SlideShare a Scribd company logo
1 of 5
Download to read offline
P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703
tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com
SF49ers_56468_INS-6Shts_6-2014
Setup InstructionsSetup Instructions
SF 49ers Stadium Management Co._56568
Custom Outdoor Kiosk_ 4 Units
Bench
Assembly
3-Piece Counter
Assembly
Tubular Posts
Tubular Graphic
Header
Canopy Cover
Post-CanopyFrameAssy_6-14
P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703
tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com
SF 49ers Stadium Management Co.
Custom Outdoor Kiosk Display
with Waterproof Canopy
FrameAssembly
1. Remove all items from carrying bag. Frame
members are labeled and must be
positioned as shown.
2. Snap together all joints, beginning with the
perimeter rails.
3. Connect spreaders to the perimeter rails
using the provided 3" bolts.
4. Attached the 3 Counter Sections together
as described on the next sheet.
5. Attach the 6 posts to the spreaders on the
canopy using the 3" bolts.
6. Attach the 1-1/4" tubular rails to the posts as
shown using the 3" bolts provided.
Material List (1 Kiosk)
6 Perimeter Rails with Elbows
6 Posts
2 1-1/4" Rails
10 Spreaders
18 5/16-18x 3" Bolts
1 Allen Wrench
1 Instruction Set
Perimeter
Rails
Spreaders
1-1/4"
Tubular
Rails
Posts
T-BUTT
CONNECTION
SNAPBUTTON
CONNECTION
Isometric View
Image_
FrameAssembly
P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703
tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com
Post-CounterAssy_6-14
SF 49ers Stadium Management Co.
Custom Outdoor Kiosk Display_
Counter/PostAssembly
CounterAssembly
1. The 3 Counter Frame Sections ship
intact. Position the Counter Sections
as shown and secure together with
2-1/2" thumbturn bolts, washers and
wingnut fasteners detailed below right.
2. Slide the Frame Posts into the Stand-
Collars and secure with the 3"
thumbturn bolt and wingnut fasteners
detailed at right.
3. The Corner Brackets on the Counter
Frames secure with 3/4" round-head
bolts at 2 places each Bracket. These
Brackets remain attached to the
Counter Frame and should not be
removed for packing.
FastenerDetail
Slide Post into Collar-Stand and
Secure with 1/4-20x3"Thumbturn
Bolt and Wing Nut Fasteners at
1 Location each.
FastenerDetail
Secure the 3 Counters together at 4
places with 1/4-20x 2-1/2"Thumbturn
Bolt, 2 Washers and Wing Nut Fasteners.
KA
KC
KB
To Engage:
Line-Up Drill Hole With
Bullet Plunger, Depress
Bullet and Push Metal
Tube onto Connector.
To Disengage:
Depress Bullet
Plunger and Pull
Metal Tube From
Connector.
Typical Snap-Fit Bullet Connectors
Posts Slide into
Stand Collars and
Secure in-Place
Please Note that the
Shelf Panels and Base
Panels remain attached
to the Counter Sections
but are Not Shown for Clarity.
Cabinet Frame
Sections
Counter Tops
Collar-Stand Secured
to Cabinet Frame
CounterImage
Counter
Fasteners
Post-Collar
Stand
Isometric View
Counter Tops
Shelf Panels
Recessed on
Flanged Frame
Corner Brackets
Remain Secured
to Frame
P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703
tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com
CanopyCover-CntrWrapAssy_6-14
SF 49ers Stadium Management Co.
Custom Outdoor Kiosk Display_
Canopy Cover-Counter WrapAssembly
CanopyAssembly
1. Attach Canopy Cover to top of Canopy Frame. The
underside of the Cover has Corner Pockets that
slide onto the Corner Canopy Frame.
2. Attach the Cover to the top corners then, carefully
pull the Cover down over the Bottom Canopy
Corner Frames.
Attaching Canopy Cover
3. Slide Cover Corner Pockets onto top of Corner Frame to
secure. Then slide Bottom Corner Pockets onto Corner
Frames.
Attaching Header Fabric-Graphic
4. Velcro the Fabric Graphic to the 1-1/4" Tubular Rails.
Counter Fabric WrapAssembly
5. Velcro the Fabric Wrap to the Counter perimeter Frame as
shown. Begin at the back corner and slowly work around to
the opposite side. Note that the Counter Tops are not shown
but remain attached to the Counter Sections.
Metal BenchAssembly
6. Secure Metal Bench to Counter Frames at 4 places shown
thru clearance holes in Fabric Wrap with 3" Thumbturn bolts
with WingNut fasteners.
FastenerDetail
Secure Metal Bench to Counter
Framing with 1/4-20x3"Thumbturn
Bolt and Wing Nut Fasteners at
4 Locations.
Eyelet Strap falls on both sides of
Tubular Rail.Thread Cable-Tie thru
both Eyelets to secure Canopy Cover
toTubular Framing. Eyelet Straps
occur at 5 locations.
Strap/Cable-Tie
1-Piece Canopy
Cover
Canopy Corner
Pocket for Frame
Canopy Corner
Pocket for Frame
Bench-Cushion
Secured to Frame
Bench Frame
Isometric View
Please Note that the Counter Tops, Shelf
Panels and Base Panels remain attached to the
Counter Sections but are Not Shown for Clarity.
Velco Counter Fabric
Wrap to Counter Top
and Bottom Frame
Perimeter
P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703
tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com
Crate-Packing_6-14
SF 49ers Stadium Management Co.
Custom Outdoor Kiosk Display_
Crate PackingAssembly (4 Separate Crates)
Image-Front View
Pack 1 Unit per Crate
Graphic Wrap
Graphic Fabric Header
Canopy Cover
Kiosk Tubular Framing
Metal Bench Assembly
Hardware Packet
3-Piece Counter Assembly

More Related Content

Viewers also liked (19)

Tarea 4
Tarea 4Tarea 4
Tarea 4
 
Elsa Lee's Transformation - Lost 1/4 of my body
Elsa Lee's Transformation - Lost 1/4 of my bodyElsa Lee's Transformation - Lost 1/4 of my body
Elsa Lee's Transformation - Lost 1/4 of my body
 
Presentacion aea pacayas 2016
Presentacion aea pacayas 2016Presentacion aea pacayas 2016
Presentacion aea pacayas 2016
 
3179 javascript
3179 javascript3179 javascript
3179 javascript
 
Picture Diary
Picture DiaryPicture Diary
Picture Diary
 
Presentación enquisa violencia de xénero
Presentación enquisa violencia de xénero Presentación enquisa violencia de xénero
Presentación enquisa violencia de xénero
 
ShariGraydon_Poster
ShariGraydon_PosterShariGraydon_Poster
ShariGraydon_Poster
 
nadeem-cv-jun2016
nadeem-cv-jun2016nadeem-cv-jun2016
nadeem-cv-jun2016
 
Informe Agencia de Extensión Agropecuaria de Tarrazú
Informe  Agencia de Extensión Agropecuaria de TarrazúInforme  Agencia de Extensión Agropecuaria de Tarrazú
Informe Agencia de Extensión Agropecuaria de Tarrazú
 
Soluciones Químicas
Soluciones QuímicasSoluciones Químicas
Soluciones Químicas
 
Introducción teorías de la personalidad
Introducción teorías de la personalidadIntroducción teorías de la personalidad
Introducción teorías de la personalidad
 
Monasterio de Batalha. Batalha. Portugal.
Monasterio de Batalha. Batalha. Portugal.Monasterio de Batalha. Batalha. Portugal.
Monasterio de Batalha. Batalha. Portugal.
 
MONASTERIO DE SANTA CLARA, TORDESILLAS
MONASTERIO DE SANTA CLARA, TORDESILLASMONASTERIO DE SANTA CLARA, TORDESILLAS
MONASTERIO DE SANTA CLARA, TORDESILLAS
 
GREAT NATURAL DISASTERS
GREAT NATURAL DISASTERSGREAT NATURAL DISASTERS
GREAT NATURAL DISASTERS
 
9 tintes para el pelo
9 tintes para el pelo9 tintes para el pelo
9 tintes para el pelo
 
Analyzing Political Cartoons
Analyzing Political CartoonsAnalyzing Political Cartoons
Analyzing Political Cartoons
 
8 cosmética de uñas
8 cosmética de uñas8 cosmética de uñas
8 cosmética de uñas
 
Farma 7
Farma 7Farma 7
Farma 7
 
Expressionism
ExpressionismExpressionism
Expressionism
 

Similar to SF 49ers Stadium Outdoor Kiosk Display Assembly

Solar cooker installation
Solar cooker installationSolar cooker installation
Solar cooker installationPrabhat Kumar
 
Machine Your Fishing Reel - Mechanix Illustrated
Machine Your Fishing Reel - Mechanix IllustratedMachine Your Fishing Reel - Mechanix Illustrated
Machine Your Fishing Reel - Mechanix IllustratedAnibal Ruben Reyes
 
Mounting Instructions | C-More Serendipity Red Dot Sights | Optics Trade
Mounting Instructions | C-More Serendipity Red Dot Sights | Optics TradeMounting Instructions | C-More Serendipity Red Dot Sights | Optics Trade
Mounting Instructions | C-More Serendipity Red Dot Sights | Optics TradeOptics-Trade
 
Instruction Manual C-MORE Serendipity Mounting | Optics Trade
Instruction Manual C-MORE Serendipity Mounting | Optics TradeInstruction Manual C-MORE Serendipity Mounting | Optics Trade
Instruction Manual C-MORE Serendipity Mounting | Optics TradeOptics-Trade
 
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Solar
 
Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guidDon Pell
 
Italian Trade Commission_56221_INS-7Shts_4-14
Italian Trade Commission_56221_INS-7Shts_4-14Italian Trade Commission_56221_INS-7Shts_4-14
Italian Trade Commission_56221_INS-7Shts_4-14Mike Castillo
 
Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideWestern-Building-Center
 
Hilton_Backwall-Kiosk
Hilton_Backwall-KioskHilton_Backwall-Kiosk
Hilton_Backwall-KioskMike Castillo
 
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...Thorne & Derrick International
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guidejaydeedee
 
Technical Instructions (FSAE)
Technical Instructions (FSAE)Technical Instructions (FSAE)
Technical Instructions (FSAE)Michael Walker
 
iMovR TopView Max Unison Monitor Arm
iMovR TopView Max Unison Monitor ArmiMovR TopView Max Unison Monitor Arm
iMovR TopView Max Unison Monitor ArmiMovR
 
Build instructions Homeslice Tower ver 070514
Build instructions   Homeslice Tower ver 070514Build instructions   Homeslice Tower ver 070514
Build instructions Homeslice Tower ver 070514Jeff Vetterick
 

Similar to SF 49ers Stadium Outdoor Kiosk Display Assembly (20)

Solar cooker installation
Solar cooker installationSolar cooker installation
Solar cooker installation
 
Machine Your Fishing Reel - Mechanix Illustrated
Machine Your Fishing Reel - Mechanix IllustratedMachine Your Fishing Reel - Mechanix Illustrated
Machine Your Fishing Reel - Mechanix Illustrated
 
Mounting Instructions | C-More Serendipity Red Dot Sights | Optics Trade
Mounting Instructions | C-More Serendipity Red Dot Sights | Optics TradeMounting Instructions | C-More Serendipity Red Dot Sights | Optics Trade
Mounting Instructions | C-More Serendipity Red Dot Sights | Optics Trade
 
Instruction Manual C-MORE Serendipity Mounting | Optics Trade
Instruction Manual C-MORE Serendipity Mounting | Optics TradeInstruction Manual C-MORE Serendipity Mounting | Optics Trade
Instruction Manual C-MORE Serendipity Mounting | Optics Trade
 
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
SunMaxx Installation Manual - TitanPower ALDH29 Flat Plate Collector - Flush ...
 
UWR Weapon Racks Installation Instructions
UWR Weapon Racks Installation InstructionsUWR Weapon Racks Installation Instructions
UWR Weapon Racks Installation Instructions
 
Effective heat installation guid
Effective heat installation guidEffective heat installation guid
Effective heat installation guid
 
Bright_Covers_Installation_Manual
Bright_Covers_Installation_ManualBright_Covers_Installation_Manual
Bright_Covers_Installation_Manual
 
Italian Trade Commission_56221_INS-7Shts_4-14
Italian Trade Commission_56221_INS-7Shts_4-14Italian Trade Commission_56221_INS-7Shts_4-14
Italian Trade Commission_56221_INS-7Shts_4-14
 
Cooper a1assemblyposter vt_r_nxtov
Cooper a1assemblyposter vt_r_nxtovCooper a1assemblyposter vt_r_nxtov
Cooper a1assemblyposter vt_r_nxtov
 
Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation Guide
 
Hilton_Backwall-Kiosk
Hilton_Backwall-KioskHilton_Backwall-Kiosk
Hilton_Backwall-Kiosk
 
TRU-FIT
TRU-FITTRU-FIT
TRU-FIT
 
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE SWA 3 ...
 
Effective heat installation guide
Effective heat installation guideEffective heat installation guide
Effective heat installation guide
 
FrameWRX Installation Instructions
FrameWRX Installation InstructionsFrameWRX Installation Instructions
FrameWRX Installation Instructions
 
Technical Instructions (FSAE)
Technical Instructions (FSAE)Technical Instructions (FSAE)
Technical Instructions (FSAE)
 
610902026P
610902026P610902026P
610902026P
 
iMovR TopView Max Unison Monitor Arm
iMovR TopView Max Unison Monitor ArmiMovR TopView Max Unison Monitor Arm
iMovR TopView Max Unison Monitor Arm
 
Build instructions Homeslice Tower ver 070514
Build instructions   Homeslice Tower ver 070514Build instructions   Homeslice Tower ver 070514
Build instructions Homeslice Tower ver 070514
 

More from Mike Castillo

BetterBedNow_PatentDrwgs_OP
BetterBedNow_PatentDrwgs_OPBetterBedNow_PatentDrwgs_OP
BetterBedNow_PatentDrwgs_OPMike Castillo
 
DMikeCastillo_Examples
DMikeCastillo_ExamplesDMikeCastillo_Examples
DMikeCastillo_ExamplesMike Castillo
 
QuoteTop_Steer_Chute_6x9
QuoteTop_Steer_Chute_6x9QuoteTop_Steer_Chute_6x9
QuoteTop_Steer_Chute_6x9Mike Castillo
 

More from Mike Castillo (6)

HA_WesternToon_Ad-2
HA_WesternToon_Ad-2HA_WesternToon_Ad-2
HA_WesternToon_Ad-2
 
PBR_BullWackerToon
PBR_BullWackerToonPBR_BullWackerToon
PBR_BullWackerToon
 
BetterBedNow_PatentDrwgs_OP
BetterBedNow_PatentDrwgs_OPBetterBedNow_PatentDrwgs_OP
BetterBedNow_PatentDrwgs_OP
 
Coupler_IsoDrawing
Coupler_IsoDrawingCoupler_IsoDrawing
Coupler_IsoDrawing
 
DMikeCastillo_Examples
DMikeCastillo_ExamplesDMikeCastillo_Examples
DMikeCastillo_Examples
 
QuoteTop_Steer_Chute_6x9
QuoteTop_Steer_Chute_6x9QuoteTop_Steer_Chute_6x9
QuoteTop_Steer_Chute_6x9
 

SF 49ers Stadium Outdoor Kiosk Display Assembly

  • 1. P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703 tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com SF49ers_56468_INS-6Shts_6-2014 Setup InstructionsSetup Instructions SF 49ers Stadium Management Co._56568 Custom Outdoor Kiosk_ 4 Units Bench Assembly 3-Piece Counter Assembly Tubular Posts Tubular Graphic Header Canopy Cover
  • 2. Post-CanopyFrameAssy_6-14 P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703 tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com SF 49ers Stadium Management Co. Custom Outdoor Kiosk Display with Waterproof Canopy FrameAssembly 1. Remove all items from carrying bag. Frame members are labeled and must be positioned as shown. 2. Snap together all joints, beginning with the perimeter rails. 3. Connect spreaders to the perimeter rails using the provided 3" bolts. 4. Attached the 3 Counter Sections together as described on the next sheet. 5. Attach the 6 posts to the spreaders on the canopy using the 3" bolts. 6. Attach the 1-1/4" tubular rails to the posts as shown using the 3" bolts provided. Material List (1 Kiosk) 6 Perimeter Rails with Elbows 6 Posts 2 1-1/4" Rails 10 Spreaders 18 5/16-18x 3" Bolts 1 Allen Wrench 1 Instruction Set Perimeter Rails Spreaders 1-1/4" Tubular Rails Posts T-BUTT CONNECTION SNAPBUTTON CONNECTION Isometric View Image_ FrameAssembly
  • 3. P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703 tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com Post-CounterAssy_6-14 SF 49ers Stadium Management Co. Custom Outdoor Kiosk Display_ Counter/PostAssembly CounterAssembly 1. The 3 Counter Frame Sections ship intact. Position the Counter Sections as shown and secure together with 2-1/2" thumbturn bolts, washers and wingnut fasteners detailed below right. 2. Slide the Frame Posts into the Stand- Collars and secure with the 3" thumbturn bolt and wingnut fasteners detailed at right. 3. The Corner Brackets on the Counter Frames secure with 3/4" round-head bolts at 2 places each Bracket. These Brackets remain attached to the Counter Frame and should not be removed for packing. FastenerDetail Slide Post into Collar-Stand and Secure with 1/4-20x3"Thumbturn Bolt and Wing Nut Fasteners at 1 Location each. FastenerDetail Secure the 3 Counters together at 4 places with 1/4-20x 2-1/2"Thumbturn Bolt, 2 Washers and Wing Nut Fasteners. KA KC KB To Engage: Line-Up Drill Hole With Bullet Plunger, Depress Bullet and Push Metal Tube onto Connector. To Disengage: Depress Bullet Plunger and Pull Metal Tube From Connector. Typical Snap-Fit Bullet Connectors Posts Slide into Stand Collars and Secure in-Place Please Note that the Shelf Panels and Base Panels remain attached to the Counter Sections but are Not Shown for Clarity. Cabinet Frame Sections Counter Tops Collar-Stand Secured to Cabinet Frame CounterImage Counter Fasteners Post-Collar Stand Isometric View Counter Tops Shelf Panels Recessed on Flanged Frame Corner Brackets Remain Secured to Frame
  • 4. P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703 tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com CanopyCover-CntrWrapAssy_6-14 SF 49ers Stadium Management Co. Custom Outdoor Kiosk Display_ Canopy Cover-Counter WrapAssembly CanopyAssembly 1. Attach Canopy Cover to top of Canopy Frame. The underside of the Cover has Corner Pockets that slide onto the Corner Canopy Frame. 2. Attach the Cover to the top corners then, carefully pull the Cover down over the Bottom Canopy Corner Frames. Attaching Canopy Cover 3. Slide Cover Corner Pockets onto top of Corner Frame to secure. Then slide Bottom Corner Pockets onto Corner Frames. Attaching Header Fabric-Graphic 4. Velcro the Fabric Graphic to the 1-1/4" Tubular Rails. Counter Fabric WrapAssembly 5. Velcro the Fabric Wrap to the Counter perimeter Frame as shown. Begin at the back corner and slowly work around to the opposite side. Note that the Counter Tops are not shown but remain attached to the Counter Sections. Metal BenchAssembly 6. Secure Metal Bench to Counter Frames at 4 places shown thru clearance holes in Fabric Wrap with 3" Thumbturn bolts with WingNut fasteners. FastenerDetail Secure Metal Bench to Counter Framing with 1/4-20x3"Thumbturn Bolt and Wing Nut Fasteners at 4 Locations. Eyelet Strap falls on both sides of Tubular Rail.Thread Cable-Tie thru both Eyelets to secure Canopy Cover toTubular Framing. Eyelet Straps occur at 5 locations. Strap/Cable-Tie 1-Piece Canopy Cover Canopy Corner Pocket for Frame Canopy Corner Pocket for Frame Bench-Cushion Secured to Frame Bench Frame Isometric View Please Note that the Counter Tops, Shelf Panels and Base Panels remain attached to the Counter Sections but are Not Shown for Clarity. Velco Counter Fabric Wrap to Counter Top and Bottom Frame Perimeter
  • 5. P.O. Box 110527 Durham, NC 27709 • 4102 South Miami Blvd, Durham, NC 27703 tel 919.544.6504 • fax 919.544.6729 • sales@godfreygroup.com • www.godfreygroup.com Crate-Packing_6-14 SF 49ers Stadium Management Co. Custom Outdoor Kiosk Display_ Crate PackingAssembly (4 Separate Crates) Image-Front View Pack 1 Unit per Crate Graphic Wrap Graphic Fabric Header Canopy Cover Kiosk Tubular Framing Metal Bench Assembly Hardware Packet 3-Piece Counter Assembly