"experts in project status & performance measurement"
"White Paper Series"
CONTINGENCY
"Use and Misuse"
THE ONLY MEASURE OF PROJECT
Copyright CMS Inc. 2009 Contingency - "Uses and Misuses"
2
©©©© Copyright 2009, CMS Inc. All rights reserved
This document is sole property of CMS Inc. and has been reprinted with permission and consent
by CMS Inc. No part of this document is to be reproduced and its contents are intended for use
and review only. No part of this document may be reproduced, copied or distributed in any form
or by any means, either wholly or in part without the express written consent of CMS Inc. It is
understood that no right is conveyed to distribute, reproduce or have any portion of this
document or item herein disclosed without the express written permission of CMS Inc.
CONTINGENCY
"Use and Misuse"
Author: Martin Smith CCC, P.Mgr
President & CEO, CMS Inc.
Phone: (519) 336-4672
Fax: (519) 336-4774
Email: martinsmith@cms-inc.ca
www.cms-inc.ca
Copyright CMS Inc. 2009 Contingency - "Uses and Misuses"
3
Introduction
Contingency is probably the most misunderstood allowance in a project estimate, right from its initial
definition to its application during the course of the project. Numerous companies use contingency in
varying ways. The problem is, with no one systematic approach there is no actual set of rules or guidelines
to follow. The application of contingency is really based upon the definition that the owner of the estimate
has for contingency.
The purpose of this paper then is to define what CMS Inc.’s definition of contingency is when we believe it
should be used, and how it should be utilized as a forecast tool as part of the overall cost summary, and
project forecast at completion. In order to do that, we must recognize that we do not have the only
definition of contingency. Some companies have specific rules about the application of contingency, which
need to be followed during the course of a project. As well, contractors and sub-contractors have their own
definition of contingency. These definitions of contingency are normally slightly different to suit a different
purpose.
Copyright CMS Inc. 2009 Contingency - "Uses and Misuses"
4
The Definition
CMS Inc will use the following definition:
Contingency is an allowance to mitigate risk to the project.
This allowance is based on the level of definition at the time of the estimate, and is to cover the risk of
scope growth due to incomplete definition. Even with a Class II or final estimate with a plus or minus 10%
accuracy, the scope is really based on 10% of the engineering, maybe 15% if the owner allows a high
degree of front-end engineering. Even when the design basis and specifications are clear, the actual
details of how we will execute the project are not. Consequently, contingency is there to mitigate the risk
because of expected scope growth. Since contingency is there for risk then it should be considered as a
risk allowance to be run down as the project progresses. As more of the project is committed, there is less
risk to the project and less of an allowance is required.
Copyright CMS Inc. 2009 Contingency - "Uses and Misuses"
5
The Uses
There are various methods to run down contingency. Contingency can be rundown linearly, as a
percentage of commitment, against specific events, or matching progress. All of these methods are
acceptable as long as a plan has been constructed to run them down. Our preference is to run them down
on a linear basis holding 10% of the contingency for after mechanical completion. This final 10% of
contingency is there to cover changes that are required during the commissioning and start-up stages. The
10% is an acceptable number based on historical data and experiences. This ensures that there are
reasonable funds available to make changes should something be found to be deficient in the design
during commissioning, while not holding on to excess funds that could be more beneficial if applied
elsewhere.
With the use of the Monte Carlo analysis risk programs, which is a system where risk is assigned to specific
tasks, a contingency allowance is calculated based upon the overall calculated probability of success.
Contingency rundown should be based on the completion of those specific tasks. As that task is completed
the contingency for that task should also be run down. The advantages of running it down on a continuous
basis are that we do not see contingency as a cash account, we see it as an allowance and a forecast
buffer. At the start of the project we are really saying our forecast is accurate to 10%, so we have added
10% contingency. As we progress through the project, the level of unknown decreases as commitments are
made and work completed. As the unknowns decrease, the risk decreases and the need to fund that risk
decreases.
CMS Inc.’s position is that running it down linearly and charting it creates cost awareness amongst the
project team. Especially in the early stages when we are still working the process details, and designers are
looking to design the best possible plant for the owner. During this time there is often a tendency to forget
that the project was appropriated on a certain level of quality, and that construction has risk. Graphically
showing how much change we would expect, and how much additional scope is being added quickly
communicates how well we are doing in managing changes to the scope of the project. With the plan and
results on a chart, if we are above the plan curve you can see quite clearly too much scope is being added
to the project. Conversely, if we are below the curve, not as much scope is being added and management
becomes more confident that the scope will be delivered for the appropriate dollars.
Copyright CMS Inc. 2009 Contingency - "Uses and Misuses"
6
Only allowing the current budget to change with an approved scope change will keep the playing field fair
for the contractor and the owner. The contractor will be held accountable to a true budget, based on their
estimate of the cost plus the additional costs for scope that has been added and approved by the owner
during the execution of the project. By not allowing contingency to be used for performance issues, we
can quickly identify a variance between the forecast and the current control budget. These variances will
indicate areas of either poor performance or estimating problems. The other advantage, apart from
identifying a problem early and taking actions to mitigate it, is that at the end of project we can quickly
reconcile the final costs back to the ‘class two’ or ‘final’ estimate.
This provides a two-fold advantage in that it also aids the estimating agency in compiling data in order to
close the loop on their estimating factors. If they find that they are consistently high in one area, they have
sufficient evidence to change their estimating unit. Equally, if they are low in an area they have the
opportunity to change it at the same time. The basis of this also helps to modify a standard estimating
database for different locations and work conditions. Then a company could estimate a job the same way
for any location and then apply a series of factors based on the historical data that allows them to bring that
estimate into a more probable number. A more accurate estimate would make for a more effective use of
funds. After all, there is no sense in returning 20% of the appropriated funds, and there is no value to an
organization in trying to do a $200 million project for $150 million. So the accuracy of the estimate is a key
factor and an important benefit of not using contingency as a buffer to the forecast.
A secondary note on the use of contingency; changes to fabricated items during the course of completing
engineering would not be considered added scope. Budgets for equipment and materials should also
include allowances for changes made during fabrication, and growth in material quantity. This would be
added to what was committed and the growth allowance again would be managed, but the commitment
plus the growth allowance would end up being your forecast. This applies in the field also. Its never been
known for a construction contractor to come on to a project and execute the scope exactly, as per the
drawings, with everything fitting perfectly. There is always some level of change but this amount is
dependant upon on the quality of the package put together or the quality of the engineering and the quality
of the drawings. Field changes must also be allowed for in the forecast. They need to be segregated into
Copyright CMS Inc. 2009 Contingency - "Uses and Misuses"
7
scope changes, errors or rework. True scope changes would result in a change in budget. The error and
rework would become a measure of performance.
As we will address in our paper on Change Management, you must really consider that there are three
types of changes to a project. First, the big “S” scope change is a change in the project basis, i.e. a change
in the original definition of the project. Second, is the small “s” scope change, which are the ones that are
required to make the project safe and operable. Thirdly, are deviations that really reflect project
performance such as over-runs in engineering, or the fact that a piece of equipment cost more than what
was originally estimated. These are trend changes or estimating errors, but not additional scope. For
example, if you are purchasing a 90,000-barrel tank and the estimate was a million dollars for the tank.
When it was actually tendered and awarded, the best bid was $1.2 million. This would give you a trend for
$200,000. To cover this trend off with contingency is not an acceptable way to use it since this is the same
tank as described in the basis nothing has changed, we just got the cost wrong.
In the next section, we will discuss how we see the misuse of contingency and explain why we feel that
there is an appropriate way to use contingency.
Copyright CMS Inc. 2009 Contingency - "Uses and Misuses"
8
The Misuses
Contingency is used improperly in many ways. For one, it is not there to cover additional scope due to a
change in basis. For example, if the project is to deliver a plant capable of producing 20,000 bpd and the
Owner changes it to 22,000 bpd then the costs associated with the increase in capacity should be funded
separately, including its own contingency. If during the course of design you needed to put in two
additional heat exchangers, then this would be what we term as a small “s” scope change. This is an
addition to the scope as defined by the design specification, but not a scope change as defined by the
basis. This means we are still building a 20,000 bpd unit, however we need additional heat exchangers to
make the process work. The budget for those heat exchangers, engineering associated with them, and all
other associated costs would be increased to make it fair to the contractor. So the sum total of all of those
small 's' scope changes should be equal to the contingency that was allotted to the project. However, we
do not actually make a budgetary transfer. Considering contingency to be an actual pocket of money is
also a mistake. Contingency should always be considered to be an allowance for the amount of risk that is
left in the project. So early on in the project, we have done little, therefore we carry the full contingency.
Conversely, at the end of the project, the risk is minimal so we should carry a minimal contingency to the
project forecast.
A major concern with contingency is its use as a “slush” fund. We would normally find that this starts during
design engineering, and the overruns in engineering get covered by that “slush” fund. The reason being is
that is a natural tendency to believe our own organizations operate effectively. Therefore any cost overrun
must have come from the changes introduced by the owner and not from inefficiencies within ourselves.
Changes are inevitable, especially early in the design stage. The initial design is really only a preliminary
one, although with the use of front end loading and allowing engineering to progress before the project is
appropriated, project definition is becoming clearer and the overall overruns to the project can be reduced.
As a side note, this will probably lead to a reduction in the amount of contingency to future projects. Since
the risk to scope is becoming less, then the need for that amount of contingency is also being reduced.
Again, contingency is dependent on the risk that is left to the scope, in the project, when appropriated.
With projects, there are always going to be changes so it is unrealistic for an engineering contractor to
believe that they can do a job without any changes. Many of the changes are generated during owner
Copyright CMS Inc. 2009 Contingency - "Uses and Misuses"
9
reviews. These changes should be expected and should be allowed for in the contractor’s original budget.
If the contractor has set aggressive targets in order to win the contract, then that is their business decision,
and they should be accountable for it and not expect the owner to bury their poor performance with
contingency.
Engineering is not an exact science; it develops as the project progresses. However, when using
contingency to continually ‘fill the pot’ we easily lose sight of engineering overruns. You will also lose sight
of how much real scope has been added into the job. The contractor has very little control over new scope
brought into the project. Historically, the owner, as a desire for something better, adds most of the new
scope. Reviews or new process design parameters may cause equipment to be sized or located a little
differently. Performance is totally a contractor issue. The contractors are responsible for their own
efficiencies and for managing its personnel. The owner needs to know the difference.
The other danger of using contingency to fill the pot is that no one is accountable for the budget. Every time
someone says, “we had to change this”, or “it took us a little longer to do that than we had in the estimate”,
or “this was not quite right so we had to rework this issue”, the budget is continually moved. It is difficult to
track a moving target, forecast where it is going, and hard to hold those who have control of the budget
accountable for the budget. If no one is accountable then it makes it difficult to manage the project
effectively.
A greater danger of using contingency as a “slush” fund is that the issues causing project overruns become
hidden, and therefore cannot be readily dealt with. The filling of the pot technique allows the contractor to
continue working without the owner recognizing that there is a problem. This removes the ability to see the
problems and we lose the ability to see the opportunities.
Since engineering and procurement budgets are the first to be used, they would also be the first to be
topped up with the “slush” fund. By the time we go into the field to construct the project, there is
insufficient contingency left to manage the risk through the execution stage of the project. Once the project
reaches the execution phase, you have reached the point of no return. Changes in the way the job is to be
executed are legitimate applications of contingencies. There is always an inherit risk in construction.
There is a risk to the availability of manpower, or having to do things in a different sequence, so
Copyright CMS Inc. 2009 Contingency - "Uses and Misuses"
10
contingency is there for the owner to cover the risk and to take advantage of opportunities that may arise.
Consequently, if there were one overwhelming misuse in applying contingency, it would have to be its use
as a “slush” fund.
Conclusion
We will summarize CMS Inc.'s position on the use of contingency as follows:
• Contingency is an allowance for unknown scope
• It must have a rundown plan, developed early in the project
• CMS Inc.'s preference is to run it down linearly over time, holding 10% back for completion /
startup activities
• Contingency is not a slush fund to be used to top up poorly performing areas

More Related Content

Viewers also liked

Пуговица
ПуговицаПуговица
Пуговицаtendey
 
Fitri artikel unpam_pertemuan3
Fitri artikel unpam_pertemuan3Fitri artikel unpam_pertemuan3
Fitri artikel unpam_pertemuan3Ayu2602
 
Презентация для мастер-класса "Продвижение порталов и магазинов"
Презентация для мастер-класса "Продвижение порталов и магазинов"Презентация для мастер-класса "Продвижение порталов и магазинов"
Презентация для мастер-класса "Продвижение порталов и магазинов"Artilleria
 
What makes you work while you are sick? Evidence from a survey of union members
What makes you work while you are sick? Evidence from a survey of union membersWhat makes you work while you are sick? Evidence from a survey of union members
What makes you work while you are sick? Evidence from a survey of union membersPalkansaajien tutkimuslaitos
 
Deen dayal jan awas yojna, Haryana
Deen dayal jan awas yojna, HaryanaDeen dayal jan awas yojna, Haryana
Deen dayal jan awas yojna, HaryanaSushant Kumar
 
Massive MIMO: Bristol - Lund Joint Field Trial Experiments and Record Breakin...
Massive MIMO: Bristol - Lund Joint Field Trial Experiments and Record Breakin...Massive MIMO: Bristol - Lund Joint Field Trial Experiments and Record Breakin...
Massive MIMO: Bristol - Lund Joint Field Trial Experiments and Record Breakin...Communication Systems & Networks
 
beauty salon managment professional
beauty salon managment professionalbeauty salon managment professional
beauty salon managment professionalZane Sheikh
 
Тема 3 . Урок 3
Тема 3 . Урок 3Тема 3 . Урок 3
Тема 3 . Урок 3history-kpl
 
KwizKraft 2011 Prelims
KwizKraft 2011 PrelimsKwizKraft 2011 Prelims
KwizKraft 2011 PrelimsQuizMonks
 
Massive MIMO and Random Matrix
Massive MIMO and Random MatrixMassive MIMO and Random Matrix
Massive MIMO and Random MatrixVARUN KUMAR
 
Camouflage for the patriot
Camouflage for the patriotCamouflage for the patriot
Camouflage for the patriotIF109
 
Hesham_Mahmoud_Helw_Eldin_hr 2013
Hesham_Mahmoud_Helw_Eldin_hr 2013Hesham_Mahmoud_Helw_Eldin_hr 2013
Hesham_Mahmoud_Helw_Eldin_hr 2013Hisham helweldin
 

Viewers also liked (17)

Survey
SurveySurvey
Survey
 
Пуговица
ПуговицаПуговица
Пуговица
 
звіт
звітзвіт
звіт
 
CMS Capabilities
CMS CapabilitiesCMS Capabilities
CMS Capabilities
 
Fitri artikel unpam_pertemuan3
Fitri artikel unpam_pertemuan3Fitri artikel unpam_pertemuan3
Fitri artikel unpam_pertemuan3
 
Презентация для мастер-класса "Продвижение порталов и магазинов"
Презентация для мастер-класса "Продвижение порталов и магазинов"Презентация для мастер-класса "Продвижение порталов и магазинов"
Презентация для мастер-класса "Продвижение порталов и магазинов"
 
What makes you work while you are sick? Evidence from a survey of union members
What makes you work while you are sick? Evidence from a survey of union membersWhat makes you work while you are sick? Evidence from a survey of union members
What makes you work while you are sick? Evidence from a survey of union members
 
Deen dayal jan awas yojna, Haryana
Deen dayal jan awas yojna, HaryanaDeen dayal jan awas yojna, Haryana
Deen dayal jan awas yojna, Haryana
 
Massive MIMO: Bristol - Lund Joint Field Trial Experiments and Record Breakin...
Massive MIMO: Bristol - Lund Joint Field Trial Experiments and Record Breakin...Massive MIMO: Bristol - Lund Joint Field Trial Experiments and Record Breakin...
Massive MIMO: Bristol - Lund Joint Field Trial Experiments and Record Breakin...
 
beauty salon managment professional
beauty salon managment professionalbeauty salon managment professional
beauty salon managment professional
 
Тема 3 . Урок 3
Тема 3 . Урок 3Тема 3 . Урок 3
Тема 3 . Урок 3
 
KwizKraft 2011 Prelims
KwizKraft 2011 PrelimsKwizKraft 2011 Prelims
KwizKraft 2011 Prelims
 
Massive MIMO and Random Matrix
Massive MIMO and Random MatrixMassive MIMO and Random Matrix
Massive MIMO and Random Matrix
 
Camouflage for the patriot
Camouflage for the patriotCamouflage for the patriot
Camouflage for the patriot
 
Hesham_Mahmoud_Helw_Eldin_hr 2013
Hesham_Mahmoud_Helw_Eldin_hr 2013Hesham_Mahmoud_Helw_Eldin_hr 2013
Hesham_Mahmoud_Helw_Eldin_hr 2013
 
El rostro de dios
El rostro de diosEl rostro de dios
El rostro de dios
 
Sse api
Sse apiSse api
Sse api
 

Similar to experts in project status & performance measurement

CMS Intro Brochure Feb 2016
CMS Intro Brochure Feb 2016CMS Intro Brochure Feb 2016
CMS Intro Brochure Feb 2016Aaron Buntrock
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM Divante
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM Mati Polak
 
Budgeting in SCRUM by Divante
Budgeting in SCRUM by DivanteBudgeting in SCRUM by Divante
Budgeting in SCRUM by DivanteDivante
 
Modelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction ContractsModelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction ContractsFinancial Modelling Handbook
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Quantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesQuantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesMichael Pink
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)FahadHasan36
 
INFORMATION SYTEMS .docx
INFORMATION SYTEMS                                                .docxINFORMATION SYTEMS                                                .docx
INFORMATION SYTEMS .docxpauline234567
 
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15Project Control | PROJ CTRL
 
Project Governance Model PowerPoint Presentation Slides
Project Governance Model PowerPoint Presentation Slides Project Governance Model PowerPoint Presentation Slides
Project Governance Model PowerPoint Presentation Slides SlideTeam
 
Project Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation SlidesProject Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation SlidesSlideTeam
 
Risk Management Software Implementation Guide eBook
Risk Management Software Implementation Guide eBookRisk Management Software Implementation Guide eBook
Risk Management Software Implementation Guide eBookGlenn Peake
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsEssam Lotffy, PMP®, CCP®
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)Robert Byrd
 

Similar to experts in project status & performance measurement (20)

CMS Intro Brochure Feb 2016
CMS Intro Brochure Feb 2016CMS Intro Brochure Feb 2016
CMS Intro Brochure Feb 2016
 
CMS Inc.
CMS Inc.CMS Inc.
CMS Inc.
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM
 
Budgeting in SCRUM
Budgeting in SCRUM Budgeting in SCRUM
Budgeting in SCRUM
 
Management Reserve
Management ReserveManagement Reserve
Management Reserve
 
Budgeting in SCRUM by Divante
Budgeting in SCRUM by DivanteBudgeting in SCRUM by Divante
Budgeting in SCRUM by Divante
 
Modelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction ContractsModelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction Contracts
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Value chain analysis 4
Value chain analysis 4Value chain analysis 4
Value chain analysis 4
 
Quantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesQuantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficiencies
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)
 
INFORMATION SYTEMS .docx
INFORMATION SYTEMS                                                .docxINFORMATION SYTEMS                                                .docx
INFORMATION SYTEMS .docx
 
Aiab089228
Aiab089228Aiab089228
Aiab089228
 
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
Pm blackjack the21thingsyour-projectsponsorreallywantstoknow.-whitepaper_15
 
Project Governance Model PowerPoint Presentation Slides
Project Governance Model PowerPoint Presentation Slides Project Governance Model PowerPoint Presentation Slides
Project Governance Model PowerPoint Presentation Slides
 
Project Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation SlidesProject Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation Slides
 
Risk Management Software Implementation Guide eBook
Risk Management Software Implementation Guide eBookRisk Management Software Implementation Guide eBook
Risk Management Software Implementation Guide eBook
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projects
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
Deepwater Decommissioning Cost Estimation Whitepaper (2016-01)
 

experts in project status & performance measurement

  • 1. "experts in project status & performance measurement" "White Paper Series" CONTINGENCY "Use and Misuse" THE ONLY MEASURE OF PROJECT
  • 2. Copyright CMS Inc. 2009 Contingency - "Uses and Misuses" 2 ©©©© Copyright 2009, CMS Inc. All rights reserved This document is sole property of CMS Inc. and has been reprinted with permission and consent by CMS Inc. No part of this document is to be reproduced and its contents are intended for use and review only. No part of this document may be reproduced, copied or distributed in any form or by any means, either wholly or in part without the express written consent of CMS Inc. It is understood that no right is conveyed to distribute, reproduce or have any portion of this document or item herein disclosed without the express written permission of CMS Inc. CONTINGENCY "Use and Misuse" Author: Martin Smith CCC, P.Mgr President & CEO, CMS Inc. Phone: (519) 336-4672 Fax: (519) 336-4774 Email: martinsmith@cms-inc.ca www.cms-inc.ca
  • 3. Copyright CMS Inc. 2009 Contingency - "Uses and Misuses" 3 Introduction Contingency is probably the most misunderstood allowance in a project estimate, right from its initial definition to its application during the course of the project. Numerous companies use contingency in varying ways. The problem is, with no one systematic approach there is no actual set of rules or guidelines to follow. The application of contingency is really based upon the definition that the owner of the estimate has for contingency. The purpose of this paper then is to define what CMS Inc.’s definition of contingency is when we believe it should be used, and how it should be utilized as a forecast tool as part of the overall cost summary, and project forecast at completion. In order to do that, we must recognize that we do not have the only definition of contingency. Some companies have specific rules about the application of contingency, which need to be followed during the course of a project. As well, contractors and sub-contractors have their own definition of contingency. These definitions of contingency are normally slightly different to suit a different purpose.
  • 4. Copyright CMS Inc. 2009 Contingency - "Uses and Misuses" 4 The Definition CMS Inc will use the following definition: Contingency is an allowance to mitigate risk to the project. This allowance is based on the level of definition at the time of the estimate, and is to cover the risk of scope growth due to incomplete definition. Even with a Class II or final estimate with a plus or minus 10% accuracy, the scope is really based on 10% of the engineering, maybe 15% if the owner allows a high degree of front-end engineering. Even when the design basis and specifications are clear, the actual details of how we will execute the project are not. Consequently, contingency is there to mitigate the risk because of expected scope growth. Since contingency is there for risk then it should be considered as a risk allowance to be run down as the project progresses. As more of the project is committed, there is less risk to the project and less of an allowance is required.
  • 5. Copyright CMS Inc. 2009 Contingency - "Uses and Misuses" 5 The Uses There are various methods to run down contingency. Contingency can be rundown linearly, as a percentage of commitment, against specific events, or matching progress. All of these methods are acceptable as long as a plan has been constructed to run them down. Our preference is to run them down on a linear basis holding 10% of the contingency for after mechanical completion. This final 10% of contingency is there to cover changes that are required during the commissioning and start-up stages. The 10% is an acceptable number based on historical data and experiences. This ensures that there are reasonable funds available to make changes should something be found to be deficient in the design during commissioning, while not holding on to excess funds that could be more beneficial if applied elsewhere. With the use of the Monte Carlo analysis risk programs, which is a system where risk is assigned to specific tasks, a contingency allowance is calculated based upon the overall calculated probability of success. Contingency rundown should be based on the completion of those specific tasks. As that task is completed the contingency for that task should also be run down. The advantages of running it down on a continuous basis are that we do not see contingency as a cash account, we see it as an allowance and a forecast buffer. At the start of the project we are really saying our forecast is accurate to 10%, so we have added 10% contingency. As we progress through the project, the level of unknown decreases as commitments are made and work completed. As the unknowns decrease, the risk decreases and the need to fund that risk decreases. CMS Inc.’s position is that running it down linearly and charting it creates cost awareness amongst the project team. Especially in the early stages when we are still working the process details, and designers are looking to design the best possible plant for the owner. During this time there is often a tendency to forget that the project was appropriated on a certain level of quality, and that construction has risk. Graphically showing how much change we would expect, and how much additional scope is being added quickly communicates how well we are doing in managing changes to the scope of the project. With the plan and results on a chart, if we are above the plan curve you can see quite clearly too much scope is being added to the project. Conversely, if we are below the curve, not as much scope is being added and management becomes more confident that the scope will be delivered for the appropriate dollars.
  • 6. Copyright CMS Inc. 2009 Contingency - "Uses and Misuses" 6 Only allowing the current budget to change with an approved scope change will keep the playing field fair for the contractor and the owner. The contractor will be held accountable to a true budget, based on their estimate of the cost plus the additional costs for scope that has been added and approved by the owner during the execution of the project. By not allowing contingency to be used for performance issues, we can quickly identify a variance between the forecast and the current control budget. These variances will indicate areas of either poor performance or estimating problems. The other advantage, apart from identifying a problem early and taking actions to mitigate it, is that at the end of project we can quickly reconcile the final costs back to the ‘class two’ or ‘final’ estimate. This provides a two-fold advantage in that it also aids the estimating agency in compiling data in order to close the loop on their estimating factors. If they find that they are consistently high in one area, they have sufficient evidence to change their estimating unit. Equally, if they are low in an area they have the opportunity to change it at the same time. The basis of this also helps to modify a standard estimating database for different locations and work conditions. Then a company could estimate a job the same way for any location and then apply a series of factors based on the historical data that allows them to bring that estimate into a more probable number. A more accurate estimate would make for a more effective use of funds. After all, there is no sense in returning 20% of the appropriated funds, and there is no value to an organization in trying to do a $200 million project for $150 million. So the accuracy of the estimate is a key factor and an important benefit of not using contingency as a buffer to the forecast. A secondary note on the use of contingency; changes to fabricated items during the course of completing engineering would not be considered added scope. Budgets for equipment and materials should also include allowances for changes made during fabrication, and growth in material quantity. This would be added to what was committed and the growth allowance again would be managed, but the commitment plus the growth allowance would end up being your forecast. This applies in the field also. Its never been known for a construction contractor to come on to a project and execute the scope exactly, as per the drawings, with everything fitting perfectly. There is always some level of change but this amount is dependant upon on the quality of the package put together or the quality of the engineering and the quality of the drawings. Field changes must also be allowed for in the forecast. They need to be segregated into
  • 7. Copyright CMS Inc. 2009 Contingency - "Uses and Misuses" 7 scope changes, errors or rework. True scope changes would result in a change in budget. The error and rework would become a measure of performance. As we will address in our paper on Change Management, you must really consider that there are three types of changes to a project. First, the big “S” scope change is a change in the project basis, i.e. a change in the original definition of the project. Second, is the small “s” scope change, which are the ones that are required to make the project safe and operable. Thirdly, are deviations that really reflect project performance such as over-runs in engineering, or the fact that a piece of equipment cost more than what was originally estimated. These are trend changes or estimating errors, but not additional scope. For example, if you are purchasing a 90,000-barrel tank and the estimate was a million dollars for the tank. When it was actually tendered and awarded, the best bid was $1.2 million. This would give you a trend for $200,000. To cover this trend off with contingency is not an acceptable way to use it since this is the same tank as described in the basis nothing has changed, we just got the cost wrong. In the next section, we will discuss how we see the misuse of contingency and explain why we feel that there is an appropriate way to use contingency.
  • 8. Copyright CMS Inc. 2009 Contingency - "Uses and Misuses" 8 The Misuses Contingency is used improperly in many ways. For one, it is not there to cover additional scope due to a change in basis. For example, if the project is to deliver a plant capable of producing 20,000 bpd and the Owner changes it to 22,000 bpd then the costs associated with the increase in capacity should be funded separately, including its own contingency. If during the course of design you needed to put in two additional heat exchangers, then this would be what we term as a small “s” scope change. This is an addition to the scope as defined by the design specification, but not a scope change as defined by the basis. This means we are still building a 20,000 bpd unit, however we need additional heat exchangers to make the process work. The budget for those heat exchangers, engineering associated with them, and all other associated costs would be increased to make it fair to the contractor. So the sum total of all of those small 's' scope changes should be equal to the contingency that was allotted to the project. However, we do not actually make a budgetary transfer. Considering contingency to be an actual pocket of money is also a mistake. Contingency should always be considered to be an allowance for the amount of risk that is left in the project. So early on in the project, we have done little, therefore we carry the full contingency. Conversely, at the end of the project, the risk is minimal so we should carry a minimal contingency to the project forecast. A major concern with contingency is its use as a “slush” fund. We would normally find that this starts during design engineering, and the overruns in engineering get covered by that “slush” fund. The reason being is that is a natural tendency to believe our own organizations operate effectively. Therefore any cost overrun must have come from the changes introduced by the owner and not from inefficiencies within ourselves. Changes are inevitable, especially early in the design stage. The initial design is really only a preliminary one, although with the use of front end loading and allowing engineering to progress before the project is appropriated, project definition is becoming clearer and the overall overruns to the project can be reduced. As a side note, this will probably lead to a reduction in the amount of contingency to future projects. Since the risk to scope is becoming less, then the need for that amount of contingency is also being reduced. Again, contingency is dependent on the risk that is left to the scope, in the project, when appropriated. With projects, there are always going to be changes so it is unrealistic for an engineering contractor to believe that they can do a job without any changes. Many of the changes are generated during owner
  • 9. Copyright CMS Inc. 2009 Contingency - "Uses and Misuses" 9 reviews. These changes should be expected and should be allowed for in the contractor’s original budget. If the contractor has set aggressive targets in order to win the contract, then that is their business decision, and they should be accountable for it and not expect the owner to bury their poor performance with contingency. Engineering is not an exact science; it develops as the project progresses. However, when using contingency to continually ‘fill the pot’ we easily lose sight of engineering overruns. You will also lose sight of how much real scope has been added into the job. The contractor has very little control over new scope brought into the project. Historically, the owner, as a desire for something better, adds most of the new scope. Reviews or new process design parameters may cause equipment to be sized or located a little differently. Performance is totally a contractor issue. The contractors are responsible for their own efficiencies and for managing its personnel. The owner needs to know the difference. The other danger of using contingency to fill the pot is that no one is accountable for the budget. Every time someone says, “we had to change this”, or “it took us a little longer to do that than we had in the estimate”, or “this was not quite right so we had to rework this issue”, the budget is continually moved. It is difficult to track a moving target, forecast where it is going, and hard to hold those who have control of the budget accountable for the budget. If no one is accountable then it makes it difficult to manage the project effectively. A greater danger of using contingency as a “slush” fund is that the issues causing project overruns become hidden, and therefore cannot be readily dealt with. The filling of the pot technique allows the contractor to continue working without the owner recognizing that there is a problem. This removes the ability to see the problems and we lose the ability to see the opportunities. Since engineering and procurement budgets are the first to be used, they would also be the first to be topped up with the “slush” fund. By the time we go into the field to construct the project, there is insufficient contingency left to manage the risk through the execution stage of the project. Once the project reaches the execution phase, you have reached the point of no return. Changes in the way the job is to be executed are legitimate applications of contingencies. There is always an inherit risk in construction. There is a risk to the availability of manpower, or having to do things in a different sequence, so
  • 10. Copyright CMS Inc. 2009 Contingency - "Uses and Misuses" 10 contingency is there for the owner to cover the risk and to take advantage of opportunities that may arise. Consequently, if there were one overwhelming misuse in applying contingency, it would have to be its use as a “slush” fund. Conclusion We will summarize CMS Inc.'s position on the use of contingency as follows: • Contingency is an allowance for unknown scope • It must have a rundown plan, developed early in the project • CMS Inc.'s preference is to run it down linearly over time, holding 10% back for completion / startup activities • Contingency is not a slush fund to be used to top up poorly performing areas