SlideShare a Scribd company logo
1 of 48
PRESNTATION ON SUMMER INTERNSHIP AT HONDA
CARS INDIA LIMITED
JAPAN BLOC
NORTH
AMERICA
BLOC
SOUTH
AMERIC
A BLOC
EUROPE-AFRICA-
MIDDLE EAST BLOC
ASIA/OCEANIA BLOC
Canada
USA
Ohio
Alabama
Mexico
Columbia
Brazil
Peru
Nigeria
UK
Morocco
Mauritius
Spain
France
Turkey
Italy
Australia
Indonesia
Malaysia
Thailand Philippines
Taiwan
China
India
Pakistan
Vietnam
1
2
3
5
6
4
HONDA worldwide operation
Cars
HONDA Jet
Power Products
• Leading Company in Mobility Business
• Product range from Motorcycles to Aircraft
• Future technologies - Robots, Fuel Cell Cars etc.
• Focus on Environment Friendly Technologies
Motorcycles
1949
1953
1963
2000
2004
Asimo
Fuel Cell Car
2008
HONDA history
PLANT-II
HCIL
CHENNAI
MUMBAI
Manufacturing Unit
Zonal Office
GR. NOIDA
PLANT -I
BHIWADI
HONDA MANMUFACTURING UNIT IN INDIA
Welcome to
Honda Cars India Ltd.
Tapukara (Rajasthan)
(Assembly Frame)
(Vehicle Quality)
(Plastic Object Painting Area)
(Assembly Engine)
COMPANY OVERVIEW
 5 S:
 5S is a method for achieving and sustaining efficiency and effectiveness
through organization and standardization in the workplace
 KAIZEN :- "change for the best"
 When applied to the workplace, kaizen refers to activities that
continually improve all functions, and involves all employees
from the CEO to the assembly line workers.
Press Shop
POPA (Plastic Object
Paint Application)
Al
Fe
Mission
Weld Shop
AE (Engine Assembly)
AF (Frame Assembly)
Vehicle Quality
PRODUCTION FLOW
WHERE;
AE: ASSEMBLY ENGINE
CQA: COMPLETE QUALITY ASSURANCE
CBU: COMPLETE BUILD UNIT
POPA: PLASTIC OBJECT AND PAINT APPLICATION
The Blank sheets of metal are received from RPSC. These Blank sheets of metal have a
thickness between 0.65 to 0.70 mm. There are two lines for the production of stamped
parts. The whole production process is automatic and is carried out with the help of robots.
A View Of Press Shop
 Press Shop
Stamping die used in forming of sheet
metal
 The Al department is responsible for development of all the aluminum parts,
for example the engine block and the engine head. CNC lathes and machining
tools like grinding wheels etc. are used.
Petrol Engine Block Manufactured in AL Shop
AL Shop
 Connecting rod and crank shaft are manufactured in FE Shop.
 There are two different production lines for con rod and crankshaft
Connecting Rod Crankshaft
 FE Shop
 The missions are made for two types of engines, diesel and petrol, with each
gear box having its own identification. The diesel model can be identified by
the presence of a single line on the main shaft while the petrol gear box has
two lines on the main shaft.
 Mission- A Subassembly Of Gear arrangement in gear
box
 MISSION SHOP
 PAINT SHOP
Paint Application
The main objectives of the Paint Division are to provide
vehicles with a high gloss, attractive, colorful finish, with a
long term durable resistance to corrosion.
PAINT INSPECTION
 AF SHOP (FRAME ASSEMBLY)
 Frame assembly is the last part of the production line.
 Parts from various shops are received,assembed dand
Finished cars drive out of the AF shop.
ASSEMBLY FRAME
MY WORK AREA: AE SHOP (ENGINE ASSEMBLY
Assembly
procedure
Assembly :-
Assembly is whole unit of subassembly
Subassembly :-
Subassembly is part of assembly
Sub assembly
Assembly
Assembly
●Combination number of parts
or subassemblies put together
to perform a specific function,
and capable of disassembly
without destruction.
What may be an assembly at
one point, however, may be a
subassembly at another.
Sub-Assembly
A unit assembled separately
but designed to fit with other
units in a manufactured
product
Example :
Piston sub assembly
PISTON SUBASSEMBLY
ASSEMBLED ENGINE
O
 Block Line:- This is the First Line in which the Cylinder
Block Loading , Piston Insertion , Crankshaft Installation ,
Flywheel Installation , Starter Motor Installation ,
Cylinder Head Docking etc. are take place. It consists of
Station No. 1 - 21 .
 Bare Line :-This is the Second Line in which the Rocker
Arm Installation, Fuel Pipe Installation , Connecting Pipe
Installation , Cam Chain Installation , Spark Plug
Installation , Mission Docking , etc. take place . It
Consists Of Station No. 22-42
 OHC Line :- This is the Last Line in which the Alternate
Current Generator Installation, AC Compressor, HAC
Belt, etc are take place . It consists of Station No. 43-53
LAYOUT OF ASSEMBLY LINE OF ENGINE
 Conveyors used
 Pallet
 Side out trolley
 Manipulator
 MBC Tightening machine
 Sealant application machine
 Pnuematic tools-For fastening purpose
 Torque wrench
 Sensors
 Couplers
 Wire harnesses
Belt type
 Conveyor belts are used in a wide variety of material
transport applications such as manufacturing, food
processing, and heavy industry.
 This conveyor is used in block and bare line
Overhead Conveyor
An overhead conveyor is an elevated system similar to a floor-level
conveyor belt that is used to transport items throughout a facility. Unlike a
conveyor belt, which is belt-driven, an overhead conveyor is driven by a
chain and is considerably thinner.
 Pallet is used to load the engine & carrying from one work
station to other station for assembly.
Jig Locating
pins (4 nos) of
palletPrimary (base)pallet
CYLINDER BLOCK PLACED ON A PALLET
Jigs
Pallet :
Cylinder block
 Side out trolley is used for taking out ‘Engine with pallet’ from conveyor in case
any problem with engine or any specific work to be done
 Since the main objective of a sealant is to seal assemblies and
joints, sealants need to have sufficient adhesion to the
substrates and resistance to environmental conditions to
remain bonded over the required life of the assembly.
Basic Requirement
・Provide mechanism to ensure the balance during component lift.
・Parts Weight 100Kg
・Revolution Angle 300 Degree (Attach adjustable
function)
・Revolution diameter 1500mm~2000mm
・Low & high range
・Installation Height 2000mm
・Provide mechanism to easily install the jig, attachment etc.
 Manipulator is used for picking the component from one specified place & place
at specified place
Mission coupling Subframe fitment
Manipulator for Mission coupling
 Accuracy ± 15%
 Torque setting Possible
 Operator dependency Less
 Torque transmission through oil pulse
(piston mechanism)
Application: Tightening bolt by pressing press button
Pulse unit
Trim
valve
Shut-off system
Air motor
Air
supply
in
Press
button
Socket for bolt
PNEUMATIC AIR GUN
Clicker torque wrenches signal when the desired
amount of torque is reached by emitting an
audible click
A tool for setting and adjusting the tightness of nuts and bolts to a desired value.
a) Clicker Torque Wrench
c) Open Torque Wrench
b) Dial Torque Wrench
Open torque wrench are also clicker type ,it has
open arrangement for holding Nut or bolt
A dial torque wrench is typically used as a
quality control instrument to verify or
monitor torque. The dial torque wrench can
be used for joint testing, auditing or
verification of torque applied.
Torque wrench
Socket
Bolt for tightening
MBC bolt tightening Cylinder head bolt tightening
OXYGEN SENSOR:
IT IS INSTALLED ABOVE THE CATALYTIC CONVERTOR AND USED
TO VERIFY THE BREATHING OF THE ENGINE. IT DETERMINE
WHETHER THE FUEL IS RICH OR LEAN. THEN SEND SIGNAL TO
E.C.U WHICH CONTROLS THE FUEL AIR MIXTURE ACCORDINGLY.
SENSORS
OXYGEN SENSOR
MAP SENSOR:
MAP STANDS FOR MANIFOLD ABSOLUTE PRESSURE AND
SENSOR IS USED TO PROVIDE THE INFORMATION OF MANIFOLD
PRESSURE TO E.C.U, WHICH IS NECESSARY TO CALCULATE AIR
DENSITY AND TO DETERMINE AIR MASS FLOW RATE, WHICH IN
TURN USED TO CALCULATE APPROPRIATE FUEL FLOW.
MAP SENSOR
FUNCTION OF PART:
 ENGINE COOLANT TEMPERATURE SENSOR:
THIS SENSOR IS INSTALLED ON THE REAR SIDE
OF CYLINDER HEAD AND IS USED TO SEND
TEMPERATURE INFORMATION TO E.C.U BY
DETERMINE THE COOLANT TEMPERATURE OF
AN ENGINE.
 TP SENSOR:
TP STANDS FOR THROTTLE POSITION AND SENSOR IS USED TO
DETERMINE THE THROTTLE VALVE POSITION. THE SIGNAL IS
USED BY E.C.U. AS IGNITIION TIMING AND FUEL INJECTION
TIMING DEPENDS UPON THE POSITION OF THE THROTTLE VALVE.
THROTTLE POSITION
SENSOR
ENGINE COOLANT TEMPERATURE
SENSOR
Coupler: Coupler mean connecting device & will handle multiple.
Terminal B is designed to prevent dislocation, & will not allow disconnection even it is
pulled
Coupler -B
Coupler- A
Multipoint
Handling of couplers
1. Couplers should be inserted fully
2. When disconnecting couplers, always
remove locks.
3. Couplers with lock should be checked to see
that locks are completely fixed
4. Insure the couplers are covered completely
5. Always grasp the main body of couplers
Terminals are used for connecting electrical circuits and male, female parts in pair
Terminals are used at place where fitting & removal can be easily accomplished
-connection by terminals are bonding of conductors & cause contact resistance
Terminal A
Terminal B
Handling of connectors
1. Do not use wire harness that are worn
2. Before connecting confirm that the connector cover
is not torn & female terminal is not open wide.
3. Insure the cover of terminal
4. Wire harness should be arranged so that ,there are
no slack& tension
Terminals
1.Cleanliness (Before
assembly)
The part that is going to
assemble must be clean,
free from dust, dent ,burr
&damage on its surface.
Example: Sealant application
area.
2.Lubrication (while assembly)
Some parts requires oil application during assembly,
it works as prilubrication.
Example: Piston ring assembly.
-while fitment of metal &journals engine oil must be
applied
SPRAY CLEANING CLEANING WITH CLOTH
LUBRICATION
3.Freeness (After assembly)
After fitment assembly to be checked
for freeness(no jam rotation)
Example: Crankshaft rotation, piston
ring rotation
4.Assembly confirmation (After
assembly)
After application of torque, assembly must
be identified by paint colour,on its bolt
CRANK ROTATION
CHECK
PROCESS
CONFIRMATION
5.Torque application :
-While giving torque ,hold the
torque wrench,as shown in
picture.
Socket point above the bolt
should be hold by left hand
Corner of the torque wrench
should be hold by right hand
Clik Sound: as the specified set
torque value reaches, auditable
click sound with feel will come ,
means torque is applied
-Do not over tight ,after click
sound
Presentation on Summer Internship at Honda Cars India Limited

More Related Content

What's hot

Honda operation management..ninad
Honda operation management..ninadHonda operation management..ninad
Honda operation management..ninadNinad Jadhav
 
Honda Cars India Ltd. Group-11
Honda Cars India Ltd. Group-11Honda Cars India Ltd. Group-11
Honda Cars India Ltd. Group-11Rohit Jangid
 
Honda Strategic Marketing
Honda Strategic Marketing Honda Strategic Marketing
Honda Strategic Marketing Mohit Gandhi
 
Iv report VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY indust...
Iv report VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY indust...Iv report VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY indust...
Iv report VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY indust...'Enosh Jogi
 
Jyoti sharda bcom
Jyoti sharda bcomJyoti sharda bcom
Jyoti sharda bcomMd Aktar
 
Honda Company Analysis Report
Honda Company Analysis ReportHonda Company Analysis Report
Honda Company Analysis ReportQazi Faheem
 
Honda-International business mgt
Honda-International business mgtHonda-International business mgt
Honda-International business mgtJoel Pais
 
International Cars & Motors Ltd.(ICML) Sonalika Training Report
International Cars & Motors Ltd.(ICML) Sonalika Training Report International Cars & Motors Ltd.(ICML) Sonalika Training Report
International Cars & Motors Ltd.(ICML) Sonalika Training Report Shubham Thakur
 
Bussines Plan for Car Manufacturing
Bussines Plan for Car ManufacturingBussines Plan for Car Manufacturing
Bussines Plan for Car ManufacturingRupal Lala
 
Manish sharma internship project manish @@@@@@
Manish sharma internship project manish @@@@@@Manish sharma internship project manish @@@@@@
Manish sharma internship project manish @@@@@@Manish Kaushik
 
SUMMER TRAINING AT TATA MOTORS
SUMMER TRAINING AT TATA MOTORSSUMMER TRAINING AT TATA MOTORS
SUMMER TRAINING AT TATA MOTORSRohitBabu16
 

What's hot (20)

Honda operation management..ninad
Honda operation management..ninadHonda operation management..ninad
Honda operation management..ninad
 
mahindra & mahindra ppt report
mahindra & mahindra ppt reportmahindra & mahindra ppt report
mahindra & mahindra ppt report
 
Honda Cars India Ltd. Group-11
Honda Cars India Ltd. Group-11Honda Cars India Ltd. Group-11
Honda Cars India Ltd. Group-11
 
Industrial Visit of VolksWagen
Industrial Visit of VolksWagenIndustrial Visit of VolksWagen
Industrial Visit of VolksWagen
 
Honda Strategic Marketing
Honda Strategic Marketing Honda Strategic Marketing
Honda Strategic Marketing
 
Iv report VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY indust...
Iv report VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY indust...Iv report VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY indust...
Iv report VOLKSWAGEN SCHREIBER DYNAMIX PIAGGIO BARAMATI SUGAR INDUSTRY indust...
 
Jyoti sharda bcom
Jyoti sharda bcomJyoti sharda bcom
Jyoti sharda bcom
 
Honda
HondaHonda
Honda
 
Honda Company Analysis Report
Honda Company Analysis ReportHonda Company Analysis Report
Honda Company Analysis Report
 
Honda-International business mgt
Honda-International business mgtHonda-International business mgt
Honda-International business mgt
 
Honda project report
Honda project reportHonda project report
Honda project report
 
International Cars & Motors Ltd.(ICML) Sonalika Training Report
International Cars & Motors Ltd.(ICML) Sonalika Training Report International Cars & Motors Ltd.(ICML) Sonalika Training Report
International Cars & Motors Ltd.(ICML) Sonalika Training Report
 
Summer training project.pptx
Summer training project.pptxSummer training project.pptx
Summer training project.pptx
 
Bussines Plan for Car Manufacturing
Bussines Plan for Car ManufacturingBussines Plan for Car Manufacturing
Bussines Plan for Car Manufacturing
 
Honda pakistan
Honda pakistanHonda pakistan
Honda pakistan
 
Honda
HondaHonda
Honda
 
Manish sharma internship project manish @@@@@@
Manish sharma internship project manish @@@@@@Manish sharma internship project manish @@@@@@
Manish sharma internship project manish @@@@@@
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
TATA MOTORS, JAMSHEDPUR.
TATA  MOTORS, JAMSHEDPUR.TATA  MOTORS, JAMSHEDPUR.
TATA MOTORS, JAMSHEDPUR.
 
SUMMER TRAINING AT TATA MOTORS
SUMMER TRAINING AT TATA MOTORSSUMMER TRAINING AT TATA MOTORS
SUMMER TRAINING AT TATA MOTORS
 

Viewers also liked

Importance of Supporting the End-to-end Customer Lifecycle
Importance of Supporting the End-to-end Customer LifecycleImportance of Supporting the End-to-end Customer Lifecycle
Importance of Supporting the End-to-end Customer LifecycleKelley Curtin
 
Munkatársi elismerés felmérés - 2015 november
Munkatársi elismerés felmérés - 2015 novemberMunkatársi elismerés felmérés - 2015 november
Munkatársi elismerés felmérés - 2015 novemberKrisztián Fazekas
 
coches y motos deportivas
coches y motos deportivascoches y motos deportivas
coches y motos deportivasmikel osoro
 
resume kwabena obeng
resume kwabena obeng  resume kwabena obeng
resume kwabena obeng Kwabena Obeng
 
Prof jeff catspa
Prof jeff catspaProf jeff catspa
Prof jeff catspayah2527
 
The Importance of Selling Business Outcomes
The Importance of Selling Business OutcomesThe Importance of Selling Business Outcomes
The Importance of Selling Business OutcomesKelley Curtin
 
Portrait ppt
Portrait pptPortrait ppt
Portrait pptHari Khan
 
Pět tipů pro agentury, kterak ošidit své klienty
Pět tipů pro agentury, kterak ošidit své klientyPět tipů pro agentury, kterak ošidit své klienty
Pět tipů pro agentury, kterak ošidit své klientyTaste Medio
 
Summer Training Presentation .
Summer Training Presentation .Summer Training Presentation .
Summer Training Presentation .PUSHP
 
Honda presentation
Honda presentationHonda presentation
Honda presentationRahulSN
 

Viewers also liked (16)

Shideshare
ShideshareShideshare
Shideshare
 
Importance of Supporting the End-to-end Customer Lifecycle
Importance of Supporting the End-to-end Customer LifecycleImportance of Supporting the End-to-end Customer Lifecycle
Importance of Supporting the End-to-end Customer Lifecycle
 
Munkatársi elismerés felmérés - 2015 november
Munkatársi elismerés felmérés - 2015 novemberMunkatársi elismerés felmérés - 2015 november
Munkatársi elismerés felmérés - 2015 november
 
coches y motos deportivas
coches y motos deportivascoches y motos deportivas
coches y motos deportivas
 
old office
old officeold office
old office
 
resume kwabena obeng
resume kwabena obeng  resume kwabena obeng
resume kwabena obeng
 
Jose Manuel Dominguez ingles
Jose Manuel Dominguez inglesJose Manuel Dominguez ingles
Jose Manuel Dominguez ingles
 
Prof jeff catspa
Prof jeff catspaProf jeff catspa
Prof jeff catspa
 
SR. SITE ENGINEER
SR. SITE ENGINEERSR. SITE ENGINEER
SR. SITE ENGINEER
 
The Importance of Selling Business Outcomes
The Importance of Selling Business OutcomesThe Importance of Selling Business Outcomes
The Importance of Selling Business Outcomes
 
Portrait ppt
Portrait pptPortrait ppt
Portrait ppt
 
Pět tipů pro agentury, kterak ošidit své klienty
Pět tipů pro agentury, kterak ošidit své klientyPět tipů pro agentury, kterak ošidit své klienty
Pět tipů pro agentury, kterak ošidit své klienty
 
Investigación educativa una estrategia constructivista
Investigación educativa una estrategia constructivistaInvestigación educativa una estrategia constructivista
Investigación educativa una estrategia constructivista
 
Summer Training Presentation .
Summer Training Presentation .Summer Training Presentation .
Summer Training Presentation .
 
Bikes in India
Bikes in IndiaBikes in India
Bikes in India
 
Honda presentation
Honda presentationHonda presentation
Honda presentation
 

Similar to Presentation on Summer Internship at Honda Cars India Limited

Har 1014 Vortec DBW Wiring Harness Manual and Instructions
Har 1014 Vortec DBW Wiring Harness Manual and Instructions Har 1014 Vortec DBW Wiring Harness Manual and Instructions
Har 1014 Vortec DBW Wiring Harness Manual and Instructions PSI Conversion
 
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upKomatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upfjkkekmdm
 
Komatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and upKomatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and upfjjskekdm
 
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upKomatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and uphfhjskedme
 
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upKomatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upfjskekmdm
 
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upKomatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upfjkkekmdm
 
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upKomatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upfjsekqazxkdmmem
 
Komatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and upKomatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and upfjjskekdm
 
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upKomatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and uphfhjskedme
 
Komatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and upKomatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and upfjekkdmmem
 
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upKomatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upfjsekqazxkdmmem
 
Komatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and upKomatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and upfjjfyjsekdmme
 
Komatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and upKomatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and upfjekkdmmem
 
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upKomatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upfjsekqazxkdmmem
 
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upKomatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upfjskekmdm
 
Komatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and upKomatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and upfjjfyjsekdmme
 
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upKomatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and uphfhjskedme
 
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upKomatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upfjskekmdm
 
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upKomatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upfjkkekmdm
 
Maintenance and operating of nmrv series gb
Maintenance and operating of nmrv series gbMaintenance and operating of nmrv series gb
Maintenance and operating of nmrv series gbN Mahesh Thakker
 

Similar to Presentation on Summer Internship at Honda Cars India Limited (20)

Har 1014 Vortec DBW Wiring Harness Manual and Instructions
Har 1014 Vortec DBW Wiring Harness Manual and Instructions Har 1014 Vortec DBW Wiring Harness Manual and Instructions
Har 1014 Vortec DBW Wiring Harness Manual and Instructions
 
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upKomatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and upKomatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and up
 
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upKomatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upKomatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upKomatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upKomatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and upKomatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and up
 
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upKomatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and upKomatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and up
 
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upKomatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and upKomatsu pc200 6 excavator service repair manual sn a80001 and up
Komatsu pc200 6 excavator service repair manual sn a80001 and up
 
Komatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and upKomatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and up
 
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upKomatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and upKomatsu pc210 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc210 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and upKomatsu pc200 lc 6 excavator service repair manual sna80001 and up
Komatsu pc200 lc 6 excavator service repair manual sna80001 and up
 
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and upKomatsu pc220 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc220 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upKomatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
 
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and upKomatsu pc250 lc 6 excavator service repair manual sn a80001 and up
Komatsu pc250 lc 6 excavator service repair manual sn a80001 and up
 
Maintenance and operating of nmrv series gb
Maintenance and operating of nmrv series gbMaintenance and operating of nmrv series gb
Maintenance and operating of nmrv series gb
 

More from NISHANT552

More from NISHANT552 (6)

ashok leyland
ashok leylandashok leyland
ashok leyland
 
Gears presentation
Gears presentation Gears presentation
Gears presentation
 
GEARS
GEARSGEARS
GEARS
 
Ashok leyland
Ashok leylandAshok leyland
Ashok leyland
 
ashok leyland
ashok leylandashok leyland
ashok leyland
 
Lucas tvs 1
Lucas tvs 1Lucas tvs 1
Lucas tvs 1
 

Recently uploaded

John Deere 200lc Excavator Operation And Tests Repair Manual.pdf
John Deere 200lc Excavator Operation And Tests Repair Manual.pdfJohn Deere 200lc Excavator Operation And Tests Repair Manual.pdf
John Deere 200lc Excavator Operation And Tests Repair Manual.pdfExcavator
 
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESUNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESDineshKumar4165
 
Electronic Vehicle (EV) Industry Challenges
Electronic Vehicle (EV) Industry ChallengesElectronic Vehicle (EV) Industry Challenges
Electronic Vehicle (EV) Industry Challengesmarketingmangosemi
 
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Saket 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubaikojalkojal131
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERDineshKumar4165
 
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile GirlsVip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girlsshivangimorya083
 
The 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyThe 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyHyundai Motor Group
 
Delhi Call Girls East Of Kailash 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls East Of Kailash 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls East Of Kailash 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls East Of Kailash 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptDineshKumar4165
 
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...shivangimorya083
 
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...Hot Call Girls In Sector 58 (Noida)
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂Hot Call Girls In Sector 58 (Noida)
 
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorHow To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorAndres Auto Service
 
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryPooja Nehwal
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxDineshKumar4165
 

Recently uploaded (20)

John Deere 200lc Excavator Operation And Tests Repair Manual.pdf
John Deere 200lc Excavator Operation And Tests Repair Manual.pdfJohn Deere 200lc Excavator Operation And Tests Repair Manual.pdf
John Deere 200lc Excavator Operation And Tests Repair Manual.pdf
 
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESUNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
 
Electronic Vehicle (EV) Industry Challenges
Electronic Vehicle (EV) Industry ChallengesElectronic Vehicle (EV) Industry Challenges
Electronic Vehicle (EV) Industry Challenges
 
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Saket 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
 
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile GirlsVip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
 
The 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyThe 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journey
 
Delhi Call Girls East Of Kailash 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls East Of Kailash 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls East Of Kailash 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls East Of Kailash 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
 
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
 
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorHow To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
 
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
 

Presentation on Summer Internship at Honda Cars India Limited

  • 1. PRESNTATION ON SUMMER INTERNSHIP AT HONDA CARS INDIA LIMITED
  • 2. JAPAN BLOC NORTH AMERICA BLOC SOUTH AMERIC A BLOC EUROPE-AFRICA- MIDDLE EAST BLOC ASIA/OCEANIA BLOC Canada USA Ohio Alabama Mexico Columbia Brazil Peru Nigeria UK Morocco Mauritius Spain France Turkey Italy Australia Indonesia Malaysia Thailand Philippines Taiwan China India Pakistan Vietnam 1 2 3 5 6 4 HONDA worldwide operation
  • 3. Cars HONDA Jet Power Products • Leading Company in Mobility Business • Product range from Motorcycles to Aircraft • Future technologies - Robots, Fuel Cell Cars etc. • Focus on Environment Friendly Technologies Motorcycles 1949 1953 1963 2000 2004 Asimo Fuel Cell Car 2008 HONDA history
  • 4. PLANT-II HCIL CHENNAI MUMBAI Manufacturing Unit Zonal Office GR. NOIDA PLANT -I BHIWADI HONDA MANMUFACTURING UNIT IN INDIA
  • 5. Welcome to Honda Cars India Ltd. Tapukara (Rajasthan)
  • 6. (Assembly Frame) (Vehicle Quality) (Plastic Object Painting Area) (Assembly Engine) COMPANY OVERVIEW
  • 7.  5 S:  5S is a method for achieving and sustaining efficiency and effectiveness through organization and standardization in the workplace
  • 8.  KAIZEN :- "change for the best"  When applied to the workplace, kaizen refers to activities that continually improve all functions, and involves all employees from the CEO to the assembly line workers.
  • 9. Press Shop POPA (Plastic Object Paint Application) Al Fe Mission Weld Shop AE (Engine Assembly) AF (Frame Assembly) Vehicle Quality
  • 10. PRODUCTION FLOW WHERE; AE: ASSEMBLY ENGINE CQA: COMPLETE QUALITY ASSURANCE CBU: COMPLETE BUILD UNIT POPA: PLASTIC OBJECT AND PAINT APPLICATION
  • 11. The Blank sheets of metal are received from RPSC. These Blank sheets of metal have a thickness between 0.65 to 0.70 mm. There are two lines for the production of stamped parts. The whole production process is automatic and is carried out with the help of robots. A View Of Press Shop  Press Shop Stamping die used in forming of sheet metal
  • 12.  The Al department is responsible for development of all the aluminum parts, for example the engine block and the engine head. CNC lathes and machining tools like grinding wheels etc. are used. Petrol Engine Block Manufactured in AL Shop AL Shop
  • 13.  Connecting rod and crank shaft are manufactured in FE Shop.  There are two different production lines for con rod and crankshaft Connecting Rod Crankshaft  FE Shop
  • 14.  The missions are made for two types of engines, diesel and petrol, with each gear box having its own identification. The diesel model can be identified by the presence of a single line on the main shaft while the petrol gear box has two lines on the main shaft.  Mission- A Subassembly Of Gear arrangement in gear box  MISSION SHOP
  • 15.  PAINT SHOP Paint Application The main objectives of the Paint Division are to provide vehicles with a high gloss, attractive, colorful finish, with a long term durable resistance to corrosion.
  • 17.  AF SHOP (FRAME ASSEMBLY)  Frame assembly is the last part of the production line.  Parts from various shops are received,assembed dand Finished cars drive out of the AF shop.
  • 19. MY WORK AREA: AE SHOP (ENGINE ASSEMBLY
  • 21. Assembly :- Assembly is whole unit of subassembly Subassembly :- Subassembly is part of assembly Sub assembly Assembly
  • 22. Assembly ●Combination number of parts or subassemblies put together to perform a specific function, and capable of disassembly without destruction. What may be an assembly at one point, however, may be a subassembly at another. Sub-Assembly A unit assembled separately but designed to fit with other units in a manufactured product Example : Piston sub assembly PISTON SUBASSEMBLY ASSEMBLED ENGINE
  • 23. O
  • 24.  Block Line:- This is the First Line in which the Cylinder Block Loading , Piston Insertion , Crankshaft Installation , Flywheel Installation , Starter Motor Installation , Cylinder Head Docking etc. are take place. It consists of Station No. 1 - 21 .  Bare Line :-This is the Second Line in which the Rocker Arm Installation, Fuel Pipe Installation , Connecting Pipe Installation , Cam Chain Installation , Spark Plug Installation , Mission Docking , etc. take place . It Consists Of Station No. 22-42  OHC Line :- This is the Last Line in which the Alternate Current Generator Installation, AC Compressor, HAC Belt, etc are take place . It consists of Station No. 43-53
  • 25. LAYOUT OF ASSEMBLY LINE OF ENGINE
  • 26.  Conveyors used  Pallet  Side out trolley  Manipulator  MBC Tightening machine  Sealant application machine  Pnuematic tools-For fastening purpose  Torque wrench  Sensors  Couplers  Wire harnesses
  • 27. Belt type  Conveyor belts are used in a wide variety of material transport applications such as manufacturing, food processing, and heavy industry.  This conveyor is used in block and bare line
  • 28. Overhead Conveyor An overhead conveyor is an elevated system similar to a floor-level conveyor belt that is used to transport items throughout a facility. Unlike a conveyor belt, which is belt-driven, an overhead conveyor is driven by a chain and is considerably thinner.
  • 29.
  • 30.  Pallet is used to load the engine & carrying from one work station to other station for assembly. Jig Locating pins (4 nos) of palletPrimary (base)pallet
  • 31. CYLINDER BLOCK PLACED ON A PALLET Jigs Pallet : Cylinder block
  • 32.  Side out trolley is used for taking out ‘Engine with pallet’ from conveyor in case any problem with engine or any specific work to be done
  • 33.
  • 34.  Since the main objective of a sealant is to seal assemblies and joints, sealants need to have sufficient adhesion to the substrates and resistance to environmental conditions to remain bonded over the required life of the assembly.
  • 35. Basic Requirement ・Provide mechanism to ensure the balance during component lift. ・Parts Weight 100Kg ・Revolution Angle 300 Degree (Attach adjustable function) ・Revolution diameter 1500mm~2000mm ・Low & high range ・Installation Height 2000mm ・Provide mechanism to easily install the jig, attachment etc.  Manipulator is used for picking the component from one specified place & place at specified place
  • 36. Mission coupling Subframe fitment Manipulator for Mission coupling
  • 37.  Accuracy ± 15%  Torque setting Possible  Operator dependency Less  Torque transmission through oil pulse (piston mechanism) Application: Tightening bolt by pressing press button Pulse unit Trim valve Shut-off system Air motor Air supply in Press button Socket for bolt
  • 39. Clicker torque wrenches signal when the desired amount of torque is reached by emitting an audible click A tool for setting and adjusting the tightness of nuts and bolts to a desired value. a) Clicker Torque Wrench c) Open Torque Wrench b) Dial Torque Wrench Open torque wrench are also clicker type ,it has open arrangement for holding Nut or bolt A dial torque wrench is typically used as a quality control instrument to verify or monitor torque. The dial torque wrench can be used for joint testing, auditing or verification of torque applied.
  • 40. Torque wrench Socket Bolt for tightening MBC bolt tightening Cylinder head bolt tightening
  • 41. OXYGEN SENSOR: IT IS INSTALLED ABOVE THE CATALYTIC CONVERTOR AND USED TO VERIFY THE BREATHING OF THE ENGINE. IT DETERMINE WHETHER THE FUEL IS RICH OR LEAN. THEN SEND SIGNAL TO E.C.U WHICH CONTROLS THE FUEL AIR MIXTURE ACCORDINGLY. SENSORS OXYGEN SENSOR MAP SENSOR: MAP STANDS FOR MANIFOLD ABSOLUTE PRESSURE AND SENSOR IS USED TO PROVIDE THE INFORMATION OF MANIFOLD PRESSURE TO E.C.U, WHICH IS NECESSARY TO CALCULATE AIR DENSITY AND TO DETERMINE AIR MASS FLOW RATE, WHICH IN TURN USED TO CALCULATE APPROPRIATE FUEL FLOW. MAP SENSOR FUNCTION OF PART:
  • 42.  ENGINE COOLANT TEMPERATURE SENSOR: THIS SENSOR IS INSTALLED ON THE REAR SIDE OF CYLINDER HEAD AND IS USED TO SEND TEMPERATURE INFORMATION TO E.C.U BY DETERMINE THE COOLANT TEMPERATURE OF AN ENGINE.  TP SENSOR: TP STANDS FOR THROTTLE POSITION AND SENSOR IS USED TO DETERMINE THE THROTTLE VALVE POSITION. THE SIGNAL IS USED BY E.C.U. AS IGNITIION TIMING AND FUEL INJECTION TIMING DEPENDS UPON THE POSITION OF THE THROTTLE VALVE. THROTTLE POSITION SENSOR ENGINE COOLANT TEMPERATURE SENSOR
  • 43. Coupler: Coupler mean connecting device & will handle multiple. Terminal B is designed to prevent dislocation, & will not allow disconnection even it is pulled Coupler -B Coupler- A Multipoint Handling of couplers 1. Couplers should be inserted fully 2. When disconnecting couplers, always remove locks. 3. Couplers with lock should be checked to see that locks are completely fixed 4. Insure the couplers are covered completely 5. Always grasp the main body of couplers
  • 44. Terminals are used for connecting electrical circuits and male, female parts in pair Terminals are used at place where fitting & removal can be easily accomplished -connection by terminals are bonding of conductors & cause contact resistance Terminal A Terminal B Handling of connectors 1. Do not use wire harness that are worn 2. Before connecting confirm that the connector cover is not torn & female terminal is not open wide. 3. Insure the cover of terminal 4. Wire harness should be arranged so that ,there are no slack& tension Terminals
  • 45. 1.Cleanliness (Before assembly) The part that is going to assemble must be clean, free from dust, dent ,burr &damage on its surface. Example: Sealant application area. 2.Lubrication (while assembly) Some parts requires oil application during assembly, it works as prilubrication. Example: Piston ring assembly. -while fitment of metal &journals engine oil must be applied SPRAY CLEANING CLEANING WITH CLOTH LUBRICATION
  • 46. 3.Freeness (After assembly) After fitment assembly to be checked for freeness(no jam rotation) Example: Crankshaft rotation, piston ring rotation 4.Assembly confirmation (After assembly) After application of torque, assembly must be identified by paint colour,on its bolt CRANK ROTATION CHECK PROCESS CONFIRMATION
  • 47. 5.Torque application : -While giving torque ,hold the torque wrench,as shown in picture. Socket point above the bolt should be hold by left hand Corner of the torque wrench should be hold by right hand Clik Sound: as the specified set torque value reaches, auditable click sound with feel will come , means torque is applied -Do not over tight ,after click sound