PROJECT AREAS            Phase 1                            Phase 2                              Phases 3


Town School for Boys                                                           Key Areas/ Improvements
FACT SHEET
                                                                                                         Strengthen columns & 
December 2011                                                                  Seismic & Safety          foundations, replace glazing at 
                                                                                                                                            Includes foundation work 
                                                                                                                                            at west stair
                                                                                                                                            at west stair
                                                                                                         courtyard
                                                                                                         Flattened slab & openings to 
                                                                               Theater                   Cafeteria for more flexible 
 PROJECT AREAS         Existing      Phase 1           Phases 2 & 3                                      programming

                                                                                                         Barrier removal for 
                                                                               Cafeteria
Area Totals                                                                                              accessibility & new flooring

                                                                                                         Renovate 2nd Floor east wing 
                                                                                                                                            Complete STEM Center 
                                                                                                                                                p
Site Area              35,113 sqft   No change         No Change
                                                                               STEM                      to collaborative center for 
                                                                                                              ll b               f
                                                                                                                                            with 2nd Lab
                                                                                                         Science, Math & Technology
                                                                                                         Renovate 3rd Floor for 
Building Area: Gross   54,540 sqft   54,540 sqft       72,600 sqft             Art                       combined Lower & Upper 
                                                                                                         School Art classroom

                                                                                                         Co‐locate Upper School classes 
Building Area: Net     48,500 sqft   48,900 sqft       69,200 sqft             Upper School
                                                                                                         & lockers in East Wing
Building Area:
       g
                                                                                                                                            Renovate 2nd floor west wing 
Useable teaching       31,300 sqft   28,900 sqft       45,300 sqft             Lower School
areas                                                                                                                                       for 3rd & 4th grade classrooms

                                                                                                                                            Shell construction for 8,000         Buildout of gym & stage 
Proposed Expansion                                                             Multipurpose Gym / 
                                                                                                                                            sqft flexible gym/assembly           finishes including seating for 
                                                                               Theater
                                                                                                                                            room                                 450.

Building Area: Gross   --            0 sqft            17,200 sqft                                                                                                               2nd Floor Music & Drama 
                                                                               Music & Drama
                                                                                                                                                                                 classrooms above the stage
                                                       20,300 ft (includes
                                                       20 300 sqft (i l d
Building Area: Net     --            0 sqft                                                                                                 New P.E. Studio, renovated 
                                                       Roof Learning Lab)      Existing Gym support
                                                                                                                                            Locker Room & P.E. Office.
Building Area:
                                                       11,700 sqft (includes
Useable Teaching       --            0 sqft                                                                                                 New double‐height Project 
Areas
                                                       Roof Learning Lab)      Classrooms
                                                                                                                                            Room & Roof Learning Lab.

                                                                                                                                            Double‐height Project Room, 
Proposed Improved
                                                                               Meeting Rooms                                                renovated Faculty Lounge & 
                                                                                                                                            3rd Floor Meeting Room.
                                                                                                                                                            g
Building Area: Gross                 17,400 sqft       17,400 sqft                                       Create collaborative               Expand STEM team room, 
                                                                               Teacher Teaming &         STEM, Humanities &                 create Reading/ English team 
                                                                               Support Areas             Language  teacher team             room & 3rd floor staff support 
Building Area: Net     --            14,200 sqft       15,100 sqft
                                                                                                         rooms                              space

Building Area:                                                                                                                              Centrally locate 2‐floor Literary 
Useable teaching       --            12,500 sqft       4,400 sqft                                                                           Arts Center with stacks, flex 
                                                                               Literary Arts
areas                                                                                                                                       teaching spaces & Literary 
                                                                                                                                            team room.
                                                                                                                                            team room
Schedule
                                                                               Educational support                                          Co‐locate Reading/ English 
                                                                                                         Option to co‐locate 3 
                                                                               (Reading, Learning                                           Team Room with Librarians & 
                                                                                                         Reading Rooms
Project Schedules                    6/2012 – 8/2012   6/2013 – 8/2014         resources, etc)                                              Learning Services.
                                                                                                                                            Sprinkler system throughout, 
                                                                                                         Sprinklers at Existing 
                                                                                                                                            Upgrade heating system 
                                                                               Other                     Theater, Upgrade heating 
                                                                                                                                            throughout. Stair, Elevator & 
                                                                                                         system
                                                                                                                                            Restrooms renovations

More Related Content

More from MKThink Strategy

1400617 Experience Design Meeting 2
1400617 Experience Design Meeting 21400617 Experience Design Meeting 2
1400617 Experience Design Meeting 2MKThink Strategy
 
UC Hastings 200 Programming and Planning Update
UC Hastings 200 Programming and Planning UpdateUC Hastings 200 Programming and Planning Update
UC Hastings 200 Programming and Planning UpdateMKThink Strategy
 
140603 GGU Experience Design Kick-Off
140603 GGU Experience Design Kick-Off140603 GGU Experience Design Kick-Off
140603 GGU Experience Design Kick-OffMKThink Strategy
 
Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)MKThink Strategy
 
Phase 7D Meeting 2 (4/22/14)
Phase 7D Meeting 2 (4/22/14)Phase 7D Meeting 2 (4/22/14)
Phase 7D Meeting 2 (4/22/14)MKThink Strategy
 
Conceptual Organizational Model Presentation - 140407
Conceptual Organizational Model Presentation - 140407Conceptual Organizational Model Presentation - 140407
Conceptual Organizational Model Presentation - 140407MKThink Strategy
 
140328_UCH_200 P and P_COM
140328_UCH_200 P and P_COM140328_UCH_200 P and P_COM
140328_UCH_200 P and P_COMMKThink Strategy
 
140113 UC Hastings 200 McAllister Re-Programming Kick Off
140113 UC Hastings 200 McAllister Re-Programming Kick Off140113 UC Hastings 200 McAllister Re-Programming Kick Off
140113 UC Hastings 200 McAllister Re-Programming Kick OffMKThink Strategy
 
131002 woodside priory programming v1
131002 woodside priory programming v1131002 woodside priory programming v1
131002 woodside priory programming v1MKThink Strategy
 
131002 woodside priory programming fall 2015 spring 2016
131002 woodside priory programming fall 2015   spring 2016131002 woodside priory programming fall 2015   spring 2016
131002 woodside priory programming fall 2015 spring 2016MKThink Strategy
 
131002 woodside priory programming current spring 2015
131002 woodside priory programming current   spring 2015131002 woodside priory programming current   spring 2015
131002 woodside priory programming current spring 2015MKThink Strategy
 
131002 woodside priory programming fall 2016
131002 woodside priory programming fall 2016131002 woodside priory programming fall 2016
131002 woodside priory programming fall 2016MKThink Strategy
 
Classroom redesign master_130311
Classroom redesign master_130311Classroom redesign master_130311
Classroom redesign master_130311MKThink Strategy
 
Classroom redesign master_130225
Classroom redesign master_130225Classroom redesign master_130225
Classroom redesign master_130225MKThink Strategy
 

More from MKThink Strategy (20)

140709 july 9th meeting
140709 july 9th meeting140709 july 9th meeting
140709 july 9th meeting
 
1400617 Experience Design Meeting 2
1400617 Experience Design Meeting 21400617 Experience Design Meeting 2
1400617 Experience Design Meeting 2
 
UC Hastings 200 Programming and Planning Update
UC Hastings 200 Programming and Planning UpdateUC Hastings 200 Programming and Planning Update
UC Hastings 200 Programming and Planning Update
 
140603 GGU Experience Design Kick-Off
140603 GGU Experience Design Kick-Off140603 GGU Experience Design Kick-Off
140603 GGU Experience Design Kick-Off
 
140506 meeting4
140506 meeting4140506 meeting4
140506 meeting4
 
140429 meeting3
140429 meeting3140429 meeting3
140429 meeting3
 
Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)
 
Phase 7D Meeting 2 (4/22/14)
Phase 7D Meeting 2 (4/22/14)Phase 7D Meeting 2 (4/22/14)
Phase 7D Meeting 2 (4/22/14)
 
140425 COM Presentation
140425 COM Presentation140425 COM Presentation
140425 COM Presentation
 
Conceptual Organizational Model Presentation - 140407
Conceptual Organizational Model Presentation - 140407Conceptual Organizational Model Presentation - 140407
Conceptual Organizational Model Presentation - 140407
 
140328_UCH_200 P and P_COM
140328_UCH_200 P and P_COM140328_UCH_200 P and P_COM
140328_UCH_200 P and P_COM
 
140113 UC Hastings 200 McAllister Re-Programming Kick Off
140113 UC Hastings 200 McAllister Re-Programming Kick Off140113 UC Hastings 200 McAllister Re-Programming Kick Off
140113 UC Hastings 200 McAllister Re-Programming Kick Off
 
131002 woodside priory programming v1
131002 woodside priory programming v1131002 woodside priory programming v1
131002 woodside priory programming v1
 
131002 woodside priory programming fall 2015 spring 2016
131002 woodside priory programming fall 2015   spring 2016131002 woodside priory programming fall 2015   spring 2016
131002 woodside priory programming fall 2015 spring 2016
 
131002 woodside priory programming current spring 2015
131002 woodside priory programming current   spring 2015131002 woodside priory programming current   spring 2015
131002 woodside priory programming current spring 2015
 
131002 woodside priory programming fall 2016
131002 woodside priory programming fall 2016131002 woodside priory programming fall 2016
131002 woodside priory programming fall 2016
 
Ggu lsp 130909
Ggu lsp 130909Ggu lsp 130909
Ggu lsp 130909
 
Dg (test)
Dg (test)Dg (test)
Dg (test)
 
Classroom redesign master_130311
Classroom redesign master_130311Classroom redesign master_130311
Classroom redesign master_130311
 
Classroom redesign master_130225
Classroom redesign master_130225Classroom redesign master_130225
Classroom redesign master_130225
 

Fact Sheet

  • 1. PROJECT AREAS Phase 1 Phase 2 Phases 3 Town School for Boys Key Areas/ Improvements FACT SHEET Strengthen columns &  December 2011 Seismic & Safety foundations, replace glazing at  Includes foundation work  at west stair at west stair courtyard Flattened slab & openings to  Theater Cafeteria for more flexible  PROJECT AREAS Existing Phase 1 Phases 2 & 3 programming Barrier removal for  Cafeteria Area Totals accessibility & new flooring Renovate 2nd Floor east wing  Complete STEM Center  p Site Area 35,113 sqft No change No Change STEM to collaborative center for  ll b f with 2nd Lab Science, Math & Technology Renovate 3rd Floor for  Building Area: Gross 54,540 sqft 54,540 sqft 72,600 sqft Art combined Lower & Upper  School Art classroom Co‐locate Upper School classes  Building Area: Net 48,500 sqft 48,900 sqft 69,200 sqft Upper School & lockers in East Wing Building Area: g Renovate 2nd floor west wing  Useable teaching 31,300 sqft 28,900 sqft 45,300 sqft Lower School areas for 3rd & 4th grade classrooms Shell construction for 8,000  Buildout of gym & stage  Proposed Expansion Multipurpose Gym /  sqft flexible gym/assembly  finishes including seating for  Theater room 450. Building Area: Gross -- 0 sqft 17,200 sqft 2nd Floor Music & Drama  Music & Drama classrooms above the stage 20,300 ft (includes 20 300 sqft (i l d Building Area: Net -- 0 sqft New P.E. Studio, renovated  Roof Learning Lab) Existing Gym support Locker Room & P.E. Office. Building Area: 11,700 sqft (includes Useable Teaching -- 0 sqft New double‐height Project  Areas Roof Learning Lab) Classrooms Room & Roof Learning Lab. Double‐height Project Room,  Proposed Improved Meeting Rooms renovated Faculty Lounge &  3rd Floor Meeting Room. g Building Area: Gross 17,400 sqft 17,400 sqft Create collaborative  Expand STEM team room,  Teacher Teaming &  STEM, Humanities &  create Reading/ English team  Support Areas Language  teacher team  room & 3rd floor staff support  Building Area: Net -- 14,200 sqft 15,100 sqft rooms space Building Area: Centrally locate 2‐floor Literary  Useable teaching -- 12,500 sqft 4,400 sqft Arts Center with stacks, flex  Literary Arts areas teaching spaces & Literary  team room. team room Schedule Educational support  Co‐locate Reading/ English  Option to co‐locate 3  (Reading, Learning  Team Room with Librarians &  Reading Rooms Project Schedules 6/2012 – 8/2012 6/2013 – 8/2014 resources, etc) Learning Services. Sprinkler system throughout,  Sprinklers at Existing  Upgrade heating system  Other Theater, Upgrade heating  throughout. Stair, Elevator &  system Restrooms renovations