More Related Content Similar to profile Pawan Kaushal (20) profile Pawan Kaushal1. PROFILE: PAWANKUMAR KAUSHAL
IndependentConsultantSolarProjects
DOB April 13, 1949
Education: B. Sc and B Sc in engineeringElectrical fromGNECPunjabUnversity
Communication Basedat Gurgaon, Phone 9717697099
Current Engagements
Empanelledby followingagencies
1 Electronicsskill developmentCentre (ESDC) underNSDCtrainingof trainers (TOT) forSolar
Projects
ConductedTOTprogrammesfor Pune UniversityseniorFacultymembers
ConductedTOTprogram for three batchesat National Instituteof solarenergyGurgaon
2 Aspire Disruptive Skill DevelopmentFoundation (ADS) Ahmadabad
RegularlyconductTOT conductprogramsfor Suryamitraand PMKVYtrainers,the flagshipskill
developmentprogramsof GOI. Advise ADSforestablishingskill developmentprogramsforother
tradessuch as welding,CNCmachines,splicingof Optical fibre etc.ADSiscurrentlyconductingskill
developmentprogramat eightdifferentcentresacrossstate of Gujarat.
3 AdviserArtof living (AOL) Foundationaglobal spiritual NGOfoundedbySri Sri Ravi Shankar.
Conceptualised,planned,engineered,identifiedagenciesandinstalledsolar microgrid projectsat12
no villageshavingnoaccessto gridpoweracross statesof Karnataka,Odisha,WestBengal andTamil
Nadu.Establishedasolarandelectrical trainingcentre atSri Sri Rural DevelopmentProgram(SSRDP)
Art of LivingBangalore withthe helpof Schneiderfortrainingof AOL trainers
4 Central Boardsof Irrigationand Power(CBIP)
2. For providingsolartraining toemployeesof variousagenciesasperrequirement Recentlyprovided
trainingtoseniorexecutivesof IRADA
4 Thirdparty inspectionof solarprojectsof capacitiesrangingfrom1KW to 1 MW of MNRE and SECI
GOI. Inspectedmore than175 solarprojectstill date
5 Provide designof rooftopand groundmountedsolarprojectsonrequirementbasis
Vice PresidentProjectsPremierSolar Powertech Hydrabad
March 2010 to August2014
Projectsundertaken
7x2MW ground mountedprojectsinstalledatDeogarhJharkhand
430 KWprooftopsolarprojectsat Tihar Jai New Delhi
1 MW groundmountedsolarprojectatBPCL Greater Noida
I MW YES solar projectMedakAP
5 MW solarprojectsDigwal AP
4X25 KW rooftopprojectsat Delhi hospitalsunderDSIDC
Vice PresidentBusiness DevelopmentINABENSABHARAT NewDelhi
Period:March 2010 to March 2011
Businessdevelopmentof EHV transmissionandsolarPV projects acrossIndiaandNepal
AdviserACME Tele Power Gurgaon
Period:Completesupportfordesign,engineeringprocurementandinstallationof 2.5mw
concentratedsolarproject(TowerTechnology) installedatBikanerRajasthan
POWERGRID CORPORATIONOF INDIA
Period:Nov1991 to April 2009
General Managerand Additional General Manager
In charge Operationmaintenance andconstruction activitiesof Powergrid corporationof Indiaat
regional office Jammuresponsible forall itsinstallationsinstatesof J&K,Panjab,Haryana,Himachal
PradeshandChandigarh.The networkconsistedof 14 noEHV substationsandmore than 6500
circuitkilometresof transmissionlines.Alsoresponsible forconstructionof transmission lines
locatedinsnowboundareasof J&K (Kishenpur- WagooraandSrinagar- Leh),Amritsar- Jullundur
In charge consultancyservicesforPSEB,Chandigarh(UT) anddisastermanagementforstate
transmissionutilities
3. Kol dam – Ludhiana,Parvati Amritsartransmissionlines,400 KV Amritsar,Ludhiana,Patialaand
Kaithal 400/220 Kv substations
DeputyGeneral Manager
Constructionof 2x800 KV S/C KishenpurMogatransmissionlines, firsttransmissionline laidinthe
countryat thisvoltage level
SeniorManager/Manager
Group headat Malda withworkconsistingof operationandmaintenance of Malda(WB), Farakka
(WB inNTPC substation) Dhalkola(WB) andPurnea(Bihar)substations andabout600 Km OF 220 and
400 Kvtransmissionlines
National HydroelectricPowerCorporation
PeriodFeb1983- Nov1991
In charge for constructionandoperationandmaintenance 220 KvBongaigaon(Assam)andBirpara
(WB) SubstationsandBirparaBongagaonand ChukhaBirpara (Indiaportion) transmissionlines
underChukha(Bhutan) HE transmissionsystem
Designandengineeringandfeasibilitystudiesandreportsfornew transmissionprojectsacrossthe
country
PSEB - AnandpurSahebHydroelectricProject
Period:Feb1982-Jan 1983
Lookedafterinstallationof stationservice andcontrol andrelaypanelsfor2x2x35 MW HE machines
at AnandpurSahebHydroelectricproject
Bhakra BeasManagementBoard/BeasConstructionBoard
Period:September1976-Feb1982
Construction operationandmaintenance of 400 kv,220 kv and132 kv switchyardsandinterlinking
transmissionlines associatedwith 4x165MW Dehar Powerplant inHP
PSEB
Jan 1976-Sept 1976
In charge (subdivisional officerdistribution) Civil linesPatialasubdivisionformaintenanceand
revenue collectionof electricityinstallationsformore than10000 consumers