1. JAWAD ALIJAWAD ALI
Address: Sami town Muslimabad fatehargh mughlpura Lahore
Phone +92 3205420517
+92 3334903676
Jawadali819@yahoo.com
To secure a position in a forward-looking organization, where I can bring into reality
my passion for what I do and to help meet society's ever changing demand of critical
needs.
Working as ELECTRICAL ENGINEER in different Multinational companies. Performing different types of
duties in technical and innovative environment and having immense interest in tracing and removing
technical faults.
• DESCON Engineering limited.
Date: 26 July 2015 to onward.
Working as Workshop Incharge in EE department.
Key Responsibilities:
Motor starting Techniques.
Motor Faults Locations.
Transformer practical Designing.
Solar Panels Designing.
UPS system Designing.
Home wiring Techniques.
Electrical Supervisor.
Industrial Electrician.
Electrical supervisor during practical training.
Safety Locations.
Prepared Conceptual Workings.
Made the time table for Electrical workshops.
• Colgate Palmolive limited.
Location: Colgate Palmolive sunder city Lahore.
Date: 22 June 2012 to 21 March 2013.
Working as PLC Machine Operator in EE department
Page 1
OBJECTIVE
Career Experience
Career Experience (past)
Career Profile
2. Key Responsibilities
Running and installing the new PLC machines
Repair and maintenance the machines
Manually working on machines
Automatic working on the machines
Overhauling of the machines
System Sensors
• Electrical Engineering services limited.
Location: EES Muslim town Lahore.
Date: 14 April 2010 to 22 august 2011.
Working as Panel designer in EE department
Key Responsibilities
Single phase panel Wiring
Three phase panel wiring
Motor Control panel
PLC control panel
• PEL (Pakistan elektron limited)
Location: PEL Lahore
Date: 11 august 2014 to 10 September 2014.
Working as Internee Engineer
Key Responsibilities
Transformer Designing Calculations
Practical Designing
Transformer Testing
• Solar Panel Designing.
Load Calculations
Panel Designing
Panel Rating and Costing
Invertor rating and costing
PLCC Operations (Final year Project)
Power line Carrier Communication
Automatic meter reading project
Operating conditions
Page 2
Technical Skills:
Internship
3. Optical Fiber (PTCL)
Fiber Communication
Fiber operations
Fiber faults
• PLC Operations:
Working conditions
Operator conditions
Panel Designing
• Head Management Team Horse & Cattle Show 2015
Performed duty as Group Head in Fortress stadium in Lahore
• Head Management Team Punjab youth festival 2014
Performed duty as Group Head in Punjab Hockey stadium in Lahore
• PAK & ZIM series 2015 management team 2015
Performed duty with Punjab police in Gaddafi stadium Lahore
Presentation skills
MATLAB
Micro Controller Programming
Programing Languages (C, C++, OOP)
TURBO C++, C Free
MS Word, MS Power Point, MS Excel
Page 3
COMPUTER SKILLS
Management skills
4. B.S.C Electrical Engineering (Power)
University of South Asia
DAE Electrical Technology
GCT Lahore
Matric
Bise Lahore
Will be furnished on the demand.
Page 4
Qualification
Reference