Project or Maintenance Description: ______________________________________________________
Date Inspected: ________________________
Project Manager: _____________________________________________________________
Work Permit ID: ___________________
ITEM DESCRIPTION YES/NO
N/A
CORRECTIVE ACTION/
DATE CORRECTED/COMMENTS
G GENERAL
G1
Work area is clean, orderly, no leftover material or
debris.
G2
Safety Hazards Addressed: Sharp edges, low head
clearance, missing equipment guards, etc…
G3
Maximo Tag, Nameplate, and Serial Number are
attached to equipment.
G4
Instrument gauges/meters labeling is correct and
operating in the normal range.
G5
Equipment and components are labeled according to
labeling standard.
G6
Wall and ceiling penetrations are repaired, painted,
or replaced with equivalent material.
G7
Penetrations through fire rated construction has been
sealed with fire caulk and pillows.
G8 Installation meets code compliance requirements.
G9
Isolation devices (valves, disconnects, etc.) have
provisions for lock-out devices.
G10
Material has been disposed or recycled in the proper
containers (Ex: Wood, Metal, General Trash,
Cardboard).
G11
Abandoned, unused, or decommissioned equipment
has been wrecked out or removed from service
G12
Manufacturer installation, operation, and start-up
checklist are complete and verified.
G13
Equipment meets requirements for work space
clearance (Ex. Electrical panels, thermostats, etc…)
G14
Project was installed according to the construction
drawings provided by System Owner.
D DOCUMENTATION:
D1
Submittal of equipment operation manuals and
specifications to System Owner.
D2
As-built documentation such as red line drawings are
submitted to System Owner.
D3
Initial operating parameters are documented and
submitted to system owner (Ex. Testing and balance,
current, rotation, phasing, etc…)
D4
LOTO procedures have been documented for non-
standard or special electrical, mechanical, and
chemical systems which will be needed for future
use.
E ELECTRICAL:
E1
Verify sufficient lighting levels and fixtures lamped
within the area. (Coordinate with O&M to address)
Electrical Commissioning Checklist - Rev B
WW Design & Sales Facilities
Printed Specifications are NOT Controlled Documents. Verify Revision before using.
Inspected By: ___________________________________
Inspected By: ___________________________________
Inspected By: ___________________________________
1/2
ITEM DESCRIPTION YES/NO
N/A
CORRECTIVE ACTION/
DATE CORRECTED/COMMENTS
Inspected By: ___________________________________
E2
Ensure electrical conductors, receptacles, boxes,
and equipment are properly routed and supported.
E3
Verify all electrical connections are tighten and/or
torqued according to manufacturer specifications.
E4
Verify all holes are covered, breaker spaces are
filled, and screws are replaced on panelboard.
E5
Ensure there are not any tripping hazards caused by
conductor routing, plugstrips, and equipment.
E6
Document the conductor and main breaker
information on panel schedule during panel
shutdown or energized work.
E7
Electrical measurements have been performed
(voltage, amperage, continuity, etc…) and
documented.
E8
E-PST Commissioning or additional Checklists have
been completed for new equipment installations
where applicable
PM SYSTEM OWNER/PROJECT MANAGER:
PM1
AutoCAD drawings (electrical oneline, plan view
layout, P&ID) have been updated and stored in
Meridian.
PM2
Sequence of Operations (SOO) and Standard
Operating Procedures (SOP) have been created or
updated for equipment as required.
PM3
Preventative Maintenance Job Plans and Warranty
information has been created and documented in
Maximo.
PM4
Training of Operations and Maintenance teams are
complete for new systems
PM5
Financial invoices have been submitted, purchase
orders matched/closed, and submitted for closure in
SAP.
PM6
Panel schedule has been updated with equipment,
breaker, and conductor information in ESM.
B a0212366, Jeff Miller 7/12/2012 Added Ops training & minor updates.
A a0866742, Marcus Lockhart 7/3/2012 Updated based on lessons learned.
Authored By: a0866742, Marcus Lockhart
Approved By: a0212366, Jeff Miller Date: 7/11/2012
REVISION HISTORY:
Date: 6/15/2011
Inspected By: ___________________________________
2/2

Sample Electrical Commissioning Checklist.pdf

  • 1.
    Project or MaintenanceDescription: ______________________________________________________ Date Inspected: ________________________ Project Manager: _____________________________________________________________ Work Permit ID: ___________________ ITEM DESCRIPTION YES/NO N/A CORRECTIVE ACTION/ DATE CORRECTED/COMMENTS G GENERAL G1 Work area is clean, orderly, no leftover material or debris. G2 Safety Hazards Addressed: Sharp edges, low head clearance, missing equipment guards, etc… G3 Maximo Tag, Nameplate, and Serial Number are attached to equipment. G4 Instrument gauges/meters labeling is correct and operating in the normal range. G5 Equipment and components are labeled according to labeling standard. G6 Wall and ceiling penetrations are repaired, painted, or replaced with equivalent material. G7 Penetrations through fire rated construction has been sealed with fire caulk and pillows. G8 Installation meets code compliance requirements. G9 Isolation devices (valves, disconnects, etc.) have provisions for lock-out devices. G10 Material has been disposed or recycled in the proper containers (Ex: Wood, Metal, General Trash, Cardboard). G11 Abandoned, unused, or decommissioned equipment has been wrecked out or removed from service G12 Manufacturer installation, operation, and start-up checklist are complete and verified. G13 Equipment meets requirements for work space clearance (Ex. Electrical panels, thermostats, etc…) G14 Project was installed according to the construction drawings provided by System Owner. D DOCUMENTATION: D1 Submittal of equipment operation manuals and specifications to System Owner. D2 As-built documentation such as red line drawings are submitted to System Owner. D3 Initial operating parameters are documented and submitted to system owner (Ex. Testing and balance, current, rotation, phasing, etc…) D4 LOTO procedures have been documented for non- standard or special electrical, mechanical, and chemical systems which will be needed for future use. E ELECTRICAL: E1 Verify sufficient lighting levels and fixtures lamped within the area. (Coordinate with O&M to address) Electrical Commissioning Checklist - Rev B WW Design & Sales Facilities Printed Specifications are NOT Controlled Documents. Verify Revision before using. Inspected By: ___________________________________ Inspected By: ___________________________________ Inspected By: ___________________________________ 1/2
  • 2.
    ITEM DESCRIPTION YES/NO N/A CORRECTIVEACTION/ DATE CORRECTED/COMMENTS Inspected By: ___________________________________ E2 Ensure electrical conductors, receptacles, boxes, and equipment are properly routed and supported. E3 Verify all electrical connections are tighten and/or torqued according to manufacturer specifications. E4 Verify all holes are covered, breaker spaces are filled, and screws are replaced on panelboard. E5 Ensure there are not any tripping hazards caused by conductor routing, plugstrips, and equipment. E6 Document the conductor and main breaker information on panel schedule during panel shutdown or energized work. E7 Electrical measurements have been performed (voltage, amperage, continuity, etc…) and documented. E8 E-PST Commissioning or additional Checklists have been completed for new equipment installations where applicable PM SYSTEM OWNER/PROJECT MANAGER: PM1 AutoCAD drawings (electrical oneline, plan view layout, P&ID) have been updated and stored in Meridian. PM2 Sequence of Operations (SOO) and Standard Operating Procedures (SOP) have been created or updated for equipment as required. PM3 Preventative Maintenance Job Plans and Warranty information has been created and documented in Maximo. PM4 Training of Operations and Maintenance teams are complete for new systems PM5 Financial invoices have been submitted, purchase orders matched/closed, and submitted for closure in SAP. PM6 Panel schedule has been updated with equipment, breaker, and conductor information in ESM. B a0212366, Jeff Miller 7/12/2012 Added Ops training & minor updates. A a0866742, Marcus Lockhart 7/3/2012 Updated based on lessons learned. Authored By: a0866742, Marcus Lockhart Approved By: a0212366, Jeff Miller Date: 7/11/2012 REVISION HISTORY: Date: 6/15/2011 Inspected By: ___________________________________ 2/2