SSE experience James Stone
August 2008 – Present
 Cable Retriever 28/05/08-31/07/08 SEAIOCMA standby
Acting SSE - SEAIOCMA standby, various post repair cable burial operations
using Perry Tritech ST201.
 CS Sovereign 05/05/09 - 15/06/09
 Thornton Bank wind farm power cable burial, Belgium 06/05 – 12/05
Atlas1 ROV utilised to bury 96mm power cable to 0.8m. Survey equipment
fitted to Atlas 1, Octans Gyro, Hi Res Sonar, Bathy
 Horns Rev 2 wind farm power cable burial, Esbjerg, Denmark 13/05 – 12/06
Atlas1 ROV utilised to bury 86, 92 and 102mm power cable to 0.8m.Survey
equipment fitted to Atlas 1, Octans Gyro, Hi Res Sonar, Bathy
 Kelvin cable and BU installation, Portrush, Northern Ireland to Hibernia
Transatlantic system 16/06 – 05/07
Plough K and Atlas 1 utilised to bury 25km of cable plus BU to 1m in
ploughing and PLIB operations.
 CS Sovereign 05/11/09 - 19/01/10
 SGSCS system loading Rognan, Norway and transit to Trinidad
Plough trails took place in Lyme Bay in November, a good deal of this
commission was spent in Norway where outside temperatures ranged from;
-10°C to -25°C meaning on deck maintenance work was impractical, the ROV
and Plough were therefore winterised, Atlas1 was covered with tarpaulin and
heated from underneath using two space heaters. Lowest temperature
recorded under the tarpaulin was 0°C.
 CS Sovereign 08/04/10-07/06/10
 SGSCS Plough and PLIB operations in Guyana and Suriname 22/04 – 02/05
SMD Plough H and Atlas1 ROV utilised to bury telecoms cable to 0.6m
 Dry dock, Birkenhead, preparations for Belwind and Super Mohawk mob,
22/05 – 28/05
 Belwind wind farm power cable burial, Belgium 31/05 – 07/06
Atlas1 ROV utilised to bury 110mm power cable to 1.0m. Survey equipment
fitted to Atlas 1, Octans Gyro, Hi Res Sonar
 CS Sovereign 10/08/10 - 06/10/10
 Project Judy, Clyde BU to Judy platform, North Sea 13/08 - 29/08
Atlas 1 utilised to bury 25km of telecoms cable plus BU to 1.0m
Super Mohawk utilised for mattress position fixing across Fulmar pipeline
crossing and cable touchdown monitoring across mattress
 EMEC tidal power cable installation, Eday, Orkney Isles 13/09 - 04/10
Atlas 1 utilised for 7x lift line cable recoveries, 1x cable cut and survey of
installed cable. Super Mohawk utilised for survey of installed cable
 CS Sovereign 28/11/10 - 21/01/11
Project Judy, Clyde BU to Judy platform, North Sea 03/01 - 20/01
Completion of cable installation and PRIB
 Cable Retriever 23/08/11 – 31/12/2013
SEAIOCMA standby, various post repair cable burial operations using Perry
Tritech ST201. Planning of new Forum XT601 trenching ROV with 3m burial
capability fitment and integration into ships systems.
 Cable Retriever 01/01/14 – 26/09/15
Mobilisation and integration of new Forum XT601 trenching ROV with 3m
burial capability and Dynacon LARS. SEAIOCMA standby - various post
repair cable burial operations.

More Related Content

Similar to SSE experience James Stone

Barry Moran ROV - Plough Log Book.
Barry Moran ROV - Plough Log Book.Barry Moran ROV - Plough Log Book.
Barry Moran ROV - Plough Log Book.bazza323
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
IanWalker CV 2015
IanWalker CV  2015IanWalker CV  2015
IanWalker CV 2015Ian Walker
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.brian timpson
 
CV Mr Michael Marley-Savage
CV Mr Michael Marley-SavageCV Mr Michael Marley-Savage
CV Mr Michael Marley-Savagemichael savage
 
Tubular Track - Namibia
Tubular Track - NamibiaTubular Track - Namibia
Tubular Track - NamibiaTubular Track
 
Case study_Walney_rev1
Case study_Walney_rev1Case study_Walney_rev1
Case study_Walney_rev1Rune Kaltoft
 
My Status and References of Submarine Cable
My Status and References of Submarine CableMy Status and References of Submarine Cable
My Status and References of Submarine CableChristian Georges Chene
 
C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)Scott Goodwin
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline ProtectionSikko Krol
 
Daniel Snyman Resume
Daniel Snyman ResumeDaniel Snyman Resume
Daniel Snyman ResumeDaniel Snyman
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirris
 
Russell Ferrier's Resume
Russell Ferrier's ResumeRussell Ferrier's Resume
Russell Ferrier's ResumeRussell Ferrier
 
Morritt andrew cv 2017 ref
Morritt andrew cv 2017 refMorritt andrew cv 2017 ref
Morritt andrew cv 2017 refAndy Morritt
 
MORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 RefMORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 RefAndy Morritt
 
Chad Irvine's CV
Chad Irvine's CVChad Irvine's CV
Chad Irvine's CVChad Irvine
 
GM-casestudy-uninett
GM-casestudy-uninettGM-casestudy-uninett
GM-casestudy-uninettScott Miller
 

Similar to SSE experience James Stone (20)

Barry Moran ROV - Plough Log Book.
Barry Moran ROV - Plough Log Book.Barry Moran ROV - Plough Log Book.
Barry Moran ROV - Plough Log Book.
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
Leonardo Fortuin Resume.2
Leonardo Fortuin Resume.2Leonardo Fortuin Resume.2
Leonardo Fortuin Resume.2
 
IanWalker CV 2015
IanWalker CV  2015IanWalker CV  2015
IanWalker CV 2015
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.
 
CV Mr Michael Marley-Savage
CV Mr Michael Marley-SavageCV Mr Michael Marley-Savage
CV Mr Michael Marley-Savage
 
A CLARK 16
A CLARK 16A CLARK 16
A CLARK 16
 
Tubular Track - Namibia
Tubular Track - NamibiaTubular Track - Namibia
Tubular Track - Namibia
 
Case study_Walney_rev1
Case study_Walney_rev1Case study_Walney_rev1
Case study_Walney_rev1
 
My Status and References of Submarine Cable
My Status and References of Submarine CableMy Status and References of Submarine Cable
My Status and References of Submarine Cable
 
C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)C.H.Scott Goodwin (2)
C.H.Scott Goodwin (2)
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline Protection
 
Daniel Snyman Resume
Daniel Snyman ResumeDaniel Snyman Resume
Daniel Snyman Resume
 
Sirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-PowerSirrs Materials Day 2010 - C-Power
Sirrs Materials Day 2010 - C-Power
 
Russell Ferrier's Resume
Russell Ferrier's ResumeRussell Ferrier's Resume
Russell Ferrier's Resume
 
Morritt andrew cv 2017 ref
Morritt andrew cv 2017 refMorritt andrew cv 2017 ref
Morritt andrew cv 2017 ref
 
MORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 RefMORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 Ref
 
Experience Cable All
Experience Cable AllExperience Cable All
Experience Cable All
 
Chad Irvine's CV
Chad Irvine's CVChad Irvine's CV
Chad Irvine's CV
 
GM-casestudy-uninett
GM-casestudy-uninettGM-casestudy-uninett
GM-casestudy-uninett
 

SSE experience James Stone

  • 1. SSE experience James Stone August 2008 – Present  Cable Retriever 28/05/08-31/07/08 SEAIOCMA standby Acting SSE - SEAIOCMA standby, various post repair cable burial operations using Perry Tritech ST201.  CS Sovereign 05/05/09 - 15/06/09  Thornton Bank wind farm power cable burial, Belgium 06/05 – 12/05 Atlas1 ROV utilised to bury 96mm power cable to 0.8m. Survey equipment fitted to Atlas 1, Octans Gyro, Hi Res Sonar, Bathy  Horns Rev 2 wind farm power cable burial, Esbjerg, Denmark 13/05 – 12/06 Atlas1 ROV utilised to bury 86, 92 and 102mm power cable to 0.8m.Survey equipment fitted to Atlas 1, Octans Gyro, Hi Res Sonar, Bathy  Kelvin cable and BU installation, Portrush, Northern Ireland to Hibernia Transatlantic system 16/06 – 05/07 Plough K and Atlas 1 utilised to bury 25km of cable plus BU to 1m in ploughing and PLIB operations.  CS Sovereign 05/11/09 - 19/01/10  SGSCS system loading Rognan, Norway and transit to Trinidad Plough trails took place in Lyme Bay in November, a good deal of this commission was spent in Norway where outside temperatures ranged from; -10°C to -25°C meaning on deck maintenance work was impractical, the ROV and Plough were therefore winterised, Atlas1 was covered with tarpaulin and heated from underneath using two space heaters. Lowest temperature recorded under the tarpaulin was 0°C.  CS Sovereign 08/04/10-07/06/10  SGSCS Plough and PLIB operations in Guyana and Suriname 22/04 – 02/05
  • 2. SMD Plough H and Atlas1 ROV utilised to bury telecoms cable to 0.6m  Dry dock, Birkenhead, preparations for Belwind and Super Mohawk mob, 22/05 – 28/05  Belwind wind farm power cable burial, Belgium 31/05 – 07/06 Atlas1 ROV utilised to bury 110mm power cable to 1.0m. Survey equipment fitted to Atlas 1, Octans Gyro, Hi Res Sonar  CS Sovereign 10/08/10 - 06/10/10  Project Judy, Clyde BU to Judy platform, North Sea 13/08 - 29/08 Atlas 1 utilised to bury 25km of telecoms cable plus BU to 1.0m Super Mohawk utilised for mattress position fixing across Fulmar pipeline crossing and cable touchdown monitoring across mattress  EMEC tidal power cable installation, Eday, Orkney Isles 13/09 - 04/10 Atlas 1 utilised for 7x lift line cable recoveries, 1x cable cut and survey of installed cable. Super Mohawk utilised for survey of installed cable  CS Sovereign 28/11/10 - 21/01/11 Project Judy, Clyde BU to Judy platform, North Sea 03/01 - 20/01 Completion of cable installation and PRIB  Cable Retriever 23/08/11 – 31/12/2013 SEAIOCMA standby, various post repair cable burial operations using Perry Tritech ST201. Planning of new Forum XT601 trenching ROV with 3m burial capability fitment and integration into ships systems.  Cable Retriever 01/01/14 – 26/09/15 Mobilisation and integration of new Forum XT601 trenching ROV with 3m burial capability and Dynacon LARS. SEAIOCMA standby - various post repair cable burial operations.