This document provides updates on various construction, renovation, and infrastructure projects taking place in 2011 across multiple Local Government Areas in Lagos State, Nigeria. Projects include the construction of new classrooms and healthcare facilities, rehabilitation of primary schools and primary health centers, provision of water sources, and procurement of ambulances. Status updates are provided such as the level of completion of building works or storage of supplied equipment pending facility completion.
1. Pictorial presentation of some
projects (Stage 2)
Lagos State
INDEPENDENT PERFORMANCE MGT OF
2011 CGS - LG INTERVENTIONS 1
2. 13/02/13. LG/EO/001: Construction of a new block of 8 classrooms with water
source - project up to lintel level. Borehole drilled and cased (sited at the back of the
building)
8. 12/02/13. LG/EO/010: Supply of basic equipment and furniture to Araromi PHC – ambulance
kept at the LG headquarters, other items stored at Okumopo PHC awaiting completion of the
PHC
15. 12/02/13. LG/IL/040-042: Provision of medical equipment for Apakin, Folu, Okunraye PHC –
equipment in store at the LG headquarters awaiting distribution to the beneficiary facilities.
16. 12/02/13. LG/IL/078: Construction of fence walls around Community Primary School Otolu with
gate and gate house – gate house at substructure level
17. 12/02/13. LG/IL/079: Renovation of a block of six classrooms at Roman Catholic Mission
School, Olomowewe – making good the superstructure/frame
The consultant and Asst Area Engineer
discussing
22. 11/02/13. LG/IK/053: Provision of solar powered borehole, pumping machine & overhead
tanks at Bola memorial primary school, Abule Onigbagbo – already serving the school
23. 11/02/13. LG/IK/054: Provision of solar powered borehole, pumping machine & overhead
tanks at Community primary school, Wasinmi – already serving the school
24. 11/02/13. LG/IK/055: Provision of solar powered borehole, pumping machine & overhead
tanks at Opebi primary school, Opebi – already serving the school
26. 11/02/13. LG/IK/058: Construction of PHC at Olusosun – project at DPC level. PHC is being
constructed in the same compound with the school but will be separated out at completion