SlideShare a Scribd company logo
1 of 2
Download to read offline
Mieczyslaw “Mitch” Zylow
8430 W. Howard Avenue #4
Milwaukee, WI 53228
(414)698-6260
EDUCATION:
Milwaukee School Of Engineering
B.S. Architectural and Building Construction Engineering, 1994
EXPERIENCE:
Diverse Construction Field Management in both the Public and Private areas. Traveled extensively as
a Site Superintendent on various Commercial Projects. The projects varied from remodeling/additions
to Turn-key operations. With regard to Public Sector work, it is in the area of Roadway Work for the
Georgia Dept. of Transportation as well as Wisconsin and Illinois Transportation Projects. This ranged
from materials testing, inspection and records keeping to Resident Engineer.
EXPERIENCE:
Expertz Engineering, Milwaukee, WI, May 2013 to April 2015, Seasonal work as Inspector for
Milwaukee County
Projects. 107th
Street from Brown Deer Road to County Line Road (2013) and CTH A (68th
Street at
the House of Correction) and CTH H -Box Culvert Replacement (2014).
Buveck Consultants, Milwaukee, WI April 2009 to Nov. 2011, Senior Construction Inspector.
WISDOT Projects, participated as part of the Management Team on STH 24 (HWY 100 to 45th
Street ), 2009. CTH X, Waukesha County, 2010. I-94 Traffic Mitigation Projects, (Layton Ave at 794,
and Oklahoma Ave at 794) 2011. Also, Superintendent for Night work at Target Stores in Greenfield
and Delafield from May through September 2011.
Collins Engineering, Milwaukee, WI, Sept. 2007 to Nov. 2008, Engineer, Construction Inspection
on the Following Projects, ILL Tollway (WI/ILL State Line to Grand Ave), and USH 41 Peshtigo, WI.
Manutec. INC, Milwaukee, WI, June 2004 to Sept 2009, Project Manager/Estimator, Provided
miscellaneous and structural metals for various projects successfully bid on, managed projects
including shop drawings, ordering material, and scheduling delivery. Projects included of note were
The Fencing for the Marquette Interchange, Brady Street Bridge over Lake Shore Drive, Oak Creek
Power Plant and Port Washington Power Plant.
Bloom Consultants, Milwaukee, WI, April 1999 to Feb. 2004, Resident Engineer on various
WISDOT Projects CTH X ( Saylesville Road), 2003, Green Tree Road Bridge over the Milwaukee
River (2002), Good Hope Road bridges over the Milwaukee River (2001). Inspector on I-43/I-94
Resurfacing (2000) and USH45 Resurfacing (1999)
Graef, Anhalt, & Schloemer, Milwaukee, WI, April 1989 to May 1994, Various WISDOT Road and
Bridge Projects as Materials Engineer to Assistant Resident Engineer. USH 45 Clintonville, WI, STH
29, Wausau, WI, and Marion Wayside as well as IDOT.
EXPERIENCE:
Graunau Project Developement, Milwaukee, WI, May 1999 to March 2000, Assistant, Alverno
College Addition, $25M, Responsible for coordination of interface between Old and New
Construction, Occupancy Permits for New Elevators, Door and Hardware Installation, and Interior
Finishes.
Building Committee, INC, Milwaukee, WI, July 1996 to March 1999, Site Superintendent for
remodeling and turn key Construction of various Financial Institutions. Including obtaining bids and
subcontractors, scheduling, pay requests and change orders. Projects ranged from $50K to $3M
Major Construction Projects Included the Firestone Credit Union, Toledo, OH (1998-1999),
Americana Bank, Albert Lee, MN (1997- 1998), various remodels such Winslow State Bank, Winslow
IL, and Pillsbury Credit Union, Clarksville, IN.
Construction One, Columbus OH, June 1994 to June 1996, Site Superintendent, Remodel and
Construction of Value City Department and Furniture Stores. Remodeled various stores through out
such as Charleston, VA, Mathews, NC, Toledo OH. New construction, Assistant Interior Finishes in
Taylor MI. Site Superintendent for new 156,000SF, $6M, facility in Saginaw MI. Total turn-key
project which opened 30 days ahead of schedule.
References available upon request.

More Related Content

Similar to Resume 2015a

Frank s. chuang designed retaining walls along the ramps
Frank s. chuang designed retaining walls along the rampsFrank s. chuang designed retaining walls along the ramps
Frank s. chuang designed retaining walls along the rampsfrankchuang
 
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck DriveSunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck DriveFairfax County
 
Lynn Johnson Jr Resume - Copy 2016 06-13
Lynn Johnson Jr Resume - Copy 2016 06-13Lynn Johnson Jr Resume - Copy 2016 06-13
Lynn Johnson Jr Resume - Copy 2016 06-13MR LYNN JOHNSON
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16David Beverly
 
BHI_Carolinas Region_Newsletter Summer 2016
BHI_Carolinas Region_Newsletter Summer 2016BHI_Carolinas Region_Newsletter Summer 2016
BHI_Carolinas Region_Newsletter Summer 2016Megan Sebring
 
Mark Whedbee's Resume
Mark Whedbee's ResumeMark Whedbee's Resume
Mark Whedbee's ResumeMark Whedbee
 
Mark Whedbee's Resume
Mark Whedbee's ResumeMark Whedbee's Resume
Mark Whedbee's ResumeMark Whedbee
 
Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Kristy Plummer
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor HarperTaylor Harper
 
Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtNewington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtFairfax County
 
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsElm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsFairfax County
 
Workhouse Arts Foundation Access Road
Workhouse Arts Foundation Access RoadWorkhouse Arts Foundation Access Road
Workhouse Arts Foundation Access RoadFairfax County
 

Similar to Resume 2015a (20)

WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
Frank s. chuang designed retaining walls along the ramps
Frank s. chuang designed retaining walls along the rampsFrank s. chuang designed retaining walls along the ramps
Frank s. chuang designed retaining walls along the ramps
 
Edward Maudsley Resume
Edward Maudsley ResumeEdward Maudsley Resume
Edward Maudsley Resume
 
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck DriveSunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
 
DameryJennifer-resume
DameryJennifer-resumeDameryJennifer-resume
DameryJennifer-resume
 
resume
resumeresume
resume
 
Lynn Johnson Jr Resume - Copy 2016 06-13
Lynn Johnson Jr Resume - Copy 2016 06-13Lynn Johnson Jr Resume - Copy 2016 06-13
Lynn Johnson Jr Resume - Copy 2016 06-13
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16
 
BHI_Carolinas Region_Newsletter Summer 2016
BHI_Carolinas Region_Newsletter Summer 2016BHI_Carolinas Region_Newsletter Summer 2016
BHI_Carolinas Region_Newsletter Summer 2016
 
Mark Whedbee's Resume
Mark Whedbee's ResumeMark Whedbee's Resume
Mark Whedbee's Resume
 
Mark Whedbee's Resume
Mark Whedbee's ResumeMark Whedbee's Resume
Mark Whedbee's Resume
 
Current Resume
Current ResumeCurrent Resume
Current Resume
 
IBC1677
IBC1677IBC1677
IBC1677
 
Resume
ResumeResume
Resume
 
Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16Resume + Abstract-update 4-15-16
Resume + Abstract-update 4-15-16
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtNewington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
 
2021 Scholars Program: Director Paul C. Ajegba, P.E.
2021 Scholars Program: Director Paul C. Ajegba, P.E.2021 Scholars Program: Director Paul C. Ajegba, P.E.
2021 Scholars Program: Director Paul C. Ajegba, P.E.
 
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsElm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
 
Workhouse Arts Foundation Access Road
Workhouse Arts Foundation Access RoadWorkhouse Arts Foundation Access Road
Workhouse Arts Foundation Access Road
 

Resume 2015a

  • 1. Mieczyslaw “Mitch” Zylow 8430 W. Howard Avenue #4 Milwaukee, WI 53228 (414)698-6260 EDUCATION: Milwaukee School Of Engineering B.S. Architectural and Building Construction Engineering, 1994 EXPERIENCE: Diverse Construction Field Management in both the Public and Private areas. Traveled extensively as a Site Superintendent on various Commercial Projects. The projects varied from remodeling/additions to Turn-key operations. With regard to Public Sector work, it is in the area of Roadway Work for the Georgia Dept. of Transportation as well as Wisconsin and Illinois Transportation Projects. This ranged from materials testing, inspection and records keeping to Resident Engineer. EXPERIENCE: Expertz Engineering, Milwaukee, WI, May 2013 to April 2015, Seasonal work as Inspector for Milwaukee County Projects. 107th Street from Brown Deer Road to County Line Road (2013) and CTH A (68th Street at the House of Correction) and CTH H -Box Culvert Replacement (2014). Buveck Consultants, Milwaukee, WI April 2009 to Nov. 2011, Senior Construction Inspector. WISDOT Projects, participated as part of the Management Team on STH 24 (HWY 100 to 45th Street ), 2009. CTH X, Waukesha County, 2010. I-94 Traffic Mitigation Projects, (Layton Ave at 794, and Oklahoma Ave at 794) 2011. Also, Superintendent for Night work at Target Stores in Greenfield and Delafield from May through September 2011. Collins Engineering, Milwaukee, WI, Sept. 2007 to Nov. 2008, Engineer, Construction Inspection on the Following Projects, ILL Tollway (WI/ILL State Line to Grand Ave), and USH 41 Peshtigo, WI. Manutec. INC, Milwaukee, WI, June 2004 to Sept 2009, Project Manager/Estimator, Provided miscellaneous and structural metals for various projects successfully bid on, managed projects including shop drawings, ordering material, and scheduling delivery. Projects included of note were The Fencing for the Marquette Interchange, Brady Street Bridge over Lake Shore Drive, Oak Creek Power Plant and Port Washington Power Plant. Bloom Consultants, Milwaukee, WI, April 1999 to Feb. 2004, Resident Engineer on various WISDOT Projects CTH X ( Saylesville Road), 2003, Green Tree Road Bridge over the Milwaukee River (2002), Good Hope Road bridges over the Milwaukee River (2001). Inspector on I-43/I-94 Resurfacing (2000) and USH45 Resurfacing (1999) Graef, Anhalt, & Schloemer, Milwaukee, WI, April 1989 to May 1994, Various WISDOT Road and Bridge Projects as Materials Engineer to Assistant Resident Engineer. USH 45 Clintonville, WI, STH 29, Wausau, WI, and Marion Wayside as well as IDOT.
  • 2. EXPERIENCE: Graunau Project Developement, Milwaukee, WI, May 1999 to March 2000, Assistant, Alverno College Addition, $25M, Responsible for coordination of interface between Old and New Construction, Occupancy Permits for New Elevators, Door and Hardware Installation, and Interior Finishes. Building Committee, INC, Milwaukee, WI, July 1996 to March 1999, Site Superintendent for remodeling and turn key Construction of various Financial Institutions. Including obtaining bids and subcontractors, scheduling, pay requests and change orders. Projects ranged from $50K to $3M Major Construction Projects Included the Firestone Credit Union, Toledo, OH (1998-1999), Americana Bank, Albert Lee, MN (1997- 1998), various remodels such Winslow State Bank, Winslow IL, and Pillsbury Credit Union, Clarksville, IN. Construction One, Columbus OH, June 1994 to June 1996, Site Superintendent, Remodel and Construction of Value City Department and Furniture Stores. Remodeled various stores through out such as Charleston, VA, Mathews, NC, Toledo OH. New construction, Assistant Interior Finishes in Taylor MI. Site Superintendent for new 156,000SF, $6M, facility in Saginaw MI. Total turn-key project which opened 30 days ahead of schedule. References available upon request.