(Podolec)
SENECA COLLEGE
SCHOOL OF APPLIED ARTS AND TECHNOLOGY
Update of the Ashbridges Bay Wastewater
Treatment Plant To Tertiary Conditions
TECHNICAL REPORT
Julian Tersigni
ENVIRONMENTAL TECHNOLOGY
4/7/2011
Writing Advisor: Peter Rethazy Technical Advisor: Nadia Kelton
Update of the Ashbridges Bay Wastewater Treatment
Plant To Tertiary Conditions
Prepared By: Julian Tersigni
Student Number: 028 606 085
Environmental Technology: EMT
Engineering Technical Report II: ETR 592 BD
Prepared For: Nadia Kelton, April 7 2011
Peter Rethazy, April 7 2011
Acknowledgments
I would like to thank my advisor Nadia Kelton, for her time and guidance in the
completion of this report.
Abstract
Lake Ontario faces numerous water quality issues due to industries and population growth surrounding
it. Wastewater treatment facilities in the city of Toronto are currently designed to release secondarily
treated effluent into the lake. If nutrient concentrations in effluent were lowered, this could contribute
to the lakes recovery. This could be achieved by upgrading the plant to tertiary conditions with a focus
on removing specific pollutants: nitrogen, and phosphorus. Numerous technologies are available for
tertiary treatment. The denitrifying filter process best suits Ashbridges Bay as it requires a relatively
small area to function and it provides a high removal rate of nitrogen and phosphorus. Reducing
nutrient concentrations at Ashbridges Bay alone may not have a significant impact. However, if all
WWTP’s discharging into the lake implement a tertiary system, the reduction of nutrient loadings would
be significant. In order for this to proceed the Maximum Allowable Concentrations on each plant’s
Certificate of Approval would have to be lowered and each facility would need adequate surface area to
implement tertiary treatment.
Table of Contents
Acknowledgments ii
Abstract iii
List of Illustrations vi
1.0 Introduction 1
1.1 Purpose 1
1.2 Scope 1
2.0 Water Quality of Lake Ontario 2
2.1 Historical Conditions 2
2.2 Current Conditions 3
3.0 Operations at Ashbridges Bay WWTP 4
3.1 Influent Quality 4
3.2 Preliminary Treatment 5
3.3 Primary Treatment 5
3.4 Secondary Treatment 6
3.5 Final Effluent 7
4.0 Comparison of Technologies Available 7
4.1 Denitrifying Filters with Chemical Removal 8
4.2 Tertiary Clarification with Filtration 9
4.3 Membrane Filtration Technologies (Dynasand D2 Advanced Filtration System) 9
4.4 Suitable Process 10
5.0 Impact Assessment 11
5.1 Nutrient Reduction at Ashbridges Bay WWTP 11
5.2 Nutrient Reduction for all WWTP Discharging to Lake 12
5.3 Environmental Impacts 13
6.0 Feasibility 13
6.1 Lowering MAC’s 13
6.2 Design Footprint 14
7.0 Conclusion 15
Work Cited 16
Work Consulted 17
Glossary 18
List of Illustrations
Figures
Figure 1 Historical Nutrient Concentrations for Lake Ontario 2
Figure 2 Total Phosphorus Concentrations in the Great Lakes 3
Figure 3 General Processes at the Ashbridges Bay WWTP 4
Figure 4 Denitrifying Filter Process 8
Figure 5 Denitrifying Filter Makeup 9
Figure 6 Dynasand D2 Advanced Filtration System 10
Figure 7 Proposed Site Location and Footprint 14
Tables
Table 1 Influent Parameters 5
Table 2 Primary Treatment Effluent Parameters 6
Table 3 Secondary Treatment Effluent Parameters 6
Table 4 Final Effluent Parameters 7
1.0 Introduction
Wastewater treatment facilities in the city of Toronto are currently designed to release secondarily
treated effluent. Lake Ontario, the plants discharge point, has suffered greatly from effluent containing
low water quality from various sources. This report analyzes the environmental benefits of creating
tertiary treatment conditions at the plant. This topic is applicable as an update to an already existing
treatment plant. The plant is required to meet various water quality parameters under a Certificate of
Approval (C of A) provided by the province. These parameters include meeting Maximum Allowable
Concentrations (MAC) of nutrients such as nitrogen and phosphorus. The effect of lowering
concentrations of these nutrients has been analyzed.
1.1 Purpose
This report analyzes how reducing nutrient concentrations in the plant’s effluent affects Lake
Ontario’s water quality. Lake Ontario has suffered from numerous water quality issues in the
past due to industries and population growth surrounding it. 95 waste water treatment plants
(WWTPs) discharge into the lake having similar effluent water quality constraints as Ashbridges
Bay, these constraints are outlined in a Certificate of Approval issued by the province (Toronto
Water). If all WWTPs discharging into the lake reduced effluent nutrient concentrations the
reduction in loading could be significant. This report analyzes the effects derived from reducing
nutrient concentrations in effluent from Ashbridges Bay as well as surrounding WWTPs
discharging into the lake. It focuses on water quality statistics for Lake Ontario, the plant’s
current operations, tertiary technologies, environmental impacts, and feasibility. Treatment
plants must constantly undergo improvements meeting higher water quality constraints, this
ensures environmental impacts are minimized.
1.2 Scope
This report is specifically applicable at the Ashbridges Bay Waste Water Treatment Plant in the
city of Toronto. It is one of four major wastewater plants in the city. It is applicable as an update
to an already existing treatment plant. The design and methods used at the plant are similar to
wastewater facilities across Ontario, therefore data from this report can be applied to other
WWTPs in the province.
2.0 Water Quality of Lake Ontario
Lake Ontario has faced, and still faces, a variety of water quality issues derived from industrial chemicals,
agricultural fertilizers, untreated sewage and detergents (“Lake Ontario”). These issues have led to the
lakes increased eutrophication. Lake Ontario is one of five great lakes in North America with populous
cities, industries and agriculture surrounding it. These land uses have changed the lake’s water
chemistry and ecological communities into what is seen today. Effects have been seen both socially and
economically. For example, frequent beach closing due to poor water quality (specifically high bacterial
counts) has given residents a negative outlook on the lake leading to reduced recreational use.
Furthermore, as water quality degrades the costs for treating drinking water increases significantly.
2.1 Historical Conditions
During the early 70’s lax laws on industries and municipalities led to increased pollution in the
lake. Addition of substances such as nitrates and phosphates caused negative water quality
effects (eutrophication). Sources of these substances were found mainly from fertilizers or
detergents in sewage water. The result was excessive plant growth (i.e. frequent algal blooms)
Once the nutrient supply was exhausted, algal populations died on mass and the resulting decay
brought about a severe drop in dissolved oxygen, which caused fish deaths (United States E.P.A).
High concentration of nutrients through this time period is seen in Figure 1 at approximately
22.5 ug/L. Since then environmental stresses led to tighter environmental regulations and
constraints on industries and municipalities. Higher restrictions on waste water treatment plants
and de-industrialization surrounding the lake assisted in restoring water quality (“Lake
Ontario”).
Figure 1 Historical Nutrient Concentrations for Lake Ontario (“Ecological Indicators”)
2.2 Current Conditions
Although water quality has improved since previous years, eutrophication is still an issue (United
States E.P.A). Drinking water has received scrutiny over taste and odour problems and these
problems have been linked to naturally occurring chemicals such as geosmin, produced by blue-
green algae and bacteria. Drinking water treatment costs increase as more resources are
needed to purify lake water to acceptable levels. Localized beach closings surrounding the lake
have occurred due to increased levels of E. Coli, which thrive under low oxygen, eutrophic
conditions (United States E.P.A). This poses a health risk when levels exceed 100 organisms/100
ml. Aesthetic reasons such as dead fish and algae blooms have also been involved in closures.
Nitrates and phosphates are considered nutrients and do not bio-accumulate, however, at
elevated concentrations, nitrates can have toxic implications. This has resulted in reduced
fishery levels and negative effects on humans (United States E.P.A). The lake has a volume of
1638 km3
and a residence time of approximately 8 years. Figure 1 shows that TP concentrations
have levelled at 10 ug/L from previous years, this converts to 0.01 mg/L. Figure 2 spatially
illustrates total phosphorus (TP) concentrations across all of the Great Lakes. Lake Ontario and
Erie are most affected by eutrophication.
Figure 2 Total Phosphorus Concentrations in the Great Lakes (Environment Canada)
3.0 Operations at Ashbridges Bay WWTP
Wastewater plants in the city of Toronto are required to meet various water quality parameters under a
Certificate of Approval provided by the province. A revision of the maximum allowable quantities for
each parameter is done annually. In 2009, Ashbridges Bay continued to generate a high quality effluent
which met requirements of the plant’s Certificate of Approval. It provides secondary treatment for
wastewater which includes the removal of suspended solids and dissolved organics. The plant also
provides effluent disinfection and disposal of biosolids. Figure 3 illustrates major treatment processes
including screening and grit removal, primary and secondary treatment, effluent disinfection, waste
activated sludge thickening, anaerobic digestion, biosolids dewatering and biosolids management
(Toronto Water).
Figure 3 General Processes at the Ashbridges Bay WWTP (Toronto Water)
3.1 Influent Quality
Upon entering the plant, wastewater is gravity fed throughout the plants processes. Influent
received at the plant includes sludge flows coming from the Humber treatment Plant and the
North Toronto treatment Plant. Ashbridges Bay received 40.4 dry tonnes/day of liquid biosolids
and 15.0 dry tonnes/day of waste activated sludge, on average, from the Humber Treatment
Plant via the Mid-Toronto Interceptor. The North Toronto Treatment Plant transferred an
average of 4.4 dry tonnes/day of biosolids to Ashbridges Bay via the Coxwell Sanitary Trunk
Sewer. This totalled 59.8 dry tonnes/day of solids received in 2009 coming from these two
sources. Ashbridges Bay experienced an increase of 7% for influent flows from 2008 to 2009. A
summary of annual flow and influent parameter concentrations for 2008/2009 is included in
Table 1. Influent Total Phosphorus is considerably high and must be lowered to reduce
environmental impacts. If influent concentrations were not lowered Lake Ontario would suffer
from harmful effects (Toronto Water).
Table 1 Influent Parameters (Toronto Water)
3.2 Preliminary Treatment
The process starts with wastewater entering one of three Grit and Screening Buildings which
provides preliminary treatment. In total, there are six chain and bucket type grit channels, each
rated for 145,340 m3
/day. There are ten aerated grit channels (clam shell bucket type), each
rated for 313,390 m3
/day, for removing grit and inorganic material from wastewater flow. There
are 14 automatic bar screens, with bars spaced at 1.25 centimetres apart. These mechanical
screening machines remove rags and large pieces of debris from the wastewater. Grit and used
screenings are hauled to a sanitary landfill site. Grit and screenings removed by the aerated grit
channels and mechanical bar screens averaged approximately 9.67 tonnes/day in 2009, being a
12% increase from 2008 (Toronto Water). Preliminary processes significantly reduce TP by
removing sediments and debris from wastewater.
3.3 Primary Treatment
The following step in the treatment process is called Primary Settling or Sedimentation. Here,
flow enters large tanks where its velocity is reduced, this allows heavier solids in the wastewater
to settle to the bottom. Sludge collectors in the tank sweep and remove the settled sludge into
sludge hoppers located at the bottom of the tank at one end, where it is pumped to the
anaerobic digestion tanks. This process removes some phosphorus by physically removing
Parameter 2009 2008
Influent Flow (ML/day) 697.6 653.2
Total Annual Flow (ML) 254,609 239,045
Influent SS (mg/L) 255.5 274.3
Influent CBOD5 (mg/L) 121.1 101.0
Influent TP (mg/L) 6.2 6.0
settled sludge and sediments. Twelve Primary Clarifiers exist, six tanks with dimensions of 61 m
x 19.5 m X 4.5 m and rated at 142,900 m3
/day, three tanks with dimensions of 76.2 m x 32.04 m
X 4.5 m and rated at 308,400 m3
/day, and an additional three tanks with dimensions of 91.4 m x
35.05 m X 4.88 m rated at 385,500 m3
/day. This totals to an installed capacity of 2,939,100
m3
/day. Table 2 is a summary of primary treatment effluent parameter concentrations over
2008/2009 (Toronto Water).
Table 2 Primary Treatment Effluent Parameters (Toronto Water)
Parameter 2009 2008
Primary SS (mg/L) 319.1 257.7
Primary CBOD5 (mg/L) 113.5 96.9
3.4 Secondary Treatment
In the activated sludge process, effluent from the Primary Clarifiers is mixed with Return
Activated Sludge from the Final Clarifiers and aerated. This sludge is made up of naturally
occurring bacteria and other micro-organisms. The micro-organisms use oxygen and dissolved
organics in the wastewater for their metabolic functions which help purify wastewater. There
are eleven rectangular Aeration Tanks, these have dimensions of 161.5 m x 6.17 m x 4.6 m and
rated at 91,000 m3
/day. These tanks employ a step-feed aeration process with four passes per
aeration tank and are equipped with coarse air bubble diffusers. Mixed liquor from the Aeration
Tanks flows to large Final Clarifiers where Activated Sludge is allowed to settle. A controlled
amount of this sludge is returned to the Aeration Tanks to repeat the treatment process. Any
excess is removed as Waste Activated Sludge and directed to the Primary Clarifiers, or the
Flotation process for thickening, and then pumped to the Digestion Tanks. There are eleven
Final Clarifiers, each with dimensions of 124.4 m x 24 m x 5.3 m and rated for 91,000 m3
/day
(Toronto Water). A summary of key aeration parameters for the previous two years is seen in
Table 3.
Table 3 Secondary Treatment Process Parameters (Toronto Water)
Parameters 2009 2008
Aeration Loading (kg CBOD5/day) 0.65 0.53
Mixed Liquor Suspended Solids (mg/L) 2215 2014
3.5 Final Effluent
Before being discharged into Lake Ontario, chlorine is used to disinfect final effluent. The final
effluent conduit is equipped with several diffusers and extends 1000 m into the lake from the
shore. The Ashbridges Bay Treatment Plant produced a high quality effluent which met
requirements of the plant’s Certificate of Approval in 2009. This certificate outlines maximum
allowable concentrations of various water quality parameters. A summary of key final effluent
parameters for the previous two years is shown in Table 4. TP concentrations in final effluent
are recorded at 0.7 mg/L and meets allowable concentrations. That concentration limit provided
by the Certificate of Approval is based on minimizing effects on receiving waters and
ecosystems. Although the limit is sufficient for not causing major harmful effects on discharge
points, it could further be improved to almost eliminating any negative impacts caused by
excessive nutrients.
Table 4 Final Effluent Parameters (Toronto Water)
Parameter Certificate
of Approval
2009 Removal
Efficiency
2008 Removal
Efficiency
Final SS (mg/L) 25 8.7 97% 9.4 97%
Final CBOD5 (mg/L) 25 4.7 95% 3.6 96%
Final TP (mg/L) 1 0.7 89% 0.7 88%
Final E-coli (CFU/100ml) 200 1.9 - 2 -
Final SS Loading Rate
(kg/day)
20,450 6,041 - 6,128 -
Final CBOD5 Loading
Rate (kg/day)
20,450 3,239 - 2,347 -
Final TP Loading Rate
(kg/day)
818 482 - 464 -
4.0 Comparison of Technologies Available
To achieve tertiary conditions at the plant the focus is on removing specific pollutants: nitrogen, and
phosphorus. Different processes are available for the removal of these pollutants. These processes are
described and compared based on benefits/limitations and ease of application to existing conditions.
The process most suitable for the plant depends on target effluent quality and influent quality. These
processes are either an extension of usual secondary biological treatment or are physical and chemical
separation techniques (United States E.P.A.). A decision on which process would be best suited for the
plant has been made after comparison.
4.1 Denitrifying Filters with Chemical Removal
Denitrification is the process involved in converting nitrate to nitrogen gas. This process is
placed after secondary treatment. Besides providing nitrogen and phosphorus removal, it also
acts as an effluent filter. Denitrifying filters require a small area compared to other add-on
denitrification processes. Because it is carrying out denitrification, a carbon source, like
methanol, must be supplied for it to function. For the process to achieve a low concentration of
phosphorus, chemical addition such as ferric chloride (FeCl3) may be considered. Filters are used
to capture phosphorus as floc. These filters may use various materials in its design including:
sand, gravel, or anthracite. Denitrifying filters operate in an upflow mode, meaning water is sent
up through filtration materials. Through this, nitrogen gas created becomes trapped between
the grains which are then released through pumping. These types of denitrification filters have
a removal rate of 1 to 2 mg/L nitrate-nitrogen and are known to release effluent containing 0.1
to 0.3mg/L of TP (United States E.P.A.). A process flow diagram implementing the denitrifying
filter process is depicted in Figure 4. The denitrifying filter makeup is depicted in Figure 5.
Figure 4 Denitrifying Filter Process (United States E.P.A.)
Figure 5 Denitrifying Filter Makeup (“Astrasand”)
4.2 Tertiary Clarification with Filtration
This process involves the addition of a tertiary clarifier upstream of filters. This process would be
of benefit as it can achieve extremely low solids concentrations and in turn low phosphorus
levels. Different versions of tertiary clarifiers exist including solids contact clarifiers, up flow
buoyant-media clarifiers, tube clarifiers, plate clarifiers, and another set of secondary clarifiers.
Coagulants such as ferric chloride (FeCl3) or alum (KAl(SO4)2.12H2O) may be considered to
further improve the performance of the system. Secondary effluent undergoes heavy mixing in
this process with coagulants and previously settled solids creating a larger floc, thereafter
moving towards the settling zone where heavier solids move downwards and purified water
exits the unit. After this process, a filter further removes solids that pass through the clarifier.
For tertiary clarification to work, velocity through the system must be low enough to allow solids
to settle to the bottom. Case studies have shown that implementing tertiary clarification can
reduce effluent concentrations of TP to 0.05 mg/L (United States E.P.A.).
____________________________________________________
4.3 Membrane Filtration Technologies (Dynasand D2 Advanced Filtration System)
This process involves the use of a membrane filter either externally or internally. It is built into
the activated sludge process as a Membrane Bio Reactor. The system uses a suspended growth
biological reactor where effluent passes through a membrane filter. Through this process
suspended solids are effectively taken out. Micro-organisms then take up phosphates that
remain in the reactor. In most cases, this membrane is associated with the final aerobic step. A
lower level of TP concentration can then be achieved through the use of chemical precipitation
for any solids not taken up by these micro-organisms. Case studies have shown to achieve an
annual average of 0.027 mg/l of TP. Figure 6 depicts the process of the Dynasand D2 Advanced
Filtration System process being one of many membrane filtration technologies (United States
E.P.A.).
Figure 6 Dynasand D2 Advanced Filtration System (United States E.P.A.)
4.4 Suitable Process
The above descriptions assisted in the decision of implementing the denitrifying filter process at
the plant. The process takes up a relatively small area compared to other existing processes. In
addition to providing a high removal rate of nitrogen/phosphorus the system also acts as a filter
for all effluent coming out of the plant. Minimum retrofitting is needed to implement the
process in comparison to other technologies. Case studies have shown that the technology can
release effluent with low total nitrogen and TP concentrations. Although Tertiary Clarification
has a high capability of producing very low TP concentrations, it needs a large surface area to
implement. Ashbridges Bay has low space availability for further technologies and any upgrades
must have a low footprint associated with it. Various membrane filtration technologies available
may also produce low concentrations of TP, however the costs of these specialty filtration
systems do not make them feasible.
5.0 Impact Assessment
With the update of the plant to tertiary conditions, the further purified effluent is capable of impacting
water quality and aquatic life in Lake Ontario. Nitrogen and phosphorus are the main source of
eutrophication in surface waters. This eutrophication directly impacts the amount of algae blooms that
occur in a water body. Impacts of this eutrophication include low dissolved oxygen, death of fish, murky
water and the depletion of desirable flora and fauna (United States E.P.A.). The reduction of nutrient
loading has been examined for Ashbridges Bay with the addition of tertiary treatment. The magnitude of
impact the addition has had is based on the reduction of phosphorus, as TP is limiting in freshwater
(“Lake Ontario”). This impact is based on target TP effluent concentrations.
5.1 Nutrient Reduction at Ashbridges Bay WWTP
To examine impact, it is assumed that the system is capable of producing a final TP
concentration of 0.2 mg/l. This is based on removal rates from the denitrifying filter process.
Currently, final TP concentrations at the plant equals 0.7 mg/L, using effluent flow rate of 689
ML/day this gives a final TP loading rate of 483 kg/day (Toronto Water). Final nitrogen
concentrations are not of concern as it does not affect lake quality unless TP is in excess. The
filtration process in place removes nitrogen by converting it to a gas which is then released into
the atmosphere.
Current TP loading Over 1 Year: 0.7 mg/L X 689 ML/Day = 482 kg/day
482 Kg/day X 365 Days = 175,930 kg/year
Lake Volume: 1638 km3
X (1 X 10^12
L) = 1.638 X 10^15
L
Current TP In Lake: 0.01 mg/L X (1.638 X 10^15
L) = 1.638 X 10^13
mg/L
= 1.638 X 10^7
kg/L
Proportion of TP from
Ashbridges Bay: 175,930 kg / 1.638 X 10^7
kg/L = 0.01
= 1%
Reduced Effluent
Concentrations to 0.2 mg/L: 0.2 mg/L X 690 ML/Day = 138 kg/day
138 kg/day X 365 days = 50,370 kg/year
50,370 kg / 1.638 X 10^7
kg/L = 0.003
= 0.3 %
5.2 Nutrient Reduction for all WWTP Discharging to Lake
Calculations show that reducing TP concentrations to 0.2 mg/L only accounts for 0.3% of the
total mass of TP in the Lake. Thus, if the lake is mixing, this has limited impact on water quality.
However, 95 WWTP’s currently discharge into the lake and thus, if all facilities converted to
tertiary treatment, the impact may become significant. Total effluent flow rate coming from
these sources equal to 6,846 ML/day (“Lake Ontario”) It is assumed that these plants currently
release effluent containing the same concentration of TP as Ashbridges Bay.
TP Loading for all WWTP
(Effluent TP-0.7 mg/L): 0.7 mg/L X 6,846 ML/day = 4,792.2 kg/day
4,792.2 kg/day X 365 days = 1,749,153 kg/year
TP Loading Percentage
Per Lake Volume: 1,749,153 kg / (1.638 X 10^7
kg/L) = 0.107
= 10.7 %
TP Loading for all WWTP
(Effluent TP-0.2 mg/L): 0.2 mg/L X 6,846 ML/Day = 1,369.2 kg/day
1,369.2 kg/day X 365 days = 499,758 kg/year
TP Loading Percentage
Per Lake Volume: 88,147.5 kg/year X 90 WWTP’s = 7,933,275 kg/year
499,758 kg / (1.638 X 10^7
kg/L) = 0.031
= 3.1%
5.3 Environmental Impacts
Reducing final TP concentrations at Ashbridges Bay WWTP alone may not have a significant
impact on TP levels in Lake Ontario. The large volume of water in the lake dilutes TP
concentrations coming out of the plant. However, calculations have shown that if all WWTP’s
discharging into the lake implemented a tertiary system, the total TP loading may be reduced by
7.6 %. Reduced TP concentrations will have a positive impact on the lake’s recovery.
Eutrophication will be reduced which will reduce the amount of algae blooms that occur in the
water body. Dissolved oxygen levels will not drop which will allow desirable fish to thrive. The
lake may become more desirable for recreational uses and drinking water treatment will require
fewer resources in creating potable water.
6.0 Feasibility
In order for municipalities to implement tertiary technology, Maximum Allowable Concentrations
(MACs) on the Certificate of Approval must be lowered. If any environmental benefits are to be seen all
WWTPs discharging to the lake must implement the denitrifying filtration process or another tertiary
technology capable of discharging nutrient concentrations of 0.2 mg/L or lower. These facilities must
have the physical space (land surface area) to implement tertiary treatment.
6.1 Lowering MACs
Ashbridges Bay currently operates under a Certificate of Approval No. 8319-7TTR62 issued by
the Ministry of the Environment. If all WWTPs discharging to the lake were to lower effluent TP
concentrations, MACs would have to be lowered on each plant’s Certificate of Approval. The
main purpose of these certificates in this context is to make sure that proposed works or
amendments are established or altered, in harmony with the Ministry’s requirements. These
certificates outline performance standards that protect human health and the environment by
preventing potential harmful effects. The Ministry may update a certificate based on site-
specific information or to support other environmental protection priorities at any time. A
process is taken in updating a Certificate of Approval for a facility. The Ministry of Environment
works with the facility manager throughout the process where the existing certificate is
presented with an application to amend current operations. During pre-application
consultation, the extent to which the Ministry may require new or amended requirements is
discussed for a certificate. In open dialogue, the ministry and the facility manager work together
to define environmental protection requirements of the project (new effluent requirements,
acceptability of proposed technology). An acknowledgment letter is sent to the facility manager
from the Ministry outlining their intent on updating the certificate in harmony with the
established protocol. The proposed amendments are then subject to public comment for a
period of time as required by the Environmental Bill of Rights. Upon completion, the final
edition of the amended Certificate of Approval is issued (Ministry of the Environment).
6.2 Design Footprint
Calculations below (based on Ashbridges Bay) give a rough estimate on the area needed to
implement the denitrifying filter process. It outlines the proposed area needed including
available space for tank, piping, platform and buffer area sizes. Figure 7 displays proposed site
locations and illustrates area needed to implement the design. The tanks would be arranged in a
2 by 8 formation outlining 16 tanks in total. This is a typical formation for this system. Surface
area dimensions equal out to approximately 60 ft by 250 ft.
Surface Area of Individual Tank: pi X (16 ft)2
= 804.25 ft2
Surface Area of Design: 804.25 ft2
X 16 Tanks = 12868 ft2
= 0.1195 ha
= 0.2954 Acres
Proposed Area Needed: 60 ft X 250 ft = 15,000 ft2
Available Area for Piping, Etc: 15,000 ft2
- 12868 ft2
= 2000 ft2
Figure 7 Proposed Site Location and Footprint
N
7.0 Conclusion
Ashbridges Bay WWTP currently operates as a secondary treatment plant. Various nutrient reducing
technologies are available to upgrade a WWTP to tertiary conditions. The environmental benefits of
creating these conditions have been examined at Ashbridges Bay. If the denitrifying filter process is
implemented, TP concentrations in effluent would be reduced to 0.2 mg/L. This would reduce nutrient
loading on Lake Ontario. For benefits to be seen on the entire lake, all 95 WWTPs discharging to the lake
would have to reduce nutrient concentrations to 0.2 mg/L by upgrading to tertiary treatment. For this to
happen, MACs for TP on each plants Certificate of Approval would have to be lowered to that
concentration. The Ministry of Environment would have to proceed in an administrative process to
amend MAC’s on each plant’s Certificate of Approval. This could take a substantial amount of time and
money. If the denitrifying filter process is implemented at Ashbridges Bay it would need a relatively
small portion of land. Locations have been proposed as to where the system could operate.
Work Cited
“Astrasand Continuous Backwash Filter.” Siemens Water Technologies. Siemens, Dec. 2007. Web. 12
Feb. 2011.
“Ecological Indicators and Sustainability of the Lake Ontario Ecosystem.” Sea Grant New York, November
2006. Web. 28 March 2011.
Environment Canada. "Nearshore Waters of the Great Lakes." Canadian Government, October 2006.
Web. 16 Feb. 2011.
“Lake Ontario.” International Lake Environment Committee. World Lakes Database, June 1992. Web. 12
Feb. 2011.
“Lake Ontario.” New World Encyclopedia. 2 April 2008. Web. 28 Mar. 2011.
Ministry of the Environment. "Protocol for Updating Certificates of Approval for Sewage Works." Govt.
of Canada, January 2005. Web. 28 Mar. 2011.
Podolec, Tom. Ashbridges Bay Wastewater Treatment. 2008. Tom Podolec Photostream, Toronto. Flickr.
Web. 28 Mar. 2011.
Toronto Water. "Ashbridges Bay Wastewater Treatment Plant 2009 Annual Report." City of Toronto, 31
March 2010. Web. 28 Oct. 2010.
United States E.P.A. "Biological Nutrient Removal Processes and Costs." United States Government,
June 2007. Web. 27 Nov. 2010.
United States E.P.A. "Municipal Nutrient Removal Technologies Reference Document." United States
Government, September 2008. Web. 30 Jan. 2011.
Work Consulted
Hammer, Mark J., and Mark J. Hammer Jr. Water and Wastewater Technology. 5th
ed. New Jersey:
Pearson, 2004. Print.
United States E.P.A. "Primer for Municipal Wastewater Treatment Systems." United States Government,
June 2007. Web. 27 Nov. 2010.
United States E.P.A. "Human Health and the Great Lakes." United States Government, 29 April 2003.
Web. 27 Nov. 2010.
Glossary
Activated Sludge - System for treating sewage and industrial wastewater using air and biological floc
composed of bacteria and protozoans.
Anaerobic Digestion - A processes in which micro-organisms break down biodegradable material in the
lack of oxygen.
Bios Solids (Sludge) – Refers to the remaining semi-solid material left from industrial wastewater
treatment processes. It also is used as a generic term for solids separated from suspension in a liquid.
Certificate of Approval - A facility that releases emissions to the atmosphere, discharges contaminants
to surface waters, provides potable water or disposes of waste must have a Certificate of Approval to
operate under the law.
Coagulants (Colloids) - A colloidal sized particle is defined in diameter from 5-200 nanometers.
Denitrification – Process involved in converting nitrogen to nitrogen gas.
E. Coli - This bacteria is commonly found in recreational waters, and their presence indicates the
existence of faecal contamination.
Eutrophication - Process by which a body of water becomes supplemented in nutrients, which in turn
stimulates aquatic plant growth and death, resulting in the depletion of dissolved oxygen.
Fauna - Animal life in any particular region or time.
Flocculation (Floc) - Process by which fine particles are clumped together to form a larger substance
(floc) that can be more easily filtered.
Flora - Plant life existing in a defined region.
Geosmin - This substance is produced by cyanobacteria (blue-green algae) among other microbes and is
released when these microbes die. Drinking water derived from surface water can occasionally be
unpleasant-tasting when bacteria release geosmin into the local water supply.
Mega Liter (ML) – One million liters in the metric system.
Metabolic Functions - Chemical reactions that occur in living organisms to sustain life.
Precipitation - The creation of a solid in a solution or inside an additional solid through a chemical
reaction.
Residence Time - The average time that a particle spends in a particular system. This varies with the
amount of substance in the system.

More Related Content

Similar to Upgrading Ashbridges Bay WWTP to Tertiary Treatment

Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...IRJESJOURNAL
 
Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Louisette Lanteigne
 
Sewage and its treatment - experience from setting up STPs
Sewage and its treatment - experience from setting up STPs     Sewage and its treatment - experience from setting up STPs
Sewage and its treatment - experience from setting up STPs PRABHASH GOKARN
 
Science and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.pptScience and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.pptUmangi Mehta
 
IRJET- Water Reclamation and Reuse
IRJET- Water Reclamation and ReuseIRJET- Water Reclamation and Reuse
IRJET- Water Reclamation and ReuseIRJET Journal
 
Thorgren Basin / Salt Creek Watershed
Thorgren Basin / Salt Creek WatershedThorgren Basin / Salt Creek Watershed
Thorgren Basin / Salt Creek Watershed219GreenConnect
 
Save the Dunes Update - Green Drinks 9-19-11
Save the Dunes Update - Green Drinks 9-19-11Save the Dunes Update - Green Drinks 9-19-11
Save the Dunes Update - Green Drinks 9-19-11219GreenConnect
 
IRJET- Water Quality Analysis of Avaragere Lake- A Case Study
IRJET- Water Quality Analysis of Avaragere Lake- A Case StudyIRJET- Water Quality Analysis of Avaragere Lake- A Case Study
IRJET- Water Quality Analysis of Avaragere Lake- A Case StudyIRJET Journal
 
Florida DEP Indirect Potable & Direct Potable Reuse presentation 10 sep12
Florida DEP Indirect Potable & Direct Potable Reuse presentation 10 sep12Florida DEP Indirect Potable & Direct Potable Reuse presentation 10 sep12
Florida DEP Indirect Potable & Direct Potable Reuse presentation 10 sep12Terrance (Terry) Keep
 
Water quality protection of truc bach lake [final]
Water quality protection of truc bach lake [final]Water quality protection of truc bach lake [final]
Water quality protection of truc bach lake [final]Thành Dương Nguyễn
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination studyJeffrey Pickett
 
Determination-Of-Sources-Of-Water-Pollution
Determination-Of-Sources-Of-Water-PollutionDetermination-Of-Sources-Of-Water-Pollution
Determination-Of-Sources-Of-Water-PollutionCOLLINS KUFFOUR
 
Rejuvenation of lakes
Rejuvenation of lakesRejuvenation of lakes
Rejuvenation of lakesKrishanPal21
 
Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...
Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...
Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...LOWaterkeeper
 
Evaluation of water quality index in the main drain river
Evaluation of water quality index in the main drain riverEvaluation of water quality index in the main drain river
Evaluation of water quality index in the main drain riverAlexander Decker
 
Drinking Source Water Protection in Ontario June 2014
Drinking Source Water Protection in Ontario June 2014Drinking Source Water Protection in Ontario June 2014
Drinking Source Water Protection in Ontario June 2014Bakhtiyor Mukhammadiev
 

Similar to Upgrading Ashbridges Bay WWTP to Tertiary Treatment (20)

Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
 
Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02
 
Sewage and its treatment - experience from setting up STPs
Sewage and its treatment - experience from setting up STPs     Sewage and its treatment - experience from setting up STPs
Sewage and its treatment - experience from setting up STPs
 
Water extremes in austin texas
Water extremes in austin texasWater extremes in austin texas
Water extremes in austin texas
 
EIA Project
EIA ProjectEIA Project
EIA Project
 
Science and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.pptScience and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.ppt
 
IRJET- Water Reclamation and Reuse
IRJET- Water Reclamation and ReuseIRJET- Water Reclamation and Reuse
IRJET- Water Reclamation and Reuse
 
Thorgren Basin / Salt Creek Watershed
Thorgren Basin / Salt Creek WatershedThorgren Basin / Salt Creek Watershed
Thorgren Basin / Salt Creek Watershed
 
Save the Dunes Update - Green Drinks 9-19-11
Save the Dunes Update - Green Drinks 9-19-11Save the Dunes Update - Green Drinks 9-19-11
Save the Dunes Update - Green Drinks 9-19-11
 
IRJET- Water Quality Analysis of Avaragere Lake- A Case Study
IRJET- Water Quality Analysis of Avaragere Lake- A Case StudyIRJET- Water Quality Analysis of Avaragere Lake- A Case Study
IRJET- Water Quality Analysis of Avaragere Lake- A Case Study
 
Aggregateact
AggregateactAggregateact
Aggregateact
 
Florida DEP Indirect Potable & Direct Potable Reuse presentation 10 sep12
Florida DEP Indirect Potable & Direct Potable Reuse presentation 10 sep12Florida DEP Indirect Potable & Direct Potable Reuse presentation 10 sep12
Florida DEP Indirect Potable & Direct Potable Reuse presentation 10 sep12
 
Water quality protection of truc bach lake [final]
Water quality protection of truc bach lake [final]Water quality protection of truc bach lake [final]
Water quality protection of truc bach lake [final]
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination study
 
Determination-Of-Sources-Of-Water-Pollution
Determination-Of-Sources-Of-Water-PollutionDetermination-Of-Sources-Of-Water-Pollution
Determination-Of-Sources-Of-Water-Pollution
 
Rejuvenation of lakes
Rejuvenation of lakesRejuvenation of lakes
Rejuvenation of lakes
 
Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...
Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...
Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...
 
Evaluation of water quality index in the main drain river
Evaluation of water quality index in the main drain riverEvaluation of water quality index in the main drain river
Evaluation of water quality index in the main drain river
 
Drinking Source Water Protection in Ontario June 2014
Drinking Source Water Protection in Ontario June 2014Drinking Source Water Protection in Ontario June 2014
Drinking Source Water Protection in Ontario June 2014
 
Pollution
PollutionPollution
Pollution
 

Upgrading Ashbridges Bay WWTP to Tertiary Treatment

  • 1. (Podolec) SENECA COLLEGE SCHOOL OF APPLIED ARTS AND TECHNOLOGY Update of the Ashbridges Bay Wastewater Treatment Plant To Tertiary Conditions TECHNICAL REPORT Julian Tersigni ENVIRONMENTAL TECHNOLOGY 4/7/2011 Writing Advisor: Peter Rethazy Technical Advisor: Nadia Kelton
  • 2. Update of the Ashbridges Bay Wastewater Treatment Plant To Tertiary Conditions Prepared By: Julian Tersigni Student Number: 028 606 085 Environmental Technology: EMT Engineering Technical Report II: ETR 592 BD Prepared For: Nadia Kelton, April 7 2011 Peter Rethazy, April 7 2011
  • 3. Acknowledgments I would like to thank my advisor Nadia Kelton, for her time and guidance in the completion of this report.
  • 4. Abstract Lake Ontario faces numerous water quality issues due to industries and population growth surrounding it. Wastewater treatment facilities in the city of Toronto are currently designed to release secondarily treated effluent into the lake. If nutrient concentrations in effluent were lowered, this could contribute to the lakes recovery. This could be achieved by upgrading the plant to tertiary conditions with a focus on removing specific pollutants: nitrogen, and phosphorus. Numerous technologies are available for tertiary treatment. The denitrifying filter process best suits Ashbridges Bay as it requires a relatively small area to function and it provides a high removal rate of nitrogen and phosphorus. Reducing nutrient concentrations at Ashbridges Bay alone may not have a significant impact. However, if all WWTP’s discharging into the lake implement a tertiary system, the reduction of nutrient loadings would be significant. In order for this to proceed the Maximum Allowable Concentrations on each plant’s Certificate of Approval would have to be lowered and each facility would need adequate surface area to implement tertiary treatment.
  • 5. Table of Contents Acknowledgments ii Abstract iii List of Illustrations vi 1.0 Introduction 1 1.1 Purpose 1 1.2 Scope 1 2.0 Water Quality of Lake Ontario 2 2.1 Historical Conditions 2 2.2 Current Conditions 3 3.0 Operations at Ashbridges Bay WWTP 4 3.1 Influent Quality 4 3.2 Preliminary Treatment 5 3.3 Primary Treatment 5 3.4 Secondary Treatment 6 3.5 Final Effluent 7 4.0 Comparison of Technologies Available 7 4.1 Denitrifying Filters with Chemical Removal 8 4.2 Tertiary Clarification with Filtration 9 4.3 Membrane Filtration Technologies (Dynasand D2 Advanced Filtration System) 9 4.4 Suitable Process 10 5.0 Impact Assessment 11
  • 6. 5.1 Nutrient Reduction at Ashbridges Bay WWTP 11 5.2 Nutrient Reduction for all WWTP Discharging to Lake 12 5.3 Environmental Impacts 13 6.0 Feasibility 13 6.1 Lowering MAC’s 13 6.2 Design Footprint 14 7.0 Conclusion 15 Work Cited 16 Work Consulted 17 Glossary 18
  • 7. List of Illustrations Figures Figure 1 Historical Nutrient Concentrations for Lake Ontario 2 Figure 2 Total Phosphorus Concentrations in the Great Lakes 3 Figure 3 General Processes at the Ashbridges Bay WWTP 4 Figure 4 Denitrifying Filter Process 8 Figure 5 Denitrifying Filter Makeup 9 Figure 6 Dynasand D2 Advanced Filtration System 10 Figure 7 Proposed Site Location and Footprint 14 Tables Table 1 Influent Parameters 5 Table 2 Primary Treatment Effluent Parameters 6 Table 3 Secondary Treatment Effluent Parameters 6 Table 4 Final Effluent Parameters 7
  • 8. 1.0 Introduction Wastewater treatment facilities in the city of Toronto are currently designed to release secondarily treated effluent. Lake Ontario, the plants discharge point, has suffered greatly from effluent containing low water quality from various sources. This report analyzes the environmental benefits of creating tertiary treatment conditions at the plant. This topic is applicable as an update to an already existing treatment plant. The plant is required to meet various water quality parameters under a Certificate of Approval (C of A) provided by the province. These parameters include meeting Maximum Allowable Concentrations (MAC) of nutrients such as nitrogen and phosphorus. The effect of lowering concentrations of these nutrients has been analyzed. 1.1 Purpose This report analyzes how reducing nutrient concentrations in the plant’s effluent affects Lake Ontario’s water quality. Lake Ontario has suffered from numerous water quality issues in the past due to industries and population growth surrounding it. 95 waste water treatment plants (WWTPs) discharge into the lake having similar effluent water quality constraints as Ashbridges Bay, these constraints are outlined in a Certificate of Approval issued by the province (Toronto Water). If all WWTPs discharging into the lake reduced effluent nutrient concentrations the reduction in loading could be significant. This report analyzes the effects derived from reducing nutrient concentrations in effluent from Ashbridges Bay as well as surrounding WWTPs discharging into the lake. It focuses on water quality statistics for Lake Ontario, the plant’s current operations, tertiary technologies, environmental impacts, and feasibility. Treatment plants must constantly undergo improvements meeting higher water quality constraints, this ensures environmental impacts are minimized. 1.2 Scope This report is specifically applicable at the Ashbridges Bay Waste Water Treatment Plant in the city of Toronto. It is one of four major wastewater plants in the city. It is applicable as an update to an already existing treatment plant. The design and methods used at the plant are similar to wastewater facilities across Ontario, therefore data from this report can be applied to other WWTPs in the province.
  • 9. 2.0 Water Quality of Lake Ontario Lake Ontario has faced, and still faces, a variety of water quality issues derived from industrial chemicals, agricultural fertilizers, untreated sewage and detergents (“Lake Ontario”). These issues have led to the lakes increased eutrophication. Lake Ontario is one of five great lakes in North America with populous cities, industries and agriculture surrounding it. These land uses have changed the lake’s water chemistry and ecological communities into what is seen today. Effects have been seen both socially and economically. For example, frequent beach closing due to poor water quality (specifically high bacterial counts) has given residents a negative outlook on the lake leading to reduced recreational use. Furthermore, as water quality degrades the costs for treating drinking water increases significantly. 2.1 Historical Conditions During the early 70’s lax laws on industries and municipalities led to increased pollution in the lake. Addition of substances such as nitrates and phosphates caused negative water quality effects (eutrophication). Sources of these substances were found mainly from fertilizers or detergents in sewage water. The result was excessive plant growth (i.e. frequent algal blooms) Once the nutrient supply was exhausted, algal populations died on mass and the resulting decay brought about a severe drop in dissolved oxygen, which caused fish deaths (United States E.P.A). High concentration of nutrients through this time period is seen in Figure 1 at approximately 22.5 ug/L. Since then environmental stresses led to tighter environmental regulations and constraints on industries and municipalities. Higher restrictions on waste water treatment plants and de-industrialization surrounding the lake assisted in restoring water quality (“Lake Ontario”). Figure 1 Historical Nutrient Concentrations for Lake Ontario (“Ecological Indicators”)
  • 10. 2.2 Current Conditions Although water quality has improved since previous years, eutrophication is still an issue (United States E.P.A). Drinking water has received scrutiny over taste and odour problems and these problems have been linked to naturally occurring chemicals such as geosmin, produced by blue- green algae and bacteria. Drinking water treatment costs increase as more resources are needed to purify lake water to acceptable levels. Localized beach closings surrounding the lake have occurred due to increased levels of E. Coli, which thrive under low oxygen, eutrophic conditions (United States E.P.A). This poses a health risk when levels exceed 100 organisms/100 ml. Aesthetic reasons such as dead fish and algae blooms have also been involved in closures. Nitrates and phosphates are considered nutrients and do not bio-accumulate, however, at elevated concentrations, nitrates can have toxic implications. This has resulted in reduced fishery levels and negative effects on humans (United States E.P.A). The lake has a volume of 1638 km3 and a residence time of approximately 8 years. Figure 1 shows that TP concentrations have levelled at 10 ug/L from previous years, this converts to 0.01 mg/L. Figure 2 spatially illustrates total phosphorus (TP) concentrations across all of the Great Lakes. Lake Ontario and Erie are most affected by eutrophication. Figure 2 Total Phosphorus Concentrations in the Great Lakes (Environment Canada)
  • 11. 3.0 Operations at Ashbridges Bay WWTP Wastewater plants in the city of Toronto are required to meet various water quality parameters under a Certificate of Approval provided by the province. A revision of the maximum allowable quantities for each parameter is done annually. In 2009, Ashbridges Bay continued to generate a high quality effluent which met requirements of the plant’s Certificate of Approval. It provides secondary treatment for wastewater which includes the removal of suspended solids and dissolved organics. The plant also provides effluent disinfection and disposal of biosolids. Figure 3 illustrates major treatment processes including screening and grit removal, primary and secondary treatment, effluent disinfection, waste activated sludge thickening, anaerobic digestion, biosolids dewatering and biosolids management (Toronto Water). Figure 3 General Processes at the Ashbridges Bay WWTP (Toronto Water) 3.1 Influent Quality Upon entering the plant, wastewater is gravity fed throughout the plants processes. Influent received at the plant includes sludge flows coming from the Humber treatment Plant and the North Toronto treatment Plant. Ashbridges Bay received 40.4 dry tonnes/day of liquid biosolids and 15.0 dry tonnes/day of waste activated sludge, on average, from the Humber Treatment Plant via the Mid-Toronto Interceptor. The North Toronto Treatment Plant transferred an average of 4.4 dry tonnes/day of biosolids to Ashbridges Bay via the Coxwell Sanitary Trunk Sewer. This totalled 59.8 dry tonnes/day of solids received in 2009 coming from these two
  • 12. sources. Ashbridges Bay experienced an increase of 7% for influent flows from 2008 to 2009. A summary of annual flow and influent parameter concentrations for 2008/2009 is included in Table 1. Influent Total Phosphorus is considerably high and must be lowered to reduce environmental impacts. If influent concentrations were not lowered Lake Ontario would suffer from harmful effects (Toronto Water). Table 1 Influent Parameters (Toronto Water) 3.2 Preliminary Treatment The process starts with wastewater entering one of three Grit and Screening Buildings which provides preliminary treatment. In total, there are six chain and bucket type grit channels, each rated for 145,340 m3 /day. There are ten aerated grit channels (clam shell bucket type), each rated for 313,390 m3 /day, for removing grit and inorganic material from wastewater flow. There are 14 automatic bar screens, with bars spaced at 1.25 centimetres apart. These mechanical screening machines remove rags and large pieces of debris from the wastewater. Grit and used screenings are hauled to a sanitary landfill site. Grit and screenings removed by the aerated grit channels and mechanical bar screens averaged approximately 9.67 tonnes/day in 2009, being a 12% increase from 2008 (Toronto Water). Preliminary processes significantly reduce TP by removing sediments and debris from wastewater. 3.3 Primary Treatment The following step in the treatment process is called Primary Settling or Sedimentation. Here, flow enters large tanks where its velocity is reduced, this allows heavier solids in the wastewater to settle to the bottom. Sludge collectors in the tank sweep and remove the settled sludge into sludge hoppers located at the bottom of the tank at one end, where it is pumped to the anaerobic digestion tanks. This process removes some phosphorus by physically removing Parameter 2009 2008 Influent Flow (ML/day) 697.6 653.2 Total Annual Flow (ML) 254,609 239,045 Influent SS (mg/L) 255.5 274.3 Influent CBOD5 (mg/L) 121.1 101.0 Influent TP (mg/L) 6.2 6.0
  • 13. settled sludge and sediments. Twelve Primary Clarifiers exist, six tanks with dimensions of 61 m x 19.5 m X 4.5 m and rated at 142,900 m3 /day, three tanks with dimensions of 76.2 m x 32.04 m X 4.5 m and rated at 308,400 m3 /day, and an additional three tanks with dimensions of 91.4 m x 35.05 m X 4.88 m rated at 385,500 m3 /day. This totals to an installed capacity of 2,939,100 m3 /day. Table 2 is a summary of primary treatment effluent parameter concentrations over 2008/2009 (Toronto Water). Table 2 Primary Treatment Effluent Parameters (Toronto Water) Parameter 2009 2008 Primary SS (mg/L) 319.1 257.7 Primary CBOD5 (mg/L) 113.5 96.9 3.4 Secondary Treatment In the activated sludge process, effluent from the Primary Clarifiers is mixed with Return Activated Sludge from the Final Clarifiers and aerated. This sludge is made up of naturally occurring bacteria and other micro-organisms. The micro-organisms use oxygen and dissolved organics in the wastewater for their metabolic functions which help purify wastewater. There are eleven rectangular Aeration Tanks, these have dimensions of 161.5 m x 6.17 m x 4.6 m and rated at 91,000 m3 /day. These tanks employ a step-feed aeration process with four passes per aeration tank and are equipped with coarse air bubble diffusers. Mixed liquor from the Aeration Tanks flows to large Final Clarifiers where Activated Sludge is allowed to settle. A controlled amount of this sludge is returned to the Aeration Tanks to repeat the treatment process. Any excess is removed as Waste Activated Sludge and directed to the Primary Clarifiers, or the Flotation process for thickening, and then pumped to the Digestion Tanks. There are eleven Final Clarifiers, each with dimensions of 124.4 m x 24 m x 5.3 m and rated for 91,000 m3 /day (Toronto Water). A summary of key aeration parameters for the previous two years is seen in Table 3. Table 3 Secondary Treatment Process Parameters (Toronto Water) Parameters 2009 2008 Aeration Loading (kg CBOD5/day) 0.65 0.53 Mixed Liquor Suspended Solids (mg/L) 2215 2014
  • 14. 3.5 Final Effluent Before being discharged into Lake Ontario, chlorine is used to disinfect final effluent. The final effluent conduit is equipped with several diffusers and extends 1000 m into the lake from the shore. The Ashbridges Bay Treatment Plant produced a high quality effluent which met requirements of the plant’s Certificate of Approval in 2009. This certificate outlines maximum allowable concentrations of various water quality parameters. A summary of key final effluent parameters for the previous two years is shown in Table 4. TP concentrations in final effluent are recorded at 0.7 mg/L and meets allowable concentrations. That concentration limit provided by the Certificate of Approval is based on minimizing effects on receiving waters and ecosystems. Although the limit is sufficient for not causing major harmful effects on discharge points, it could further be improved to almost eliminating any negative impacts caused by excessive nutrients. Table 4 Final Effluent Parameters (Toronto Water) Parameter Certificate of Approval 2009 Removal Efficiency 2008 Removal Efficiency Final SS (mg/L) 25 8.7 97% 9.4 97% Final CBOD5 (mg/L) 25 4.7 95% 3.6 96% Final TP (mg/L) 1 0.7 89% 0.7 88% Final E-coli (CFU/100ml) 200 1.9 - 2 - Final SS Loading Rate (kg/day) 20,450 6,041 - 6,128 - Final CBOD5 Loading Rate (kg/day) 20,450 3,239 - 2,347 - Final TP Loading Rate (kg/day) 818 482 - 464 - 4.0 Comparison of Technologies Available To achieve tertiary conditions at the plant the focus is on removing specific pollutants: nitrogen, and phosphorus. Different processes are available for the removal of these pollutants. These processes are described and compared based on benefits/limitations and ease of application to existing conditions. The process most suitable for the plant depends on target effluent quality and influent quality. These processes are either an extension of usual secondary biological treatment or are physical and chemical separation techniques (United States E.P.A.). A decision on which process would be best suited for the plant has been made after comparison.
  • 15. 4.1 Denitrifying Filters with Chemical Removal Denitrification is the process involved in converting nitrate to nitrogen gas. This process is placed after secondary treatment. Besides providing nitrogen and phosphorus removal, it also acts as an effluent filter. Denitrifying filters require a small area compared to other add-on denitrification processes. Because it is carrying out denitrification, a carbon source, like methanol, must be supplied for it to function. For the process to achieve a low concentration of phosphorus, chemical addition such as ferric chloride (FeCl3) may be considered. Filters are used to capture phosphorus as floc. These filters may use various materials in its design including: sand, gravel, or anthracite. Denitrifying filters operate in an upflow mode, meaning water is sent up through filtration materials. Through this, nitrogen gas created becomes trapped between the grains which are then released through pumping. These types of denitrification filters have a removal rate of 1 to 2 mg/L nitrate-nitrogen and are known to release effluent containing 0.1 to 0.3mg/L of TP (United States E.P.A.). A process flow diagram implementing the denitrifying filter process is depicted in Figure 4. The denitrifying filter makeup is depicted in Figure 5. Figure 4 Denitrifying Filter Process (United States E.P.A.)
  • 16. Figure 5 Denitrifying Filter Makeup (“Astrasand”) 4.2 Tertiary Clarification with Filtration This process involves the addition of a tertiary clarifier upstream of filters. This process would be of benefit as it can achieve extremely low solids concentrations and in turn low phosphorus levels. Different versions of tertiary clarifiers exist including solids contact clarifiers, up flow buoyant-media clarifiers, tube clarifiers, plate clarifiers, and another set of secondary clarifiers. Coagulants such as ferric chloride (FeCl3) or alum (KAl(SO4)2.12H2O) may be considered to further improve the performance of the system. Secondary effluent undergoes heavy mixing in this process with coagulants and previously settled solids creating a larger floc, thereafter moving towards the settling zone where heavier solids move downwards and purified water exits the unit. After this process, a filter further removes solids that pass through the clarifier. For tertiary clarification to work, velocity through the system must be low enough to allow solids to settle to the bottom. Case studies have shown that implementing tertiary clarification can reduce effluent concentrations of TP to 0.05 mg/L (United States E.P.A.). ____________________________________________________ 4.3 Membrane Filtration Technologies (Dynasand D2 Advanced Filtration System) This process involves the use of a membrane filter either externally or internally. It is built into the activated sludge process as a Membrane Bio Reactor. The system uses a suspended growth biological reactor where effluent passes through a membrane filter. Through this process
  • 17. suspended solids are effectively taken out. Micro-organisms then take up phosphates that remain in the reactor. In most cases, this membrane is associated with the final aerobic step. A lower level of TP concentration can then be achieved through the use of chemical precipitation for any solids not taken up by these micro-organisms. Case studies have shown to achieve an annual average of 0.027 mg/l of TP. Figure 6 depicts the process of the Dynasand D2 Advanced Filtration System process being one of many membrane filtration technologies (United States E.P.A.). Figure 6 Dynasand D2 Advanced Filtration System (United States E.P.A.) 4.4 Suitable Process The above descriptions assisted in the decision of implementing the denitrifying filter process at the plant. The process takes up a relatively small area compared to other existing processes. In addition to providing a high removal rate of nitrogen/phosphorus the system also acts as a filter for all effluent coming out of the plant. Minimum retrofitting is needed to implement the process in comparison to other technologies. Case studies have shown that the technology can release effluent with low total nitrogen and TP concentrations. Although Tertiary Clarification has a high capability of producing very low TP concentrations, it needs a large surface area to implement. Ashbridges Bay has low space availability for further technologies and any upgrades must have a low footprint associated with it. Various membrane filtration technologies available may also produce low concentrations of TP, however the costs of these specialty filtration systems do not make them feasible.
  • 18. 5.0 Impact Assessment With the update of the plant to tertiary conditions, the further purified effluent is capable of impacting water quality and aquatic life in Lake Ontario. Nitrogen and phosphorus are the main source of eutrophication in surface waters. This eutrophication directly impacts the amount of algae blooms that occur in a water body. Impacts of this eutrophication include low dissolved oxygen, death of fish, murky water and the depletion of desirable flora and fauna (United States E.P.A.). The reduction of nutrient loading has been examined for Ashbridges Bay with the addition of tertiary treatment. The magnitude of impact the addition has had is based on the reduction of phosphorus, as TP is limiting in freshwater (“Lake Ontario”). This impact is based on target TP effluent concentrations. 5.1 Nutrient Reduction at Ashbridges Bay WWTP To examine impact, it is assumed that the system is capable of producing a final TP concentration of 0.2 mg/l. This is based on removal rates from the denitrifying filter process. Currently, final TP concentrations at the plant equals 0.7 mg/L, using effluent flow rate of 689 ML/day this gives a final TP loading rate of 483 kg/day (Toronto Water). Final nitrogen concentrations are not of concern as it does not affect lake quality unless TP is in excess. The filtration process in place removes nitrogen by converting it to a gas which is then released into the atmosphere. Current TP loading Over 1 Year: 0.7 mg/L X 689 ML/Day = 482 kg/day 482 Kg/day X 365 Days = 175,930 kg/year Lake Volume: 1638 km3 X (1 X 10^12 L) = 1.638 X 10^15 L Current TP In Lake: 0.01 mg/L X (1.638 X 10^15 L) = 1.638 X 10^13 mg/L = 1.638 X 10^7 kg/L Proportion of TP from Ashbridges Bay: 175,930 kg / 1.638 X 10^7 kg/L = 0.01 = 1%
  • 19. Reduced Effluent Concentrations to 0.2 mg/L: 0.2 mg/L X 690 ML/Day = 138 kg/day 138 kg/day X 365 days = 50,370 kg/year 50,370 kg / 1.638 X 10^7 kg/L = 0.003 = 0.3 % 5.2 Nutrient Reduction for all WWTP Discharging to Lake Calculations show that reducing TP concentrations to 0.2 mg/L only accounts for 0.3% of the total mass of TP in the Lake. Thus, if the lake is mixing, this has limited impact on water quality. However, 95 WWTP’s currently discharge into the lake and thus, if all facilities converted to tertiary treatment, the impact may become significant. Total effluent flow rate coming from these sources equal to 6,846 ML/day (“Lake Ontario”) It is assumed that these plants currently release effluent containing the same concentration of TP as Ashbridges Bay. TP Loading for all WWTP (Effluent TP-0.7 mg/L): 0.7 mg/L X 6,846 ML/day = 4,792.2 kg/day 4,792.2 kg/day X 365 days = 1,749,153 kg/year TP Loading Percentage Per Lake Volume: 1,749,153 kg / (1.638 X 10^7 kg/L) = 0.107 = 10.7 % TP Loading for all WWTP (Effluent TP-0.2 mg/L): 0.2 mg/L X 6,846 ML/Day = 1,369.2 kg/day 1,369.2 kg/day X 365 days = 499,758 kg/year TP Loading Percentage Per Lake Volume: 88,147.5 kg/year X 90 WWTP’s = 7,933,275 kg/year 499,758 kg / (1.638 X 10^7 kg/L) = 0.031 = 3.1%
  • 20. 5.3 Environmental Impacts Reducing final TP concentrations at Ashbridges Bay WWTP alone may not have a significant impact on TP levels in Lake Ontario. The large volume of water in the lake dilutes TP concentrations coming out of the plant. However, calculations have shown that if all WWTP’s discharging into the lake implemented a tertiary system, the total TP loading may be reduced by 7.6 %. Reduced TP concentrations will have a positive impact on the lake’s recovery. Eutrophication will be reduced which will reduce the amount of algae blooms that occur in the water body. Dissolved oxygen levels will not drop which will allow desirable fish to thrive. The lake may become more desirable for recreational uses and drinking water treatment will require fewer resources in creating potable water. 6.0 Feasibility In order for municipalities to implement tertiary technology, Maximum Allowable Concentrations (MACs) on the Certificate of Approval must be lowered. If any environmental benefits are to be seen all WWTPs discharging to the lake must implement the denitrifying filtration process or another tertiary technology capable of discharging nutrient concentrations of 0.2 mg/L or lower. These facilities must have the physical space (land surface area) to implement tertiary treatment. 6.1 Lowering MACs Ashbridges Bay currently operates under a Certificate of Approval No. 8319-7TTR62 issued by the Ministry of the Environment. If all WWTPs discharging to the lake were to lower effluent TP concentrations, MACs would have to be lowered on each plant’s Certificate of Approval. The main purpose of these certificates in this context is to make sure that proposed works or amendments are established or altered, in harmony with the Ministry’s requirements. These certificates outline performance standards that protect human health and the environment by preventing potential harmful effects. The Ministry may update a certificate based on site- specific information or to support other environmental protection priorities at any time. A process is taken in updating a Certificate of Approval for a facility. The Ministry of Environment works with the facility manager throughout the process where the existing certificate is presented with an application to amend current operations. During pre-application consultation, the extent to which the Ministry may require new or amended requirements is discussed for a certificate. In open dialogue, the ministry and the facility manager work together
  • 21. to define environmental protection requirements of the project (new effluent requirements, acceptability of proposed technology). An acknowledgment letter is sent to the facility manager from the Ministry outlining their intent on updating the certificate in harmony with the established protocol. The proposed amendments are then subject to public comment for a period of time as required by the Environmental Bill of Rights. Upon completion, the final edition of the amended Certificate of Approval is issued (Ministry of the Environment). 6.2 Design Footprint Calculations below (based on Ashbridges Bay) give a rough estimate on the area needed to implement the denitrifying filter process. It outlines the proposed area needed including available space for tank, piping, platform and buffer area sizes. Figure 7 displays proposed site locations and illustrates area needed to implement the design. The tanks would be arranged in a 2 by 8 formation outlining 16 tanks in total. This is a typical formation for this system. Surface area dimensions equal out to approximately 60 ft by 250 ft. Surface Area of Individual Tank: pi X (16 ft)2 = 804.25 ft2 Surface Area of Design: 804.25 ft2 X 16 Tanks = 12868 ft2 = 0.1195 ha = 0.2954 Acres Proposed Area Needed: 60 ft X 250 ft = 15,000 ft2 Available Area for Piping, Etc: 15,000 ft2 - 12868 ft2 = 2000 ft2 Figure 7 Proposed Site Location and Footprint N
  • 22. 7.0 Conclusion Ashbridges Bay WWTP currently operates as a secondary treatment plant. Various nutrient reducing technologies are available to upgrade a WWTP to tertiary conditions. The environmental benefits of creating these conditions have been examined at Ashbridges Bay. If the denitrifying filter process is implemented, TP concentrations in effluent would be reduced to 0.2 mg/L. This would reduce nutrient loading on Lake Ontario. For benefits to be seen on the entire lake, all 95 WWTPs discharging to the lake would have to reduce nutrient concentrations to 0.2 mg/L by upgrading to tertiary treatment. For this to happen, MACs for TP on each plants Certificate of Approval would have to be lowered to that concentration. The Ministry of Environment would have to proceed in an administrative process to amend MAC’s on each plant’s Certificate of Approval. This could take a substantial amount of time and money. If the denitrifying filter process is implemented at Ashbridges Bay it would need a relatively small portion of land. Locations have been proposed as to where the system could operate.
  • 23. Work Cited “Astrasand Continuous Backwash Filter.” Siemens Water Technologies. Siemens, Dec. 2007. Web. 12 Feb. 2011. “Ecological Indicators and Sustainability of the Lake Ontario Ecosystem.” Sea Grant New York, November 2006. Web. 28 March 2011. Environment Canada. "Nearshore Waters of the Great Lakes." Canadian Government, October 2006. Web. 16 Feb. 2011. “Lake Ontario.” International Lake Environment Committee. World Lakes Database, June 1992. Web. 12 Feb. 2011. “Lake Ontario.” New World Encyclopedia. 2 April 2008. Web. 28 Mar. 2011. Ministry of the Environment. "Protocol for Updating Certificates of Approval for Sewage Works." Govt. of Canada, January 2005. Web. 28 Mar. 2011. Podolec, Tom. Ashbridges Bay Wastewater Treatment. 2008. Tom Podolec Photostream, Toronto. Flickr. Web. 28 Mar. 2011. Toronto Water. "Ashbridges Bay Wastewater Treatment Plant 2009 Annual Report." City of Toronto, 31 March 2010. Web. 28 Oct. 2010. United States E.P.A. "Biological Nutrient Removal Processes and Costs." United States Government, June 2007. Web. 27 Nov. 2010. United States E.P.A. "Municipal Nutrient Removal Technologies Reference Document." United States Government, September 2008. Web. 30 Jan. 2011.
  • 24. Work Consulted Hammer, Mark J., and Mark J. Hammer Jr. Water and Wastewater Technology. 5th ed. New Jersey: Pearson, 2004. Print. United States E.P.A. "Primer for Municipal Wastewater Treatment Systems." United States Government, June 2007. Web. 27 Nov. 2010. United States E.P.A. "Human Health and the Great Lakes." United States Government, 29 April 2003. Web. 27 Nov. 2010.
  • 25. Glossary Activated Sludge - System for treating sewage and industrial wastewater using air and biological floc composed of bacteria and protozoans. Anaerobic Digestion - A processes in which micro-organisms break down biodegradable material in the lack of oxygen. Bios Solids (Sludge) – Refers to the remaining semi-solid material left from industrial wastewater treatment processes. It also is used as a generic term for solids separated from suspension in a liquid. Certificate of Approval - A facility that releases emissions to the atmosphere, discharges contaminants to surface waters, provides potable water or disposes of waste must have a Certificate of Approval to operate under the law. Coagulants (Colloids) - A colloidal sized particle is defined in diameter from 5-200 nanometers. Denitrification – Process involved in converting nitrogen to nitrogen gas. E. Coli - This bacteria is commonly found in recreational waters, and their presence indicates the existence of faecal contamination. Eutrophication - Process by which a body of water becomes supplemented in nutrients, which in turn stimulates aquatic plant growth and death, resulting in the depletion of dissolved oxygen. Fauna - Animal life in any particular region or time. Flocculation (Floc) - Process by which fine particles are clumped together to form a larger substance (floc) that can be more easily filtered. Flora - Plant life existing in a defined region. Geosmin - This substance is produced by cyanobacteria (blue-green algae) among other microbes and is released when these microbes die. Drinking water derived from surface water can occasionally be unpleasant-tasting when bacteria release geosmin into the local water supply. Mega Liter (ML) – One million liters in the metric system.
  • 26. Metabolic Functions - Chemical reactions that occur in living organisms to sustain life. Precipitation - The creation of a solid in a solution or inside an additional solid through a chemical reaction. Residence Time - The average time that a particle spends in a particular system. This varies with the amount of substance in the system.