2. Track Record of Execution and Early Market Success
2
100+ Adara Certified Installers1st Gen Systems
Installed in 13 States
Awards and Industry Recognition
25MWH of Solar Energy Shifted to Evening/Peak Hours
10Tons of Peaker Plant CO2 Eliminated
3. SGIP FinallyArrives
New process
Submit anytime on Day One – if oversubscribed lottery with priority for solar plus storage
Separate budget for residential, large scale and generation technologies
Removed Manufacturer Cap and implemented a 20% Developer Cap
Results
300 Developers registered, 132 submitted
All categories oversubscribed on first day except PG&E Resi which lasted 3 days
Accelerated reduction for Step 2
13. Adara | Delta Inverter | LG Battery Solution
Currently Available Commercial Solution
13
Commercial Site
Controller Hardware
Features and Benefits
Peak Demand Reduction
Energy Peak Shifting
Voltage Regulation
Rate Arbitrage
Electricity RateTier Delta
Direct input to 3 phase installations
Adara Cloud
Comprehensive Monitoring &
Diagnostics of
Inverter/Battery/Grid/Load
Building Management & Utility
Integration
14. Features of Delta 125kW PCS
14
Efficient
High efficiency:
peak 97.8%,
CEC 97.5%
High power density:
150W/l
357W/kg
Low standby loss:
<20 W
CEC Efficiency = 0.04 x Eff10% + 0.05 x Eff20% + 0.12 x Eff30% + 0.21 x Eff50% + 0.53 x Eff75%. + 0.05 x Eff100%.
Faster Installation
Straightforward wiring
AC, DC switches integrated
Scalable
Up to 500kW in parallel
configuration
Quick Response
System response time
< 34 ms
OUTDOOR
Type 3R rated
16. ESS Applications – Slow Response
Peak Shaving
► Defer distribution
network and
generation investment
► Avoid high demand
charge
PV Self-Consumption
(Load Shifting)
► Fully utilize power
generation from PV
system
► Decrease contracted
capacity with utility
company for cost
saving
Time of Use Optimization
► Leveling power
consumption at peak
and off-peak hours
► Decrease contracted
capacity with utility
company for cost
saving
Back-up Power +
Islanding
► Improve power
quality
► Seamless
transition
16
17. Virtual Project Developer – Commercial ESS Services
Individual Project Services
Energy storage training
Electricity bill modeling of interval data
Proposal development
Design support services
ESS hardware resale and fulfillment
Permit and Interconnection support
Installation support
Commissioning
Data requirements for incentives or utilities
Operations and Maintenance
Portfolio Analysis
Engage with large real estate holding companies to analyze portfolio of commercial buildings
Custom Product Engineering
Application programming interfaces
Software integration to building management systems or utilities
17
Modeling,
Proposal & ESS
Sourcing
Design and
Installation
Support
Operations and
Maintenance
18. 18
Power: 250kW 250kW
Power Density: 90w/l 150w/l
Energy: 480kWh 554kWh (nameplate)
Energy Density (mm³): 45w/l 63w/l
Energy density (Kg) 65w/kg 120w/kg
RTE 89% 95%
Discharge: C/2 1C (LG)
Tesla Powerpack Adara / Delta / LG
4110mm
2185mm
3000mm
2200mm
Competitive Comparison
20. Ideal Customer Attributes
Peak demand over 60kW (per inverter)
Peak demand charges greater than $12.00 USD per kW
DemandCharges exceeding 30% of monthly power bill
Peak demand that is short duration or occurs during the peak pricing time of the day
Critical infrastructure that requires back-up, power smoothing and/or voltage regulation
Enrolled in UtilityTime of Use rate structures
Supporting EV fast charging
Subject to mandatory Utility self-consumption programs
Supports Renewable Energy Portfolio Standards
Eligible for the Federal InvestmentTax Credit when combined with solar
Eligible for California Self Generation Incentive Program
Eligible for Accelerated Depreciation
Eligible for State Renewable Energy Rebate/Credit programs
21. How to SubmitYour Adara ESS project for SGIP
Obtain a Developer “Key”
Complete the online Reservation Form at www.selfgenca.com
You will need the following:
Full scope of project
Adara Equipment list including part numbers
Specs, UL certs and warranty info
Energy storage sizing worksheet
Signed Reservation Request Form
Preliminary Monitoring Plan (sent to you by Adara)
Application Fee (signed check uploaded, mailed within 7 days if selected)
Proof of utility & load documentation
Energy Efficiency Audit (Residential)
Questions: Call us at 888-MYADARA (692-3272)