2. MIKE RYAN | PORTFOLIO
Hi, my name is Mike. I like to have a good time and make things happen.
My life revolves around all aspects of design and construction. I have been an Illinois-
licensed architect since 2001. In my pastime I enjoy cooking, biking, live music
and spending time with my 9-year-old son.
CONTENTS
Georgian Manor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Urban Condo. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Ravenswood Residence. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Depaul Residence. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Lincoln Park Spec Home. . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Buddy Guys Legends. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Lakeview Residence. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Lincoln Park Residence. . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Halal Guys Restaurant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Lincoln Park Remodel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3. MIKE RYAN | PORTFOLIO
GEORGIAN MANOR | PAGE 5
GEORGIAN
MANOR
6,000 SF, completed 2015
AIA AWARD 2016 | Detailed intricate main stair and hall |
Designed and detailed exterior railings and roof deck
| Managed entire project from inception to completion
4. MIKE RYAN | PORTFOLIO
GEORGIAN MANOR | PAGE 7
T/ GRADE
0"
T/ FIRST FLOOR
0"
T/ SECOND FLOOR
0"
T/ THIRD FLOOR
0"
T/ BLDG. HEIGHT
0"
T/ BASEMENT FLOOR
0"
T/ EAVE
0"
T/ ROOF
0"
8'-8"2'-4"9'-0"2'-0"10'-0"2'-0"9'-0"
A
B
C
D
A
B
C C C
D D D
MODULAR BRICK
ENGLISH BOND
PREFAB. BRICK
JACK ARCH (TYP.)
COPPER CONDUCTOR
HEAD & DOWNSPOUT
LIMESTONE
CORNICE
COPPER GUTTER
ALUM. CLAD WOOD
WINDOW W/ BRICKMOLD
SYNTHETIC WOOD TRIM
AT DORMERS, TYP.
SYNTHETIC SLATE
SHINGLE ROOFING
COPPER CORNICE
LIMESTONE COPING
AROUND CONC.
CHIMNEY CAP, TYP.
COPPER FLASHING
LIMESTONE BAND
AND SILLS
POWDER COATED
STEEL RAILING
3'-6"
2'-73/8"
2
A5.2
1
A5.2
8
A5.2
7
A5.2
6
A5.2
TYP.
105
DN 9R
@7.55"
DN 1R
@4"
DESK
2'-2"
DINING
ROOM
LIVING
ROOM
ENTRY HALL
BUTLER'S
PANTRY
PWDR 1
1'-2" 14'-4" 10" 15'-8" 5" 6'-4"
1'-2"12'-8"10"7'-4"2'-2"1'-2"
4'-2" 7" 2'-0"
1'-81/2"
3"
6'-4"
4'-2"5'-8"8'-6"7'-0"
12'-8"
5" 4'-0" 7" 2'-2"
5"5'-0"1'-81/2"
8"11'-6"11'-4"1'-0"
DN 17R
@7.76"
UP 19R
@7.58"
5'-0"
SDCO
STAIR 1
ELEV 1
5'-8" 5'-4" 13'-2" 11'-10" 3'-8"
1'-2"3" 3'-8" 10'-2" 3"
5'-8" 2'-8" 2'-8" 5'-8" 2'-8" 9'-8" 2'-8" 8'-0"
1'-8" 3'-2" 7'-8" 3'-2" 6"
2'-63/4"
4'-2" 1'-2" 3'-8" 1'-2" 4'-2"
1'-8"
1"
4"
4"
6'-8"
101
104
106
102 103
1
2
3
4
5
6
7 8 9
10
11
12
13
14
15
16
10
17
1/A6.1-1 1/A6.1-1
1/A6.1-1
2/A6.1-12/A6.1-1
3/A6.1-1 3/A6.1-1
3/A6.1-1
4/A6.1-14/A6.1-1
1/A6.1-2
4/A6.1-2
1/A6.1-2
1/A6.1-2
2/A6.1-2
4/A6.1-2
4/A6.1-2
3/A6.1-23/A6.1-2
5
A6.1-2
PLAN AT
FRONT YARD,
SEE SHEET
A2.2
NOTE: FRAMING UNDER ALL WINDOWS TO BE RECESSED 1" TO ALLOW FOR INTERIOR PANEL DETAIL
42" HIGH
GUARDRAIL, TYP.
42" HIGH
GUARDRAIL, TYP.
MASONRY
FIREPLACE
5. MIKE RYAN | PORTFOLIO
URBAN CONDO | PAGE 9
URBAN CONDO
1,400 SF, completed 2012
Managed project from inception to completion |
Coordinatedroofdeckandstairrestructuring | Coordinated
extensive home automation system | Designed and
detailed intricate millwork
7. MIKE RYAN | PORTFOLIO
Ravenswood Residence
7,000 SF, completed 2011
RAVENSWOOD RESIDENCE | PAGE 13
Managed entire LEED Gold Certification process | Managed all exterior, shell and core coordination and detailing,
including shop drawing review and approval | Managed all MEP coordination with engineers | Managed extensive
low-voltage home automation install | Attended all client meetings with interior designers | Coordinated
landscape design and installation
8. MIKE RYAN | PORTFOLIO
DEPAUL RESIDENCE | PAGE 15
DEPAUL RESIDENCE
5,000 SF, completed 2005
Managed 3-Unit project from inception to completion | Coordinated
international interior design including CAD conversions | Main stair
design, detailing and shop drawing approval | Construction administration
9. FIRST PROJECT NAME GOES HERE | PAGE 17
MIKE RYAN | PORTFOLIO
LINCOLN PARK SPEC HOME | PAGE 17
Designed and detailed all interiors and millwork | Organized the complete restructuring throughout gut rehab |
Managed MEP coordination | Construction administration through project completion
LINCOLN PARK SPEC HOME
7,000 SF, completed 2016
10. MIKE RYAN | PORTFOLIO
LINCOLN PARK SPEC HOME | PAGE 19
CONTROL
PANEL
HYD.
PUMP
ELECT.
BENCH
24"
REF.
24"
DW
27"
WINE 27"
WINE
LOWER LEVEL
1626 SF
OPEN TO
BELOW
COVE LT.
CEILING
COFFERED
CEILING
OPEN TO BELOW
PANTRY
30"
REF
BARREL VAULT
CEILING
24"
MICRO
24"
DW
24"
UCR
48" RANGE
42" FP
+4'-0" ABOVE GRADE
18" 24" 18"
30"
REF
FIRST FLOOR
1632 SF
1WINDOW
REMOVED
OPEN TO
BELOW
COVE LT.
CEILING
BENCH
24"
UCRLAYOUT
TABLE
BARREL VAULT
CEILING
BENCH
SECOND FLOOR
1680 SF
OPEN TO BELOW
ROOFBELOW
LCLC
BENCH
THIRD FLOOR
1632 SF
1WINDOW
REMOVED
'JOMY'
LADDER
OPEN TO BELOW
6'-8" ceil. ht.
PENTHOUSE
356 SF
1WINDOW
REMOVED
AREA CALCULATION - 1922 N. DAYTON
PENTHOUSE 356 SF
THIRD FLOOR 1632 SF
SECOND FLOOR 1680 SF
FIRST FLOOR 1632 SF
LOWER LEVEL 1626 SF
TOTAL 6926 SF
11. MIKE RYAN | PORTFOLIO
BUDDY GUYS LEGENDS | PAGE 21
BUDDY GUYS LEGENDS
16,000 SF, completed 2010
Coordinated extensive structural renovation | Coordinated MEP engineering | Coordinated restaurant
equipment | Detailed interior millwork | Organized and integrated stage lighting and sound system
12. MIKE RYAN | PORTFOLIO
LAKEVIEW RESIDENCE | PAGE 23
Lakeview Residence
4,000 SF, completed 2004
Lead design role | Managed all exterior, shell and core coordination and detailing, including shop drawing review
and approval | Managed all MEP coordination with engineers | Designed and detailed all interiors and finishes
14. MIKE RYAN | PORTFOLIO
LINCOLN PARK RESIDENCE | PAGE 27
Lincoln Park Residence
13,000 SF, completed 2012
Lead design role | Managed all exterior, shell and core coordination and detailing, including shop drawing review
and approval | Managed all MEP coordination with engineers | Attended all client meetings with interior
designers throughout design and construction | Managed extensive low-voltage home automation install
Coordinated landscape design and installation
15. MIKE RYAN | PORTFOLIO
HALAL GUYS | PAGE 29
HALAL GUYS
750 SF RESTAURANT, completed 2015
Coordinated restaurant equipment and furnishings | Detailed interior millwork | Expedited building permit
16. MIKE RYAN | PORTFOLIO
CRUISE RESIDENCE | PAGE 31
LINCOLN PARK REMODEL
5,200 SF, completed 2007
Conducted energy audit | Detailed extensive interior trim and millwork |
Oversaw intricate remodeling | Coordinated home automation system
17. MIKE RYAN | PORTFOLIO
MIKE RYAN
P O R T F O L I O
themikeryan@gmail.com | 773.580.0032