5 point of Risk Management (Logistics)
- 2. Need identify hazardous on the way A to Z
for logistics difficulties.
POINT and Marked always.
- 4. On the basis of assess hazardous need to
control decisions and make pure.
- 5. Need to implement guidelines with
immediate effects to resolve the hazardous.
- 6. All things depends on review. Need to set
parameters to supervise the hazardous.
- 7. Above 5 point for risk management, this is
basis point for success with hazardous.
Thank you
Jitendra Singh