Laurie Brlas, Chief Financial Officer
CIBC 19th Annual Whistler Investor Conference
January 2016
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 2January 2016
Cautionary statement
Cautionary statement regarding forward looking statements:
This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and
Section 21E of the Securities Exchange Act of 1934, as amended, and are intended to be covered by the safe harbor provided for under
such sections. Such forward-looking statements may include, without limitation: (i) estimates of future consolidated and attributable
production and sales; (ii) estimates of future costs applicable to sales and All-in sustaining costs; (iii) estimates of future consolidated and
attributable capital expenditures; (iv) our efforts to continue delivering reduced costs and efficiency; (v) expectations regarding the
development, growth and exploration potential of the Company’s operations and projects, including the Turf Vent Shaft, Merian, Long
Canyon Phase 1, Tanami Expansion, Subika Underground and Ahafo Mill Expansion; (vi) expectations regarding the repayment of debt
from cash flows and existing cash; and (vii) expectations regarding future price assumptions, financial performance and other outlook or
guidance. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect.
Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical, hydrological
and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s operations and projects being
consistent with current expectations and mine plans, including without limitation receipt of export approvals; (iii) political developments in
any jurisdiction in which the Company operates being consistent with its current expectations; (iv) certain exchange rate assumptions for
the Australian dollar to the U.S. dollar, as well as other the exchange rates being approximately consistent with current levels; (v) certain
price assumptions for gold, copper and oil; (vi) prices for key supplies being approximately consistent with current levels; (vii) the accuracy
of our current mineral reserve and mineralized material estimates; (viii) the acceptable outcome of negotiation of the amendment to the
Contract of Work and/or resolution of export issues in Indonesia (ix) there being no significant acquisitions or divestitures during the
outlook period and; (x) other assumptions noted herein. Where the Company expresses an expectation or belief as to future events or
results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are
subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed,
projected or implied by the “forward-looking statements”. Such risks include, but are not limited to, gold and other metals price volatility,
currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans,
political and operational risks, community relations, conflict resolution and outcome of projects or oppositions and governmental regulation
and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company’s 2014 Annual Report on Form
10-K, filed on February 20, 2015, with the Securities and Exchange Commission (the “SEC”), the Company’s Quarterly Report on Form
10-Q filed on July 23, 2015, as well as the Company’s other SEC filings. The Company does not undertake any obligation to release
publicly revisions to any “forward-looking statement,” including, without limitation, outlook, to reflect events or circumstances after the date
of this presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.
Investors should not assume that any lack of update to a previously issued “forward-looking statement” constitutes a reaffirmation of that
statement. Continued reliance on “forward-looking statements” is at investors' own risk.
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 3January 2016
Strategy to lead the gold sector in value creation
• Improve the underlying business – deliver ongoing cost and efficiency improvements
• Strengthen the portfolio – increase portfolio value and balance sheet strength
• Create shareholder value – outperform sector in free cash flow and shareholder returns
Merian
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 4January 2016
0.65
0.47
0.39
0.32
0.2
0.3
0.4
0.5
0.6
0.7
2012 2013 2014 2015 YTD
Running a safer and more productive business
Injury rates (total recordable injuries per 200,000 hours worked)
Labor costs ($ per gold equivalent ounce produced)
Injury rates down ~50%
Productivity up ~40%
$492
$433
$392
$284
$200
$300
$400
$500
2012 2013 2014 2015 YTD
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 5January 2016
Realizing our Full Potential
• Structured approach to accelerating value delivery
• Full Potential improvements of $1 billion to date1
• Future savings expected to exceed targets
• Stronger technical fundamentals, knowledge-sharing
Full Potential improvements by type (2012 – 2015 YTD)
Processing
• Ore blending and throughput
• Maintenance shutdowns
Sustaining capex
• Equipment reliability
• Asset management
Mining
• Modeling and mine planning
• Payload and fleet availability
41%
Processing
30%
Sustaining
Capital
24%
Mining
5%
Supply Chain
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 6January 2016
Step change in portfolio value delivered
Divested Reinvested
Assets
Midas, Jundee,
Penmont, Waihi
Merian, Long
Canyon, CC&V
Mine life Less than 6 years More than 10 years
Production 500Koz/year ~1Moz/year
Costs $900 – $950/oz Below $800/oz
Risk
Higher technical
and social risk
Lower technical
and social risk
AISC down 19%
Mine life up 66%
*Production and cost data represent expected weighted average calculation based on 5-year outlook estimates
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 7January 2016
0.5x
1.0x
1.5x
2.0x
2.5x
3.0x
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3
Maintaining industry leading net debt to EBITDA
2013 2014 2015
Net debt to EBITDA2
Newmont Competitor average
*Competitors include Agnico Eagle, Anglogold Ashanti, Barrick, Buenaventura, Goldcorp, Gold Fields, Harmony, Kinross, Newcrest, and Yamana; net debt to EBITDA utilizes trailing
12-month EBITDA. Competitor average is weighted based on Total Enterprise Value (September 30, 2015). Newmont Q2 2015 net debt excludes cash for CC&V of $820 million.
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 8January 2016
0%
2%
4%
6%
8%
10%
12%
14%
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3
Industry leading return on capital employed
Return on capital employed (%)
*Competitors include Agnico Eagle, Anglogold Ashanti, Barrick, Buenaventura, Goldcorp, Gold Fields, Harmony, Kinross, Newcrest, and Yamana; ROCE is a non-GAAP metric and
utilizes rolling 12 month earnings before interest and taxes (EBIT) over capital employed less cash and equivalents. Competitor average is weighted based on Total Enterprise Value
(September 30, 2015). All figures sourced from Capital IQ.
2013 2014 2015
Newmont Competitor average
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 9January 2016
Prepared for opportunities and challenges
Upside
• Maintain cost and capital
discipline
• Follow up on most
promising exploration
prospects
• Accelerate debt
repayment
• Pursue value-accretive
growth
• Pay higher dividends in
line with policy
$1,100/ounce gold
• Optimize costs & capital
• Complete current
projects
• Near-mine, high value
exploration focus
• Reduce support costs
across business
• Review Batu Hijau
Phase 7 and Ahafo Mill
Expansion options
• Pay dividend at Board’s
discretion
Downside
• Reduce stripping and
increase stockpile
processing
• Complete current
projects
• Mothball lowest margin
operations
• Reduce exploration
• Discontinue early debt
repayments
• Reevaluate dividend
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 10January 2016
Where are we today? Where are we heading?
Safety Industry leading performance Zero injuries and illnesses
Sustainability Industry leading performance Improved country risk profile
Costs AISC down 27% since 20123 Ongoing savings to offset inflation
Portfolio ~$1.7B in non-core asset sales Superior value and risk profile
Production Steady production High value vs high cost ounces
Free Cash Flow Positive for 6 quarters running4 Self-fund projects and dividends
Returns Maximize risk-adjusted returns Maintain first quartile TSR
Balance sheet Net debt down 35% since 2013 Superior financial flexibility
Building on a solid foundation
Questions?
Appendix
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 13January 2016
% of 2015E
gold production
Maximizing returns across the portfolio
North America
Carlin
Phoenix
Twin Creeks
Long Canyon
CC&V
South America
Merian
Yanacocha
Project Integral
Conga
Africa
Ahafo
Akyem
Asia Pacific
Batu Hijau
Boddington
Kalgoorlie
Tanami
Since 2012*
Injury rates
− 50%
Productivity
+ 40%
AISC
− 27%
Sust CapEx
− 55%
Projects
+ 5
Operations
Projects
2015E gold
production
North America
34%
South America
10%
Africa
16%
Australia
33%
Indonesia
7%
*Percentage change compares Q3 2015 YTD vs 2012A; sustaining capital expenditure compares 2015E vs 2012A
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 14January 2016
2012A 2013A 2014A 2015E 2016E 2017E 2018E 2019E 2020E
AISC improvements are sustained
Consolidated gold all-in sustaining cost per ounce3 ($/oz)
850 – 950900 – 960
1,002
1,113
1,177
900 – 1,000880 – 940
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 15January 2016
2012A 2013A 2014A 2015E 2016E 2017E 2018E 2019E 2020E
Attributable gold production5 (Moz)
Steady attributable gold production
5.2 – 5.7
4.5 – 5.0
5.0 5.1 4.8 – 5.3
4.8
4.7 – 5.1
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 16January 2016
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
2012A 2013A 2014A 2015E 2016E 2017E 2018E 2019E 2020E
Disciplined approach to capital expenditures
Consolidated capital expenditure ($M)
700 – 800
900 –
1,000
3,152
1,812
1,099
1,205 –
1,420
1,415 –
1,625
Sustaining capital Merian Turf Vent Shaft
Long Canyon CC&V Tanami Expansion
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 17January 2016
Optimized project portfolio and disciplined execution
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 18January 2016
Long Canyon opens prospective new district
• High grade oxide deposit, with trend potential
and mineralization open in all directions
• Optimized to lower capital, improve returns
• Progressing on schedule and on budget
Production 100 – 150 Koz
AISC $500 – $600/oz
Capital $250 – $300M
First production Early 2017
Production and AISC calculated as first full five year average
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 19January 2016
Merian construction on schedule, below budget
• Optimized approach, partnership and broad
engagement lower cost and risk
• Construction on schedule at reduced budget
• First ore grades are favorable to model Production and capital on a 100% basis; production and AISC calculated as
first full five year average
Production 400 – 500 Koz
AISC $650 – $750/oz
Capital $800 – $875M
First production 2016
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 20January 2016
Disciplined approach to portfolio optimization
De-risk Maintain
Close or divest Improve value
LowValueHigh
High Risk Low
Portfolio approach
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 21January 2016
Strengthening the balance sheet
Regional debt Convertibles Term loan Other corporate debt
Debt ($M) 2014A 2015 YTD 2016E – 2018E6
Regional debt - $130M $400M
Convertibles $575M to term loan - -
Term loan $100M $200M -
Other corporate debt - - ~$300 - $800M
Revolving credit facility - Extended to 2020 -
Total de-levering $100M $330M YTD ~$700 - $1,200M
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 22January 2016
Steady dividend with upside potential
Annualized dividend per share (US$)*
*For illustrative purposes, declaration of dividend remains subject to Board of Directors approval
$0.10
$0.20
$0.40
$0.60
$0.80
$1.00
$1.20
$0.00
$0.50
$1.00
$1.50
<$1,300
$1,300-$1,399
$1,400-$1,499
$1,500-$1,599
$1,600-$1,699
$1,700-$1,799
$1,800-$1,899
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 23January 2016
Labor &
services
45%
Materials
30%
Power
10%
Diesel
10%
Royalties
& other 5%
Conservative plan with upside leverageConservative plan with upside leverage
*All other variables held constant (i.e. FCF for flexed gold price does not include changes to Cu price, AUD or WTI). Economics assume 35% portfolio tax rate. Excludes hedges.
CAS pie chart excludes inventory changes.
2016 CAS breakdown Potential upside includes:
• Further cost and efficiency
improvements
• FX and oil tailwinds
• Projects that are not yet
approved
2016 sensitivities 2016 Price Change FCF (US$M) Attrib. FCF (US$M)
Gold ($/oz) $1,100 +$100 +$350 +$300
Copper ($/lb) $2.50 +$0.25 +$75 +$50
Australian Dollar $0.75 -$0.05 +$60 +$60
Oil ($/bbl) $65 -$10 +$40 +$30
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 24January 2016
Base salary
13%
Personal
bonus
6%
Company bonus
14%
Performance
Stock Units 45%
Restricted Stock
Units 22%
Personal
objectives
Two-thirds of
compensation
based on stock
performance
Operating
performance
CEO compensation
Executive compensation tied to shareholder returns
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 25January 2016
2015 Corporate Performance Metrics
• Health and Safety
• Operational Excellence
(EBITDA, Cost)
• Growth (Reserves, Projects)
• People (Leadership, Personal
objectives)
• Sustainability and External
Relations (Regions only)
Safety Profitability Growth / Future Value
Safety Metrics EBITDA Cost
Reserves and
Resources
Project Delivery
20% 20% 40% 10% 10%
Incentives plan supports strategic objectives
Note: Chart represents annual incentive plan for Senior Vice President and above.
Personal
Bonus
30%
Company
Bonus
70%
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 26January 2016
aOutlook projections used in this presentation (“Outlook”) are
considered “forward-looking statements” and represent
management’s good faith estimates or expectations of future
production results as of December 2, 2015. Outlook is based upon
certain assumptions, including, but not limited to, metal prices, oil
prices, certain exchange rates and other assumptions. For example,
Outlook assumes $1,100/oz Au, $2.50/lb Cu, $0.75 USD/AUD
exchange rate and $65/barrel WTI. AISC and CAS cost estimates
do not include inflation. Production, AISC and capital estimates
exclude projects that have not yet been approved (NW Exodus,
Twin Underground, Batu Phase 7, Ahafo Mill Expansion and Subika
Underground). The potential impact on inventory valuation as a
result of lower prices, input costs, and project decisions are not
included as part of this Outlook. Such assumptions may prove to be
incorrect and actual results may differ materially from those
anticipated. Consequently, Outlook cannot be guaranteed. As such,
investors are cautioned not to place undue reliance upon Outlook
and forward-looking statements as there can be no assurance that
the plans, assumptions or expectations upon which they are placed
will occur.
bNon-GAAP measure. All-in sustaining costs as used in the
Company’s Outlook is a non-GAAP metric defined as the sum of
cost applicable to sales (including all direct and indirect costs
related to current gold production incurred to execute on the current
mine plan), remediation costs (including operating accretion and
amortization of asset retirement costs), G&A, exploration expense,
advanced projects and R&D, treatment and refining costs, other
expense, net of one-time adjustments and sustaining capital.
cIncludes Lone Tree operations.
dIncludes TRJV operations.
eConsolidated production for Yanacocha is presented on a total
production basis for the mine site; attributable production represents
a 51.35% interest.
fBoth consolidated and attributable production are shown on a pro-
rata basis with a 50% ownership for Kalgoorlie.
gProduction outlook does not include equity production from stakes
in TMAC (29.4%), La Zanja (46.94%) and Regis (19.45%).
hConsolidated production for Batu Hijau is presented on a total
production basis for the mine site; whereas attributable production
represents a 48.5% ownership interest in 2016 outlook. Outlook for
Batu Hijau remains subject to various factors, including, without
limitation, renegotiation of the CoW, issuance of future export
approvals, negotiations with the labor union, future in-country
smelting availability and regulations relating to export quotas, and
certain other factors.
iConsolidated expense outlook is adjusted to exclude extraordinary
items. For example, the tax rate outlook above is a consolidated
adjusted rate, which assumes the exclusion of certain tax valuation
allowance adjustments.
2016 Outlooka
Consolidated Attributable Consolidated
Consolidated
All-in Sustaining
Consolidated
Total Capital
Production Production CAS Costsb
Expenditures
(Koz, Kt) (Koz, Kt) ($/oz, $/lb) ($/oz, $/lb) ($M)
North America
Carlin 1,040 – 1,100 1,040 – 1,100 $750 – $800 $925 – $975 $175 – $195
Phoenix
c
180 – 200 180 – 200 $825 – $875 $975 – $1,025 $20 – $30
Twin Creeks
d
370 – 400 370 – 400 $575 – $625 $700 – $750 $30 – $40
CC&V 350 – 400 350 – 400 $525 – $575 $650 – $700 $120 – $130
Long Canyon $140 – $160
Other North America $5 – $15
Total 1,940 – 2,100 1,940 – 2,100 $675 – $725 $850 – $925 $490 – $570
South America
Yanacocha
e
630 – 660 310 – 350 $820 – $870 $1,100 – $1,170 $70 – $90
Merian 120 – 140 90 – 100 $430 – $460 $650 – $700 $260 – $300
Total 750 – 800 400 – 450 $760 – $810 $1,050 – $1,150 $330 – $380
Asia Pacific
Boddington 725 – 775 725 – 775 $690 – $730 $800 – $850 $60 – $70
Tanami 400 – 475 400 – 475 $550 – $600 $800 – $850 $150 – $160
Kalgoorlie
f
350 – 400 350 – 400 $650 – $700 $725 – $775 $10 – $20
Other Asia Pacific $5 – $15
Batu Hijau 525 – 575 250 – 275 $500 – $550 $650 – $700 $50 – $60
Total 2,000 – 2,225 1,725 – 1,925 $600 – $650 $760 – $820 $275 – $325
Africa
Ahafo 330 – 360 330 – 360 $775 – $825 $1,020 – $1,100 $60 – $80
Akyem 430 – 460 430 – 460 $560 – $600 $700 – $750 $40 – $50
Total 760 – 820 760 – 820 $650 – $700 $850 – $900 $100 – $130
Corporate/Other $10 – $15
Total Gold
g
5,450 – 5,945 4,825 – 5,295 $650 – $700 $900 – $960 $1,205 – $1,420
Phoenix 15 – 25 15 – 25 $1.70 – $1.90 $2.10 – $2.30
Boddington 25 – 35 25 – 35 $1.90 – $2.10 $2.30 – $2.50
Batu Hijau
h
170 – 190 80 – 100 $1.00 – $1.20 $1.40 – $1.60
Total Copper 210 – 250 120 – 160 $1.20 – $1.40 $1.50 – $1.70
Consolidated Expense Outlook
General & Administrative $ 225 – $ 275
Interest Expense $ 270 – $ 290
DD&A $ 1,350 – $ 1,425
Exploration and Projects $ 275 – $ 300
Sustaining Capital $ 700 – $ 750
Tax Rate 35% – 39%
i
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 27January 2016
Three Months Ended Nine Months Ended
September 30, September 30,
2015 2014 2015 2014
Net income (loss) attributable to Newmont stockholders $ 219 $ 213 $ 474 $ 493
Net income (loss) attributable to noncontrolling interests 66 (138) 188 (225)
Loss (income) from discontinued operations (17) (3) (34) 16
Equity loss (income) of affiliates 18 — 34 (2)
Income and mining tax expense (benefit) 151 (47) 496 (22)
Depreciation and amortization 331 318 896 922
Interest expense, net 81 89 248 276
EBITDA $ 849 $ 432 $ 2,302 $ 1,458
Adjustments:
Impairments and loss provisions $ 32 $ 8 $ 108 $ 22
Restructuring and other 12 19 26 32
Acquisitions costs 7 — 15 —
Gain on deconsolidation of TMAC (76) — (76) —
Loss (gain) on asset and investment sales (66) (41) (109) (93)
Abnormal production costs at Batu Hijau — 37 — 53
Adjusted EBITDA $ 758 $ 455 $ 2,266 $ 1,472
EBITDA and Adjusted EBITDA
Management uses Earnings before interest, taxes and depreciation and amortization (EBITDA) and EBITDA adjusted for
non-core or certain items that have a disproportionate impact on our results for a particular period (Adjusted EBITDA) as
non-GAAP measures to evaluate the Company’s operating performance. EBITDA and Adjusted EBITDA do not represent,
and should not be considered an alternative to, net earnings (loss), operating earnings (loss), or cash flow from operations
as those terms are defined by GAAP, and does not necessarily indicate whether cash flows will be sufficient to fund cash
needs. Although Adjusted EBITDA and similar measures are frequently used as measures of operations and the ability to
meet debt service requirements by other companies, our calculation of Adjusted EBITDA is not necessarily comparable to
such other similarly titled captions of other companies. The Company believes that Adjusted EBITDA provides useful
information to investors and others in understanding and evaluating our operating results in the same manner as our
management and board of directors. Management’s determination of the components of Adjusted EBITDA are evaluated
periodically and based, in part, on a review of non-GAAP financial measures used by mining industry analysts. Net income
(loss) attributable to Newmont stockholders is reconciled to EBITDA and Adjusted EBITDA as follows:
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 28January 2016
Free Cash Flow
Free Cash Flow is cash generated from Net cash provided from continuing operations less Additions to property, plant and
mine development as presented on the Statement of Cash Flows. To supplement our statements of cash flows presented
on a GAAP basis, we use non-GAAP measures of cash flows to analyze cash flows generated from our operations. We
believe Free Cash Flow is also useful as one of the bases for comparing our performance with our competitors. The
presentation of non-GAAP Free Cash Flow is not meant to be considered in isolation or as an alternative to net income as
an indicator of our performance, or as an alternative to cash flows from operating activities as a measure of liquidity. Net
cash provided from continuing operations is reconciled to Free Cash Flow as follows:
Three Months Ended Nine Months Ended
September 30, September 30,
2015 2014 2015 2014
Net cash provided by continuing operations $ 813 $ 328 $ 1,882 $ 889
Less: Additions to property, plant and mine development (335) (277) (941) (766)
Free Cash Flow $ 478 $ 51 $ 941 $ 123
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 29January 2016
Newmont has worked to develop a metric that expands on GAAP measures such as cost of goods sold and non-GAAP measures, such as costs applicable to sales per ounce, to provide visibility into the
economics of our mining operations related to expenditures, operating performance and the ability to generate cash flow from operations.
Current GAAP-measures used in the mining industry, such as cost of goods sold, do not capture all of the expenditures incurred to discover, develop, and sustain gold production. Therefore, we believe that all-in
sustaining costs is a non-GAAP measure that provides additional information to management, investors, and analysts that aid in the understanding of the economics of our operations and performance compared
to other producers and in the investor’s visibility by better defining the total costs associated with production.
All-in sustaining cost (AISC) amounts are intended to provide additional information only and do not have any standardized meaning prescribed by GAAP and should not be considered in isolation or as a
substitute for measures of performance prepared in accordance with GAAP. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP. Other
companies may calculate these measures differently as a result of differences in the underlying accounting principles, policies applied and in accounting frameworks such as in International Financial Reporting
Standards (IFRS), or by reflecting the benefit from selling non-gold metals as a reduction to AISC. Differences may also arise related to definitional differences of sustaining versus development capital activities
based upon each company’s internal policies.
The following disclosure provides information regarding the adjustments made in determining the all-in sustaining costs measure:
Cost Applicable to Sales - Includes all direct and indirect costs related to current gold production incurred to execute the current mine plan. Costs Applicable to Sales (CAS) includes by-product credits from
certain metals obtained during the process of extracting and processing the primary ore-body. CAS is accounted for on an accrual basis and excludes Amortization and Reclamation and remediation, which is
consistent with our presentation of CAS on the Statement of Consolidated Income. In determining AISC, only the CAS associated with producing and selling an ounce of gold is included in the measure.
Therefore, the amount of gold CAS included in AISC is derived from the CAS presented in the Company’s Statement of Consolidated Income less the amount of CAS attributable to the production of copper at our
Phoenix, Boddington and Batu Hijau mines. The copper CAS at those mine sites is disclosed in Note 3 – Segments that accompanies the Consolidated Financial Statements. The allocation of CAS between gold
and copper at the Phoenix, Boddington and Batu Hijau mines is based upon the relative sales percentage of copper and gold sold during the period.
Remediation Costs - Includes accretion expense related to asset retirement obligations (ARO) and the amortization of the related Asset Retirement Cost (ARC) for the Company’s operating properties recorded as
an ARC asset. Accretion related to ARO and the amortization of the ARC assets for reclamation and remediation do not reflect annual cash outflows but are calculated in accordance with GAAP. The accretion
and amortization reflect the periodic costs of reclamation and remediation associated with current gold production and are therefore included in the measure. The allocation of these costs to gold and copper is
determined using the same allocation used in the allocation of CAS between gold and copper at the Phoenix, Boddington and Batu Hijau mines.
Advanced Projects and Exploration - Includes incurred expenses related to projects that are designed to increase or enhance current gold production and gold exploration. We note that as current resources are
depleted, exploration and advance projects are necessary for us to replace the depleting reserves or enhance the recovery and processing of the current reserves. As this relates to sustaining our gold production,
and is considered a continuing cost of a mining company, these costs are included in the AISC measure. These costs are derived from the Advanced projects, research and development and Exploration amounts
presented in the Company’s Statement of Consolidated Income less the amount attributable to the production of copper at our Phoenix, Boddington and Batu Hijau mines. The allocation of these costs to gold and
copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Batu Hijau, Boddington and Phoenix mines.
General and Administrative - Includes cost related to administrative tasks not directly related to current gold production, but rather related to support our corporate structure and fulfilling our obligations to operate
as a public company. Including these expenses in the AISC metric provides visibility of the impact that general and administrative activities have on current operations and profitability on a per ounce basis.
Other Expense, net - Includes costs related to regional administration and community development to support current gold production. We exclude certain exceptional or unusual expenses from Other expense,
net, such as restructuring, as these are not indicative to sustaining our current gold operations. Furthermore, this adjustment to Other expense, net is also consistent with the nature of the adjustments made to
Net income (loss) as disclosed in the Company’s non-GAAP financial measure Adjusted net income (loss). The allocation of these costs to gold and copper is determined using the same allocation used in the
allocation of CAS between gold and copper at the Phoenix, Boddington and Batu Hijau mines.
Treatment and Refining Costs - Includes costs paid to smelters for treatment and refining of our concentrates to produce the salable metal. These costs are presented net as a reduction of Sales.
Sustaining Capital - We determined sustaining capital as those capital expenditures that are necessary to maintain current gold production and execute the current mine plan. Capital expenditures to develop new
operations, or related to projects at existing operations where these projects will enhance gold production or reserves, are considered development. We determined the breakout of sustaining and development
capital costs based on a systematic review of our project portfolio in light of the nature of each project. Sustaining capital costs are relevant to the AISC metric as these are needed to maintain the Company’s
current gold operations and provide improved transparency related to our ability to finance these expenditures from current operations. The allocation of these costs to gold and copper is determined using the
same allocation used in the allocation of CAS between gold and copper at the Batu Hijau, Boddington and Phoenix mines.
All-in sustaining costs
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 30January 2016
All-in sustaining costs
Year Ended December 31, 2014
Costs
Applicable
to Sales
(1)
(2)(3)
Remediation
Costs
(4)
Advanced
Projects
and
Exploration
General and
Administrative
Other
Expense,
Net
(5)
Treatment
and
Refining
Costs
Sustaining
Capital
(6)
All-In
Sustaining
Costs
Ounces
(000)/
Pounds
(millions)
Sold
All-In
Sustaining
Costs per
oz/lb
GOLD
Carlin $ 795 $ 4 $ 22 $ - $ 8 $ - $ 141 $ 970 905 $ 1,072
Phoenix 160 3 4 - 3 9 17 196 222 883
Twin Creeks 207 2 5 - 3 - 111 328 400 820
La Herradura 89 2 12 - - - 21 124 119 1,042
Other North America - - 25 - 6 - 9 40 - -
North America 1,251 11 68 - 20 9 299 1,658 1,646 1,007
Yanacocha 663 101 32 - 35 - 80 911 966 943
Other South America - - 41 - 2 - - 43 - -
South America 663 101 73 - 37 - 80 954 966 988
Boddington 585 11 - - 2 4 69 671 690 972
Tanami 251 4 10 - 2 - 91 358 345 1,038
Jundee 85 5 1 - 2 - 15 108 140 771
Waihi 76 3 7 - 2 - 2 90 131 687
Kalgoorlie 284 4 5 - 1 4 32 330 327 1,009
Other Australia/New Zealand - - 5 3 21 - 6 35 - -
Australia/New Zealand 1,281 27 28 3 30 8 215 1,592 1,633 975
Batu Hijau 81 3 - - 4 9 8 105 72 1,458
Other Indonesia - - - - - - - - - -
Indonesia 81 3 - - 4 9 8 105 72 1,458
Ahafo 249 8 27 - 6 - 92 382 450 849
Akyem 172 3 - - 8 - 17 200 473 423
Other Africa - - 8 - 7 - - 15 - -
Africa 421 11 35 - 21 - 109 597 923 647
Corporate and Other - - 116 182 31 - 17 346 - -
Total Gold $ 3,697 $ 153 $ 320 $ 185 $ 143 $ 26 $ 728 $ 5,252 5,240 $ 1,002
COPPER
Phoenix $ 108 $ 1 $ 2 $ - $ 1 $ 5 $ 13 $ 130 46 $ 2.83
Boddington 158 2 - - 1 25 18 204 66 3.09
Batu Hijau 494 15 3 1 20 45 51 629 152 4.14
Total Copper $ 760 $ 18 $ 5 $ 1 $ 22 $ 75 $ 82 $ 963 264 $ 3.65
Consolidated $ 4,457 $ 171 $ 325 $ 186 $ 165 $ 101 $ 810 $ 6,215
(1) Excludes Depreciation and
amortization and Reclamation and
remediation.
(2) Includes by-product credits of $85.
(3) Includes stockpile and leach pad
inventory adjustment of $127 at Carlin,
$13 at Phoenix, $15 at Twin Creeks, $75
at Yanacocha, $69 at Boddington, and
$191 at Batu Hijau.
(4) Remediation costs include operating
accretion of $71 and amortization of
asset retirement costs of $100.
(5) Other expense, net is adjusted for
restructuring costs of $40.
(6) Excludes $300 of development capital
expenditures, capitalized interest, and the
increase in accrued capital. The following
are major development projects; Turf
Vent Shaft, Merian, Correnso and Conga
for 2014.
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 31January 2016
All-in sustaining costs
Year Ended December 31, 2013
Costs
Applicable
to Sales
(1)
(2)(3)
Remediation
Costs
(4)
Advanced
Projects
and
Exploration
General and
Administrative
Other
Expense,
Net
(5)
Treatment
and
Refining
Costs
Sustaining
Capital
(6)
All-In
Sustaining
Costs
Ounces
(000)/
Pounds
(millions)
Sold
All-In
Sustaining
Costs per
oz/lb
GOLD
Carlin $ 767 $ 5 $ 34 $ - $ 7 $ 14 $ 154 $ 981 1,013 $ 968
Phoenix 164 3 7 - 2 9 20 205 225 911
Twin Creeks 273 6 7 - 4 - 56 346 518 668
La Herradura 177 - 42 - - - 74 293 183 1,601
Other North America - - 42 - 4 - 23 69 - -
North America 1,381 14 132 - 17 23 327 1,894 1,939 977
Yanacocha 684 90 41 - 63 - 148 1,026 1,022 1,004
Other South America - - 34 - 4 - - 38 - -
South America 684 90 75 - 67 - 148 1,064 1,022 1,041
Boddington 805 6 1 - 2 4 90 908 743 1,222
Tanami 270 3 11 - 3 - 91 378 325 1,163
Jundee 206 13 7 - 1 - 45 272 279 975
Waihi 103 3 5 - 2 - 7 120 111 1,081
Kalgoorlie 342 7 3 - 1 - 19 372 329 1,131
Other Australia/New Zealand - - 13 - 34 - 4 51 - -
Australia/New Zealand 1,726 32 40 - 43 4 256 2,101 1,787 1,176
Batu Hijau 107 2 2 - 3 5 12 131 46 2,848
Other Indonesia - - - - (2) - - (2) - -
Indonesia 107 2 2 - 1 5 12 129 46 2,804
Ahafo 307 3 51 - 14 - 109 484 566 855
Akyem 32 - 8 - 3 - - 43 129 333
Other Africa - - 8 - 10 - - 18 - -
Africa 339 3 67 - 27 - 109 545 695 784
Corporate and Other - - 137 203 25 - 12 377 - -
Total Gold $ 4,237 $ 141 $ 453 $ 203 $ 180 $ 32 $ 864 $ 6,110 5,489 $ 1,113
COPPER
Phoenix $ 52 $ 1 $ 3 $ - $ 1 $ 5 $ 7 $ 69 29 $ 2.38
Boddington 195 1 - - 1 19 22 238 71 3.35
Batu Hijau 815 9 13 - 24 47 93 1,001 158 6.34
Total Copper $ 1,062 $ 11 $ 16 $ - $ 26 $ 71 $ 122 $ 1,308 258 $ 5.07
Consolidated $ 5,299 $ 152 $ 469 $ 203 $ 206 $ 103 $ 986 $ 7,418
(1) Excludes Depreciation and
amortization and Reclamation and
remediation.
(2) Includes by-product credits of $111.
(3) Includes stockpile and leach pad
inventory adjustments of $69 at Carlin, $1
at Twin Creeks, $24 at La Herradura,
$107 at Yanacocha, $184 at Boddington,
$1 at Tanami, $4 at Waihi, $45 at
Kalgoorlie, and $523 at Batu Hijau.
(4) Remediation costs include operating
accretion of $61 and amortization of
asset retirement costs of $91.
(5) Other expense, net is adjusted for
restructuring of $67 and TMAC
transaction costs of $45, offset by $18 for
Boddington Contingent Consideration.
(6) Excludes $914 of development capital
expenditures, capitalized interest, and the
increase in accrued capital. The following
are major development projects; Phoenix
Copper Leach, Turf Vent Shaft,
Yanacocha Bio Leach, Conga, Merian,
Ahafo Mill Expansion, and Akyem for
2013.
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 32January 2016
All-in sustaining costs
(1) Excludes Depreciation and
amortization and Reclamation and
remediation.
(2) Includes by-product credits of $146.
(3) Includes stockpile and leach pad
inventory adjustments of $6 at
Yanacocha, $5 at Tanami, and $17 at
Waihi.
(4) Remediation costs include operating
accretion of $55 and amortization of
asset retirement costs of $40.
(5) Other expense, net is adjusted for
restructuring of $58, Hope Bay care and
maintenance of $144, and Boddington
Contingent Consideration of $12.
(6) Excludes $1,521 of development
capital expenditures, capitalized interest,
and the increase in accrued capital. The
following are major development projects;
Emigrant, Phoenix Copper Leach, Turf
Vent Shaft, Yanacocha Bio Leach,
Conga, Tanami Shaft, Ahafo Mill
Expansion, and Akyem for 2012.
Year Ended December 31, 2012
Costs
Applicable
to Sales (1)
(2)(3)
Remediation
Costs
(4)
Advanced
Projects
and
Exploration
General and
Administrative
Other
Expense,
Net
(5)
Treatment
and
Refining
Costs
Sustaining
Capital
(6)
All-In
Sustaining
Costs
Ounces
(000)/
Pounds
(millions)
Sold
All-In
Sustaining
Costs per
oz/lb
GOLD
Carlin $ 767 $ 4 $ 47 $ - $ 6 $ 14 $ 229 $ 1,067 978 $ 1,091
Phoenix 111 3 14 - 1 8 57 194 188 1,032
Twin Creeks 256 3 30 - - - 117 406 553 734
La Herradura 132 - 41 - - - 71 244 212 1,151
Other North America - - 40 - 11 - 66 117 - -
North America 1,266 10 172 - 18 22 540 2,028 1,931 1,050
Yanacocha 669 34 59 - 70 - 479 1,311 1,325 989
Other South America - - 72 - 4 - 10 86 - -
South America 669 34 131 - 74 - 489 1,397 1,325 1,054
Boddington 623 6 6 - 3 7 112 757 711 1,065
Tanami 250 2 28 - 3 - 130 413 180 2,294
Jundee 172 10 20 - 1 - 58 261 322 811
Waihi 97 4 12 - 3 - 4 120 62 1,935
Kalgoorlie 277 8 5 - 1 - 20 311 341 912
Other Australia/New Zealand - - 19 - 39 - 19 77 - -
Australia/New Zealand 1,419 30 90 - 50 7 343 1,939 1,616 1,200
Batu Hijau 71 2 5 - 8 7 23 116 67 1,731
Other Indonesia - - - - (3) - - (3) - -
Indonesia 71 2 5 - 5 7 23 113 67 1,687
Ahafo 314 4 53 - 24 - 85 480 527 911
Akyem - - 19 - 1 - - 20 - -
Other Africa - - 10 - 1 - - 11 - -
Africa 314 4 82 - 26 - 85 511 527 970
Corporate and Other - - 188 212 18 - 25 443 - -
Total Gold $ 3,739 $ 80 $ 668 $ 212 $ 191 $ 36 $ 1,505 $ 6,431 5,466 $ 1,177
COPPER
Phoenix $ 60 $ 2 $ 7 $ - $ 1 $ 5 $ 31 $ 106 28 $ 3.79
Boddington 150 1 2 - 1 17 27 198 66 3.00
Batu Hijau 385 12 27 - 42 45 126 637 163 3.91
Total Copper $ 595 $ 15 $ 36 $ - $ 44 $ 67 $ 184 $ 941 257 $ 3.66
Consolidated $ 4,334 $ 95 $ 704 $ 212 $ 235 $ 103 $ 1,689 $ 7,372
Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 33January 2016
Endnotes
Investors are encouraged to read the information contained in this presentation in conjunction with the following notes, the Cautionary Statement on slide 2 and the factors described under the
“Risk Factors” section of the Company’s Form 10-Q, filed with the SEC on July 23, 2015, and disclosure in the Company’s recent SEC filings.
1. Full potential savings used in this presentation represent cumulative incremental value realized as a result of Full Potential projects implemented from 2012 through Q3 2015. Figures
compare actual baseline to actual normalized cash flows.
2. EBITDA is a non-GAAP financial measure calculated as Earnings before interest, taxes and depreciation and amortization. The EBITDA figures used in this presentation were calculated by
Capital IQ. For management’s EBITDA calculations and reconciliation to the nearest GAAP metric, please see slide 27 in the Appendix for more information.
3. Historical AISC or All-in sustaining cost is a non-GAAP metric. See slides 29 to 32 in the Appendix for more information and a reconciliation to the nearest GAAP metric. All-in sustaining cost
(“AISC”) as used in the Company’s Outlook is a non-GAAP metric defined as the sum of cost applicable to sales (including all direct and indirect costs related to current gold production
incurred to execute on the current mine plan), remediation costs (including operating accretion and amortization of asset retirement costs), G&A, exploration expense, advanced projects and
R&D, treatment and refining costs, other expense, net of one-time adjustments and sustaining capital. See also note 5 below.
4. Free cash flow is a non-GAAP financial measure. For management’s free cash flow calculations and reconciliation to the nearest GAAP metric, please see slide 28 in the Appendix for more
information.
5. Outlook projections used in this presentation (“Outlook”) are considered “forward-looking statements” and represent management’s good faith estimates or expectations of future production
results as of December 2, 2015. Outlook is based upon certain assumptions, including, but not limited to, metal prices, oil prices, certain exchange rates and other assumptions. For example,
Outlook assumes $1,100/oz Au, $2.50/lb Cu, $0.75 USD/AUD exchange rate and $65/barrel WTI. AISC and CAS cost estimates do not include inflation. Production, AISC and capital
estimates exclude projects that have not yet been approved (NW Exodus, Twin Underground, Batu Phase 7, Ahafo Mill Expansion and Subika Underground). The potential impact on
inventory valuation as a result of lower prices, input costs, and project decisions are not included as part of this Outlook. Long term ranges (2018 – 2020) for production, AISC and capital
provided in this presentation represent 3-year averages. Scheduled debt prepayments exclude capital leases. Such assumptions may prove to be incorrect and actual results may differ
materially from those anticipated. Consequently, Outlook cannot be guaranteed. As such, investors are cautioned not to place undue reliance upon Outlook and forward-looking statements
as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur.
6. Estimated debt payment opportunities over the period, which remain subject to change depending on certain variables and the needs of the business. See also endnote 5.

More Related Content

What's hot

BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference yamanagold2016
 
Kinross Gold Corp European Gold Forum Presentation
Kinross Gold Corp European Gold Forum PresentationKinross Gold Corp European Gold Forum Presentation
Kinross Gold Corp European Gold Forum PresentationKinrossGold
 
Guy april-2017-ir-presentation
Guy april-2017-ir-presentationGuy april-2017-ir-presentation
Guy april-2017-ir-presentationguygold2016
 
Alamos corp presentation March 2017
Alamos corp presentation March 2017Alamos corp presentation March 2017
Alamos corp presentation March 2017alamosgoldinc
 
Corporate presentation january 2016
Corporate presentation   january 2016Corporate presentation   january 2016
Corporate presentation january 2016newgold2011
 
Mine Tour Chile Minera Florida Site Visit
Mine Tour  Chile  Minera Florida Site VisitMine Tour  Chile  Minera Florida Site Visit
Mine Tour Chile Minera Florida Site Visityamanagold2016
 
European Gold Forum - April 2016
European Gold Forum - April 2016European Gold Forum - April 2016
European Gold Forum - April 2016yamanagold2016
 
022617 bmo conference
022617 bmo conference022617 bmo conference
022617 bmo conferenceKinrossGold
 
Q1 2017 Conference call Presentation
Q1 2017 Conference call PresentationQ1 2017 Conference call Presentation
Q1 2017 Conference call Presentationyamanagold2016
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationAgnico Eagle Mines
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceAgnico Eagle Mines
 
Corporate presentation may 2016 (baml)
Corporate presentation   may 2016 (baml)Corporate presentation   may 2016 (baml)
Corporate presentation may 2016 (baml)newgold2011
 
DFS Technical Presentation & Webcast
DFS Technical Presentation & WebcastDFS Technical Presentation & Webcast
DFS Technical Presentation & Webcastasanko6699
 

What's hot (20)

Baml presentation.goldberg.may2016 final
Baml presentation.goldberg.may2016 finalBaml presentation.goldberg.may2016 final
Baml presentation.goldberg.may2016 final
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
 
Kinross Gold Corp European Gold Forum Presentation
Kinross Gold Corp European Gold Forum PresentationKinross Gold Corp European Gold Forum Presentation
Kinross Gold Corp European Gold Forum Presentation
 
Presentation dgf
Presentation dgfPresentation dgf
Presentation dgf
 
Guy april-2017-ir-presentation
Guy april-2017-ir-presentationGuy april-2017-ir-presentation
Guy april-2017-ir-presentation
 
2016 q1results.21apr2016
2016 q1results.21apr20162016 q1results.21apr2016
2016 q1results.21apr2016
 
Alamos corp presentation March 2017
Alamos corp presentation March 2017Alamos corp presentation March 2017
Alamos corp presentation March 2017
 
13 december 2016 investor deck final
13 december 2016 investor deck final13 december 2016 investor deck final
13 december 2016 investor deck final
 
Corporate presentation january 2016
Corporate presentation   january 2016Corporate presentation   january 2016
Corporate presentation january 2016
 
Mine Tour Chile Minera Florida Site Visit
Mine Tour  Chile  Minera Florida Site VisitMine Tour  Chile  Minera Florida Site Visit
Mine Tour Chile Minera Florida Site Visit
 
Q3 Earnings Results Presentation 2016
Q3 Earnings Results Presentation 2016Q3 Earnings Results Presentation 2016
Q3 Earnings Results Presentation 2016
 
Q1 Earnings Results Presentation 2017
Q1 Earnings Results Presentation 2017Q1 Earnings Results Presentation 2017
Q1 Earnings Results Presentation 2017
 
European Gold Forum - April 2016
European Gold Forum - April 2016European Gold Forum - April 2016
European Gold Forum - April 2016
 
022617 bmo conference
022617 bmo conference022617 bmo conference
022617 bmo conference
 
Scotia BBQ - August 18 2016
Scotia BBQ - August 18 2016Scotia BBQ - August 18 2016
Scotia BBQ - August 18 2016
 
Q1 2017 Conference call Presentation
Q1 2017 Conference call PresentationQ1 2017 Conference call Presentation
Q1 2017 Conference call Presentation
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentation
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
Corporate presentation may 2016 (baml)
Corporate presentation   may 2016 (baml)Corporate presentation   may 2016 (baml)
Corporate presentation may 2016 (baml)
 
DFS Technical Presentation & Webcast
DFS Technical Presentation & WebcastDFS Technical Presentation & Webcast
DFS Technical Presentation & Webcast
 

Similar to Cibc presentation jan 2016v final.01.12.16 with corp expense outlook

Investor day presentation 3 dec2015 (final merged)
Investor day presentation 3 dec2015 (final merged)Investor day presentation 3 dec2015 (final merged)
Investor day presentation 3 dec2015 (final merged)Newmont Mining Corporation
 
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0wGoldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0wNewmontMining
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceNewmontMining
 
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0wGoldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0wNewmont Mining Corporation
 
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...Newmont Mining Corporation
 
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat PresentationBank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat PresentationNewmont Mining Corporation
 
CIBC 18th Annual Whistler Institutional Investor Conference 2015
CIBC 18th Annual Whistler Institutional Investor Conference 2015CIBC 18th Annual Whistler Institutional Investor Conference 2015
CIBC 18th Annual Whistler Institutional Investor Conference 2015Newmont Mining Corporation
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014NewmontMining
 
Denver Gold Forum September, 2014
Denver Gold Forum September, 2014Denver Gold Forum September, 2014
Denver Gold Forum September, 2014NewmontMining
 

Similar to Cibc presentation jan 2016v final.01.12.16 with corp expense outlook (20)

Acquisition of Cripple Creek & Victor
Acquisition of Cripple Creek & VictorAcquisition of Cripple Creek & Victor
Acquisition of Cripple Creek & Victor
 
Nem december 2016 investor presentation
Nem december 2016 investor presentationNem december 2016 investor presentation
Nem december 2016 investor presentation
 
13 december 2016 investor deck
13 december 2016 investor deck13 december 2016 investor deck
13 december 2016 investor deck
 
Investor day presentation 3 dec2015 (final merged)
Investor day presentation 3 dec2015 (final merged)Investor day presentation 3 dec2015 (final merged)
Investor day presentation 3 dec2015 (final merged)
 
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0wGoldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
 
Goldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining ConferenceGoldman Sachs Global Metals & Mining Conference
Goldman Sachs Global Metals & Mining Conference
 
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0wGoldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
Goldman sachs-global-metals-mining-presentation final-presentation-v001_m53f0w
 
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...CIBC 17th  Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
CIBC 17th Annual Whistler Institutional Investor Conference Laurie Brlas, EV...
 
Denver goldforum goldberg 22sept2015 final v1
Denver goldforum goldberg 22sept2015 final v1Denver goldforum goldberg 22sept2015 final v1
Denver goldforum goldberg 22sept2015 final v1
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat PresentationBank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
Bank of America Merrill Lynch 2016 Canada Mining Fireside Chat Presentation
 
November 2016 investor presentation
November 2016 investor presentationNovember 2016 investor presentation
November 2016 investor presentation
 
Bmo presentation 20 feb2015 final.v1
Bmo presentation 20 feb2015 final.v1Bmo presentation 20 feb2015 final.v1
Bmo presentation 20 feb2015 final.v1
 
Bmo presentation 20 feb2015 final
Bmo presentation 20 feb2015 finalBmo presentation 20 feb2015 final
Bmo presentation 20 feb2015 final
 
CIBC 18th Annual Whistler Institutional Investor Conference 2015
CIBC 18th Annual Whistler Institutional Investor Conference 2015CIBC 18th Annual Whistler Institutional Investor Conference 2015
CIBC 18th Annual Whistler Institutional Investor Conference 2015
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
Denver Gold Forum September, 2014
Denver Gold Forum September, 2014Denver Gold Forum September, 2014
Denver Gold Forum September, 2014
 
Investor presentation may2017
Investor presentation may2017Investor presentation may2017
Investor presentation may2017
 
05 14 2014 baml presentation v final to post
05 14 2014 baml presentation v final to post05 14 2014 baml presentation v final to post
05 14 2014 baml presentation v final to post
 

More from Newmont Mining Corporation

Q2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalQ2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalNewmont Mining Corporation
 
Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont Mining Corporation
 

More from Newmont Mining Corporation (20)

August investor presentation final
August investor presentation finalAugust investor presentation final
August investor presentation final
 
Q2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalQ2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation final
 
2018 esg briefing slides 21 may2018_final
2018 esg briefing slides 21 may2018_final2018 esg briefing slides 21 may2018_final
2018 esg briefing slides 21 may2018_final
 
2018 baml conference presentation print final
2018 baml conference presentation print final2018 baml conference presentation print final
2018 baml conference presentation print final
 
2018 may investor presentation final (1)
2018 may investor presentation final (1)2018 may investor presentation final (1)
2018 may investor presentation final (1)
 
Q12018 earnings-presentation final
Q12018 earnings-presentation finalQ12018 earnings-presentation final
Q12018 earnings-presentation final
 
2018 march investor presentation final (2)
2018 march investor presentation final (2)2018 march investor presentation final (2)
2018 march investor presentation final (2)
 
2018 february investor presentation final
2018 february investor presentation final2018 february investor presentation final
2018 february investor presentation final
 
Investor Presentation February 2018
Investor Presentation February 2018Investor Presentation February 2018
Investor Presentation February 2018
 
Newmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentationNewmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentation
 
January 2018 investor presentation final
January 2018 investor presentation finalJanuary 2018 investor presentation final
January 2018 investor presentation final
 
2017 newmont investor day presentation
2017 newmont investor day presentation2017 newmont investor day presentation
2017 newmont investor day presentation
 
Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation final
 
Q3 2017 results presentation_final
Q3 2017 results presentation_finalQ3 2017 results presentation_final
Q3 2017 results presentation_final
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
2017 denver gold forum presentation
2017 denver gold forum presentation2017 denver gold forum presentation
2017 denver gold forum presentation
 
2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
September 2017 investor presentation
September 2017 investor presentationSeptember 2017 investor presentation
September 2017 investor presentation
 
August 2017 investor presentation
August 2017 investor presentationAugust 2017 investor presentation
August 2017 investor presentation
 

Recently uploaded

Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingFalcon Invoice Discounting
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escortsindian call girls near you
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsaronly4webmaster01
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...aditipandeya
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceanilsa9823
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 

Recently uploaded (20)

Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
 
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 3 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Call Girls In Kalkaji 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kalkaji 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Kalkaji 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kalkaji 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
 
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
 

Cibc presentation jan 2016v final.01.12.16 with corp expense outlook

  • 1. Laurie Brlas, Chief Financial Officer CIBC 19th Annual Whistler Investor Conference January 2016
  • 2. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 2January 2016 Cautionary statement Cautionary statement regarding forward looking statements: This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, and are intended to be covered by the safe harbor provided for under such sections. Such forward-looking statements may include, without limitation: (i) estimates of future consolidated and attributable production and sales; (ii) estimates of future costs applicable to sales and All-in sustaining costs; (iii) estimates of future consolidated and attributable capital expenditures; (iv) our efforts to continue delivering reduced costs and efficiency; (v) expectations regarding the development, growth and exploration potential of the Company’s operations and projects, including the Turf Vent Shaft, Merian, Long Canyon Phase 1, Tanami Expansion, Subika Underground and Ahafo Mill Expansion; (vi) expectations regarding the repayment of debt from cash flows and existing cash; and (vii) expectations regarding future price assumptions, financial performance and other outlook or guidance. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect. Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s operations and projects being consistent with current expectations and mine plans, including without limitation receipt of export approvals; (iii) political developments in any jurisdiction in which the Company operates being consistent with its current expectations; (iv) certain exchange rate assumptions for the Australian dollar to the U.S. dollar, as well as other the exchange rates being approximately consistent with current levels; (v) certain price assumptions for gold, copper and oil; (vi) prices for key supplies being approximately consistent with current levels; (vii) the accuracy of our current mineral reserve and mineralized material estimates; (viii) the acceptable outcome of negotiation of the amendment to the Contract of Work and/or resolution of export issues in Indonesia (ix) there being no significant acquisitions or divestitures during the outlook period and; (x) other assumptions noted herein. Where the Company expresses an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by the “forward-looking statements”. Such risks include, but are not limited to, gold and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, political and operational risks, community relations, conflict resolution and outcome of projects or oppositions and governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company’s 2014 Annual Report on Form 10-K, filed on February 20, 2015, with the Securities and Exchange Commission (the “SEC”), the Company’s Quarterly Report on Form 10-Q filed on July 23, 2015, as well as the Company’s other SEC filings. The Company does not undertake any obligation to release publicly revisions to any “forward-looking statement,” including, without limitation, outlook, to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. Investors should not assume that any lack of update to a previously issued “forward-looking statement” constitutes a reaffirmation of that statement. Continued reliance on “forward-looking statements” is at investors' own risk.
  • 3. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 3January 2016 Strategy to lead the gold sector in value creation • Improve the underlying business – deliver ongoing cost and efficiency improvements • Strengthen the portfolio – increase portfolio value and balance sheet strength • Create shareholder value – outperform sector in free cash flow and shareholder returns Merian
  • 4. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 4January 2016 0.65 0.47 0.39 0.32 0.2 0.3 0.4 0.5 0.6 0.7 2012 2013 2014 2015 YTD Running a safer and more productive business Injury rates (total recordable injuries per 200,000 hours worked) Labor costs ($ per gold equivalent ounce produced) Injury rates down ~50% Productivity up ~40% $492 $433 $392 $284 $200 $300 $400 $500 2012 2013 2014 2015 YTD
  • 5. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 5January 2016 Realizing our Full Potential • Structured approach to accelerating value delivery • Full Potential improvements of $1 billion to date1 • Future savings expected to exceed targets • Stronger technical fundamentals, knowledge-sharing Full Potential improvements by type (2012 – 2015 YTD) Processing • Ore blending and throughput • Maintenance shutdowns Sustaining capex • Equipment reliability • Asset management Mining • Modeling and mine planning • Payload and fleet availability 41% Processing 30% Sustaining Capital 24% Mining 5% Supply Chain
  • 6. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 6January 2016 Step change in portfolio value delivered Divested Reinvested Assets Midas, Jundee, Penmont, Waihi Merian, Long Canyon, CC&V Mine life Less than 6 years More than 10 years Production 500Koz/year ~1Moz/year Costs $900 – $950/oz Below $800/oz Risk Higher technical and social risk Lower technical and social risk AISC down 19% Mine life up 66% *Production and cost data represent expected weighted average calculation based on 5-year outlook estimates
  • 7. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 7January 2016 0.5x 1.0x 1.5x 2.0x 2.5x 3.0x Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Maintaining industry leading net debt to EBITDA 2013 2014 2015 Net debt to EBITDA2 Newmont Competitor average *Competitors include Agnico Eagle, Anglogold Ashanti, Barrick, Buenaventura, Goldcorp, Gold Fields, Harmony, Kinross, Newcrest, and Yamana; net debt to EBITDA utilizes trailing 12-month EBITDA. Competitor average is weighted based on Total Enterprise Value (September 30, 2015). Newmont Q2 2015 net debt excludes cash for CC&V of $820 million.
  • 8. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 8January 2016 0% 2% 4% 6% 8% 10% 12% 14% Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Industry leading return on capital employed Return on capital employed (%) *Competitors include Agnico Eagle, Anglogold Ashanti, Barrick, Buenaventura, Goldcorp, Gold Fields, Harmony, Kinross, Newcrest, and Yamana; ROCE is a non-GAAP metric and utilizes rolling 12 month earnings before interest and taxes (EBIT) over capital employed less cash and equivalents. Competitor average is weighted based on Total Enterprise Value (September 30, 2015). All figures sourced from Capital IQ. 2013 2014 2015 Newmont Competitor average
  • 9. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 9January 2016 Prepared for opportunities and challenges Upside • Maintain cost and capital discipline • Follow up on most promising exploration prospects • Accelerate debt repayment • Pursue value-accretive growth • Pay higher dividends in line with policy $1,100/ounce gold • Optimize costs & capital • Complete current projects • Near-mine, high value exploration focus • Reduce support costs across business • Review Batu Hijau Phase 7 and Ahafo Mill Expansion options • Pay dividend at Board’s discretion Downside • Reduce stripping and increase stockpile processing • Complete current projects • Mothball lowest margin operations • Reduce exploration • Discontinue early debt repayments • Reevaluate dividend
  • 10. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 10January 2016 Where are we today? Where are we heading? Safety Industry leading performance Zero injuries and illnesses Sustainability Industry leading performance Improved country risk profile Costs AISC down 27% since 20123 Ongoing savings to offset inflation Portfolio ~$1.7B in non-core asset sales Superior value and risk profile Production Steady production High value vs high cost ounces Free Cash Flow Positive for 6 quarters running4 Self-fund projects and dividends Returns Maximize risk-adjusted returns Maintain first quartile TSR Balance sheet Net debt down 35% since 2013 Superior financial flexibility Building on a solid foundation
  • 13. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 13January 2016 % of 2015E gold production Maximizing returns across the portfolio North America Carlin Phoenix Twin Creeks Long Canyon CC&V South America Merian Yanacocha Project Integral Conga Africa Ahafo Akyem Asia Pacific Batu Hijau Boddington Kalgoorlie Tanami Since 2012* Injury rates − 50% Productivity + 40% AISC − 27% Sust CapEx − 55% Projects + 5 Operations Projects 2015E gold production North America 34% South America 10% Africa 16% Australia 33% Indonesia 7% *Percentage change compares Q3 2015 YTD vs 2012A; sustaining capital expenditure compares 2015E vs 2012A
  • 14. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 14January 2016 2012A 2013A 2014A 2015E 2016E 2017E 2018E 2019E 2020E AISC improvements are sustained Consolidated gold all-in sustaining cost per ounce3 ($/oz) 850 – 950900 – 960 1,002 1,113 1,177 900 – 1,000880 – 940
  • 15. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 15January 2016 2012A 2013A 2014A 2015E 2016E 2017E 2018E 2019E 2020E Attributable gold production5 (Moz) Steady attributable gold production 5.2 – 5.7 4.5 – 5.0 5.0 5.1 4.8 – 5.3 4.8 4.7 – 5.1
  • 16. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 16January 2016 $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 2012A 2013A 2014A 2015E 2016E 2017E 2018E 2019E 2020E Disciplined approach to capital expenditures Consolidated capital expenditure ($M) 700 – 800 900 – 1,000 3,152 1,812 1,099 1,205 – 1,420 1,415 – 1,625 Sustaining capital Merian Turf Vent Shaft Long Canyon CC&V Tanami Expansion
  • 17. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 17January 2016 Optimized project portfolio and disciplined execution
  • 18. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 18January 2016 Long Canyon opens prospective new district • High grade oxide deposit, with trend potential and mineralization open in all directions • Optimized to lower capital, improve returns • Progressing on schedule and on budget Production 100 – 150 Koz AISC $500 – $600/oz Capital $250 – $300M First production Early 2017 Production and AISC calculated as first full five year average
  • 19. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 19January 2016 Merian construction on schedule, below budget • Optimized approach, partnership and broad engagement lower cost and risk • Construction on schedule at reduced budget • First ore grades are favorable to model Production and capital on a 100% basis; production and AISC calculated as first full five year average Production 400 – 500 Koz AISC $650 – $750/oz Capital $800 – $875M First production 2016
  • 20. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 20January 2016 Disciplined approach to portfolio optimization De-risk Maintain Close or divest Improve value LowValueHigh High Risk Low Portfolio approach
  • 21. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 21January 2016 Strengthening the balance sheet Regional debt Convertibles Term loan Other corporate debt Debt ($M) 2014A 2015 YTD 2016E – 2018E6 Regional debt - $130M $400M Convertibles $575M to term loan - - Term loan $100M $200M - Other corporate debt - - ~$300 - $800M Revolving credit facility - Extended to 2020 - Total de-levering $100M $330M YTD ~$700 - $1,200M
  • 22. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 22January 2016 Steady dividend with upside potential Annualized dividend per share (US$)* *For illustrative purposes, declaration of dividend remains subject to Board of Directors approval $0.10 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20 $0.00 $0.50 $1.00 $1.50 <$1,300 $1,300-$1,399 $1,400-$1,499 $1,500-$1,599 $1,600-$1,699 $1,700-$1,799 $1,800-$1,899
  • 23. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 23January 2016 Labor & services 45% Materials 30% Power 10% Diesel 10% Royalties & other 5% Conservative plan with upside leverageConservative plan with upside leverage *All other variables held constant (i.e. FCF for flexed gold price does not include changes to Cu price, AUD or WTI). Economics assume 35% portfolio tax rate. Excludes hedges. CAS pie chart excludes inventory changes. 2016 CAS breakdown Potential upside includes: • Further cost and efficiency improvements • FX and oil tailwinds • Projects that are not yet approved 2016 sensitivities 2016 Price Change FCF (US$M) Attrib. FCF (US$M) Gold ($/oz) $1,100 +$100 +$350 +$300 Copper ($/lb) $2.50 +$0.25 +$75 +$50 Australian Dollar $0.75 -$0.05 +$60 +$60 Oil ($/bbl) $65 -$10 +$40 +$30
  • 24. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 24January 2016 Base salary 13% Personal bonus 6% Company bonus 14% Performance Stock Units 45% Restricted Stock Units 22% Personal objectives Two-thirds of compensation based on stock performance Operating performance CEO compensation Executive compensation tied to shareholder returns
  • 25. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 25January 2016 2015 Corporate Performance Metrics • Health and Safety • Operational Excellence (EBITDA, Cost) • Growth (Reserves, Projects) • People (Leadership, Personal objectives) • Sustainability and External Relations (Regions only) Safety Profitability Growth / Future Value Safety Metrics EBITDA Cost Reserves and Resources Project Delivery 20% 20% 40% 10% 10% Incentives plan supports strategic objectives Note: Chart represents annual incentive plan for Senior Vice President and above. Personal Bonus 30% Company Bonus 70%
  • 26. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 26January 2016 aOutlook projections used in this presentation (“Outlook”) are considered “forward-looking statements” and represent management’s good faith estimates or expectations of future production results as of December 2, 2015. Outlook is based upon certain assumptions, including, but not limited to, metal prices, oil prices, certain exchange rates and other assumptions. For example, Outlook assumes $1,100/oz Au, $2.50/lb Cu, $0.75 USD/AUD exchange rate and $65/barrel WTI. AISC and CAS cost estimates do not include inflation. Production, AISC and capital estimates exclude projects that have not yet been approved (NW Exodus, Twin Underground, Batu Phase 7, Ahafo Mill Expansion and Subika Underground). The potential impact on inventory valuation as a result of lower prices, input costs, and project decisions are not included as part of this Outlook. Such assumptions may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, Outlook cannot be guaranteed. As such, investors are cautioned not to place undue reliance upon Outlook and forward-looking statements as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur. bNon-GAAP measure. All-in sustaining costs as used in the Company’s Outlook is a non-GAAP metric defined as the sum of cost applicable to sales (including all direct and indirect costs related to current gold production incurred to execute on the current mine plan), remediation costs (including operating accretion and amortization of asset retirement costs), G&A, exploration expense, advanced projects and R&D, treatment and refining costs, other expense, net of one-time adjustments and sustaining capital. cIncludes Lone Tree operations. dIncludes TRJV operations. eConsolidated production for Yanacocha is presented on a total production basis for the mine site; attributable production represents a 51.35% interest. fBoth consolidated and attributable production are shown on a pro- rata basis with a 50% ownership for Kalgoorlie. gProduction outlook does not include equity production from stakes in TMAC (29.4%), La Zanja (46.94%) and Regis (19.45%). hConsolidated production for Batu Hijau is presented on a total production basis for the mine site; whereas attributable production represents a 48.5% ownership interest in 2016 outlook. Outlook for Batu Hijau remains subject to various factors, including, without limitation, renegotiation of the CoW, issuance of future export approvals, negotiations with the labor union, future in-country smelting availability and regulations relating to export quotas, and certain other factors. iConsolidated expense outlook is adjusted to exclude extraordinary items. For example, the tax rate outlook above is a consolidated adjusted rate, which assumes the exclusion of certain tax valuation allowance adjustments. 2016 Outlooka Consolidated Attributable Consolidated Consolidated All-in Sustaining Consolidated Total Capital Production Production CAS Costsb Expenditures (Koz, Kt) (Koz, Kt) ($/oz, $/lb) ($/oz, $/lb) ($M) North America Carlin 1,040 – 1,100 1,040 – 1,100 $750 – $800 $925 – $975 $175 – $195 Phoenix c 180 – 200 180 – 200 $825 – $875 $975 – $1,025 $20 – $30 Twin Creeks d 370 – 400 370 – 400 $575 – $625 $700 – $750 $30 – $40 CC&V 350 – 400 350 – 400 $525 – $575 $650 – $700 $120 – $130 Long Canyon $140 – $160 Other North America $5 – $15 Total 1,940 – 2,100 1,940 – 2,100 $675 – $725 $850 – $925 $490 – $570 South America Yanacocha e 630 – 660 310 – 350 $820 – $870 $1,100 – $1,170 $70 – $90 Merian 120 – 140 90 – 100 $430 – $460 $650 – $700 $260 – $300 Total 750 – 800 400 – 450 $760 – $810 $1,050 – $1,150 $330 – $380 Asia Pacific Boddington 725 – 775 725 – 775 $690 – $730 $800 – $850 $60 – $70 Tanami 400 – 475 400 – 475 $550 – $600 $800 – $850 $150 – $160 Kalgoorlie f 350 – 400 350 – 400 $650 – $700 $725 – $775 $10 – $20 Other Asia Pacific $5 – $15 Batu Hijau 525 – 575 250 – 275 $500 – $550 $650 – $700 $50 – $60 Total 2,000 – 2,225 1,725 – 1,925 $600 – $650 $760 – $820 $275 – $325 Africa Ahafo 330 – 360 330 – 360 $775 – $825 $1,020 – $1,100 $60 – $80 Akyem 430 – 460 430 – 460 $560 – $600 $700 – $750 $40 – $50 Total 760 – 820 760 – 820 $650 – $700 $850 – $900 $100 – $130 Corporate/Other $10 – $15 Total Gold g 5,450 – 5,945 4,825 – 5,295 $650 – $700 $900 – $960 $1,205 – $1,420 Phoenix 15 – 25 15 – 25 $1.70 – $1.90 $2.10 – $2.30 Boddington 25 – 35 25 – 35 $1.90 – $2.10 $2.30 – $2.50 Batu Hijau h 170 – 190 80 – 100 $1.00 – $1.20 $1.40 – $1.60 Total Copper 210 – 250 120 – 160 $1.20 – $1.40 $1.50 – $1.70 Consolidated Expense Outlook General & Administrative $ 225 – $ 275 Interest Expense $ 270 – $ 290 DD&A $ 1,350 – $ 1,425 Exploration and Projects $ 275 – $ 300 Sustaining Capital $ 700 – $ 750 Tax Rate 35% – 39% i
  • 27. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 27January 2016 Three Months Ended Nine Months Ended September 30, September 30, 2015 2014 2015 2014 Net income (loss) attributable to Newmont stockholders $ 219 $ 213 $ 474 $ 493 Net income (loss) attributable to noncontrolling interests 66 (138) 188 (225) Loss (income) from discontinued operations (17) (3) (34) 16 Equity loss (income) of affiliates 18 — 34 (2) Income and mining tax expense (benefit) 151 (47) 496 (22) Depreciation and amortization 331 318 896 922 Interest expense, net 81 89 248 276 EBITDA $ 849 $ 432 $ 2,302 $ 1,458 Adjustments: Impairments and loss provisions $ 32 $ 8 $ 108 $ 22 Restructuring and other 12 19 26 32 Acquisitions costs 7 — 15 — Gain on deconsolidation of TMAC (76) — (76) — Loss (gain) on asset and investment sales (66) (41) (109) (93) Abnormal production costs at Batu Hijau — 37 — 53 Adjusted EBITDA $ 758 $ 455 $ 2,266 $ 1,472 EBITDA and Adjusted EBITDA Management uses Earnings before interest, taxes and depreciation and amortization (EBITDA) and EBITDA adjusted for non-core or certain items that have a disproportionate impact on our results for a particular period (Adjusted EBITDA) as non-GAAP measures to evaluate the Company’s operating performance. EBITDA and Adjusted EBITDA do not represent, and should not be considered an alternative to, net earnings (loss), operating earnings (loss), or cash flow from operations as those terms are defined by GAAP, and does not necessarily indicate whether cash flows will be sufficient to fund cash needs. Although Adjusted EBITDA and similar measures are frequently used as measures of operations and the ability to meet debt service requirements by other companies, our calculation of Adjusted EBITDA is not necessarily comparable to such other similarly titled captions of other companies. The Company believes that Adjusted EBITDA provides useful information to investors and others in understanding and evaluating our operating results in the same manner as our management and board of directors. Management’s determination of the components of Adjusted EBITDA are evaluated periodically and based, in part, on a review of non-GAAP financial measures used by mining industry analysts. Net income (loss) attributable to Newmont stockholders is reconciled to EBITDA and Adjusted EBITDA as follows:
  • 28. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 28January 2016 Free Cash Flow Free Cash Flow is cash generated from Net cash provided from continuing operations less Additions to property, plant and mine development as presented on the Statement of Cash Flows. To supplement our statements of cash flows presented on a GAAP basis, we use non-GAAP measures of cash flows to analyze cash flows generated from our operations. We believe Free Cash Flow is also useful as one of the bases for comparing our performance with our competitors. The presentation of non-GAAP Free Cash Flow is not meant to be considered in isolation or as an alternative to net income as an indicator of our performance, or as an alternative to cash flows from operating activities as a measure of liquidity. Net cash provided from continuing operations is reconciled to Free Cash Flow as follows: Three Months Ended Nine Months Ended September 30, September 30, 2015 2014 2015 2014 Net cash provided by continuing operations $ 813 $ 328 $ 1,882 $ 889 Less: Additions to property, plant and mine development (335) (277) (941) (766) Free Cash Flow $ 478 $ 51 $ 941 $ 123
  • 29. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 29January 2016 Newmont has worked to develop a metric that expands on GAAP measures such as cost of goods sold and non-GAAP measures, such as costs applicable to sales per ounce, to provide visibility into the economics of our mining operations related to expenditures, operating performance and the ability to generate cash flow from operations. Current GAAP-measures used in the mining industry, such as cost of goods sold, do not capture all of the expenditures incurred to discover, develop, and sustain gold production. Therefore, we believe that all-in sustaining costs is a non-GAAP measure that provides additional information to management, investors, and analysts that aid in the understanding of the economics of our operations and performance compared to other producers and in the investor’s visibility by better defining the total costs associated with production. All-in sustaining cost (AISC) amounts are intended to provide additional information only and do not have any standardized meaning prescribed by GAAP and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP. Other companies may calculate these measures differently as a result of differences in the underlying accounting principles, policies applied and in accounting frameworks such as in International Financial Reporting Standards (IFRS), or by reflecting the benefit from selling non-gold metals as a reduction to AISC. Differences may also arise related to definitional differences of sustaining versus development capital activities based upon each company’s internal policies. The following disclosure provides information regarding the adjustments made in determining the all-in sustaining costs measure: Cost Applicable to Sales - Includes all direct and indirect costs related to current gold production incurred to execute the current mine plan. Costs Applicable to Sales (CAS) includes by-product credits from certain metals obtained during the process of extracting and processing the primary ore-body. CAS is accounted for on an accrual basis and excludes Amortization and Reclamation and remediation, which is consistent with our presentation of CAS on the Statement of Consolidated Income. In determining AISC, only the CAS associated with producing and selling an ounce of gold is included in the measure. Therefore, the amount of gold CAS included in AISC is derived from the CAS presented in the Company’s Statement of Consolidated Income less the amount of CAS attributable to the production of copper at our Phoenix, Boddington and Batu Hijau mines. The copper CAS at those mine sites is disclosed in Note 3 – Segments that accompanies the Consolidated Financial Statements. The allocation of CAS between gold and copper at the Phoenix, Boddington and Batu Hijau mines is based upon the relative sales percentage of copper and gold sold during the period. Remediation Costs - Includes accretion expense related to asset retirement obligations (ARO) and the amortization of the related Asset Retirement Cost (ARC) for the Company’s operating properties recorded as an ARC asset. Accretion related to ARO and the amortization of the ARC assets for reclamation and remediation do not reflect annual cash outflows but are calculated in accordance with GAAP. The accretion and amortization reflect the periodic costs of reclamation and remediation associated with current gold production and are therefore included in the measure. The allocation of these costs to gold and copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Phoenix, Boddington and Batu Hijau mines. Advanced Projects and Exploration - Includes incurred expenses related to projects that are designed to increase or enhance current gold production and gold exploration. We note that as current resources are depleted, exploration and advance projects are necessary for us to replace the depleting reserves or enhance the recovery and processing of the current reserves. As this relates to sustaining our gold production, and is considered a continuing cost of a mining company, these costs are included in the AISC measure. These costs are derived from the Advanced projects, research and development and Exploration amounts presented in the Company’s Statement of Consolidated Income less the amount attributable to the production of copper at our Phoenix, Boddington and Batu Hijau mines. The allocation of these costs to gold and copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Batu Hijau, Boddington and Phoenix mines. General and Administrative - Includes cost related to administrative tasks not directly related to current gold production, but rather related to support our corporate structure and fulfilling our obligations to operate as a public company. Including these expenses in the AISC metric provides visibility of the impact that general and administrative activities have on current operations and profitability on a per ounce basis. Other Expense, net - Includes costs related to regional administration and community development to support current gold production. We exclude certain exceptional or unusual expenses from Other expense, net, such as restructuring, as these are not indicative to sustaining our current gold operations. Furthermore, this adjustment to Other expense, net is also consistent with the nature of the adjustments made to Net income (loss) as disclosed in the Company’s non-GAAP financial measure Adjusted net income (loss). The allocation of these costs to gold and copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Phoenix, Boddington and Batu Hijau mines. Treatment and Refining Costs - Includes costs paid to smelters for treatment and refining of our concentrates to produce the salable metal. These costs are presented net as a reduction of Sales. Sustaining Capital - We determined sustaining capital as those capital expenditures that are necessary to maintain current gold production and execute the current mine plan. Capital expenditures to develop new operations, or related to projects at existing operations where these projects will enhance gold production or reserves, are considered development. We determined the breakout of sustaining and development capital costs based on a systematic review of our project portfolio in light of the nature of each project. Sustaining capital costs are relevant to the AISC metric as these are needed to maintain the Company’s current gold operations and provide improved transparency related to our ability to finance these expenditures from current operations. The allocation of these costs to gold and copper is determined using the same allocation used in the allocation of CAS between gold and copper at the Batu Hijau, Boddington and Phoenix mines. All-in sustaining costs
  • 30. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 30January 2016 All-in sustaining costs Year Ended December 31, 2014 Costs Applicable to Sales (1) (2)(3) Remediation Costs (4) Advanced Projects and Exploration General and Administrative Other Expense, Net (5) Treatment and Refining Costs Sustaining Capital (6) All-In Sustaining Costs Ounces (000)/ Pounds (millions) Sold All-In Sustaining Costs per oz/lb GOLD Carlin $ 795 $ 4 $ 22 $ - $ 8 $ - $ 141 $ 970 905 $ 1,072 Phoenix 160 3 4 - 3 9 17 196 222 883 Twin Creeks 207 2 5 - 3 - 111 328 400 820 La Herradura 89 2 12 - - - 21 124 119 1,042 Other North America - - 25 - 6 - 9 40 - - North America 1,251 11 68 - 20 9 299 1,658 1,646 1,007 Yanacocha 663 101 32 - 35 - 80 911 966 943 Other South America - - 41 - 2 - - 43 - - South America 663 101 73 - 37 - 80 954 966 988 Boddington 585 11 - - 2 4 69 671 690 972 Tanami 251 4 10 - 2 - 91 358 345 1,038 Jundee 85 5 1 - 2 - 15 108 140 771 Waihi 76 3 7 - 2 - 2 90 131 687 Kalgoorlie 284 4 5 - 1 4 32 330 327 1,009 Other Australia/New Zealand - - 5 3 21 - 6 35 - - Australia/New Zealand 1,281 27 28 3 30 8 215 1,592 1,633 975 Batu Hijau 81 3 - - 4 9 8 105 72 1,458 Other Indonesia - - - - - - - - - - Indonesia 81 3 - - 4 9 8 105 72 1,458 Ahafo 249 8 27 - 6 - 92 382 450 849 Akyem 172 3 - - 8 - 17 200 473 423 Other Africa - - 8 - 7 - - 15 - - Africa 421 11 35 - 21 - 109 597 923 647 Corporate and Other - - 116 182 31 - 17 346 - - Total Gold $ 3,697 $ 153 $ 320 $ 185 $ 143 $ 26 $ 728 $ 5,252 5,240 $ 1,002 COPPER Phoenix $ 108 $ 1 $ 2 $ - $ 1 $ 5 $ 13 $ 130 46 $ 2.83 Boddington 158 2 - - 1 25 18 204 66 3.09 Batu Hijau 494 15 3 1 20 45 51 629 152 4.14 Total Copper $ 760 $ 18 $ 5 $ 1 $ 22 $ 75 $ 82 $ 963 264 $ 3.65 Consolidated $ 4,457 $ 171 $ 325 $ 186 $ 165 $ 101 $ 810 $ 6,215 (1) Excludes Depreciation and amortization and Reclamation and remediation. (2) Includes by-product credits of $85. (3) Includes stockpile and leach pad inventory adjustment of $127 at Carlin, $13 at Phoenix, $15 at Twin Creeks, $75 at Yanacocha, $69 at Boddington, and $191 at Batu Hijau. (4) Remediation costs include operating accretion of $71 and amortization of asset retirement costs of $100. (5) Other expense, net is adjusted for restructuring costs of $40. (6) Excludes $300 of development capital expenditures, capitalized interest, and the increase in accrued capital. The following are major development projects; Turf Vent Shaft, Merian, Correnso and Conga for 2014.
  • 31. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 31January 2016 All-in sustaining costs Year Ended December 31, 2013 Costs Applicable to Sales (1) (2)(3) Remediation Costs (4) Advanced Projects and Exploration General and Administrative Other Expense, Net (5) Treatment and Refining Costs Sustaining Capital (6) All-In Sustaining Costs Ounces (000)/ Pounds (millions) Sold All-In Sustaining Costs per oz/lb GOLD Carlin $ 767 $ 5 $ 34 $ - $ 7 $ 14 $ 154 $ 981 1,013 $ 968 Phoenix 164 3 7 - 2 9 20 205 225 911 Twin Creeks 273 6 7 - 4 - 56 346 518 668 La Herradura 177 - 42 - - - 74 293 183 1,601 Other North America - - 42 - 4 - 23 69 - - North America 1,381 14 132 - 17 23 327 1,894 1,939 977 Yanacocha 684 90 41 - 63 - 148 1,026 1,022 1,004 Other South America - - 34 - 4 - - 38 - - South America 684 90 75 - 67 - 148 1,064 1,022 1,041 Boddington 805 6 1 - 2 4 90 908 743 1,222 Tanami 270 3 11 - 3 - 91 378 325 1,163 Jundee 206 13 7 - 1 - 45 272 279 975 Waihi 103 3 5 - 2 - 7 120 111 1,081 Kalgoorlie 342 7 3 - 1 - 19 372 329 1,131 Other Australia/New Zealand - - 13 - 34 - 4 51 - - Australia/New Zealand 1,726 32 40 - 43 4 256 2,101 1,787 1,176 Batu Hijau 107 2 2 - 3 5 12 131 46 2,848 Other Indonesia - - - - (2) - - (2) - - Indonesia 107 2 2 - 1 5 12 129 46 2,804 Ahafo 307 3 51 - 14 - 109 484 566 855 Akyem 32 - 8 - 3 - - 43 129 333 Other Africa - - 8 - 10 - - 18 - - Africa 339 3 67 - 27 - 109 545 695 784 Corporate and Other - - 137 203 25 - 12 377 - - Total Gold $ 4,237 $ 141 $ 453 $ 203 $ 180 $ 32 $ 864 $ 6,110 5,489 $ 1,113 COPPER Phoenix $ 52 $ 1 $ 3 $ - $ 1 $ 5 $ 7 $ 69 29 $ 2.38 Boddington 195 1 - - 1 19 22 238 71 3.35 Batu Hijau 815 9 13 - 24 47 93 1,001 158 6.34 Total Copper $ 1,062 $ 11 $ 16 $ - $ 26 $ 71 $ 122 $ 1,308 258 $ 5.07 Consolidated $ 5,299 $ 152 $ 469 $ 203 $ 206 $ 103 $ 986 $ 7,418 (1) Excludes Depreciation and amortization and Reclamation and remediation. (2) Includes by-product credits of $111. (3) Includes stockpile and leach pad inventory adjustments of $69 at Carlin, $1 at Twin Creeks, $24 at La Herradura, $107 at Yanacocha, $184 at Boddington, $1 at Tanami, $4 at Waihi, $45 at Kalgoorlie, and $523 at Batu Hijau. (4) Remediation costs include operating accretion of $61 and amortization of asset retirement costs of $91. (5) Other expense, net is adjusted for restructuring of $67 and TMAC transaction costs of $45, offset by $18 for Boddington Contingent Consideration. (6) Excludes $914 of development capital expenditures, capitalized interest, and the increase in accrued capital. The following are major development projects; Phoenix Copper Leach, Turf Vent Shaft, Yanacocha Bio Leach, Conga, Merian, Ahafo Mill Expansion, and Akyem for 2013.
  • 32. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 32January 2016 All-in sustaining costs (1) Excludes Depreciation and amortization and Reclamation and remediation. (2) Includes by-product credits of $146. (3) Includes stockpile and leach pad inventory adjustments of $6 at Yanacocha, $5 at Tanami, and $17 at Waihi. (4) Remediation costs include operating accretion of $55 and amortization of asset retirement costs of $40. (5) Other expense, net is adjusted for restructuring of $58, Hope Bay care and maintenance of $144, and Boddington Contingent Consideration of $12. (6) Excludes $1,521 of development capital expenditures, capitalized interest, and the increase in accrued capital. The following are major development projects; Emigrant, Phoenix Copper Leach, Turf Vent Shaft, Yanacocha Bio Leach, Conga, Tanami Shaft, Ahafo Mill Expansion, and Akyem for 2012. Year Ended December 31, 2012 Costs Applicable to Sales (1) (2)(3) Remediation Costs (4) Advanced Projects and Exploration General and Administrative Other Expense, Net (5) Treatment and Refining Costs Sustaining Capital (6) All-In Sustaining Costs Ounces (000)/ Pounds (millions) Sold All-In Sustaining Costs per oz/lb GOLD Carlin $ 767 $ 4 $ 47 $ - $ 6 $ 14 $ 229 $ 1,067 978 $ 1,091 Phoenix 111 3 14 - 1 8 57 194 188 1,032 Twin Creeks 256 3 30 - - - 117 406 553 734 La Herradura 132 - 41 - - - 71 244 212 1,151 Other North America - - 40 - 11 - 66 117 - - North America 1,266 10 172 - 18 22 540 2,028 1,931 1,050 Yanacocha 669 34 59 - 70 - 479 1,311 1,325 989 Other South America - - 72 - 4 - 10 86 - - South America 669 34 131 - 74 - 489 1,397 1,325 1,054 Boddington 623 6 6 - 3 7 112 757 711 1,065 Tanami 250 2 28 - 3 - 130 413 180 2,294 Jundee 172 10 20 - 1 - 58 261 322 811 Waihi 97 4 12 - 3 - 4 120 62 1,935 Kalgoorlie 277 8 5 - 1 - 20 311 341 912 Other Australia/New Zealand - - 19 - 39 - 19 77 - - Australia/New Zealand 1,419 30 90 - 50 7 343 1,939 1,616 1,200 Batu Hijau 71 2 5 - 8 7 23 116 67 1,731 Other Indonesia - - - - (3) - - (3) - - Indonesia 71 2 5 - 5 7 23 113 67 1,687 Ahafo 314 4 53 - 24 - 85 480 527 911 Akyem - - 19 - 1 - - 20 - - Other Africa - - 10 - 1 - - 11 - - Africa 314 4 82 - 26 - 85 511 527 970 Corporate and Other - - 188 212 18 - 25 443 - - Total Gold $ 3,739 $ 80 $ 668 $ 212 $ 191 $ 36 $ 1,505 $ 6,431 5,466 $ 1,177 COPPER Phoenix $ 60 $ 2 $ 7 $ - $ 1 $ 5 $ 31 $ 106 28 $ 3.79 Boddington 150 1 2 - 1 17 27 198 66 3.00 Batu Hijau 385 12 27 - 42 45 126 637 163 3.91 Total Copper $ 595 $ 15 $ 36 $ - $ 44 $ 67 $ 184 $ 941 257 $ 3.66 Consolidated $ 4,334 $ 95 $ 704 $ 212 $ 235 $ 103 $ 1,689 $ 7,372
  • 33. Newmont Mining Corporation I CIBC 19th Annual Institutional Investor Conference I Slide 33January 2016 Endnotes Investors are encouraged to read the information contained in this presentation in conjunction with the following notes, the Cautionary Statement on slide 2 and the factors described under the “Risk Factors” section of the Company’s Form 10-Q, filed with the SEC on July 23, 2015, and disclosure in the Company’s recent SEC filings. 1. Full potential savings used in this presentation represent cumulative incremental value realized as a result of Full Potential projects implemented from 2012 through Q3 2015. Figures compare actual baseline to actual normalized cash flows. 2. EBITDA is a non-GAAP financial measure calculated as Earnings before interest, taxes and depreciation and amortization. The EBITDA figures used in this presentation were calculated by Capital IQ. For management’s EBITDA calculations and reconciliation to the nearest GAAP metric, please see slide 27 in the Appendix for more information. 3. Historical AISC or All-in sustaining cost is a non-GAAP metric. See slides 29 to 32 in the Appendix for more information and a reconciliation to the nearest GAAP metric. All-in sustaining cost (“AISC”) as used in the Company’s Outlook is a non-GAAP metric defined as the sum of cost applicable to sales (including all direct and indirect costs related to current gold production incurred to execute on the current mine plan), remediation costs (including operating accretion and amortization of asset retirement costs), G&A, exploration expense, advanced projects and R&D, treatment and refining costs, other expense, net of one-time adjustments and sustaining capital. See also note 5 below. 4. Free cash flow is a non-GAAP financial measure. For management’s free cash flow calculations and reconciliation to the nearest GAAP metric, please see slide 28 in the Appendix for more information. 5. Outlook projections used in this presentation (“Outlook”) are considered “forward-looking statements” and represent management’s good faith estimates or expectations of future production results as of December 2, 2015. Outlook is based upon certain assumptions, including, but not limited to, metal prices, oil prices, certain exchange rates and other assumptions. For example, Outlook assumes $1,100/oz Au, $2.50/lb Cu, $0.75 USD/AUD exchange rate and $65/barrel WTI. AISC and CAS cost estimates do not include inflation. Production, AISC and capital estimates exclude projects that have not yet been approved (NW Exodus, Twin Underground, Batu Phase 7, Ahafo Mill Expansion and Subika Underground). The potential impact on inventory valuation as a result of lower prices, input costs, and project decisions are not included as part of this Outlook. Long term ranges (2018 – 2020) for production, AISC and capital provided in this presentation represent 3-year averages. Scheduled debt prepayments exclude capital leases. Such assumptions may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, Outlook cannot be guaranteed. As such, investors are cautioned not to place undue reliance upon Outlook and forward-looking statements as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur. 6. Estimated debt payment opportunities over the period, which remain subject to change depending on certain variables and the needs of the business. See also endnote 5.