2. Graphic should fill but not exceed the defined grey box.
John David Van Anglen
Drilling-Controls, 6650 Bingle Road, Houston, Texas
Manager: Brad Johnson
HR Manager: Marisa Henning
3. Table Of Contents
Interests & Hobbies
GRDP Intern Introduction
Assignment Overview
Project Details
What I Learned
Questions and Answers
4. Hobbies & Interests
Hobbies/Interests
Aviation
Triathlon
Hunting
LEA
Fun Facts
Second Internship at Cameron
Eagle Scout
Certified Private Pilot
Swimming State Champion
5. GRDP Intern Introduction
University of Texas: Mechanical Engineering
Graduation: Summer 2016
HomeTown: Houston, Texas
Past Experience: Cameron Drilling-Berwick,
The Applied Research Laboratories
Acoustics Department-Navy Sonar Program,
Why I Chose Cameron …
Gain oilfield experience
Personal feel, global perspective
6. Assignment Overview: RGR Subsea Controls
Areas Of The Plant Where I Worked
Controls Assembly Area
Electronics Shop
Projects and Improvements
Subsea Electronics Manual & Report
− Improve procedural consistency and understanding
Control POD Recertification Manual
Inventory of RGR parts from past WO’s
Return to Stock for Improved Margin
SEM Cathodic Protection Investigation
Assisted RGR Production Coordinator in daily duties
Product Line
Aftermarket Subsea Control Systems
7. Project Details – SEM & POD Manual/Report
What I Accomplished
Tracked procedures of RGR SEM/POD process
Enabled oversight into unwritten knowledge of
assembly procedures
Researched standards and industry guidelines
we do and do not abide by
Constructed report that included all findings and
conclusions from observations
Investigated SEM cover corrosion and cathodic
protection system (CamSERV)
Problem Solving
No manual for new production SEM’s to reference
Most electronics and POD procedures occur from memory
8. Project Details
What I Learned
The need for uniformity
− Easy to understand
− Standardized & common practices
− Continuity between procedures
− Identify gaps in procedural understanding
How Project Added Value To Cameron
Will increase understanding of key procedures
Function as a tool to provide customers
Created awareness & insight for issues to be solved
Key Stakeholders
Assemblers/Technicians, improved consistency
RGR Department, clearer procedures
9. What I Learned
SAP Optimus & OnBase
Manufacturing & Assembly Processes (Six Sigma)
Workflow with a Chain-of-Command
How to fit into the corporate structure
Takeaways
− Do not be afraid to ask questions, people usually want to help if they are able to
− Every person is different, meaning no two procedures are identical
− Understand the logic behind the process, it will make it much clearer
Ah-Ha Moments
− Get to know people - they will want to assist you later
− Understanding the procedure prior to starting will drastically improve clarity