FOUR STOREYED R.C.C BUILDING
STRUCTURAL DESIGN
FOR
The Yield Strength of Reinforcing Bars ; f = 50000 psi
ACI 318-02 Code is used.
The Cylinder Strength of Concrete ; f = 3000 psi
c
y
Special Moment Resisting Frame.
Type of Frame
Material Properties
Structural Analysis and Design
Design Code
DESIGN DATA FOR CALCULATION
'
Ceiling = 10 psf
Floor finishing = 10 psf
4.5" brick wall = 55 psf
9"tk brick wall = 100 psf
Dead Load
Loads
Wind Load = 80 mph
Seismic Load = 0.4g
Stair = 100 psf
Environmental Load
Etabs & Safe softwares are used.
Typical Floor Area = 40 psf
Roof Floor Area = 20 psf
Live Load
FOUR STOREYED R.C.C BUILDING
f =3000psi (28 days),
max size of Aggregate=1"
2. Splice
L
H/2
40d
L/2
45d
45d
h
2h
Column
Beam
H=Floor to Floor Height, d=diameter of bar
1. Material
f =50000psi
3. Special Reinforcement
(a) At every splice
max; spacing of tie bars or stirrup=4"c/c
(c) At every exterior joint(beams to column)
provide a pair of special tie bar
Specifications
(d) At exterior corner slab (only Two-way slab)
L/5
L/5
L/5
L/5
L= Longer Clear Span
Top Bar Bottom Bar
(b) At every joint(beam to beam)
max; spacing of stirrup=4"c/c
with max; spacing=6"
6"
Column
Beam
Tie bar
c
'
y
5.Standard Cutoff point for Beam
7.Anchorage
For 16mm dia =7.5"
For 18mm dia =8.5"
12d
For 10mm dia =2.25"
For 6mm dia =1.5"
135º hook
6d
180º hook For 16mm dia =2.5"
For 20mm dia =3"
4d(or)2.5"
2" 2" 2"
2" 2"
2"
L1/3 L2/3 L2/3 L3/3 L3/4
0"
0.75"
1.5"
2"
3"
2"
2"
2"
3"
L2 L3
Slab
6.Standard Cutoff point for Slab
90º hook
L1 L2 L3
L2/6
L2/6 L3/6 L3/6
stirrup stirrup stirrup
L1/4
0"
Column
Beam
L1/6 L1/6
L1/4 L3/4
L1 L3
L1/3 L2/3 L2/3 L3/3
Beam
Kind of Structure Component Clear Cover Clear End Cover
Component not Contacting
to earth
Component Contacting
to earth
Slab,Stair
Beam,Column
Beam,Column
Footing
4. Minimum Cover
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
FOOTING & STRIP BEAM PLAN
FOOTING & STRIP BEAM PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
F.1 F.1
SB.1
F.1 F.1
SB.1
F.1 F.1
SB.1
F.1 F.1
SB.1
F.2
F.2
F.2
F.2
1'
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
COLUMN PLAN
COLUMN PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
C.1
C.1
C.1 C.1
C.2 C.2
C.2 C.2
C.1 C.1
C.1 C.1
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
RETAINING WALL PLAN
RETAINING WALL PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
RW.1
PC.1
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
GROUND BEAM PLAN
GROUND BEAM PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
GB.1
GB.1
GB.1
GB.1 GB.3
GB.3
GB.2
GB.2
GB.2
GB.3
GB.3
GB.3
GB.3
GB.3
GB.3
GB.3
GB.3
GB.3
GB.2
GB.2
GB.1
PC.1
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
FIRST FLOOR BEAM PLAN
FIRST FLOOR BEAM PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
FB.1
FB.3
FB.1
FB.1
FB.1
FB.3
FB.3
FB.3
FB.3
FB.3
FB.3
FB.3
FB.4
FB.2
FB.3
FB.4
FB.4
FB.4
FB.4
FB.4
FB.4
FB.3
FB.3
FB.4
FB.4
PC.1
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
FIRST FLOOR SLAB PLAN
FIRST FLOOR SLAB PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
S.2 S.2
S.2
S.2 S.1
S.1
S.1
S.2
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
SECOND FLOOR BEAM PLAN
SECOND FLOOR BEAM PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
FB.1
FB.3
FB.1
FB.1
FB.1
FB.3
FB.3
FB.3
FB.3
FB.3
FB.3
FB.3
FB.2
FB.4
FB.4
FB.4
FB.4
FB.4
FB.4
FB.3
FB.3
FB.4
FB.4
FB.4
PC.1
FB.3
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
SECOND FLOOR SLAB PLAN
SECOND FLOOR SLAB PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
S.2 S.2
S.2
S.2 S.1
S.1
S.1
S.2
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
THIRD FLOOR BEAM PLAN
THIRD FLOOR BEAM PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
FB.1
FB.3
FB.1
FB.1
FB.1
FB.3
FB.3
FB.3
FB.3
FB.3
FB.3
FB.3
FB.2
FB.4
FB.4
FB.4
FB.4
FB.4
FB.4
FB.3
FB.3
FB.4
FB.4
FB.4
PC.1
FB.3
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
THIRD FLOOR SLAB PLAN
THIRD FLOOR SLAB PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
S.2 S.2
S.2
S.2 S.1
S.1
S.1
S.2
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
ROOF BEAM PLAN
ROOF BEAM PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
RB.1
RB.3
RB.1
RB.1
RB.1
RB.3
RB.3
RB.3
RB.4
RB.4
RB.3
RB.3
RB.3
RB.3
RB.2
RB.3
RB.3
RB.4
RB.4
RB.4
RB.4
RB.4
RB.4
RB.3
PC.1
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
ROOF SLAB PLAN
ROOF SLAB PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
S.2 S.2
S.2
S.2
S.1
S.1
S.2
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
STAIR ROOF BEAM PLAN
STAIR ROOF BEAM PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
RB.1
RB.1
RB.1
RB.2
RB.4
RB.4
RB.4
RB.4
RB.3
RB.4
RB.3
RB.3
RB.3
RB.4
RB.4
RB.4
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
STAIR ROOF SLAB PLAN
STAIR ROOF SLAB PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
S.2
S.2
S.2
S.1
S.2
S.2
S.2
S.2
S.2
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
LANDING BEAM PLAN
LANDING BEAM PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
LB.1
LB.1
LB.2
PROJECT
JOB TITLE
DESIGN BY
FOUR STOREYED
RCC BUILDING
LANDING BEAM PLAN
LANDING BEAM PLAN
A
1
B
23'
2
3
4
11'-11"
17'
13'-11"
4'-7"
4'-7"
52'
LB.1
LB.1
LB.2
Type Size
Reinforcement
Shorter Directon Longer Directon
4'-0" x 5'-0" x 0"-18"
Footing Schedule
Remark
F.1 20mmØ @ 6"c/c Isolated Footing
The Cylinder Strength of Concrete ; f = 3000 psi ;
c
' The Yield Strength of Reinforcing Bars ; f = 50000 psi
y
F.2 Isolated Footing
4'-0" x 4'-0" x 0"-18"
20mmØ @ 6"c/c
PROJECT
JOB TITLE
DESIGN BY
FOOTING SCHEDULE
FOUR STOREYED
RCC BUILDING
Strap Beam Schedules
Type
Moment Reinforcement Shear Reinforcement
Footing Strip Middle Strip (L/2)
At Support At Span
The Cylinder Strength of Concrete ; f = 3000 psi ;
c
' The Yield Strength of Reinforcing Bars ; f = 50000 psi
y
(10mmØ @ 4"c/c)
SB.1
(24" x 24") (10mmØ @ 6"c/c)
(5~20mmØ)
(5~20mmØ)
20mmØ @ 6"c/c 20mmØ @ 6"c/c
(5~20mmØ)
(5~20mmØ)
PROJECT
JOB TITLE
DESIGN BY
COLUMN SCHEDULE
Column Schedule
Shear Reinforcement
Column Strip (H/4) Middle Strip (H/2)
Size & Main Steel
Level
Type
The Cylinder Strength of Concrete ; f = 3000 psi ;
c
' The Yield Strength of Reinforcing Bars ; f = 50000 psi
y
Foundation
to
Second Floor
(2-10mmØ@6"c/c)
(2-10mmØ@4"c/c)
C.1
14" x 18"
(12 - 20mmØ)
Second Floor
to
Stair Roof Floor
14" x 18"
(12 - 16mmØ)
Foundation
to
Stair Roof Floor
10" x 10"
(8 - 20mmØ)
(2-8mmØ@6"c/c)
(2-8mmØ@4"c/c)
C.2
(2-8mmØ@6"c/c)
(2-8mmØ@4"c/c)
FOUR STOREYED
RCC BUILDING
Ground Beam
to
Stair Roof Floor
9" x 9"
(6- 16mmØ)
(1-8mmØ@4"c/c)
(1-8mmØ@4"c/c)
PC.1
PROJECT
JOB TITLE
DESIGN BY
BEAM SCHEDULE
Ground Beam Schedules
Type
Moment Reinforcement Shear Reinforcement
Column Strip (L/4) Middle Strip (L/2)
At Support At Span
The Cylinder Strength of Concrete ; f = 3000 psi ;
c The Yield Strength of Reinforcing Bars ; f = 50000 psi
y
~ Throughout bars
~ Cut-off bars
GB.1
(12" x 18")
GB.2
(9" x 15")
'
(8mmØ @ 4"c/c) (8mmØ @ 6"c/c)
(8mmØ @ 4"c/c) (8mmØ @ 6"c/c)
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(10mmØ @ 4"c/c) (10mmØ @ 6"c/c)
(5~20mmØ)
(4~20mmØ)
(5~20mmØ)
(4~20mmØ)
GB.3
(9" x 12")
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
FOUR STOREYED
RCC BUILDING
(8mmØ @ 4"c/c) (8mmØ @ 6"c/c)
LB.1
(12" x 12")
(3~20mmØ)
(3~16mmØ) (3~16mmØ)
(8mmØ @ 4"c/c) (8mmØ @ 6"c/c)
LB.2
(9" x 12")
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(3~20mmØ)
PROJECT
JOB TITLE
DESIGN BY
BEAM SCHEDULE
Floor Beam Schedules
Type
Moment Reinforcement Shear Reinforcement
Column Strip (L/4) Middle Strip (L/2)
At Support At Span
The Cylinder Strength of Concrete ; f = 3000 psi ;
c
' The Yield Strength of Reinforcing Bars ; f = 50000 psi
y
(10mmØ @ 4"c/c)
FB.1
(12" x 21")
(10mmØ @ 6"c/c)
(6~20mmØ)
(4~20mmØ)
(3~20mmØ)
(6~20mmØ)
~ Throughout bars
~ Cut-off bars
FB.2
(10" x 18")
(10mmØ @ 4"c/c) (10mmØ @ 6"c/c)
(5~20mmØ)
(3~20mmØ)
(3~20mmØ)
(5~20mmØ)
(2~16mmØ) (2~16mmØ)
FB.3
(10" x 15")
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(8mmØ @ 4"c/c) (8mmØ @ 6"c/c)
FB.4
(10" x 12")
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(8mmØ @ 4"c/c) (8mmØ @ 6"c/c)
FOUR STOREYED
RCC BUILDING
PROJECT
JOB TITLE
DESIGN BY
BEAM SCHEDULE
Roof Beam Schedules
Type
Moment Reinforcement Shear Reinforcement
Column Strip (L/4) Middle Strip (L/2)
At Support At Span
The Cylinder Strength of Concrete ; f = 3000 psi ;
c
' The Yield Strength of Reinforcing Bars ; f = 50000 psi
y
(10mmØ @ 4"c/c)
RB.1
(15" x 21")
(10mmØ @ 6"c/c)
(5~20mmØ)
(3~20mmØ)
(3~20mmØ)
(5~20mmØ)
~ Throughout bars
~ Cut-off bars
RB.2
(10" x 18")
(10mmØ @ 4"c/c) (10mmØ @ 6"c/c)
(5~20mmØ)
(3~20mmØ)
(3~20mmØ)
(5~20mmØ)
(2~16mmØ) (2~16mmØ)
RB.3
(10" x 15")
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
RB.4
(10" x 12")
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
(3~16mmØ)
FOUR STOREYED
RCC BUILDING
(8mmØ @ 4"c/c) (8mmØ @ 6"c/c)
(8mmØ @ 4"c/c) (8mmØ @ 6"c/c)
Slab Detail
L
10mm Ø @ 8"c/c
10mm Ø @ 6"c/c
4.5"
S-1 Section (for Longer direction )
10mm Ø @ 8"c/c
10mm Ø @ 6"c/c
Type Thickness Layer
Reinforcement
Shorter Directon Longer Directon
Discontinuous Edge Mid Span Continuous Edge Discontinuous Edge Mid Span Continuous Edge
S-1 4.5"
Top Bar
Bottom Bar
SCHEDULE OF R.C.C SLAB
Remark
Two Way Slab
The Cylinder Strength of Concrete ; f = 3000 psi ;
c
' The Yield Strength of Reinforcing Bars ; f =50000 psi
y
10mmØ@6"c/c
PROJECT
JOB TITLE
DESIGN BY
SLAB SCHEDULE & DETAIL
10mmØ@8"c/c
S-2 4.5"
Top Bar
Bottom Bar
One Way Slab
L
10mm Ø @ 8"c/c
10mm Ø @ 6"c/c
4.5"
S-2 Section (for Longer direction )
10mm Ø @ 8"c/c
10mm Ø @ 6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@6"c/c
10mmØ@8"c/c 10mmØ@8"c/c 10mmØ@8"c/c 10mmØ@8"c/c
10mmØ@8"c/c
10mmØ@8"c/c
10mmØ@8"c/c
10mmØ@8"c/c
10mmØ@8"c/c
FOUR STOREYED
RCC BUILDING
Stair Schedule
L/4
L/4
L
10mmØ@8"c/c
4
Confinement Steel
18"
1
2
2
1
3
4
1
1
2
2
3
16mmØ@6"c/c
Tread =
Riser =
Waist Thickness = 6"
Main Steel = 16mmØ @ 6"c/c
Distribution Steel = 10mmØ @ 8"c/c
The Cylinder Strength of Concrete ; f = 3000 psi ;
c
' The Yield Strength of Reinforcing Bars ; f =50000 psi
y
PROJECT
JOB TITLE
DESIGN BY
SLAB DETAIL
FOUR STOREYED
RCC BUILDING
PROJECT
JOB TITLE
DESIGN BY
RETAINING WALL DETAIL
FOUR STOREYED
RCC BUILDING
BOTTOM LAYER
FOOTING SLAB REINFORCEMENT PLAN ( F.1,C.1)
Type: F.1
Dimension: 4'-0" x 5'-0" x 18"
RECTANGULAR FOOTING
SINGLE FOOTING DETAILS
5'-0"
GB
4'-0"
18"
N.G.L(-2.0")
G.B.L(±0'.0")
2'-0"
8'
CROSS SECTION
Y
GB
3"tk;(1:3:6) Lean Concrete
14"x18" R.C Column
(12-20mm Ø)
(20mm Ø 6"c/c)
14"x18" Column With
(12-20mmØ Main bar)
(20mm Ø 6"c/c)
9"tk;Hard Core with Sand Filling
Ground Beam
Strap Beam
4'-0"
5'-0"
BOTTOM LAYER
FOOTING SLAB REINFORCEMENT PLAN ( F.1,C.1)
Type: F.1
Dimension: 4'-0" x 5'-0" x 18"
RECTANGULAR FOOTING
SINGLE FOOTING DETAILS
6"
23'-0"
4'-0"
PROJECT
JOB TITLE
DESIGN BY
RETAINING WALL DETAIL
2'-0"
3" Thk; 1:3:6 Lean Concrete
13½" Thk; Retaining Wall
9" Thk; Retaining Wall
INSIDE
2'-6"
2'-6"
OUTSIDE
RETAINING WALL DETAIL(RW.1)
1.5"thk;(1:2:4)Cement Concrete Toppig
4.5" Thk; 1:3:6 Cement Concrete Flooring
Sand Filling
GB
SAND FILLING
N.G.L
PLINTH LEVEL
21
4"
FOUR STOREYED
RCC BUILDING
BOTTOM LAYER
FOOTING SLAB REINFORCEMENT PLAN ( F.2,C.2)
Type: F.2
Dimension: 4'-0" x 4'-0" x 18"
RECTANGULAR FOOTING
SINGLE FOOTING DETAILS
4'-0"
GB
4'-0"
18"
N.G.L(-2.0")
G.B.L(±0'.0")
2'-0"
8'
4'-0"
10"x10" Column With
(8-20mmØ Main bar)
(20mm Ø 6"c/c)
3"tk;(1:3:6) Lean Concrete
10"x10" R.C Column
(8-20mm Ø)
(20mm Ø 6"c/c)
9"tk;Hard Core with Sand Filling
Ground Beam
PROJECT
JOB TITLE
DESIGN BY
BEAM DETAIL
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
8 mm @ 4" c/c 8 mm @ 4" c/c
L/4
stirrup spacing
8 mm @ 6" c/c
3 - 16 mm
9"
15"
9"
S e c t i o n Y2
S e c t i o n Y1
3 - 16 mm
15"
1.5"
1.5"
Y1 Y2
L/4
3 - 16 mm
3 - 16 mm
3 - 16 mm
3 - 16 mm
GROUND BEAMS
GB.2 (9"x15")
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
10 mm @ 4" c/c 10 mm @ 4" c/c
L/4
stirrup spacing
10 mm @ 6" c/c
3 - 20 mm
12"
18"
12"
S e c t i o n Y2
S e c t i o n Y1
5 - 20 mm
18"
1.5"
1.5"
Y1 Y2
L/4
GROUND BEAMS
GB.1 (12"x18")
4 - 20 mm
5 - 20 mm
2 - 20 mm
4 - 20 mm
FOUR STOREYED
RCC BUILDING
2 - 20 mm
2 - 20 mm
2 - 20 mm
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
8 mm @ 4" c/c 8 mm @ 4" c/c
L/4
stirrup spacing
8 mm @ 6" c/c
3 - 16 mm
9"
12"
9"
S e c t i o n Y2
S e c t i o n Y1
3 - 16 mm
12"
1.5"
1.5"
Y1 Y2
L/4
3 - 16 mm
3 - 16 mm
3 - 16 mm
3 - 16 mm
GROUND BEAMS
GB.3 (9"x12")
PROJECT
JOB TITLE
DESIGN BY
BEAM DETAIL
FOUR STOREYED
RCC BUILDING
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
10 mm @ 6" c/c 10 mm @ 4" c/c
L/4
stirrup spacing
10 mm @ 6" c/c
5 - 20 mm
24"
24"
24"
S e c t i o n Y2
S e c t i o n Y1
5 - 20 mm
24"
1.5"
1.5"
Y1 Y2
L/4
5 - 20 mm
5 - 20 mm
3 - 20 mm
3 - 20 mm
STRIP BEAMS
SB.1 (24"x24")
PROJECT
JOB TITLE
DESIGN BY
BEAM DETAIL
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
10 mm @ 4" c/c 10 mm @ 4" c/c
L/4
stirrup spacing
10 mm @ 6" c/c
3 - 20 mm
12"
21"
12"
S e c t i o n Y2
S e c t i o n Y1
6 - 20 mm
21"
1.5"
1.5"
Y1 Y2
3 -20mm
L/4
FLOOR BEAMS
FB.1 (12"x21")
3 - 20 mm
4 - 20 mm
4 - 20 mm
3 - 20 mm
2 - 20 mm
6 - 20 mm
2 - 16 mm
2 - 16 mm 2 - 16 mm
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
10 mm @ 4" c/c 10 mm @ 4" c/c
L/4
stirrup spacing
10 mm @ 6" c/c
3 - 20 mm
10"
18"
10"
S e c t i o n Y2
S e c t i o n Y1
5 - 20 mm
18"
1.5"
1.5"
Y1 Y2
2 -20mm
L/4
FLOOR BEAMS
FB.2 (10"x18")
2 - 20 mm
3 - 20 mm
3 - 20 mm
3 - 20 mm
2 - 20 mm
5 - 20 mm
FOUR STOREYED
RCC BUILDING
PROJECT
JOB TITLE
DESIGN BY
BEAM DETAIL
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
8 mm @ 4" c/c 8 mm @ 4" c/c
L/4
stirrup spacing
8 mm @ 6" c/c
3 - 16 mm
10"
12"
10"
S e c t i o n Y2
S e c t i o n Y1
3 - 16 mm
12"
1.5"
1.5"
Y1 Y2
L/4
3 - 16 mm
3 - 16 mm
3 - 16 mm
3 - 16 mm
FLOOR BEAMS
FB.4 (10"x12")
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
8 mm @ 4" c/c 8 mm @ 4" c/c
L/4
stirrup spacing
8 mm @ 6" c/c
3 - 16 mm
10"
15"
10"
S e c t i o n Y2
S e c t i o n Y1
3 - 16 mm
15"
1.5"
1.5"
Y1 Y2
L/4
3 - 16 mm
3 - 16 mm
3 - 16 mm
3 - 16 mm
FLOOR BEAMS
FB.3 (10"x15")
FOUR STOREYED
RCC BUILDING
PROJECT
JOB TITLE
DESIGN BY
BEAM DETAIL
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
10 mm @ 4" c/c 10 mm @ 4" c/c
L/4
stirrup spacing
10 mm @ 6" c/c
3 - 20 mm
15"
21"
15"
S e c t i o n Y2
S e c t i o n Y1
5 - 20 mm
21"
1.5"
1.5"
Y1 Y2
2 -20mm
L/4
ROOF BEAMS
RB.1 (15"x21")
2 - 20 mm
3 - 20 mm
3 - 20 mm
3 - 20 mm
2 - 20 mm
5 - 20 mm
2 - 16 mm
2 - 16 mm 2 - 16 mm
ROOF BEAMS
RB.2 (10"x18")
FOUR STOREYED
RCC BUILDING
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
10 mm @ 4" c/c 10 mm @ 4" c/c
L/4
stirrup spacing
10 mm @ 6" c/c
3 - 20 mm
10"
18"
10"
S e c t i o n Y2
S e c t i o n Y1
5 - 20 mm
18"
1.5"
1.5"
Y1 Y2
2 -20mm
L/4
2 - 20 mm
3 - 20 mm
3 - 20 mm
3 - 20 mm
2 - 20 mm
5 - 20 mm
PROJECT
JOB TITLE
DESIGN BY
BEAM DETAIL
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
8 mm @ 4" c/c 8 mm @ 4" c/c
L/4
stirrup spacing
8 mm @ 6" c/c
3 - 16 mm
10"
12"
10"
S e c t i o n Y2
S e c t i o n Y1
3 - 16 mm
12"
1.5"
1.5"
Y1 Y2
L/4
3 - 16 mm
3 - 16 mm
3 - 16 mm
3 - 16 mm
ROOF BEAMS
RB.4 (10"x12")
2
1
L
0.125L 0.125L
2' 2'
stirrup spacing stirrup spacing
8 mm @ 4" c/c 8 mm @ 4" c/c
L/4
stirrup spacing
8 mm @ 6" c/c
3 - 16 mm
10"
15"
10"
S e c t i o n Y2
S e c t i o n Y1
3 - 16 mm
15"
1.5"
1.5"
Y1 Y2
L/4
3 - 16 mm
3 - 16 mm
3 - 16 mm
3 - 16 mm
ROOF BEAMS
RB.3 (10"x15")
FOUR STOREYED
RCC BUILDING

More Related Content

Similar to Clinic update.pdf

Lecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear WallsLecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear WallsTeja Ande
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problemdhineshkumar002
 
IFA (8999) 16-478196-R.0-Imp
IFA (8999) 16-478196-R.0-ImpIFA (8999) 16-478196-R.0-Imp
IFA (8999) 16-478196-R.0-ImpJay Fraley
 
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdfBOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdfEduardoFarfan14
 
Structure Final Assignment
Structure Final AssignmentStructure Final Assignment
Structure Final AssignmentSow Wei Henn
 
Emeca SPE-USA Pile Joint Product
Emeca SPE-USA Pile Joint ProductEmeca SPE-USA Pile Joint Product
Emeca SPE-USA Pile Joint Productpdewit
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
L. labour-charges-for-11k v-system-1
L. labour-charges-for-11k v-system-1L. labour-charges-for-11k v-system-1
L. labour-charges-for-11k v-system-1Ramesh Meti
 
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)sufiyan shaikh
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural DrawingsTodd Mordoh
 
Basement wall design
Basement wall designBasement wall design
Basement wall designCETCBIM
 
Drawings of Revit project for D type qtr.
Drawings of Revit project for  D type qtr.Drawings of Revit project for  D type qtr.
Drawings of Revit project for D type qtr.mahfooz alam khan
 
6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjsBrajeshRanjanAcharya
 
Design and detailing_of_retaining_walls counter fort.تصميم الجدران الاستنادية...
Design and detailing_of_retaining_walls counter fort.تصميم الجدران الاستنادية...Design and detailing_of_retaining_walls counter fort.تصميم الجدران الاستنادية...
Design and detailing_of_retaining_walls counter fort.تصميم الجدران الاستنادية...Dr.youssef hamida
 

Similar to Clinic update.pdf (20)

Lecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear WallsLecture 6 7 Rm Shear Walls
Lecture 6 7 Rm Shear Walls
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
IFA (8999) 16-478196-R.0-Imp
IFA (8999) 16-478196-R.0-ImpIFA (8999) 16-478196-R.0-Imp
IFA (8999) 16-478196-R.0-Imp
 
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdfBOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
 
Baseplate
BaseplateBaseplate
Baseplate
 
Structure Final Assignment
Structure Final AssignmentStructure Final Assignment
Structure Final Assignment
 
3440551.ppt
3440551.ppt3440551.ppt
3440551.ppt
 
Ns eco pile
Ns eco pileNs eco pile
Ns eco pile
 
Emeca SPE-USA Pile Joint Product
Emeca SPE-USA Pile Joint ProductEmeca SPE-USA Pile Joint Product
Emeca SPE-USA Pile Joint Product
 
Shear lug verification example
Shear lug verification exampleShear lug verification example
Shear lug verification example
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
L. labour-charges-for-11k v-system-1
L. labour-charges-for-11k v-system-1L. labour-charges-for-11k v-system-1
L. labour-charges-for-11k v-system-1
 
8th Semester (June; July-2014) Civil Engineering Question Paper
8th Semester (June; July-2014) Civil Engineering Question Paper8th Semester (June; July-2014) Civil Engineering Question Paper
8th Semester (June; July-2014) Civil Engineering Question Paper
 
MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)MAIN CANOPY BAJAJ HR(22.09.2016)
MAIN CANOPY BAJAJ HR(22.09.2016)
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
 
Basement wall design
Basement wall designBasement wall design
Basement wall design
 
Drawings of Revit project for D type qtr.
Drawings of Revit project for  D type qtr.Drawings of Revit project for  D type qtr.
Drawings of Revit project for D type qtr.
 
6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs
 
Design and detailing_of_retaining_walls counter fort.تصميم الجدران الاستنادية...
Design and detailing_of_retaining_walls counter fort.تصميم الجدران الاستنادية...Design and detailing_of_retaining_walls counter fort.تصميم الجدران الاستنادية...
Design and detailing_of_retaining_walls counter fort.تصميم الجدران الاستنادية...
 

Recently uploaded

SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 nightCheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 nightDelhi Call girls
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonDelhi Call girls
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵anilsa9823
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...ankitnayak356677
 

Recently uploaded (20)

SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
 
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 nightCheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
Cheap Rate Call girls Malviya Nagar 9205541914 shot 1500 night
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
 

Clinic update.pdf

  • 1. FOUR STOREYED R.C.C BUILDING STRUCTURAL DESIGN FOR
  • 2. The Yield Strength of Reinforcing Bars ; f = 50000 psi ACI 318-02 Code is used. The Cylinder Strength of Concrete ; f = 3000 psi c y Special Moment Resisting Frame. Type of Frame Material Properties Structural Analysis and Design Design Code DESIGN DATA FOR CALCULATION ' Ceiling = 10 psf Floor finishing = 10 psf 4.5" brick wall = 55 psf 9"tk brick wall = 100 psf Dead Load Loads Wind Load = 80 mph Seismic Load = 0.4g Stair = 100 psf Environmental Load Etabs & Safe softwares are used. Typical Floor Area = 40 psf Roof Floor Area = 20 psf Live Load FOUR STOREYED R.C.C BUILDING
  • 3. f =3000psi (28 days), max size of Aggregate=1" 2. Splice L H/2 40d L/2 45d 45d h 2h Column Beam H=Floor to Floor Height, d=diameter of bar 1. Material f =50000psi 3. Special Reinforcement (a) At every splice max; spacing of tie bars or stirrup=4"c/c (c) At every exterior joint(beams to column) provide a pair of special tie bar Specifications (d) At exterior corner slab (only Two-way slab) L/5 L/5 L/5 L/5 L= Longer Clear Span Top Bar Bottom Bar (b) At every joint(beam to beam) max; spacing of stirrup=4"c/c with max; spacing=6" 6" Column Beam Tie bar c ' y
  • 4. 5.Standard Cutoff point for Beam 7.Anchorage For 16mm dia =7.5" For 18mm dia =8.5" 12d For 10mm dia =2.25" For 6mm dia =1.5" 135º hook 6d 180º hook For 16mm dia =2.5" For 20mm dia =3" 4d(or)2.5" 2" 2" 2" 2" 2" 2" L1/3 L2/3 L2/3 L3/3 L3/4 0" 0.75" 1.5" 2" 3" 2" 2" 2" 3" L2 L3 Slab 6.Standard Cutoff point for Slab 90º hook L1 L2 L3 L2/6 L2/6 L3/6 L3/6 stirrup stirrup stirrup L1/4 0" Column Beam L1/6 L1/6 L1/4 L3/4 L1 L3 L1/3 L2/3 L2/3 L3/3 Beam Kind of Structure Component Clear Cover Clear End Cover Component not Contacting to earth Component Contacting to earth Slab,Stair Beam,Column Beam,Column Footing 4. Minimum Cover
  • 5. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING FOOTING & STRIP BEAM PLAN FOOTING & STRIP BEAM PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' F.1 F.1 SB.1 F.1 F.1 SB.1 F.1 F.1 SB.1 F.1 F.1 SB.1 F.2 F.2 F.2 F.2 1'
  • 6. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING COLUMN PLAN COLUMN PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' C.1 C.1 C.1 C.1 C.2 C.2 C.2 C.2 C.1 C.1 C.1 C.1
  • 7. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING RETAINING WALL PLAN RETAINING WALL PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 RW.1 PC.1
  • 8. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING GROUND BEAM PLAN GROUND BEAM PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' GB.1 GB.1 GB.1 GB.1 GB.3 GB.3 GB.2 GB.2 GB.2 GB.3 GB.3 GB.3 GB.3 GB.3 GB.3 GB.3 GB.3 GB.3 GB.2 GB.2 GB.1 PC.1
  • 9. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING FIRST FLOOR BEAM PLAN FIRST FLOOR BEAM PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' FB.1 FB.3 FB.1 FB.1 FB.1 FB.3 FB.3 FB.3 FB.3 FB.3 FB.3 FB.3 FB.4 FB.2 FB.3 FB.4 FB.4 FB.4 FB.4 FB.4 FB.4 FB.3 FB.3 FB.4 FB.4 PC.1
  • 10. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING FIRST FLOOR SLAB PLAN FIRST FLOOR SLAB PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' S.2 S.2 S.2 S.2 S.1 S.1 S.1 S.2
  • 11. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING SECOND FLOOR BEAM PLAN SECOND FLOOR BEAM PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' FB.1 FB.3 FB.1 FB.1 FB.1 FB.3 FB.3 FB.3 FB.3 FB.3 FB.3 FB.3 FB.2 FB.4 FB.4 FB.4 FB.4 FB.4 FB.4 FB.3 FB.3 FB.4 FB.4 FB.4 PC.1 FB.3
  • 12. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING SECOND FLOOR SLAB PLAN SECOND FLOOR SLAB PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' S.2 S.2 S.2 S.2 S.1 S.1 S.1 S.2
  • 13. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING THIRD FLOOR BEAM PLAN THIRD FLOOR BEAM PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' FB.1 FB.3 FB.1 FB.1 FB.1 FB.3 FB.3 FB.3 FB.3 FB.3 FB.3 FB.3 FB.2 FB.4 FB.4 FB.4 FB.4 FB.4 FB.4 FB.3 FB.3 FB.4 FB.4 FB.4 PC.1 FB.3
  • 14. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING THIRD FLOOR SLAB PLAN THIRD FLOOR SLAB PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' S.2 S.2 S.2 S.2 S.1 S.1 S.1 S.2
  • 15. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING ROOF BEAM PLAN ROOF BEAM PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' RB.1 RB.3 RB.1 RB.1 RB.1 RB.3 RB.3 RB.3 RB.4 RB.4 RB.3 RB.3 RB.3 RB.3 RB.2 RB.3 RB.3 RB.4 RB.4 RB.4 RB.4 RB.4 RB.4 RB.3 PC.1
  • 16. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING ROOF SLAB PLAN ROOF SLAB PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' S.2 S.2 S.2 S.2 S.1 S.1 S.2
  • 17. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING STAIR ROOF BEAM PLAN STAIR ROOF BEAM PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' RB.1 RB.1 RB.1 RB.2 RB.4 RB.4 RB.4 RB.4 RB.3 RB.4 RB.3 RB.3 RB.3 RB.4 RB.4 RB.4
  • 18. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING STAIR ROOF SLAB PLAN STAIR ROOF SLAB PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' S.2 S.2 S.2 S.1 S.2 S.2 S.2 S.2 S.2
  • 19. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING LANDING BEAM PLAN LANDING BEAM PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' LB.1 LB.1 LB.2
  • 20. PROJECT JOB TITLE DESIGN BY FOUR STOREYED RCC BUILDING LANDING BEAM PLAN LANDING BEAM PLAN A 1 B 23' 2 3 4 11'-11" 17' 13'-11" 4'-7" 4'-7" 52' LB.1 LB.1 LB.2
  • 21. Type Size Reinforcement Shorter Directon Longer Directon 4'-0" x 5'-0" x 0"-18" Footing Schedule Remark F.1 20mmØ @ 6"c/c Isolated Footing The Cylinder Strength of Concrete ; f = 3000 psi ; c ' The Yield Strength of Reinforcing Bars ; f = 50000 psi y F.2 Isolated Footing 4'-0" x 4'-0" x 0"-18" 20mmØ @ 6"c/c PROJECT JOB TITLE DESIGN BY FOOTING SCHEDULE FOUR STOREYED RCC BUILDING Strap Beam Schedules Type Moment Reinforcement Shear Reinforcement Footing Strip Middle Strip (L/2) At Support At Span The Cylinder Strength of Concrete ; f = 3000 psi ; c ' The Yield Strength of Reinforcing Bars ; f = 50000 psi y (10mmØ @ 4"c/c) SB.1 (24" x 24") (10mmØ @ 6"c/c) (5~20mmØ) (5~20mmØ) 20mmØ @ 6"c/c 20mmØ @ 6"c/c (5~20mmØ) (5~20mmØ)
  • 22. PROJECT JOB TITLE DESIGN BY COLUMN SCHEDULE Column Schedule Shear Reinforcement Column Strip (H/4) Middle Strip (H/2) Size & Main Steel Level Type The Cylinder Strength of Concrete ; f = 3000 psi ; c ' The Yield Strength of Reinforcing Bars ; f = 50000 psi y Foundation to Second Floor (2-10mmØ@6"c/c) (2-10mmØ@4"c/c) C.1 14" x 18" (12 - 20mmØ) Second Floor to Stair Roof Floor 14" x 18" (12 - 16mmØ) Foundation to Stair Roof Floor 10" x 10" (8 - 20mmØ) (2-8mmØ@6"c/c) (2-8mmØ@4"c/c) C.2 (2-8mmØ@6"c/c) (2-8mmØ@4"c/c) FOUR STOREYED RCC BUILDING Ground Beam to Stair Roof Floor 9" x 9" (6- 16mmØ) (1-8mmØ@4"c/c) (1-8mmØ@4"c/c) PC.1
  • 23. PROJECT JOB TITLE DESIGN BY BEAM SCHEDULE Ground Beam Schedules Type Moment Reinforcement Shear Reinforcement Column Strip (L/4) Middle Strip (L/2) At Support At Span The Cylinder Strength of Concrete ; f = 3000 psi ; c The Yield Strength of Reinforcing Bars ; f = 50000 psi y ~ Throughout bars ~ Cut-off bars GB.1 (12" x 18") GB.2 (9" x 15") ' (8mmØ @ 4"c/c) (8mmØ @ 6"c/c) (8mmØ @ 4"c/c) (8mmØ @ 6"c/c) (3~16mmØ) (3~16mmØ) (3~16mmØ) (3~16mmØ) (10mmØ @ 4"c/c) (10mmØ @ 6"c/c) (5~20mmØ) (4~20mmØ) (5~20mmØ) (4~20mmØ) GB.3 (9" x 12") (3~16mmØ) (3~16mmØ) (3~16mmØ) (3~16mmØ) FOUR STOREYED RCC BUILDING (8mmØ @ 4"c/c) (8mmØ @ 6"c/c) LB.1 (12" x 12") (3~20mmØ) (3~16mmØ) (3~16mmØ) (8mmØ @ 4"c/c) (8mmØ @ 6"c/c) LB.2 (9" x 12") (3~16mmØ) (3~16mmØ) (3~16mmØ) (3~16mmØ) (3~20mmØ)
  • 24. PROJECT JOB TITLE DESIGN BY BEAM SCHEDULE Floor Beam Schedules Type Moment Reinforcement Shear Reinforcement Column Strip (L/4) Middle Strip (L/2) At Support At Span The Cylinder Strength of Concrete ; f = 3000 psi ; c ' The Yield Strength of Reinforcing Bars ; f = 50000 psi y (10mmØ @ 4"c/c) FB.1 (12" x 21") (10mmØ @ 6"c/c) (6~20mmØ) (4~20mmØ) (3~20mmØ) (6~20mmØ) ~ Throughout bars ~ Cut-off bars FB.2 (10" x 18") (10mmØ @ 4"c/c) (10mmØ @ 6"c/c) (5~20mmØ) (3~20mmØ) (3~20mmØ) (5~20mmØ) (2~16mmØ) (2~16mmØ) FB.3 (10" x 15") (3~16mmØ) (3~16mmØ) (3~16mmØ) (3~16mmØ) (8mmØ @ 4"c/c) (8mmØ @ 6"c/c) FB.4 (10" x 12") (3~16mmØ) (3~16mmØ) (3~16mmØ) (3~16mmØ) (8mmØ @ 4"c/c) (8mmØ @ 6"c/c) FOUR STOREYED RCC BUILDING
  • 25. PROJECT JOB TITLE DESIGN BY BEAM SCHEDULE Roof Beam Schedules Type Moment Reinforcement Shear Reinforcement Column Strip (L/4) Middle Strip (L/2) At Support At Span The Cylinder Strength of Concrete ; f = 3000 psi ; c ' The Yield Strength of Reinforcing Bars ; f = 50000 psi y (10mmØ @ 4"c/c) RB.1 (15" x 21") (10mmØ @ 6"c/c) (5~20mmØ) (3~20mmØ) (3~20mmØ) (5~20mmØ) ~ Throughout bars ~ Cut-off bars RB.2 (10" x 18") (10mmØ @ 4"c/c) (10mmØ @ 6"c/c) (5~20mmØ) (3~20mmØ) (3~20mmØ) (5~20mmØ) (2~16mmØ) (2~16mmØ) RB.3 (10" x 15") (3~16mmØ) (3~16mmØ) (3~16mmØ) (3~16mmØ) RB.4 (10" x 12") (3~16mmØ) (3~16mmØ) (3~16mmØ) (3~16mmØ) FOUR STOREYED RCC BUILDING (8mmØ @ 4"c/c) (8mmØ @ 6"c/c) (8mmØ @ 4"c/c) (8mmØ @ 6"c/c)
  • 26. Slab Detail L 10mm Ø @ 8"c/c 10mm Ø @ 6"c/c 4.5" S-1 Section (for Longer direction ) 10mm Ø @ 8"c/c 10mm Ø @ 6"c/c Type Thickness Layer Reinforcement Shorter Directon Longer Directon Discontinuous Edge Mid Span Continuous Edge Discontinuous Edge Mid Span Continuous Edge S-1 4.5" Top Bar Bottom Bar SCHEDULE OF R.C.C SLAB Remark Two Way Slab The Cylinder Strength of Concrete ; f = 3000 psi ; c ' The Yield Strength of Reinforcing Bars ; f =50000 psi y 10mmØ@6"c/c PROJECT JOB TITLE DESIGN BY SLAB SCHEDULE & DETAIL 10mmØ@8"c/c S-2 4.5" Top Bar Bottom Bar One Way Slab L 10mm Ø @ 8"c/c 10mm Ø @ 6"c/c 4.5" S-2 Section (for Longer direction ) 10mm Ø @ 8"c/c 10mm Ø @ 6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@6"c/c 10mmØ@8"c/c 10mmØ@8"c/c 10mmØ@8"c/c 10mmØ@8"c/c 10mmØ@8"c/c 10mmØ@8"c/c 10mmØ@8"c/c 10mmØ@8"c/c 10mmØ@8"c/c FOUR STOREYED RCC BUILDING
  • 27. Stair Schedule L/4 L/4 L 10mmØ@8"c/c 4 Confinement Steel 18" 1 2 2 1 3 4 1 1 2 2 3 16mmØ@6"c/c Tread = Riser = Waist Thickness = 6" Main Steel = 16mmØ @ 6"c/c Distribution Steel = 10mmØ @ 8"c/c The Cylinder Strength of Concrete ; f = 3000 psi ; c ' The Yield Strength of Reinforcing Bars ; f =50000 psi y PROJECT JOB TITLE DESIGN BY SLAB DETAIL FOUR STOREYED RCC BUILDING
  • 28. PROJECT JOB TITLE DESIGN BY RETAINING WALL DETAIL FOUR STOREYED RCC BUILDING BOTTOM LAYER FOOTING SLAB REINFORCEMENT PLAN ( F.1,C.1) Type: F.1 Dimension: 4'-0" x 5'-0" x 18" RECTANGULAR FOOTING SINGLE FOOTING DETAILS 5'-0" GB 4'-0" 18" N.G.L(-2.0") G.B.L(±0'.0") 2'-0" 8' CROSS SECTION Y GB 3"tk;(1:3:6) Lean Concrete 14"x18" R.C Column (12-20mm Ø) (20mm Ø 6"c/c) 14"x18" Column With (12-20mmØ Main bar) (20mm Ø 6"c/c) 9"tk;Hard Core with Sand Filling Ground Beam Strap Beam 4'-0" 5'-0" BOTTOM LAYER FOOTING SLAB REINFORCEMENT PLAN ( F.1,C.1) Type: F.1 Dimension: 4'-0" x 5'-0" x 18" RECTANGULAR FOOTING SINGLE FOOTING DETAILS 6" 23'-0" 4'-0"
  • 29. PROJECT JOB TITLE DESIGN BY RETAINING WALL DETAIL 2'-0" 3" Thk; 1:3:6 Lean Concrete 13½" Thk; Retaining Wall 9" Thk; Retaining Wall INSIDE 2'-6" 2'-6" OUTSIDE RETAINING WALL DETAIL(RW.1) 1.5"thk;(1:2:4)Cement Concrete Toppig 4.5" Thk; 1:3:6 Cement Concrete Flooring Sand Filling GB SAND FILLING N.G.L PLINTH LEVEL 21 4" FOUR STOREYED RCC BUILDING BOTTOM LAYER FOOTING SLAB REINFORCEMENT PLAN ( F.2,C.2) Type: F.2 Dimension: 4'-0" x 4'-0" x 18" RECTANGULAR FOOTING SINGLE FOOTING DETAILS 4'-0" GB 4'-0" 18" N.G.L(-2.0") G.B.L(±0'.0") 2'-0" 8' 4'-0" 10"x10" Column With (8-20mmØ Main bar) (20mm Ø 6"c/c) 3"tk;(1:3:6) Lean Concrete 10"x10" R.C Column (8-20mm Ø) (20mm Ø 6"c/c) 9"tk;Hard Core with Sand Filling Ground Beam
  • 30. PROJECT JOB TITLE DESIGN BY BEAM DETAIL 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 8 mm @ 4" c/c 8 mm @ 4" c/c L/4 stirrup spacing 8 mm @ 6" c/c 3 - 16 mm 9" 15" 9" S e c t i o n Y2 S e c t i o n Y1 3 - 16 mm 15" 1.5" 1.5" Y1 Y2 L/4 3 - 16 mm 3 - 16 mm 3 - 16 mm 3 - 16 mm GROUND BEAMS GB.2 (9"x15") 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 10 mm @ 4" c/c 10 mm @ 4" c/c L/4 stirrup spacing 10 mm @ 6" c/c 3 - 20 mm 12" 18" 12" S e c t i o n Y2 S e c t i o n Y1 5 - 20 mm 18" 1.5" 1.5" Y1 Y2 L/4 GROUND BEAMS GB.1 (12"x18") 4 - 20 mm 5 - 20 mm 2 - 20 mm 4 - 20 mm FOUR STOREYED RCC BUILDING 2 - 20 mm 2 - 20 mm 2 - 20 mm
  • 31. 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 8 mm @ 4" c/c 8 mm @ 4" c/c L/4 stirrup spacing 8 mm @ 6" c/c 3 - 16 mm 9" 12" 9" S e c t i o n Y2 S e c t i o n Y1 3 - 16 mm 12" 1.5" 1.5" Y1 Y2 L/4 3 - 16 mm 3 - 16 mm 3 - 16 mm 3 - 16 mm GROUND BEAMS GB.3 (9"x12") PROJECT JOB TITLE DESIGN BY BEAM DETAIL FOUR STOREYED RCC BUILDING 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 10 mm @ 6" c/c 10 mm @ 4" c/c L/4 stirrup spacing 10 mm @ 6" c/c 5 - 20 mm 24" 24" 24" S e c t i o n Y2 S e c t i o n Y1 5 - 20 mm 24" 1.5" 1.5" Y1 Y2 L/4 5 - 20 mm 5 - 20 mm 3 - 20 mm 3 - 20 mm STRIP BEAMS SB.1 (24"x24")
  • 32. PROJECT JOB TITLE DESIGN BY BEAM DETAIL 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 10 mm @ 4" c/c 10 mm @ 4" c/c L/4 stirrup spacing 10 mm @ 6" c/c 3 - 20 mm 12" 21" 12" S e c t i o n Y2 S e c t i o n Y1 6 - 20 mm 21" 1.5" 1.5" Y1 Y2 3 -20mm L/4 FLOOR BEAMS FB.1 (12"x21") 3 - 20 mm 4 - 20 mm 4 - 20 mm 3 - 20 mm 2 - 20 mm 6 - 20 mm 2 - 16 mm 2 - 16 mm 2 - 16 mm 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 10 mm @ 4" c/c 10 mm @ 4" c/c L/4 stirrup spacing 10 mm @ 6" c/c 3 - 20 mm 10" 18" 10" S e c t i o n Y2 S e c t i o n Y1 5 - 20 mm 18" 1.5" 1.5" Y1 Y2 2 -20mm L/4 FLOOR BEAMS FB.2 (10"x18") 2 - 20 mm 3 - 20 mm 3 - 20 mm 3 - 20 mm 2 - 20 mm 5 - 20 mm FOUR STOREYED RCC BUILDING
  • 33. PROJECT JOB TITLE DESIGN BY BEAM DETAIL 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 8 mm @ 4" c/c 8 mm @ 4" c/c L/4 stirrup spacing 8 mm @ 6" c/c 3 - 16 mm 10" 12" 10" S e c t i o n Y2 S e c t i o n Y1 3 - 16 mm 12" 1.5" 1.5" Y1 Y2 L/4 3 - 16 mm 3 - 16 mm 3 - 16 mm 3 - 16 mm FLOOR BEAMS FB.4 (10"x12") 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 8 mm @ 4" c/c 8 mm @ 4" c/c L/4 stirrup spacing 8 mm @ 6" c/c 3 - 16 mm 10" 15" 10" S e c t i o n Y2 S e c t i o n Y1 3 - 16 mm 15" 1.5" 1.5" Y1 Y2 L/4 3 - 16 mm 3 - 16 mm 3 - 16 mm 3 - 16 mm FLOOR BEAMS FB.3 (10"x15") FOUR STOREYED RCC BUILDING
  • 34. PROJECT JOB TITLE DESIGN BY BEAM DETAIL 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 10 mm @ 4" c/c 10 mm @ 4" c/c L/4 stirrup spacing 10 mm @ 6" c/c 3 - 20 mm 15" 21" 15" S e c t i o n Y2 S e c t i o n Y1 5 - 20 mm 21" 1.5" 1.5" Y1 Y2 2 -20mm L/4 ROOF BEAMS RB.1 (15"x21") 2 - 20 mm 3 - 20 mm 3 - 20 mm 3 - 20 mm 2 - 20 mm 5 - 20 mm 2 - 16 mm 2 - 16 mm 2 - 16 mm ROOF BEAMS RB.2 (10"x18") FOUR STOREYED RCC BUILDING 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 10 mm @ 4" c/c 10 mm @ 4" c/c L/4 stirrup spacing 10 mm @ 6" c/c 3 - 20 mm 10" 18" 10" S e c t i o n Y2 S e c t i o n Y1 5 - 20 mm 18" 1.5" 1.5" Y1 Y2 2 -20mm L/4 2 - 20 mm 3 - 20 mm 3 - 20 mm 3 - 20 mm 2 - 20 mm 5 - 20 mm
  • 35. PROJECT JOB TITLE DESIGN BY BEAM DETAIL 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 8 mm @ 4" c/c 8 mm @ 4" c/c L/4 stirrup spacing 8 mm @ 6" c/c 3 - 16 mm 10" 12" 10" S e c t i o n Y2 S e c t i o n Y1 3 - 16 mm 12" 1.5" 1.5" Y1 Y2 L/4 3 - 16 mm 3 - 16 mm 3 - 16 mm 3 - 16 mm ROOF BEAMS RB.4 (10"x12") 2 1 L 0.125L 0.125L 2' 2' stirrup spacing stirrup spacing 8 mm @ 4" c/c 8 mm @ 4" c/c L/4 stirrup spacing 8 mm @ 6" c/c 3 - 16 mm 10" 15" 10" S e c t i o n Y2 S e c t i o n Y1 3 - 16 mm 15" 1.5" 1.5" Y1 Y2 L/4 3 - 16 mm 3 - 16 mm 3 - 16 mm 3 - 16 mm ROOF BEAMS RB.3 (10"x15") FOUR STOREYED RCC BUILDING