VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
QUANTITATIVE METHODS FOR CHOOSING PROJECTS - Internal RateOf Return (IRR)
1. NADYA SAFITRI DONGORAN
SISTEM INFORMASI
UNIVERSITAS ISLAM NEGERI
SULTAN SYARIF KASIM RIAU
QUANTITATIVE METHODS FOR CHOOSING
PROJECTS - Internal Rate
Of Return (IRR)
2. Internal Rate of Return (IRR)
The internal rate of return of a project is the
discount rate that makes the net present value of
the investment zero. Managers can compare this
rate of return to their required return to decide if
the investment should be made. Calculating the
IRR of a project typically must be done by trial
and error, substituting progressively higher
interest rates into the NPV equation until the NPV
is driven down to zero. Calculators and
computers can perform this trial and error. This
measure should be used cautiously, however; if
cash flows arrive in varying amounts per period,
there can be multiple rates of return, and typical
calculators or computer programs will often
simply report the first IRR that is found.
3. Real Options
Real options The application of stock option
valuation methods to investments i nonfinancial assets.
In “real options,” the assets underlying the value of
the option are nonfinancial resources. An investor who
makes an initial investment in basic R&D or in
breakthrough technologies is, it is argued, buying a real
call option to implement that technology later should it
prove to be valuable. provides examples of investment
decision that can be viewed as real call options. With
respect to research and development:
The cost of the R&D program can be considered the price
of a call option.
The cost of future investment required to capitalize on the
R&D program (such as the cost of commercializing a new
technology that is developed) can be considered the
exercise price.
The returns to the R&D investment are analogous to the
value of a stock purchased with a call option
6. Reference
M. Amran and N. Kulatilaka, Real Options (Boston:
Harvard Business School Press, 1999); F. P. Boer,
“Valuation of Technology Using Real Options,”
Research Technology Management 43 (2000), pp.
26–31; and R. T. McGrath, “Assessing Technology
Projects Using Real Options Reasoning,” Research
Technology Management 43 (July–August, 2000), pp.
35–50.
M. Benaroch and R. Kauffman, “Justifying Electronic
Banking Network Expansion Using Real Options
Analysis,” MIS Quarterly 24 (June 2000), pp. 197–
226.
M. Perlitz, T. Peske, and R. Schrank, “Real Options
Valuation: The New Frontier in R&D Evaluation?”
R&D Management 29 (1999), pp. 255–70.