SlideShare a Scribd company logo
1 of 3
Download to read offline
‫منظومة‬ ‫الميكانيكية‬ ‫لالعمال‬ ‫التخميني‬ ‫الكشف‬SOFTERENOR RO‫العمليات‬ ‫ماء‬
SOFTERENOR RO System Mechanical
Waterproofing
‫ت‬‫ت‬‫الوحدة‬
‫الكمية‬
‫التخمينية‬
‫السعر‬
‫بالدوالر‬
‫االمريكي‬
$
‫المبلغ‬
‫بالدوالر‬
$ ‫االمريكي‬
81
‫تجهيز‬‫بطاقة‬ ‫السوفتنر‬ ‫منظومة‬ ‫وتشغيل‬ ‫ونصب‬2‫م‬3‫نوع‬ ‫ساعة‬ /
Data Blue‫فرنسية‬ ‫شركة‬ ‫من‬BWT-permo‫من‬ ‫الكلس‬ ‫الزالة‬
‫بصورة‬ ‫التنشيط‬ ‫بعملية‬ ‫يقوم‬ ‫حيث‬ ‫مايكروبروسيسر‬ ‫بنظام‬ ‫يعمل‬ ‫الماء‬
. ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬ ‫االستهالك‬ ‫حسب‬ ‫اوتوماتيكية‬
‫عدد‬1
Supplying, installing and operating the system of 2
m3 / h type Data Blue from the French company
BWT-permo to remove lime from the water using a
microprocessor system where the activation process
automatically according to consumption and as
directed by the supervising engineer.
2
‫منظومة‬ ‫وتشغيل‬ ‫وفحص‬ ‫وتركيب‬ ‫تجهيز‬RO‫بورد‬ ‫حيث‬ ‫من‬ ‫كامل‬
‫ماء‬ ‫بتنقية‬ ‫الخاص‬ ‫والماء‬ ‫الكهرباء‬ ‫وتوصيل‬ ‫للجهاز‬ ‫وقاعدة‬ ‫التشغيل‬
( ‫نوع‬ ‫العمليات‬permo‫اوربي‬ ‫مايعادلها‬ ‫او‬ ‫النوعية‬ ‫فرنسي‬ )
‫انتاجية‬ ‫طاقة‬ ‫ذات‬ ‫النوعية‬1500‫ومضخات‬ ‫خزانات‬ ‫مع‬ ‫ساعة‬ / ‫لتر‬
( ‫ستيل‬ ‫استنلس‬ ‫معدن‬ ‫من‬STAIN STEEL‫نوع‬ )grandfose
‫العكوسات‬ ‫مثل‬ ‫الضرورية‬ ‫الملحقات‬ ‫بكافة‬ ‫ومجهز‬ ‫غربي‬ ‫منشا‬ ‫من‬
‫مع‬ ‫الالزمة‬ ‫الفالتر‬ ‫وجميع‬ ‫للضغط‬ ‫ومقايس‬ ‫فالف‬ ‫والجيك‬ ‫والسترينر‬
ultroviolate lamp‫الك‬ ‫والبوردات‬‫مغلونة‬ ‫حديدية‬ ‫وقواعد‬ ‫هربائية‬
‫مزود‬ ‫خزان‬ ‫تجهيز‬ ‫السعر‬ ‫ويشمل‬ ‫الكونكريتية‬ ‫القواعد‬ ‫مع‬ ‫لالجهزة‬
‫معدن‬ ‫من‬ ‫كلها‬ ‫كهربائي‬ ‫بهيتر‬STAINSTEEL‫جميع‬ ‫مع‬ )
‫كاملة‬ ‫وانابيب‬ ‫ومصافي‬ ‫والتوصيالت‬ ‫اقفال‬ ‫من‬ ‫اللالزمة‬ ‫الملحقات‬
‫مابين‬ ‫الماء‬ ‫حرارة‬ ‫درجة‬ ‫يصل‬ ‫بحيث‬35‫م‬--40‫توجيهات‬ ‫وحسب‬ ‫م‬
‫المه‬. ‫المشرف‬ ‫ندس‬
‫عدد‬1
Supply, installation, inspection and operation of a
complete RO system in terms of the operating board
and the base of the device and the connection of
electricity and water for the purification of process
water type (permo) French quality or equivalent
European quality production capacity of 1500 liters /
hour with tanks and pumps of stainless steel (STAIN
STEEL) type grandfose From western origin and
equipped with all necessary accessories such as
reversals, strenrer, jake valves, pressure gauges and
all necessary filters with ultroviolate lamp, electrical
boards and colored iron bases for appliances with
concrete bases. Meh locks and connections and
complete refineries and pipelines up so that the
water temperature between 35 m - 40m and as
directed by the supervising engineer.
93
‫الماء‬ ‫من‬ ‫الشوائب‬ ‫الزالة‬ ‫انج‬ ‫ا‬ ‫قياس‬ ‫فلتر‬ ‫ونصب‬ ‫تجهيز‬
. ‫النوعية‬ ‫فرنسي‬
‫عدد‬1
Preparation and installation of ANG measuring filter
to remove impurities from French water quality.
104
‫الروائح‬ ‫الزالة‬ ‫وقطني‬ ‫كاربوني‬ ‫جانبو‬ ‫فلتر‬ ‫ونصب‬ ‫تجهيز‬
. ‫الدقيقة‬ ‫والشوائب‬ ‫الماء‬ ‫من‬ ‫فيها‬ ‫مرغوب‬ ‫الفير‬
‫عدد‬2
Processing and installation of a carbon and a cotton
filter to remove desirable odors from water and fine
impurities.
115
‫فوق‬ ‫باالشعة‬ ‫تعقيم‬ ‫منظومة‬ ‫وفحص‬ ‫ونصب‬ ‫تجهيز‬
‫البنفسجية‬UV‫توجيهات‬ ‫وحسب‬ ‫المنشا‬ ‫كندي‬ ‫او‬ ‫فرنسي‬
. ‫المشرف‬ ‫المهندس‬
‫عدد‬1
Supply, installation and examination of sterilization
system UV UV French or Canadian origin as directed
by the supervising engineer.
6
‫سعة‬ ‫ستيل‬ ‫ستنل‬ ‫مضخة‬ ‫وتشغيل‬ ‫ونصب‬ ‫وفحص‬ ‫تجهيز‬2
‫م‬3‫وضغط‬ ‫/ساعة‬3‫بار‬HEAD=30 M‫اتوماتيك‬ ‫مع‬
. ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬
‫عدد‬1
Supplying, testing, erecting and operating stainless
steel pump capacity 2 m3 / h and pressure 3 bar
HEAD = 30 M with automatic and as directed by the
supervising engineer.
7
‫سعة‬ ‫ستيل‬ ‫ستنل‬ ‫خزان‬ ‫وفحص‬ ‫وتركيب‬ ‫تجهيز‬1000
‫م‬3. ‫المشرف‬ ‫المهندس‬ ‫وتوجيهات‬ ‫اختيار‬ ‫وحسب‬
‫عدد‬1
Supply, installation and inspection of stainless steel
tank capacity of 1000 m3 according to the selection
and directions of the supervising engineer.
8
‫واعمال‬ ‫الكهرباء‬ ‫وخطوط‬ ‫البالستيكية‬ ‫االنابيب‬ ‫تاسيس‬
. ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬ ‫والتركيب‬ ‫الربط‬
‫جم‬‫لة‬1
Establishing plastic pipes, power lines, connection
and installation works as directed by the supervising
engineer.
129
‫حجم‬ ‫بالستكية‬ ‫انابيب‬ ‫وفحص‬ ‫وتركيب‬ ‫تجهيز‬32‫ملم‬‫و‬25‫نوع‬ ‫ملم‬
--unplasticized polyviyl chloride ---pressure pipe
20PN -(u-PVC‫جميع‬ ‫مع‬ ‫الطبي‬ ‫لالستخدام‬ ‫مالئم‬ ‫خاص‬ ‫)نوع‬
‫والتعليق‬ ‫الحفر‬ ‫السعر‬ ‫ويشمل‬ ‫واالقفال‬ ‫والتركيب‬ ‫الربط‬ ‫ملحقات‬
. ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬ ‫والعزل‬
‫م.ط‬260
Supply, installation and inspection of plastic pipes
size 32 mm and 25 mm type --unplasticized polyviyl
chloride --- pressure pipe 20PN - (u-PVC) special
type suitable for medical use with all attachments,
installation and locks and the price includes drilling,
suspension and insulation as directed by the
supervisor engineer
1310
‫عمليات‬ ‫مغسلة‬ ‫وتشغيل‬ ‫وتركيب‬ ‫تجهيز‬STAIN LESS STEEL
‫)عمق‬50‫وارتفاع‬ ‫سم‬80‫الى‬ ‫الماء‬ ‫خروج‬ ‫فتحة‬ ‫وارتفاع‬ ‫سم‬
‫االرضية‬ ‫مستوى‬124‫المغسلة‬ ‫وطول‬ ‫سم‬120‫السعر‬ ‫ويشمل‬ ‫سم‬
‫طويل‬ ‫نوع‬ ‫اجنبي‬ ‫خالط‬ ‫وتشغيل‬ ‫وتركيب‬ ‫تجهيز‬PHOTO
CELL‫كهر‬‫عدد‬ ‫بائي‬1‫نوع‬ ‫غسيل‬ ‫مسحوق‬ ‫مع‬photo cell‫عدد‬
/1‫جهاز‬ ‫وتركيب‬ ‫تجهيز‬ ‫للسعر‬ ‫ويشمل‬ultravioulate lamp‫مع‬
‫ويشمل‬ ‫الالزمة‬ ‫الملحقات‬ ‫جميع‬ ‫ومع‬ ‫المغسلة‬ ‫داخل‬ ‫الخاصة‬ ‫الفالتر‬
‫وبارتفاع‬ ‫المغسل‬ ‫بطول‬ ‫مراة‬ ‫وتركيب‬ ‫تجهيز‬ ‫السعر‬60‫وحسب‬ ‫سم‬
. ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬
‫عدد‬3
Supply, installation and operation of the laundry
process STAIN LESS STEEL) depth of 50 cm and
high 80 cm and high water outlet to the ground level
124 cm and the length of the sink 120 cm and the
price includes the processing and installation and
operation of a foreign mixer long type PHOTO CELL
electric number 1 with washing powder type photo
cell number / 1 includes For the price processing and
installation of ultravioulate lamp with special filters
inside the sink and with all the necessary
accessories and the price includes the processing
and installation of mirror length of the laundry and a
height of 60 cm and as directed by the supervisor
engineer.
2211
‫تجهيز‬‫الماء‬ ‫من‬ ‫خزان‬ ‫عمل‬ ‫لغرض‬ ‫مواد‬1500‫كيج‬ ‫بليت‬ ‫من‬ ‫لتر‬
18‫زجاجي‬ ‫بصوف‬ ‫حراري‬ ‫معزول‬ ‫ويكون‬5‫وبليت‬ ‫بسم‬ ‫وتغلف‬ ‫سم‬
‫كيج‬ ‫مغلون‬26‫وانابيب‬ ‫واقفال‬ ‫وطوافات‬ ‫حديدية‬ ‫قاعدة‬ ‫مع‬upvc
‫منظومة‬ ‫مع‬ ‫ربطها‬ ‫لغرض‬ ‫طبية‬R.O‫رئيسي‬ ‫ماء‬ ‫تغذية‬ ‫خط‬ ‫وسحب‬
, ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬
‫عدد‬2
Supply materials for the purpose of making a tank of
water 1500 liters of Plate Cage 18 and be heat
insulated with glass wool 5 cm and encased Bsm
and pallet boiled Cage 26 with iron base and rafts
and locks and pipes upvc medical for the purpose of
linking with R.O system and withdraw the main water
supply line as directed by the supervisor engineer,

More Related Content

More from Karolina Gizela Peret, MSc in E. Eng.

Afghanistan, Arghandab Integrated Water Resources Development Project
Afghanistan, Arghandab Integrated Water Resources Development ProjectAfghanistan, Arghandab Integrated Water Resources Development Project
Afghanistan, Arghandab Integrated Water Resources Development ProjectKarolina Gizela Peret, MSc in E. Eng.
 
Vietnam Market Brief - Prosperity Fund for Flood-proofing Ho Chi Minh City, V...
Vietnam Market Brief - Prosperity Fund for Flood-proofing Ho Chi Minh City, V...Vietnam Market Brief - Prosperity Fund for Flood-proofing Ho Chi Minh City, V...
Vietnam Market Brief - Prosperity Fund for Flood-proofing Ho Chi Minh City, V...Karolina Gizela Peret, MSc in E. Eng.
 

More from Karolina Gizela Peret, MSc in E. Eng. (15)

Afghanistan, Arghandab Water Project Terms of Reference
Afghanistan, Arghandab Water Project Terms of ReferenceAfghanistan, Arghandab Water Project Terms of Reference
Afghanistan, Arghandab Water Project Terms of Reference
 
Afghanistan, Arghandab Integrated Water Resources Development Project
Afghanistan, Arghandab Integrated Water Resources Development ProjectAfghanistan, Arghandab Integrated Water Resources Development Project
Afghanistan, Arghandab Integrated Water Resources Development Project
 
Canada Infrastructure Report 2019-2020
Canada Infrastructure Report 2019-2020Canada Infrastructure Report 2019-2020
Canada Infrastructure Report 2019-2020
 
Alberta Capital Plan 2019-2023
Alberta Capital Plan 2019-2023Alberta Capital Plan 2019-2023
Alberta Capital Plan 2019-2023
 
British Columbia Capital Projects Inventory 2019-2021
British Columbia Capital Projects Inventory 2019-2021British Columbia Capital Projects Inventory 2019-2021
British Columbia Capital Projects Inventory 2019-2021
 
Brazil Water Sector Brief
Brazil Water Sector Brief Brazil Water Sector Brief
Brazil Water Sector Brief
 
Argentina Water Sector & Market Information
Argentina Water Sector & Market InformationArgentina Water Sector & Market Information
Argentina Water Sector & Market Information
 
UKIBC Doing Business in India Report 2019
UKIBC Doing Business in India Report 2019 UKIBC Doing Business in India Report 2019
UKIBC Doing Business in India Report 2019
 
Media Coverage Report UKIBC Report 2019
Media Coverage Report UKIBC Report 2019Media Coverage Report UKIBC Report 2019
Media Coverage Report UKIBC Report 2019
 
Workbook - New Deals
Workbook - New DealsWorkbook - New Deals
Workbook - New Deals
 
No Deal to New Deals - Institute of Export and International Trade
No Deal to New Deals - Institute of Export and International TradeNo Deal to New Deals - Institute of Export and International Trade
No Deal to New Deals - Institute of Export and International Trade
 
No Deal to New Deals I-Can Presentation
No Deal to New Deals I-Can PresentationNo Deal to New Deals I-Can Presentation
No Deal to New Deals I-Can Presentation
 
Brexit Questions & Answers
Brexit Questions & AnswersBrexit Questions & Answers
Brexit Questions & Answers
 
Vietnam Water Market Overview
Vietnam Water Market OverviewVietnam Water Market Overview
Vietnam Water Market Overview
 
Vietnam Market Brief - Prosperity Fund for Flood-proofing Ho Chi Minh City, V...
Vietnam Market Brief - Prosperity Fund for Flood-proofing Ho Chi Minh City, V...Vietnam Market Brief - Prosperity Fund for Flood-proofing Ho Chi Minh City, V...
Vietnam Market Brief - Prosperity Fund for Flood-proofing Ho Chi Minh City, V...
 

Iraq Softerenor RO Works Waterproofing

  • 1. ‫منظومة‬ ‫الميكانيكية‬ ‫لالعمال‬ ‫التخميني‬ ‫الكشف‬SOFTERENOR RO‫العمليات‬ ‫ماء‬ SOFTERENOR RO System Mechanical Waterproofing ‫ت‬‫ت‬‫الوحدة‬ ‫الكمية‬ ‫التخمينية‬ ‫السعر‬ ‫بالدوالر‬ ‫االمريكي‬ $ ‫المبلغ‬ ‫بالدوالر‬ $ ‫االمريكي‬ 81 ‫تجهيز‬‫بطاقة‬ ‫السوفتنر‬ ‫منظومة‬ ‫وتشغيل‬ ‫ونصب‬2‫م‬3‫نوع‬ ‫ساعة‬ / Data Blue‫فرنسية‬ ‫شركة‬ ‫من‬BWT-permo‫من‬ ‫الكلس‬ ‫الزالة‬ ‫بصورة‬ ‫التنشيط‬ ‫بعملية‬ ‫يقوم‬ ‫حيث‬ ‫مايكروبروسيسر‬ ‫بنظام‬ ‫يعمل‬ ‫الماء‬ . ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬ ‫االستهالك‬ ‫حسب‬ ‫اوتوماتيكية‬ ‫عدد‬1 Supplying, installing and operating the system of 2 m3 / h type Data Blue from the French company BWT-permo to remove lime from the water using a microprocessor system where the activation process automatically according to consumption and as directed by the supervising engineer. 2 ‫منظومة‬ ‫وتشغيل‬ ‫وفحص‬ ‫وتركيب‬ ‫تجهيز‬RO‫بورد‬ ‫حيث‬ ‫من‬ ‫كامل‬ ‫ماء‬ ‫بتنقية‬ ‫الخاص‬ ‫والماء‬ ‫الكهرباء‬ ‫وتوصيل‬ ‫للجهاز‬ ‫وقاعدة‬ ‫التشغيل‬ ( ‫نوع‬ ‫العمليات‬permo‫اوربي‬ ‫مايعادلها‬ ‫او‬ ‫النوعية‬ ‫فرنسي‬ ) ‫انتاجية‬ ‫طاقة‬ ‫ذات‬ ‫النوعية‬1500‫ومضخات‬ ‫خزانات‬ ‫مع‬ ‫ساعة‬ / ‫لتر‬ ( ‫ستيل‬ ‫استنلس‬ ‫معدن‬ ‫من‬STAIN STEEL‫نوع‬ )grandfose ‫العكوسات‬ ‫مثل‬ ‫الضرورية‬ ‫الملحقات‬ ‫بكافة‬ ‫ومجهز‬ ‫غربي‬ ‫منشا‬ ‫من‬ ‫مع‬ ‫الالزمة‬ ‫الفالتر‬ ‫وجميع‬ ‫للضغط‬ ‫ومقايس‬ ‫فالف‬ ‫والجيك‬ ‫والسترينر‬ ultroviolate lamp‫الك‬ ‫والبوردات‬‫مغلونة‬ ‫حديدية‬ ‫وقواعد‬ ‫هربائية‬ ‫مزود‬ ‫خزان‬ ‫تجهيز‬ ‫السعر‬ ‫ويشمل‬ ‫الكونكريتية‬ ‫القواعد‬ ‫مع‬ ‫لالجهزة‬ ‫معدن‬ ‫من‬ ‫كلها‬ ‫كهربائي‬ ‫بهيتر‬STAINSTEEL‫جميع‬ ‫مع‬ ) ‫كاملة‬ ‫وانابيب‬ ‫ومصافي‬ ‫والتوصيالت‬ ‫اقفال‬ ‫من‬ ‫اللالزمة‬ ‫الملحقات‬ ‫مابين‬ ‫الماء‬ ‫حرارة‬ ‫درجة‬ ‫يصل‬ ‫بحيث‬35‫م‬--40‫توجيهات‬ ‫وحسب‬ ‫م‬ ‫المه‬. ‫المشرف‬ ‫ندس‬ ‫عدد‬1 Supply, installation, inspection and operation of a complete RO system in terms of the operating board and the base of the device and the connection of electricity and water for the purification of process water type (permo) French quality or equivalent European quality production capacity of 1500 liters / hour with tanks and pumps of stainless steel (STAIN STEEL) type grandfose From western origin and equipped with all necessary accessories such as reversals, strenrer, jake valves, pressure gauges and all necessary filters with ultroviolate lamp, electrical boards and colored iron bases for appliances with concrete bases. Meh locks and connections and complete refineries and pipelines up so that the water temperature between 35 m - 40m and as directed by the supervising engineer. 93 ‫الماء‬ ‫من‬ ‫الشوائب‬ ‫الزالة‬ ‫انج‬ ‫ا‬ ‫قياس‬ ‫فلتر‬ ‫ونصب‬ ‫تجهيز‬ . ‫النوعية‬ ‫فرنسي‬ ‫عدد‬1 Preparation and installation of ANG measuring filter to remove impurities from French water quality.
  • 2. 104 ‫الروائح‬ ‫الزالة‬ ‫وقطني‬ ‫كاربوني‬ ‫جانبو‬ ‫فلتر‬ ‫ونصب‬ ‫تجهيز‬ . ‫الدقيقة‬ ‫والشوائب‬ ‫الماء‬ ‫من‬ ‫فيها‬ ‫مرغوب‬ ‫الفير‬ ‫عدد‬2 Processing and installation of a carbon and a cotton filter to remove desirable odors from water and fine impurities. 115 ‫فوق‬ ‫باالشعة‬ ‫تعقيم‬ ‫منظومة‬ ‫وفحص‬ ‫ونصب‬ ‫تجهيز‬ ‫البنفسجية‬UV‫توجيهات‬ ‫وحسب‬ ‫المنشا‬ ‫كندي‬ ‫او‬ ‫فرنسي‬ . ‫المشرف‬ ‫المهندس‬ ‫عدد‬1 Supply, installation and examination of sterilization system UV UV French or Canadian origin as directed by the supervising engineer. 6 ‫سعة‬ ‫ستيل‬ ‫ستنل‬ ‫مضخة‬ ‫وتشغيل‬ ‫ونصب‬ ‫وفحص‬ ‫تجهيز‬2 ‫م‬3‫وضغط‬ ‫/ساعة‬3‫بار‬HEAD=30 M‫اتوماتيك‬ ‫مع‬ . ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬ ‫عدد‬1 Supplying, testing, erecting and operating stainless steel pump capacity 2 m3 / h and pressure 3 bar HEAD = 30 M with automatic and as directed by the supervising engineer. 7 ‫سعة‬ ‫ستيل‬ ‫ستنل‬ ‫خزان‬ ‫وفحص‬ ‫وتركيب‬ ‫تجهيز‬1000 ‫م‬3. ‫المشرف‬ ‫المهندس‬ ‫وتوجيهات‬ ‫اختيار‬ ‫وحسب‬ ‫عدد‬1 Supply, installation and inspection of stainless steel tank capacity of 1000 m3 according to the selection and directions of the supervising engineer. 8 ‫واعمال‬ ‫الكهرباء‬ ‫وخطوط‬ ‫البالستيكية‬ ‫االنابيب‬ ‫تاسيس‬ . ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬ ‫والتركيب‬ ‫الربط‬ ‫جم‬‫لة‬1 Establishing plastic pipes, power lines, connection and installation works as directed by the supervising engineer. 129 ‫حجم‬ ‫بالستكية‬ ‫انابيب‬ ‫وفحص‬ ‫وتركيب‬ ‫تجهيز‬32‫ملم‬‫و‬25‫نوع‬ ‫ملم‬ --unplasticized polyviyl chloride ---pressure pipe 20PN -(u-PVC‫جميع‬ ‫مع‬ ‫الطبي‬ ‫لالستخدام‬ ‫مالئم‬ ‫خاص‬ ‫)نوع‬ ‫والتعليق‬ ‫الحفر‬ ‫السعر‬ ‫ويشمل‬ ‫واالقفال‬ ‫والتركيب‬ ‫الربط‬ ‫ملحقات‬ . ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬ ‫والعزل‬ ‫م.ط‬260 Supply, installation and inspection of plastic pipes size 32 mm and 25 mm type --unplasticized polyviyl chloride --- pressure pipe 20PN - (u-PVC) special type suitable for medical use with all attachments, installation and locks and the price includes drilling, suspension and insulation as directed by the supervisor engineer
  • 3. 1310 ‫عمليات‬ ‫مغسلة‬ ‫وتشغيل‬ ‫وتركيب‬ ‫تجهيز‬STAIN LESS STEEL ‫)عمق‬50‫وارتفاع‬ ‫سم‬80‫الى‬ ‫الماء‬ ‫خروج‬ ‫فتحة‬ ‫وارتفاع‬ ‫سم‬ ‫االرضية‬ ‫مستوى‬124‫المغسلة‬ ‫وطول‬ ‫سم‬120‫السعر‬ ‫ويشمل‬ ‫سم‬ ‫طويل‬ ‫نوع‬ ‫اجنبي‬ ‫خالط‬ ‫وتشغيل‬ ‫وتركيب‬ ‫تجهيز‬PHOTO CELL‫كهر‬‫عدد‬ ‫بائي‬1‫نوع‬ ‫غسيل‬ ‫مسحوق‬ ‫مع‬photo cell‫عدد‬ /1‫جهاز‬ ‫وتركيب‬ ‫تجهيز‬ ‫للسعر‬ ‫ويشمل‬ultravioulate lamp‫مع‬ ‫ويشمل‬ ‫الالزمة‬ ‫الملحقات‬ ‫جميع‬ ‫ومع‬ ‫المغسلة‬ ‫داخل‬ ‫الخاصة‬ ‫الفالتر‬ ‫وبارتفاع‬ ‫المغسل‬ ‫بطول‬ ‫مراة‬ ‫وتركيب‬ ‫تجهيز‬ ‫السعر‬60‫وحسب‬ ‫سم‬ . ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫عدد‬3 Supply, installation and operation of the laundry process STAIN LESS STEEL) depth of 50 cm and high 80 cm and high water outlet to the ground level 124 cm and the length of the sink 120 cm and the price includes the processing and installation and operation of a foreign mixer long type PHOTO CELL electric number 1 with washing powder type photo cell number / 1 includes For the price processing and installation of ultravioulate lamp with special filters inside the sink and with all the necessary accessories and the price includes the processing and installation of mirror length of the laundry and a height of 60 cm and as directed by the supervisor engineer. 2211 ‫تجهيز‬‫الماء‬ ‫من‬ ‫خزان‬ ‫عمل‬ ‫لغرض‬ ‫مواد‬1500‫كيج‬ ‫بليت‬ ‫من‬ ‫لتر‬ 18‫زجاجي‬ ‫بصوف‬ ‫حراري‬ ‫معزول‬ ‫ويكون‬5‫وبليت‬ ‫بسم‬ ‫وتغلف‬ ‫سم‬ ‫كيج‬ ‫مغلون‬26‫وانابيب‬ ‫واقفال‬ ‫وطوافات‬ ‫حديدية‬ ‫قاعدة‬ ‫مع‬upvc ‫منظومة‬ ‫مع‬ ‫ربطها‬ ‫لغرض‬ ‫طبية‬R.O‫رئيسي‬ ‫ماء‬ ‫تغذية‬ ‫خط‬ ‫وسحب‬ , ‫المشرف‬ ‫المهندس‬ ‫توجيهات‬ ‫وحسب‬ ‫عدد‬2 Supply materials for the purpose of making a tank of water 1500 liters of Plate Cage 18 and be heat insulated with glass wool 5 cm and encased Bsm and pallet boiled Cage 26 with iron base and rafts and locks and pipes upvc medical for the purpose of linking with R.O system and withdraw the main water supply line as directed by the supervisor engineer,