SlideShare a Scribd company logo
1 of 43
LA 445                Research Project
Intersection Design




By Muhammad Ali BaghchehSarai 0558588
fall-winter 2009-2010
Intersections

 More complicated area for
  drivers
 Main function is to provide
  for change of direction
 Source of congestion in
  urban areas
 Concern for safety (fender
  benders in urban, fatals in
  rural)
Intersection Terminology
Types of Intersections

 Grade separated with ramps (freeway interchange)
 Grade separated without ramps (over or underpass with no access)
 At-grade
   Conventional
   Roundabouts
   New concepts (e.g., “continuous flow”)
Intersection Types
Design Objectives

 “To reduce the severity of potential conflicts between motor
  vehicles, pedestrians, and facilities while facilitating the
  convenience, ease, and comfort of people traversing the
  intersection.” AASHTO
 Provide ease/control of access consistent with the function of
  intersecting roadways
Operational Requirements

 Provide adequate sight distance – for approach and
  departure maneuvers
 Minimize turning and through conflicts
 Provide natural paths for permitted movements
 Avoid geometry (sharp curves/steep grades) that
  complicates the driving task and adversely impacts
  acceleration or deceleration
Intersection Sight Distance – ISD

 Allow drivers to have an unobstructed view of intersection
 Definition: Required ISD is the length of cross road that must
  be visible such that the driver of a turning/crossing vehicle can
  decide to and complete the maneuver without conflict with
  vehicles approaching the intersection on the cross road.
Adequate ISD

 Sight Triangle – area free of obstructions necessary to complete
  maneuver and avoid collision – needed for approach and departure
  (from stop sign for example)
 Allows driver to anticipate and avoid collisions
 Allows drivers of stopped vehicles enough view of the intersection to
  decide when to enter
Sight Triangle

 Area free of obstructions necessary to complete maneuver
  and avoid collision – needed for approach and departure
  (from stop sign for example)
 Consider horizontal as well as vertical, object below driver eye
  height may not be an obstruction
 AASHTO assumes 3.5’ above roadway
Sight Triangle
Sight Distance Obstruction




                             Hidden Vehicle
ISD Cases

No control: vehicles adjust speed
Stop control: where traffic on minor roadway must stop prior to
 entering major roadway
Yield control: vehicles on minor roadway must yield to major
 roadway traffic
Signal control: where vehicles on all approaches are required to stop
 by either a stop sign or traffic signal
All way stop
Stopped major roadway left-turn vehicles – must yield to oncoming
 traffic
Case A– No Control

 Minimum sight triangle sides = distance traveled in 3 seconds (design
  or actual?) = 2 seconds for P/R and 1 second to actuate brake/accel.
 Assumes vehicles slow ~ 50% of midblock running speed (rural???)
Case A– No Control

 Prefer appropriate SSD on both approaches (minimum really)
 Provided on lightly traveled roadways
 Provide control if sight triangle not available
 Assumes vehicle on the left yields to vehicle on the right if they arrive at
  same time
Tables


                     Can use
                     table or
                     graph



  Modify for grade
A little lower than Green Book Values
using similar triangles, …




can set critical speed to
  available stopping distance,
Example



                   Large
                   Tree                            25 mph
                                     72’



                              47’




          50 mph


                    Is sufficient stopping sight
                    distance provided?
Example



                   Large                            25 mph
                   Tree
                                     b = 72’
                                               db


                           a = 47’




          50 mph           da
Example




          da = 220 feet
Example



                       Large                            25 mph
                       Tree
                                         b = 72’
                                                   db


                               a = 47’




              50 mph           da


    da = 220 feet

    db = 47’ (220’) = 69.9’
         220’ – 72’
Example




          db = 69.9 feet
          corresponds to 15
          mph
Example



                      Large                            25 mph
                      Tree
                                        b = 72’
                                                  db


                              a = 47’




             50 mph           da


    25 mph > 15 mph, stopping sight
      distance is not sufficient for 25
      mph
Case B – Stop Control

• Three Sub Cases – Maneuvers

Turn left on to major roadway (clear traffic left, enter traffic right)
Turn right on to major roadway (enter traffic from left)
Crossing (clear traffic left/right)
Case B – Stop Control


 Need ISD for departure and completion even if vehicle comes into view

  at point of departure = 1.47 Vmajor * tg where gap time, tg=7.5-11.5s;

 add more time for grade or multilane;

 decrease by 1s. for right turns
Tables




         Left
         turn
Table
Case C - Yield Control

 Minor Roadway Yields – must be able to see left/right – adjust
  speed – possibly stop
 Sight distance exceeds that of stop control
 Similar to no-control
Case C - Yield Control

 Must use minimum stopping sight distances for da and db
 SSD calculation should include effect of grade
 Required distance = P/R + stopping distances
Case C - Yield Control

 Typically Known – a, b
 Typically Assume Va or Vb
 Similar triangles can be used to calculate safe approach speeds
  (given one approach speed) or allowable a and b.
 da/db = (da – b)/a
 db = (da *a)/ (da – b)
Yield Control

 Case C 1: Crossing maneuver from minor road
 Assumes minor road vehicles that do not stop decelerate to 60% of
  minor road speed
 Vehicle should be able to:
   Travel from decision point to intersection decelerating to 60% of design speed
   Cross and clear the intersection at the same (i.e., 60%) speed
Table




           tg




        Figure on page
        671, AASHTO
        “Green Book”
        2001
Table
Table
Table
Also …



 Case C2: Left and Right turns at yield control
 Case D: Signal control
 Case E: All way stop
 Case F: Left turn from major
 tg=5.5-7.5s + multilane adjustment
 Effect of Skew
Sighting Rod and
Target Rod
(AASHTO)

 For vertical sight distance
  with vertical curves
 Sighting rod- 3.5 feet tall
 Target rod- 4.25 feet tall
  (Top portion and bottom 2              Sighting
  feet are painted orange)      Target       Rod
                                Rod




                                                    38
Measuring at an Uncontrolled Intersection




                                              X



                                                         Assistant




                                                  Obstruction

                        Y                ne
                                       Li
                                         t
                                      gh
                                   Si




                 Decision
                            Observer
                  Point
Assistant

Movement of Assistant




          Observer
Measuring at a Stop-controlled Intersection
Assistant with Target Rod (4.25 ft)



Observer with Sighting Rod (3.5 ft)




                                      42
Comic

More Related Content

What's hot

What's hot (20)

Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional Elements
 
GEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAYGEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAY
 
Highway planning and alignment
Highway planning and alignmentHighway planning and alignment
Highway planning and alignment
 
Vertical Alignment
Vertical Alignment Vertical Alignment
Vertical Alignment
 
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGTRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
 
Pdce
PdcePdce
Pdce
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Road geometrics
Road geometricsRoad geometrics
Road geometrics
 
Sight distance
Sight distanceSight distance
Sight distance
 
Typical road structure cross section details
Typical road structure cross section detailsTypical road structure cross section details
Typical road structure cross section details
 
Wind Rose.pdf
Wind Rose.pdfWind Rose.pdf
Wind Rose.pdf
 
Geometrical design of highways
Geometrical design of highwaysGeometrical design of highways
Geometrical design of highways
 
materials of sewer
materials of sewermaterials of sewer
materials of sewer
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiway
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
Design traffic For Highways
Design traffic For HighwaysDesign traffic For Highways
Design traffic For Highways
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Recycling of the pavements
Recycling of the pavementsRecycling of the pavements
Recycling of the pavements
 

Recently uploaded

Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Nitya salvi
 
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
ZurliaSoop
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
yhavx
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
instagramfab782445
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
Isadora Agency
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
eeanqy
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
nirzagarg
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
saipriyacoool
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
awasv46j
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
wpkuukw
 

Recently uploaded (20)

Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptx
 
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best ServiceIndependent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
 

Road intersections For LA students

  • 1. LA 445 Research Project Intersection Design By Muhammad Ali BaghchehSarai 0558588 fall-winter 2009-2010
  • 2. Intersections  More complicated area for drivers  Main function is to provide for change of direction  Source of congestion in urban areas  Concern for safety (fender benders in urban, fatals in rural)
  • 4. Types of Intersections  Grade separated with ramps (freeway interchange)  Grade separated without ramps (over or underpass with no access)  At-grade  Conventional  Roundabouts  New concepts (e.g., “continuous flow”)
  • 6. Design Objectives  “To reduce the severity of potential conflicts between motor vehicles, pedestrians, and facilities while facilitating the convenience, ease, and comfort of people traversing the intersection.” AASHTO  Provide ease/control of access consistent with the function of intersecting roadways
  • 7. Operational Requirements  Provide adequate sight distance – for approach and departure maneuvers  Minimize turning and through conflicts  Provide natural paths for permitted movements  Avoid geometry (sharp curves/steep grades) that complicates the driving task and adversely impacts acceleration or deceleration
  • 8. Intersection Sight Distance – ISD  Allow drivers to have an unobstructed view of intersection  Definition: Required ISD is the length of cross road that must be visible such that the driver of a turning/crossing vehicle can decide to and complete the maneuver without conflict with vehicles approaching the intersection on the cross road.
  • 9. Adequate ISD  Sight Triangle – area free of obstructions necessary to complete maneuver and avoid collision – needed for approach and departure (from stop sign for example)  Allows driver to anticipate and avoid collisions  Allows drivers of stopped vehicles enough view of the intersection to decide when to enter
  • 10. Sight Triangle  Area free of obstructions necessary to complete maneuver and avoid collision – needed for approach and departure (from stop sign for example)  Consider horizontal as well as vertical, object below driver eye height may not be an obstruction  AASHTO assumes 3.5’ above roadway
  • 12. Sight Distance Obstruction Hidden Vehicle
  • 13. ISD Cases No control: vehicles adjust speed Stop control: where traffic on minor roadway must stop prior to entering major roadway Yield control: vehicles on minor roadway must yield to major roadway traffic Signal control: where vehicles on all approaches are required to stop by either a stop sign or traffic signal All way stop Stopped major roadway left-turn vehicles – must yield to oncoming traffic
  • 14. Case A– No Control  Minimum sight triangle sides = distance traveled in 3 seconds (design or actual?) = 2 seconds for P/R and 1 second to actuate brake/accel.  Assumes vehicles slow ~ 50% of midblock running speed (rural???)
  • 15. Case A– No Control  Prefer appropriate SSD on both approaches (minimum really)  Provided on lightly traveled roadways  Provide control if sight triangle not available  Assumes vehicle on the left yields to vehicle on the right if they arrive at same time
  • 16. Tables Can use table or graph Modify for grade
  • 17. A little lower than Green Book Values
  • 18. using similar triangles, … can set critical speed to available stopping distance,
  • 19. Example Large Tree 25 mph 72’ 47’ 50 mph Is sufficient stopping sight distance provided?
  • 20. Example Large 25 mph Tree b = 72’ db a = 47’ 50 mph da
  • 21. Example da = 220 feet
  • 22. Example Large 25 mph Tree b = 72’ db a = 47’ 50 mph da da = 220 feet db = 47’ (220’) = 69.9’ 220’ – 72’
  • 23. Example db = 69.9 feet corresponds to 15 mph
  • 24. Example Large 25 mph Tree b = 72’ db a = 47’ 50 mph da 25 mph > 15 mph, stopping sight distance is not sufficient for 25 mph
  • 25. Case B – Stop Control • Three Sub Cases – Maneuvers Turn left on to major roadway (clear traffic left, enter traffic right) Turn right on to major roadway (enter traffic from left) Crossing (clear traffic left/right)
  • 26. Case B – Stop Control  Need ISD for departure and completion even if vehicle comes into view at point of departure = 1.47 Vmajor * tg where gap time, tg=7.5-11.5s;  add more time for grade or multilane;  decrease by 1s. for right turns
  • 27. Tables Left turn
  • 28. Table
  • 29. Case C - Yield Control  Minor Roadway Yields – must be able to see left/right – adjust speed – possibly stop  Sight distance exceeds that of stop control  Similar to no-control
  • 30. Case C - Yield Control  Must use minimum stopping sight distances for da and db  SSD calculation should include effect of grade  Required distance = P/R + stopping distances
  • 31. Case C - Yield Control  Typically Known – a, b  Typically Assume Va or Vb  Similar triangles can be used to calculate safe approach speeds (given one approach speed) or allowable a and b.  da/db = (da – b)/a  db = (da *a)/ (da – b)
  • 32. Yield Control  Case C 1: Crossing maneuver from minor road  Assumes minor road vehicles that do not stop decelerate to 60% of minor road speed  Vehicle should be able to:  Travel from decision point to intersection decelerating to 60% of design speed  Cross and clear the intersection at the same (i.e., 60%) speed
  • 33. Table tg Figure on page 671, AASHTO “Green Book” 2001
  • 34. Table
  • 35. Table
  • 36. Table
  • 37. Also …  Case C2: Left and Right turns at yield control  Case D: Signal control  Case E: All way stop  Case F: Left turn from major  tg=5.5-7.5s + multilane adjustment  Effect of Skew
  • 38. Sighting Rod and Target Rod (AASHTO)  For vertical sight distance with vertical curves  Sighting rod- 3.5 feet tall  Target rod- 4.25 feet tall (Top portion and bottom 2 Sighting feet are painted orange) Target Rod Rod 38
  • 39. Measuring at an Uncontrolled Intersection X Assistant Obstruction Y ne Li t gh Si Decision Observer Point
  • 41. Measuring at a Stop-controlled Intersection
  • 42. Assistant with Target Rod (4.25 ft) Observer with Sighting Rod (3.5 ft) 42
  • 43. Comic