedules.
ORGANIZATIONAL EXPERIENCE
Since Mar’05 with Serambi Teknik (Project Management Consultant) as Project Manager
Major Projects Handled:
• Proposal Renovation Work for:
o Institute Jantung Negara (Phase 1c), Jalan Tun Razak, Kuala Lumpur for Landasan Capital SDN BHD
(Contract 1 year-MEI 2012 to 2013) (RM 30.00 Million)
o Institute Jantung Negara (Phase 2c), Jalan Tun Razak, Kuala Lumpur for Landasan Capital SDN BHD (RM
30.00 Million)
• Proposal for Construction and Completion of:
o Belawan Seaport North Sumatera (Phase 1) at Medan, Indonesia for PT Graha Bina (Design Stage) (RM
650 Million)
o Bawwath Mecca College for Bawwath Mecca, Mecca, Saudi Arabia (Design Stage) (RM 706 Million)
o Ocean Energy Power Plant at Chittagong, Bangladesh for Ocean Energy Ptd. Ltd. (Singapore) (Pre-contract)
(RM 2.30 Billion)
o Secondary School at Seri Pantai, Kuala Lumpur, Malaysia for Ministry of Education, Malaysia (RM 47.00
Million)
o Blood Bank Department Unit in Melaka General Hospital, Malaysia for Master Health Planning SDN BHD
(RM 347.00 Million)
o Detention Centre for Illegal Foreign Workers at Sepang, Selangor, Malaysia (PFI) for West Bina SDN BHD
(RM 660.00 Million)
• Construction and Completion of:
o Federal Road at Hutan Melintang, Perak Darul Ridzuan for Teguh Jati SDN BHD (RM 6.30 Million)
o Taman Palma Primary School at Kemunting, Taiping, Perak , Malaysia for Teguh Jati SDN BHD (RM 13.90
Million)
o Teachers Housing Complex at S4, Taiping, Perak, Malaysia (Design and Built) for Teguh Jati SDN BHD (RM
14.60 Million)
Aug’03 – Feb’05 with AMAL-BK Consultant as Associate
Major Projects Handled:
• Construction and Completion of:
o Mini Sport Complexes at Bandar Seri Manjung for Majlis Perbandaran Manjung, Perak Darul Ridzuan (RM
18.00 Million)
o 4 Storey Elevated Car Park at Lumut for Majlis Perbandaran Manjung, Perak Darul Ridzuan (RM 8.00
Million)
o 3 Blocks 11 Storey Apartment at SG. Senam, IPOH for Setiausaha Kerajaan Negeri Perak, Perak Darul
Ridzuan (RM 32.00 Million)
o Flat Houses for Poor Foundation at Perak State Secretary, Perak, Malaysia (RM 23.00 Million)
o Mini KDN at Bandar Meru, Perak for Kementerian Hal Ehwal Dalam Negeri at Perak, Malaysia (RM 47.50
Million)
o Sultan Idris Shah II Mosque at Slim River, Perak, Malaysia (RM 2.50 Million)
Sep’02 – Sep’03 with URC Land SDN BHD, Shah Alam as Project Manager
Major Projects Handled:
• Construction and Completion of:
o 28 Unit Single Storey Semi Detached House at Jalan Jambu, Meru, Mukim Kelang, Selangor (RM 5.00
Million)
o 36 Unit Double Storey Semi Detached House at Jalan Kebun, Mukim Kelang, Selangor (RM 7.00 Million)
o 90 Unit Single Storey Terrace House at Jalan Khamis, Meru, Mukim Kelang, Selangor (RM 11.00 Million)
Aug’96 – Aug’02 with Lumut Maritime Terminal SDN BHD, Sitiawan Perak as Sr. Quantity
Surveyor
Major Projects Handled:
• Construction and Completion of Infrastructure Works Phase:
o 001 for Lumut Port Industrial Park (RM 45.00 Million)
o 002 for Lumut Port Industrial Park (RM 24.00 Million)
o 003 for Lumut Port Industrial Park (RM 41.00 Million)
o 004 for Lumut Port Industrial Park (RM 15.00 Million)
• Construction and Completion of Reclamation Works:
o Phase 1 for Lumut Port Industrial Park (Contractor: Ballast Nedam International Ltd.) (RM 21.50 Million)
o Phase 2 for Lumut Port Industrial Park (Contractor: Zhu Kuan Flamento Ltd And Wibawa Perangsang
International SDN BHD) (RM 37.00 Million)
Jul’95 – Jul’96 with Ablelink Properties SDN BHD, Kelang Selangor as Project Quantity
Surveyor
Major Projects Handled:
• Construction and Completion of:
o 3 Block 25 Storey Regency Condominium at LOT 3356, 3357 and 3340, Mukim Kelang, Kelang Selangor
(RM 96.00 Million)
o 23 Storey Ablelink Zenith Hotel at LOT 3540, Mukim Kelang, Kelang Selangor (RM 80.00 Million)
o 243 Unit Housing Scheme for Tetuan Ablelink Properties at Mukim Kg. Jawa, Kelang Selangor (RM 48.00
Million)
o Mix Development Ablelink City at Jalan Batu 3, Kelang Selangor (RM 80.00 Million)
Aug’92 – Jun’1993 with Hanaz SDN BHD (Contractor ‘BX’ Class) as Site Supervisor/ Quantity
Surveyor
Major Projects Handled:
• Construction and Completion of:
o 3 Storey School for Maktab Perguruan Ilmu Khas at Cheras, Kuala Lumpur (RM 2.00 Million)
o Renovation Works Existing Office Convert to Muzium, Kuala Lumpur (RM 3.00 Million)
Commenced career in Jan’92 – Jul’92 with Damansara Arkitek, Plaza Damansara as Technical
Assistant
VOLUNTARY ASSIGNMENTS
Dec’05 – Sept’15 with Mercy Malaysia as QS Volunteer
Major Projects Handled:
• Temporary Shelter Project at Gorkha, Nepal for Government of Nepal (USD 75,000)
• Renovation of District Polyclinic at Doboj and Maglaj, Bosnia Herzegovina for Government of Bosnia (USD 250,000)
• Reconstruction of Nasanugan & Ballion Primary School at Leytee Island, Philippines for Government of Philippines (USD
150,000)
• Renovation of Ormoc & Paloh District Hospital at Leytee Island, Philippines for Government of Philippines (USD
300,000)
• Construction and Completion of:
o Rural Health Centre At Tando Jan Mohd. & Layyah, Punjab & Sindh District, Pakistan (USD 1.00 million)
o District Health Office at Bagh, Jammu Kashmir Azzad Khan, Kashmir, Pakistan (RM 2.30 Million)
o District Health Office at Dedaye, Ayeyawarde District, Myanmar (14 Locations) (USD 0.90 Million)
o Hospital Gunung Sitoli at Nias, Indonesia (RM 18.00 Million)
o 2 Storey Nursing College Building at Syiah Kuala University, Aceh Besar, Naggroe Aceh, Indonesia (RM
4.00 Million)
o Polyclinic at:
 Delingo, Jogjakarta, Indonesia (RM 0.60 Million)
 Awa’i Nias Island, Indonesia (RM 0.60 Million)
 Heliweto Gido, Nias Island, Indonesia (RM 0.70 Million)
o 2 Storey Akper Building at Unsyiah, Aceh Besar, Naggroe Aceh DS (Fund under Petronas Malaysia) (RM
3.60 Million)
o Single Storey Mosque at Gng Sitoli, Nias Island, Indonesia (RM 0.895 Million)
• Renovation & Reconstruction of El-Waf a Rehab Hospital, Gaza City, Palestin (USD 0.50 Million)
Since Jan’10 with Taufikaziz Architect, Bangladesh, Kazastan, Malaysia as Quantity Surveyor
Since Jan’12 with KLSS Super Studion, Mekah, Indonesia as Quantity Surveyor
Mar’13 – Nov’14 with VSIX Power Corporation SDN BHD as Project Manager
Major Project Handled:
• Sub-Contractor Proposed Construction and Completion of Sport School at Perlis Malaysia for Ministry of Education
Malaysia (RM 34.24 Juta)
EDUCATION
1995 B.Sc. (Hons. in Quantity Surveying) from Mara Institute of Technology, Shah Alam, Selangor Darul Ehsan
1991 Diploma in Building from Mara Institute of Technology, Shah Alam, Selangor Darul Ehsan
CERTIFICATION
1987 Certificate in Architecture from Ungku Omar Polytechnic, IPOH, Perak
TECHNICAL SKILLS
• Well versed with AutoCAD, MS Office (Excel, Word, PowerPoint & Project), Sketches and Internet Applications
PERSONAL DETAILS
Date of Birth: 26
th
September 1967
Linguistic Abilities: English & Malay

More Related Content

Similar to CV ZULLABIDIN

Similar to CV ZULLABIDIN (20)

Cvyapcw 2012(5) (solar & trainer-m & mes)
Cvyapcw 2012(5) (solar & trainer-m & mes)Cvyapcw 2012(5) (solar & trainer-m & mes)
Cvyapcw 2012(5) (solar & trainer-m & mes)
 
Kaushik resume
Kaushik resumeKaushik resume
Kaushik resume
 
RESUME MOHD ROSDI SAMAT-new
RESUME MOHD ROSDI SAMAT-newRESUME MOHD ROSDI SAMAT-new
RESUME MOHD ROSDI SAMAT-new
 
RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016
 
KashishMadaanCV
KashishMadaanCVKashishMadaanCV
KashishMadaanCV
 
Company Profile FUJI DNDT 20220509.pdf
Company Profile FUJI DNDT 20220509.pdfCompany Profile FUJI DNDT 20220509.pdf
Company Profile FUJI DNDT 20220509.pdf
 
AL Millennium Profile 2015 (Rev00)
AL Millennium Profile 2015 (Rev00)AL Millennium Profile 2015 (Rev00)
AL Millennium Profile 2015 (Rev00)
 
CV ref
CV refCV ref
CV ref
 
Resume Paramjit Singh PM 1
Resume Paramjit Singh PM 1Resume Paramjit Singh PM 1
Resume Paramjit Singh PM 1
 
Project Management Project 2
Project Management Project 2Project Management Project 2
Project Management Project 2
 
Curriculum Vitae (Iman Seno Adji)
Curriculum Vitae (Iman Seno Adji)Curriculum Vitae (Iman Seno Adji)
Curriculum Vitae (Iman Seno Adji)
 
LGT_2016
LGT_2016LGT_2016
LGT_2016
 
Arsalan CV final (December 2016)
Arsalan CV final (December 2016)Arsalan CV final (December 2016)
Arsalan CV final (December 2016)
 
Harvinder Singh Resume
Harvinder Singh ResumeHarvinder Singh Resume
Harvinder Singh Resume
 
Be final report (1)
Be final report (1)Be final report (1)
Be final report (1)
 
Jeevan: Site Supervisor
Jeevan: Site SupervisorJeevan: Site Supervisor
Jeevan: Site Supervisor
 
CV_17012016
CV_17012016CV_17012016
CV_17012016
 
Asia Bridge Profile
Asia Bridge ProfileAsia Bridge Profile
Asia Bridge Profile
 
Cv - Anil
Cv - AnilCv - Anil
Cv - Anil
 
Pari Resume 2015 India
Pari Resume 2015 IndiaPari Resume 2015 India
Pari Resume 2015 India
 

CV ZULLABIDIN

  • 1. JOB OBJECTIVE Seeking senior level assignments in Quantity Surveyor/ Construction Operations with an organisation of high repute, preferably in Infrastructure/ Building. SUMMARY CIDB certified professional with over 17 years of Project Management & Construction Operations experience in Infrastructure industry. Well versed with areas of Project Monitoring & Execution, Site Operations, Executing Maintenance A strategic planner with expertise in contract pricing, drafting, administration, coordination for planning and scheduling in multi-discipline projects. Expertise includes operating Excavator Machine (especially Hitachi Model). Voluntarily worked as Quantity Surveyor with Malaysia NGOs part time (once a month) at Indonesia 2005-2011; Pakistan 2009-2011; Myanmar 2010-2014; Sri Lanka 2010-2014; Palestine 2009 & 2013; Philippines 2014 & Bosnia Herzegovina- 2014. Conversant with the procedures of drafting construction/ working drawings. Strong negotiation & analytical skills with ability to network with Contractors, Suppliers, Consultants and Sub-Contractors. Adept in working with AutoCAD Software & Microsoft Project. Good analytical, troubleshooting and inter-personal skills with proven ability in driving numerous quality enhancement, process improvement and cost savings initiatives during the career span. CORE COMPETENCIES MANAGERIAL: Developing project baselines; monitoring and controlling projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure satisfactory execution of projects. Supervising the construction process from the conceptual development stage through final construction, making sure that the project gets done on time and within budget. Managing overall project activities from pre-contract, negotiation, post contract, construction programming, claim and other miscellaneous. FUNCTIONAL: Evaluating & determining appropriate construction delivery systems and the most cost-effective plan and schedule for completing the project. Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilisation to maximize the output. Inspecting field sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey data and measurements. ZULLAILI BIN ZAINAL ABIDIN : 006012-5033494, 00605-6412878 : zza_67@yahoo.co.uk; zullabidin@gmail.com : Lot 2809, LRG Baru, PRT 19, 36400, Hutan Melintang, Perak, West Malaysia
  • 2. TECHNO-COMMERCIAL: Liaising with consultants, contractors, sub-contractors & external agencies for determining technical specifications, approvals and obtaining statutory clearances. Conducting periodic review meeting with consultants and contractors in order to meet project schedules. ORGANIZATIONAL EXPERIENCE Since Mar’05 with Serambi Teknik (Project Management Consultant) as Project Manager Major Projects Handled: • Proposal Renovation Work for: o Institute Jantung Negara (Phase 1c), Jalan Tun Razak, Kuala Lumpur for Landasan Capital SDN BHD (Contract 1 year-MEI 2012 to 2013) (RM 30.00 Million) o Institute Jantung Negara (Phase 2c), Jalan Tun Razak, Kuala Lumpur for Landasan Capital SDN BHD (RM 30.00 Million) • Proposal for Construction and Completion of: o Belawan Seaport North Sumatera (Phase 1) at Medan, Indonesia for PT Graha Bina (Design Stage) (RM 650 Million) o Bawwath Mecca College for Bawwath Mecca, Mecca, Saudi Arabia (Design Stage) (RM 706 Million) o Ocean Energy Power Plant at Chittagong, Bangladesh for Ocean Energy Ptd. Ltd. (Singapore) (Pre-contract) (RM 2.30 Billion) o Secondary School at Seri Pantai, Kuala Lumpur, Malaysia for Ministry of Education, Malaysia (RM 47.00 Million) o Blood Bank Department Unit in Melaka General Hospital, Malaysia for Master Health Planning SDN BHD (RM 347.00 Million) o Detention Centre for Illegal Foreign Workers at Sepang, Selangor, Malaysia (PFI) for West Bina SDN BHD (RM 660.00 Million) • Construction and Completion of: o Federal Road at Hutan Melintang, Perak Darul Ridzuan for Teguh Jati SDN BHD (RM 6.30 Million) o Taman Palma Primary School at Kemunting, Taiping, Perak , Malaysia for Teguh Jati SDN BHD (RM 13.90 Million) o Teachers Housing Complex at S4, Taiping, Perak, Malaysia (Design and Built) for Teguh Jati SDN BHD (RM 14.60 Million) Aug’03 – Feb’05 with AMAL-BK Consultant as Associate Major Projects Handled: • Construction and Completion of: o Mini Sport Complexes at Bandar Seri Manjung for Majlis Perbandaran Manjung, Perak Darul Ridzuan (RM 18.00 Million) o 4 Storey Elevated Car Park at Lumut for Majlis Perbandaran Manjung, Perak Darul Ridzuan (RM 8.00 Million) o 3 Blocks 11 Storey Apartment at SG. Senam, IPOH for Setiausaha Kerajaan Negeri Perak, Perak Darul Ridzuan (RM 32.00 Million) o Flat Houses for Poor Foundation at Perak State Secretary, Perak, Malaysia (RM 23.00 Million) o Mini KDN at Bandar Meru, Perak for Kementerian Hal Ehwal Dalam Negeri at Perak, Malaysia (RM 47.50 Million) o Sultan Idris Shah II Mosque at Slim River, Perak, Malaysia (RM 2.50 Million) Sep’02 – Sep’03 with URC Land SDN BHD, Shah Alam as Project Manager Major Projects Handled: • Construction and Completion of:
  • 3. o 28 Unit Single Storey Semi Detached House at Jalan Jambu, Meru, Mukim Kelang, Selangor (RM 5.00 Million) o 36 Unit Double Storey Semi Detached House at Jalan Kebun, Mukim Kelang, Selangor (RM 7.00 Million) o 90 Unit Single Storey Terrace House at Jalan Khamis, Meru, Mukim Kelang, Selangor (RM 11.00 Million) Aug’96 – Aug’02 with Lumut Maritime Terminal SDN BHD, Sitiawan Perak as Sr. Quantity Surveyor Major Projects Handled: • Construction and Completion of Infrastructure Works Phase: o 001 for Lumut Port Industrial Park (RM 45.00 Million) o 002 for Lumut Port Industrial Park (RM 24.00 Million) o 003 for Lumut Port Industrial Park (RM 41.00 Million) o 004 for Lumut Port Industrial Park (RM 15.00 Million) • Construction and Completion of Reclamation Works: o Phase 1 for Lumut Port Industrial Park (Contractor: Ballast Nedam International Ltd.) (RM 21.50 Million) o Phase 2 for Lumut Port Industrial Park (Contractor: Zhu Kuan Flamento Ltd And Wibawa Perangsang International SDN BHD) (RM 37.00 Million) Jul’95 – Jul’96 with Ablelink Properties SDN BHD, Kelang Selangor as Project Quantity Surveyor Major Projects Handled: • Construction and Completion of: o 3 Block 25 Storey Regency Condominium at LOT 3356, 3357 and 3340, Mukim Kelang, Kelang Selangor (RM 96.00 Million) o 23 Storey Ablelink Zenith Hotel at LOT 3540, Mukim Kelang, Kelang Selangor (RM 80.00 Million) o 243 Unit Housing Scheme for Tetuan Ablelink Properties at Mukim Kg. Jawa, Kelang Selangor (RM 48.00 Million) o Mix Development Ablelink City at Jalan Batu 3, Kelang Selangor (RM 80.00 Million) Aug’92 – Jun’1993 with Hanaz SDN BHD (Contractor ‘BX’ Class) as Site Supervisor/ Quantity Surveyor Major Projects Handled: • Construction and Completion of: o 3 Storey School for Maktab Perguruan Ilmu Khas at Cheras, Kuala Lumpur (RM 2.00 Million) o Renovation Works Existing Office Convert to Muzium, Kuala Lumpur (RM 3.00 Million) Commenced career in Jan’92 – Jul’92 with Damansara Arkitek, Plaza Damansara as Technical Assistant VOLUNTARY ASSIGNMENTS Dec’05 – Sept’15 with Mercy Malaysia as QS Volunteer Major Projects Handled: • Temporary Shelter Project at Gorkha, Nepal for Government of Nepal (USD 75,000) • Renovation of District Polyclinic at Doboj and Maglaj, Bosnia Herzegovina for Government of Bosnia (USD 250,000) • Reconstruction of Nasanugan & Ballion Primary School at Leytee Island, Philippines for Government of Philippines (USD 150,000) • Renovation of Ormoc & Paloh District Hospital at Leytee Island, Philippines for Government of Philippines (USD 300,000) • Construction and Completion of: o Rural Health Centre At Tando Jan Mohd. & Layyah, Punjab & Sindh District, Pakistan (USD 1.00 million) o District Health Office at Bagh, Jammu Kashmir Azzad Khan, Kashmir, Pakistan (RM 2.30 Million)
  • 4. o District Health Office at Dedaye, Ayeyawarde District, Myanmar (14 Locations) (USD 0.90 Million) o Hospital Gunung Sitoli at Nias, Indonesia (RM 18.00 Million) o 2 Storey Nursing College Building at Syiah Kuala University, Aceh Besar, Naggroe Aceh, Indonesia (RM 4.00 Million) o Polyclinic at:  Delingo, Jogjakarta, Indonesia (RM 0.60 Million)  Awa’i Nias Island, Indonesia (RM 0.60 Million)  Heliweto Gido, Nias Island, Indonesia (RM 0.70 Million) o 2 Storey Akper Building at Unsyiah, Aceh Besar, Naggroe Aceh DS (Fund under Petronas Malaysia) (RM 3.60 Million) o Single Storey Mosque at Gng Sitoli, Nias Island, Indonesia (RM 0.895 Million) • Renovation & Reconstruction of El-Waf a Rehab Hospital, Gaza City, Palestin (USD 0.50 Million) Since Jan’10 with Taufikaziz Architect, Bangladesh, Kazastan, Malaysia as Quantity Surveyor Since Jan’12 with KLSS Super Studion, Mekah, Indonesia as Quantity Surveyor Mar’13 – Nov’14 with VSIX Power Corporation SDN BHD as Project Manager Major Project Handled: • Sub-Contractor Proposed Construction and Completion of Sport School at Perlis Malaysia for Ministry of Education Malaysia (RM 34.24 Juta) EDUCATION 1995 B.Sc. (Hons. in Quantity Surveying) from Mara Institute of Technology, Shah Alam, Selangor Darul Ehsan 1991 Diploma in Building from Mara Institute of Technology, Shah Alam, Selangor Darul Ehsan CERTIFICATION 1987 Certificate in Architecture from Ungku Omar Polytechnic, IPOH, Perak TECHNICAL SKILLS • Well versed with AutoCAD, MS Office (Excel, Word, PowerPoint & Project), Sketches and Internet Applications PERSONAL DETAILS Date of Birth: 26 th September 1967 Linguistic Abilities: English & Malay