(B.) TechnicalAnalysis Analysis of technical & engineering aspects is done continually when a project is being examined & formulated. Other types of analysis are closely intertwined with technical analysis. The broad purpose of technical analysis is.  To ensure that the project is technically feasible in the sense that all the inputs required to set up the project are available. And  To facilitate the most optimal formulation of the project in terms of technology, size, location, and so on.
ManufacturingProcess / Technology 	For manufacturing a product / service often two or more alternative technologies are available. For ex. Steel can be made either by the Bessemer process or the open hearth process. Cement can be made either by the dry process or the wet process. Soda can be made by the electrolysis method or the chemical method. Soap can be manufactured by the semi-boiled process or the fully boiled process.
ChoiceofTechnology The choice of technology is influenced by a variety of considerations: Plant Capacity Principal Inputs Investment Outlay & Production Cost Use by other units Product mix Latest Developments Ease of absorption
AppropriatenessofTechnology Appropriate technology refers to those methods of production which are suitable to local economic, social, and cultural conditions. In recent years, the debate about appropriate technology has been sparked off mainly by Schumacher & others. The advocates of appropriate technology urge that the technology should be evaluated in terms of the following questions: Whether the technology utilizes local raw materials? Whether the technology utilizes local man power? Whether the goods & services produced cater to the basic needs?   The technology protects ecological balance? Whether the technology is harmonious with social & cultural conditions?
TechnicalArrangements Satisfactory arrangements must be made to obtain the technical know-how needed for the proposed manufacturing process. When collaboration is sought, the following aspects of the agreement must be worked out in detail: The nature of support to be provided by the collaborators during the designing of the project, selection & procurement of equipment, installation & erection of the plant, operation & maintenance of the plant, & training of the project personnel. Process & performance guarantees in terms of plant capacity, product quality, & consumption of raw materials & utilities.
The price of technology in terms of one-time licensing fee & periodic royalty fee. The continuing benefit of research & development work being done by the collaborator. The period of the collaboration agreement. The assistance to be provided & the restrictions to be imposed by the collaborator with respect to exports. The level of equity participation & the manner of sharing management control, especially if the technical collaboration is backed by financial collaboration. Assignment of the agreement by either side in case of change of ownership. Termination of the agreement or other remedies when either party fails to meet its obligation.
MaterialInputs&Utilities 	Material inputs & utilities may be classified into four broad categories:   RawMaterials Raw materials may be classified into four types:  Agricultural Products, Mineral Products, Livestock & Forest Products, & Marine Products. Processed Industrial Materials & Components Auxiliary Materials & Factory Supplies Utilities

More Related Content

What's hot

Advanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentationAdvanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentationKerrie Noble
 
Egypt National Cleaner Production Centre
Egypt National Cleaner Production CentreEgypt National Cleaner Production Centre
Egypt National Cleaner Production CentreSekem Energy
 
Design of production systems and production technology
Design of production systems and production technology Design of production systems and production technology
Design of production systems and production technology Divya Paulose
 
Shorter product design
Shorter product designShorter product design
Shorter product designEWI
 
Sample sem 2 spring 2015
Sample sem 2 spring 2015Sample sem 2 spring 2015
Sample sem 2 spring 2015Tushar Ahuja
 
Lean manufacturing case study
  Lean manufacturing case study  Lean manufacturing case study
Lean manufacturing case studymallicknazrul
 
Workshop trondheim working without waste qrm
Workshop trondheim working without waste qrmWorkshop trondheim working without waste qrm
Workshop trondheim working without waste qrmVincent Wiegel
 
ManufacturingProcessEngineerResume (4.1)
ManufacturingProcessEngineerResume (4.1)ManufacturingProcessEngineerResume (4.1)
ManufacturingProcessEngineerResume (4.1)Michael Baril
 
Cover Letter Eau Claire 2014
Cover Letter Eau Claire 2014Cover Letter Eau Claire 2014
Cover Letter Eau Claire 2014Wale Adesanwo
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector CompanySubhradeep Mitra
 
Production and service operations planning
Production and service operations planningProduction and service operations planning
Production and service operations planningDivya Paulose
 
american connector company and djc
american connector company and djcamerican connector company and djc
american connector company and djcRajat Aggarwal
 
Remanufacturing lecture Bologna
Remanufacturing lecture BolognaRemanufacturing lecture Bologna
Remanufacturing lecture BolognaMarcel Bovy
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...A Makwana
 
American connector company supply chain
American connector company supply chainAmerican connector company supply chain
American connector company supply chainUdit Jain
 

What's hot (20)

Advanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentationAdvanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentation
 
Egypt National Cleaner Production Centre
Egypt National Cleaner Production CentreEgypt National Cleaner Production Centre
Egypt National Cleaner Production Centre
 
Design of production systems and production technology
Design of production systems and production technology Design of production systems and production technology
Design of production systems and production technology
 
Episode 26 : Project Management
Episode 26 : Project Management Episode 26 : Project Management
Episode 26 : Project Management
 
Shorter product design
Shorter product designShorter product design
Shorter product design
 
Sample sem 2 spring 2015
Sample sem 2 spring 2015Sample sem 2 spring 2015
Sample sem 2 spring 2015
 
Lean manufacturing case study
  Lean manufacturing case study  Lean manufacturing case study
Lean manufacturing case study
 
Workshop trondheim working without waste qrm
Workshop trondheim working without waste qrmWorkshop trondheim working without waste qrm
Workshop trondheim working without waste qrm
 
Facility layout
Facility layoutFacility layout
Facility layout
 
ManufacturingProcessEngineerResume (4.1)
ManufacturingProcessEngineerResume (4.1)ManufacturingProcessEngineerResume (4.1)
ManufacturingProcessEngineerResume (4.1)
 
Cover Letter Eau Claire 2014
Cover Letter Eau Claire 2014Cover Letter Eau Claire 2014
Cover Letter Eau Claire 2014
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector Company
 
Cleaner Technology
Cleaner TechnologyCleaner Technology
Cleaner Technology
 
Production and service operations planning
Production and service operations planningProduction and service operations planning
Production and service operations planning
 
american connector company and djc
american connector company and djcamerican connector company and djc
american connector company and djc
 
Remanufacturing lecture Bologna
Remanufacturing lecture BolognaRemanufacturing lecture Bologna
Remanufacturing lecture Bologna
 
American Connector
American ConnectorAmerican Connector
American Connector
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...
 
Acc group10
Acc group10Acc group10
Acc group10
 
American connector company supply chain
American connector company supply chainAmerican connector company supply chain
American connector company supply chain
 

Similar to Kiran presentation (e.d.ch 5th) b.m.e.f

PhD_ManagementofTechnologyinEducation.pptx
PhD_ManagementofTechnologyinEducation.pptxPhD_ManagementofTechnologyinEducation.pptx
PhD_ManagementofTechnologyinEducation.pptxPeyPolon
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304kriti201
 
Chapter5 technicalanalysis
Chapter5 technicalanalysisChapter5 technicalanalysis
Chapter5 technicalanalysisAKSHAYA0000
 
Mb0049 project management
Mb0049 project managementMb0049 project management
Mb0049 project managementDevendra Kachhi
 
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESSCHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESSAshok Kumar Suwalka
 
Est's assessment owes 14122017
Est's assessment   owes 14122017Est's assessment   owes 14122017
Est's assessment owes 14122017Steve Halls
 
Environmental Sound Technology Assessment
Environmental Sound Technology AssessmentEnvironmental Sound Technology Assessment
Environmental Sound Technology AssessmentSteve Halls
 
Preparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projectsPreparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projectsKrishna Mohan
 
Technology Transfer General Concepts. Part II
Technology Transfer General Concepts. Part IITechnology Transfer General Concepts. Part II
Technology Transfer General Concepts. Part IIyourlegalconsultants
 
Design For Manufacturing, (DFM)
Design For Manufacturing, (DFM)Design For Manufacturing, (DFM)
Design For Manufacturing, (DFM)Ali Karandish
 
How contract manufacturing is helpful for electrical products manufacturing.pdf
How contract manufacturing is helpful for electrical products manufacturing.pdfHow contract manufacturing is helpful for electrical products manufacturing.pdf
How contract manufacturing is helpful for electrical products manufacturing.pdfMr. Business Magazine
 
Manufacturing equipment new vs. remanufacturing
Manufacturing equipment  new vs. remanufacturingManufacturing equipment  new vs. remanufacturing
Manufacturing equipment new vs. remanufacturingAntonio Reis
 
Chapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptxChapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptxAlwanYusuf
 
Design,construction of Pilot plant for NCEs
Design,construction of Pilot plant for NCEsDesign,construction of Pilot plant for NCEs
Design,construction of Pilot plant for NCEsMutyala Naidu G
 

Similar to Kiran presentation (e.d.ch 5th) b.m.e.f (20)

PhD_ManagementofTechnologyinEducation.pptx
PhD_ManagementofTechnologyinEducation.pptxPhD_ManagementofTechnologyinEducation.pptx
PhD_ManagementofTechnologyinEducation.pptx
 
Mohamed Hegazy CV -
Mohamed Hegazy CV -Mohamed Hegazy CV -
Mohamed Hegazy CV -
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304
 
Chapter5 technicalanalysis
Chapter5 technicalanalysisChapter5 technicalanalysis
Chapter5 technicalanalysis
 
Mb0049 project management
Mb0049 project managementMb0049 project management
Mb0049 project management
 
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESSCHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
CHANGE ORDER MANAGEMENT TO PROJECT SUCCESS
 
Est's assessment owes 14122017
Est's assessment   owes 14122017Est's assessment   owes 14122017
Est's assessment owes 14122017
 
cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015
 
CV_Amit Ghule
CV_Amit GhuleCV_Amit Ghule
CV_Amit Ghule
 
Environmental Sound Technology Assessment
Environmental Sound Technology AssessmentEnvironmental Sound Technology Assessment
Environmental Sound Technology Assessment
 
Preparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projectsPreparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projects
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
RAOUF CURRICULUM VITAE 2016 Oil & Gas
RAOUF CURRICULUM VITAE 2016 Oil & GasRAOUF CURRICULUM VITAE 2016 Oil & Gas
RAOUF CURRICULUM VITAE 2016 Oil & Gas
 
Technology Transfer General Concepts. Part II
Technology Transfer General Concepts. Part IITechnology Transfer General Concepts. Part II
Technology Transfer General Concepts. Part II
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Design For Manufacturing, (DFM)
Design For Manufacturing, (DFM)Design For Manufacturing, (DFM)
Design For Manufacturing, (DFM)
 
How contract manufacturing is helpful for electrical products manufacturing.pdf
How contract manufacturing is helpful for electrical products manufacturing.pdfHow contract manufacturing is helpful for electrical products manufacturing.pdf
How contract manufacturing is helpful for electrical products manufacturing.pdf
 
Manufacturing equipment new vs. remanufacturing
Manufacturing equipment  new vs. remanufacturingManufacturing equipment  new vs. remanufacturing
Manufacturing equipment new vs. remanufacturing
 
Chapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptxChapter 4--Project Preparation and Feasibility Analysis.pptx
Chapter 4--Project Preparation and Feasibility Analysis.pptx
 
Design,construction of Pilot plant for NCEs
Design,construction of Pilot plant for NCEsDesign,construction of Pilot plant for NCEs
Design,construction of Pilot plant for NCEs
 

More from Kiran Shinde

Kiran diamond presentation
Kiran diamond presentationKiran diamond presentation
Kiran diamond presentationKiran Shinde
 
Mergers and acquisitions an indian perspective
Mergers and acquisitions   an indian perspectiveMergers and acquisitions   an indian perspective
Mergers and acquisitions an indian perspectiveKiran Shinde
 
Questionnaire construction
Questionnaire constructionQuestionnaire construction
Questionnaire constructionKiran Shinde
 
Market & demand analysis
Market & demand analysisMarket & demand analysis
Market & demand analysisKiran Shinde
 
Kiran presentation (e.d.ch 5th) b.m.e.f
Kiran presentation (e.d.ch 5th) b.m.e.fKiran presentation (e.d.ch 5th) b.m.e.f
Kiran presentation (e.d.ch 5th) b.m.e.fKiran Shinde
 

More from Kiran Shinde (7)

Tomato products
Tomato productsTomato products
Tomato products
 
Tomato products
Tomato productsTomato products
Tomato products
 
Kiran diamond presentation
Kiran diamond presentationKiran diamond presentation
Kiran diamond presentation
 
Mergers and acquisitions an indian perspective
Mergers and acquisitions   an indian perspectiveMergers and acquisitions   an indian perspective
Mergers and acquisitions an indian perspective
 
Questionnaire construction
Questionnaire constructionQuestionnaire construction
Questionnaire construction
 
Market & demand analysis
Market & demand analysisMarket & demand analysis
Market & demand analysis
 
Kiran presentation (e.d.ch 5th) b.m.e.f
Kiran presentation (e.d.ch 5th) b.m.e.fKiran presentation (e.d.ch 5th) b.m.e.f
Kiran presentation (e.d.ch 5th) b.m.e.f
 

Recently uploaded

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...apidays
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 

Recently uploaded (20)

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 

Kiran presentation (e.d.ch 5th) b.m.e.f

  • 1. (B.) TechnicalAnalysis Analysis of technical & engineering aspects is done continually when a project is being examined & formulated. Other types of analysis are closely intertwined with technical analysis. The broad purpose of technical analysis is. To ensure that the project is technically feasible in the sense that all the inputs required to set up the project are available. And To facilitate the most optimal formulation of the project in terms of technology, size, location, and so on.
  • 2. ManufacturingProcess / Technology For manufacturing a product / service often two or more alternative technologies are available. For ex. Steel can be made either by the Bessemer process or the open hearth process. Cement can be made either by the dry process or the wet process. Soda can be made by the electrolysis method or the chemical method. Soap can be manufactured by the semi-boiled process or the fully boiled process.
  • 3. ChoiceofTechnology The choice of technology is influenced by a variety of considerations: Plant Capacity Principal Inputs Investment Outlay & Production Cost Use by other units Product mix Latest Developments Ease of absorption
  • 4. AppropriatenessofTechnology Appropriate technology refers to those methods of production which are suitable to local economic, social, and cultural conditions. In recent years, the debate about appropriate technology has been sparked off mainly by Schumacher & others. The advocates of appropriate technology urge that the technology should be evaluated in terms of the following questions: Whether the technology utilizes local raw materials? Whether the technology utilizes local man power? Whether the goods & services produced cater to the basic needs? The technology protects ecological balance? Whether the technology is harmonious with social & cultural conditions?
  • 5. TechnicalArrangements Satisfactory arrangements must be made to obtain the technical know-how needed for the proposed manufacturing process. When collaboration is sought, the following aspects of the agreement must be worked out in detail: The nature of support to be provided by the collaborators during the designing of the project, selection & procurement of equipment, installation & erection of the plant, operation & maintenance of the plant, & training of the project personnel. Process & performance guarantees in terms of plant capacity, product quality, & consumption of raw materials & utilities.
  • 6. The price of technology in terms of one-time licensing fee & periodic royalty fee. The continuing benefit of research & development work being done by the collaborator. The period of the collaboration agreement. The assistance to be provided & the restrictions to be imposed by the collaborator with respect to exports. The level of equity participation & the manner of sharing management control, especially if the technical collaboration is backed by financial collaboration. Assignment of the agreement by either side in case of change of ownership. Termination of the agreement or other remedies when either party fails to meet its obligation.
  • 7. MaterialInputs&Utilities Material inputs & utilities may be classified into four broad categories: RawMaterials Raw materials may be classified into four types: Agricultural Products, Mineral Products, Livestock & Forest Products, & Marine Products. Processed Industrial Materials & Components Auxiliary Materials & Factory Supplies Utilities