SlideShare a Scribd company logo
1 of 10
End-of-Internship Presentation
Graphic should fill but not exceed the defined grey box.
John David Van Anglen
Drilling-Controls, 6650 Bingle Road, Houston, Texas
Manager: Brad Johnson
HR Manager: Marisa Henning
Table Of Contents
 Interests & Hobbies
 GRDP Intern Introduction
 Assignment Overview
 Project Details
 What I Learned
 Questions and Answers
Hobbies & Interests
Hobbies/Interests
 Aviation
 Triathlon
 Hunting
 LEA
Fun Facts
 Second Internship at Cameron
 Eagle Scout
 Certified Private Pilot
 Swimming State Champion
GRDP Intern Introduction
University of Texas: Mechanical Engineering
Graduation: Summer 2016
HomeTown: Houston, Texas
Past Experience: Cameron Drilling-Berwick,
The Applied Research Laboratories
Acoustics Department-Navy Sonar Program,
Why I Chose Cameron …
Gain oilfield experience
Personal feel, global perspective
Assignment Overview: RGR Subsea Controls
Areas Of The Plant Where I Worked
 Controls Assembly Area
 Electronics Shop
Projects and Improvements
 Subsea Electronics Manual & Report
− Improve procedural consistency and understanding
 Control POD Recertification Manual
 Inventory of RGR parts from past WO’s
 Return to Stock for Improved Margin
 SEM Cathodic Protection Investigation
 Assisted RGR Production Coordinator in daily duties
Product Line
 Aftermarket Subsea Control Systems
Project Details – SEM & POD Manual/Report
What I Accomplished
 Tracked procedures of RGR SEM/POD process
 Enabled oversight into unwritten knowledge of
assembly procedures
 Researched standards and industry guidelines
we do and do not abide by
 Constructed report that included all findings and
conclusions from observations
 Investigated SEM cover corrosion and cathodic
protection system (CamSERV)
Problem Solving
 No manual for new production SEM’s to reference
 Most electronics and POD procedures occur from memory
Project Details
What I Learned
 The need for uniformity
− Easy to understand
− Standardized & common practices
− Continuity between procedures
− Identify gaps in procedural understanding
How Project Added Value To Cameron
 Will increase understanding of key procedures
 Function as a tool to provide customers
 Created awareness & insight for issues to be solved
Key Stakeholders
 Assemblers/Technicians, improved consistency
 RGR Department, clearer procedures
What I Learned
 SAP Optimus & OnBase
 Manufacturing & Assembly Processes (Six Sigma)
 Workflow with a Chain-of-Command
 How to fit into the corporate structure
Takeaways
− Do not be afraid to ask questions, people usually want to help if they are able to
− Every person is different, meaning no two procedures are identical
− Understand the logic behind the process, it will make it much clearer
Ah-Ha Moments
− Get to know people - they will want to assist you later
− Understanding the procedure prior to starting will drastically improve clarity
Questions?
E-mail: jvananglen16@utexas.edu
Mobile: (832) 620-1186

More Related Content

Similar to VanAnglen_John EOI Presentation Final 2015

Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentationmdmilward
 
Quality improvement
Quality improvementQuality improvement
Quality improvementAdel Younis
 
New pmp exam webinar slide no annotation (No Annotation)
New pmp exam webinar slide  no annotation (No Annotation)New pmp exam webinar slide  no annotation (No Annotation)
New pmp exam webinar slide no annotation (No Annotation)CliffordEgbomeade
 
The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)CliffordEgbomeade
 
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docx
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docxApplication of Six Sigma Methodologyto Reduce Defects of a Gri.docx
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docxjustine1simpson78276
 
Southwest Airlines: How to make the great leap from paper to digital
Southwest Airlines: How to make the great leap from paper to digitalSouthwest Airlines: How to make the great leap from paper to digital
Southwest Airlines: How to make the great leap from paper to digitalBlueFish
 
Smith Jeremy Online Upload Resume 2016
Smith Jeremy Online Upload Resume 2016Smith Jeremy Online Upload Resume 2016
Smith Jeremy Online Upload Resume 2016Jeremy Smith
 
Key Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation ProjectsKey Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation ProjectsYokogawa1
 
[Sample Question] OMG OCEB 2 Fundamental (OMG-OCEB2-FUND100) Certification
[Sample Question] OMG OCEB 2 Fundamental (OMG-OCEB2-FUND100) Certification[Sample Question] OMG OCEB 2 Fundamental (OMG-OCEB2-FUND100) Certification
[Sample Question] OMG OCEB 2 Fundamental (OMG-OCEB2-FUND100) CertificationMeghna Arora
 
ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...Jim Jenkins
 
Total systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_samplerTotal systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_samplerJim Jenkins
 
Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisCharlton Inao
 
Six Sigma Green Belt Certification
Six Sigma Green Belt CertificationSix Sigma Green Belt Certification
Six Sigma Green Belt CertificationVskills
 

Similar to VanAnglen_John EOI Presentation Final 2015 (20)

Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentation
 
RPA BA
RPA BARPA BA
RPA BA
 
Quality improvement
Quality improvementQuality improvement
Quality improvement
 
New pmp exam webinar slide no annotation (No Annotation)
New pmp exam webinar slide  no annotation (No Annotation)New pmp exam webinar slide  no annotation (No Annotation)
New pmp exam webinar slide no annotation (No Annotation)
 
The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)
 
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docx
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docxApplication of Six Sigma Methodologyto Reduce Defects of a Gri.docx
Application of Six Sigma Methodologyto Reduce Defects of a Gri.docx
 
Southwest Airlines: How to make the great leap from paper to digital
Southwest Airlines: How to make the great leap from paper to digitalSouthwest Airlines: How to make the great leap from paper to digital
Southwest Airlines: How to make the great leap from paper to digital
 
Resume
ResumeResume
Resume
 
Smith Jeremy Online Upload Resume 2016
Smith Jeremy Online Upload Resume 2016Smith Jeremy Online Upload Resume 2016
Smith Jeremy Online Upload Resume 2016
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Carasik BPM ECM
Carasik BPM ECMCarasik BPM ECM
Carasik BPM ECM
 
Key Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation ProjectsKey Considerations for Scoping Reinstrumentation Projects
Key Considerations for Scoping Reinstrumentation Projects
 
Implementation of ShipManagement Systems Project Management
Implementation of ShipManagement Systems Project ManagementImplementation of ShipManagement Systems Project Management
Implementation of ShipManagement Systems Project Management
 
Shipmanagement System Selection Process
Shipmanagement System Selection ProcessShipmanagement System Selection Process
Shipmanagement System Selection Process
 
[Sample Question] OMG OCEB 2 Fundamental (OMG-OCEB2-FUND100) Certification
[Sample Question] OMG OCEB 2 Fundamental (OMG-OCEB2-FUND100) Certification[Sample Question] OMG OCEB 2 Fundamental (OMG-OCEB2-FUND100) Certification
[Sample Question] OMG OCEB 2 Fundamental (OMG-OCEB2-FUND100) Certification
 
TQM - SPC Tools
TQM - SPC ToolsTQM - SPC Tools
TQM - SPC Tools
 
ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...
 
Total systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_samplerTotal systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_sampler
 
Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysis
 
Six Sigma Green Belt Certification
Six Sigma Green Belt CertificationSix Sigma Green Belt Certification
Six Sigma Green Belt Certification
 

VanAnglen_John EOI Presentation Final 2015

  • 2. Graphic should fill but not exceed the defined grey box. John David Van Anglen Drilling-Controls, 6650 Bingle Road, Houston, Texas Manager: Brad Johnson HR Manager: Marisa Henning
  • 3. Table Of Contents  Interests & Hobbies  GRDP Intern Introduction  Assignment Overview  Project Details  What I Learned  Questions and Answers
  • 4. Hobbies & Interests Hobbies/Interests  Aviation  Triathlon  Hunting  LEA Fun Facts  Second Internship at Cameron  Eagle Scout  Certified Private Pilot  Swimming State Champion
  • 5. GRDP Intern Introduction University of Texas: Mechanical Engineering Graduation: Summer 2016 HomeTown: Houston, Texas Past Experience: Cameron Drilling-Berwick, The Applied Research Laboratories Acoustics Department-Navy Sonar Program, Why I Chose Cameron … Gain oilfield experience Personal feel, global perspective
  • 6. Assignment Overview: RGR Subsea Controls Areas Of The Plant Where I Worked  Controls Assembly Area  Electronics Shop Projects and Improvements  Subsea Electronics Manual & Report − Improve procedural consistency and understanding  Control POD Recertification Manual  Inventory of RGR parts from past WO’s  Return to Stock for Improved Margin  SEM Cathodic Protection Investigation  Assisted RGR Production Coordinator in daily duties Product Line  Aftermarket Subsea Control Systems
  • 7. Project Details – SEM & POD Manual/Report What I Accomplished  Tracked procedures of RGR SEM/POD process  Enabled oversight into unwritten knowledge of assembly procedures  Researched standards and industry guidelines we do and do not abide by  Constructed report that included all findings and conclusions from observations  Investigated SEM cover corrosion and cathodic protection system (CamSERV) Problem Solving  No manual for new production SEM’s to reference  Most electronics and POD procedures occur from memory
  • 8. Project Details What I Learned  The need for uniformity − Easy to understand − Standardized & common practices − Continuity between procedures − Identify gaps in procedural understanding How Project Added Value To Cameron  Will increase understanding of key procedures  Function as a tool to provide customers  Created awareness & insight for issues to be solved Key Stakeholders  Assemblers/Technicians, improved consistency  RGR Department, clearer procedures
  • 9. What I Learned  SAP Optimus & OnBase  Manufacturing & Assembly Processes (Six Sigma)  Workflow with a Chain-of-Command  How to fit into the corporate structure Takeaways − Do not be afraid to ask questions, people usually want to help if they are able to − Every person is different, meaning no two procedures are identical − Understand the logic behind the process, it will make it much clearer Ah-Ha Moments − Get to know people - they will want to assist you later − Understanding the procedure prior to starting will drastically improve clarity

Editor's Notes

  1. 10 seconds
  2. 10 seconds
  3. 20 seconds
  4. 20 seconds
  5. 20 seconds
  6. 45 Seconds
  7. 45 Seconds
  8. 30 Seconds