SlideShare a Scribd company logo
1 of 3
Download to read offline
| P a g e
1
Islam Abd El Naby Khalil Youssif.
Building (2),fayrouzet smouha compound-EL NAKL WEL HANDASA street-
Smouha – Alexandria, Egypt.
Telephone: 03/4224158, Mobile phone: (+2)01005042625.
E-mail: islam_naby@hotmail.com
Job Responsibilities:
 Development and implementation of Preventive maintenance schedules
for equipment.
 Review of Project specifications and P&ID in the contract.
 Supervising on receipt, inspection, checking and storage of materials.
 Reviewing piping Isometric drawings and Receipt of the piping systems (supports, hydro-
test, insulation &painting).
 Supervising on hydrostatic, flushing, and start-up testing for piping.
 Follow-up performance and operation of the equipment.
 Preparation of spare parts needed for preventive maintenance and overhauls.
 Preparation of field piping system test packages; including system limits on P&ID and piping
Isometrics at construction of the project.
 Help in temporary site services layout and design.
Educational Background:
 Arab Academy for science and technology and maritime transport.
 Faculty of Engineering - Bachelor degree in Electro-mechanical engineering.
 Graduation Year : July 2010
 Grade : very good
 Graduation Project: Electric Elevator.
 Project Grade: Excellent.
Work Experience:
 Current Job Title:
Mechanical Maintenance Engineer
 Employer:
West Delta Electricity Production – Abu Qir Power Station new project 2*650MW.
 Plant description:
Abu Qir Thermal Power Plant consists of the following major Components:
Two steam turbine generating units 650 MW each, two dual fuel fired steam
generators. Desalination Plant: This consists of 2 units using MED technology with
capacity of 10,000 m3/day.
 From: October 2011 till present time.
| P a g e
2
Islam Abd El Naby Khalil Youssif.
Job description
 Supervising on receipt, inspection, Reviewing piping Isometric drawings and Receipt of the piping
systems (supports, hydro-test, insulation &painting)for the following contracts:
 CP-106: Steam Turbine Generator and Condenser, Consortium of Mitsubishi Heavy
Industries, Ltd, and Toyota Tsusho Corporation
 CP-107: Yard Tanks, The port said engineering works (PSEW)
 PO-109: Pumps and Drives, SULZER
 PO-110: Feed water Heaters, Consortium of LG International Corp. and BHI CO, LTD.
 PO-112: Critical Piping, Seonghwa Industrial Co., Ltd, South Korea
 CP-118: Mechanical equipment / Pipe installation, Consortium of AVIC and ZTPC.
 Firefighting contract:
 Wet pipe automatic sprinklers system.
 Automatic INERGEN system for the control building (INERT Natural Gases).
 Foam water system & cooling system for tanks.
 Wet Standpipe and Hose Systems.
 Water deluge system for (9) Electrical transformers"500kv" & steam turbine lube oil.
 Per-action system for steam turbine and generator.
 Underground fire piping and private Hydrant.
 Follow up & supervising of repair, scheduled and preventive maintenance for the following
equipment:
 Air Compressors (Reciprocating – Centrifugal), Air Receiver &Air Dryers.
 Hydrogen compressors.
 Steam Turbine and generator: Mitsubishi heavy industries, LTD (2*650 MW) (three
cylinder HP-IP, LP1 and LP2 with 24 KV generator hydrogen and stator cooling water
system and turbine auxiliaries).
 Centrifugal Pumps (Single Stage – Multi Stage).
 Axial Flow Pumps, Vertical & sump Pumps.
 Positive Displacement Pumps (Gear – piston -screw).
 Reciprocating engine (diesel generator & diesel fire pump).
 Heat Exchangers (Heaters – Coolers).
 Ultrasonic inspection &scheduled thickness survey for all plant piping.
 Supervision for HVAC and Firefighting Systems for the following equipment:
 30 DX package units- type (240000 BTU/H & 180000BTU/H).
 72 DX wall split units- type (60000 BTU/H, 36000BTU/H & 24000BTU/H).
 54 exhaust fan units-type (axial-vertical).
 3 Air handing units-type (55000 m3/hr).
 5 chilled water units- type (45 TR).
 50 fan coil units- type (600 CFM).
 33 fan coil units-type (400 CFM).
 6 Centrifugal pumps (106 GPM).
| P a g e
3
Islam Abd El Naby Khalil Youssif.
(From September2010 to October 2011)
Inspection Engineer
INSPECTA Middle East Company for Quality Service MIDDLE EAST OIL REFINARY COMPANY
(MIDOR)
NDT Inspector
 Thickness survey for tanks, pipe lines & equipment’s.
 Ultrasonic test for pipe lines welds with different thickness.
 Magnetic Particle Test.
 Liquid Penetrating Testing.
 Heat treatment for pipes welding.
Certifications:
 Completed an English Conversation Course at the British Academy with grad Excellent.
 Visual testing –Level II according to SNT-TC-1A.
 Cartronics work shop at AAST from 2/2/2008 to 13/2/2008.
 Infinity Training & Development ,Alexandria ,Egypt from 15/12/2011 to 28/1/2012 training
on HVAC system( Design ,Installation and Maintenance).
 Preparation course for API 570 authorized piping inspector from 20/5/2013 to 3/6/2013.
 On shore Turbine maintenance and operation training at Mitsubishi Heavy Industries, Ltd.
Nagasaki Shipyard & machinery from 12/2/2012 to 18/4/2012.
 Diesel engines course at West delta Electricity company training center from February 2015
till March.
Training:
 Mercedes-Benz (MCV) from 1/7/2008 to 30/8/2008.
 MANTRAC Company (CAT) from 26/7/2009 to 13/8/2009.
Language skills:
 Arabic: Mother tongue
 English: very good Spoken & Written.
Computer Skills:
 Microsoft office.
 Auto Cad 2013 (2D).
 HAP software.
Personal Data
 Nationality : Egyptian
 Marital status :Married
 Military service : Exempted
 Driving License : Valid
References are available upon your request.

More Related Content

What's hot

OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06John Grover
 
Saes h-001 - 2016
Saes h-001 - 2016Saes h-001 - 2016
Saes h-001 - 2016Faisal k v
 
Saudi arabian-engineering-standards-saes-j-502
Saudi arabian-engineering-standards-saes-j-502Saudi arabian-engineering-standards-saes-j-502
Saudi arabian-engineering-standards-saes-j-502nadim khan
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)Aravinth Jai
 
Automated Orbital Welding Machines
Automated Orbital Welding MachinesAutomated Orbital Welding Machines
Automated Orbital Welding Machinesishubhamp
 
Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha Ramisetti
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)ghani386
 
Qualitrol | Vault Monitoring
Qualitrol | Vault MonitoringQualitrol | Vault Monitoring
Qualitrol | Vault MonitoringSean Wallace
 
Coke drum applications Claudio Allevato
Coke drum applications Claudio AllevatoCoke drum applications Claudio Allevato
Coke drum applications Claudio AllevatoMinacore
 
Saes a-206-pmi
Saes a-206-pmiSaes a-206-pmi
Saes a-206-pmiabhi10apr
 
75340982 standards-issued
75340982 standards-issued75340982 standards-issued
75340982 standards-issuedMowaten Masry
 

What's hot (16)

OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06
 
Saes h-001 - 2016
Saes h-001 - 2016Saes h-001 - 2016
Saes h-001 - 2016
 
Saudi arabian-engineering-standards-saes-j-502
Saudi arabian-engineering-standards-saes-j-502Saudi arabian-engineering-standards-saes-j-502
Saudi arabian-engineering-standards-saes-j-502
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)
 
Automated Orbital Welding Machines
Automated Orbital Welding MachinesAutomated Orbital Welding Machines
Automated Orbital Welding Machines
 
WP Offshore Coating Techniques Aug 2015
WP Offshore Coating Techniques Aug 2015WP Offshore Coating Techniques Aug 2015
WP Offshore Coating Techniques Aug 2015
 
Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
 
Resume S B Mohapatra -SEP2015
Resume S B Mohapatra -SEP2015Resume S B Mohapatra -SEP2015
Resume S B Mohapatra -SEP2015
 
Qualitrol | Vault Monitoring
Qualitrol | Vault MonitoringQualitrol | Vault Monitoring
Qualitrol | Vault Monitoring
 
Vision Extrusions - Exova Report
Vision Extrusions - Exova ReportVision Extrusions - Exova Report
Vision Extrusions - Exova Report
 
Quality
QualityQuality
Quality
 
Coke drum applications Claudio Allevato
Coke drum applications Claudio AllevatoCoke drum applications Claudio Allevato
Coke drum applications Claudio Allevato
 
Saes a-206-pmi
Saes a-206-pmiSaes a-206-pmi
Saes a-206-pmi
 
75340982 standards-issued
75340982 standards-issued75340982 standards-issued
75340982 standards-issued
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 

Similar to Islam Abdul naby general cv 2016

cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 newRamez Nasr
 
Ahmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineerAhmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineerahmed salah
 
Agr Field Operations Pipeline Inspection
Agr Field Operations Pipeline InspectionAgr Field Operations Pipeline Inspection
Agr Field Operations Pipeline Inspectionjsthetford
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last updateMomen Mohamed
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 
AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD
 
Standards_Technical Seminar for Cathodic Protection to GOGC Design.pdf
Standards_Technical Seminar for Cathodic Protection to GOGC Design.pdfStandards_Technical Seminar for Cathodic Protection to GOGC Design.pdf
Standards_Technical Seminar for Cathodic Protection to GOGC Design.pdfSergeRINAUDO1
 

Similar to Islam Abdul naby general cv 2016 (20)

cv-ramez-2016 new
cv-ramez-2016 newcv-ramez-2016 new
cv-ramez-2016 new
 
eng - hazem abdelaziz
eng - hazem abdelazizeng - hazem abdelaziz
eng - hazem abdelaziz
 
Ahmed.Lepda
Ahmed.LepdaAhmed.Lepda
Ahmed.Lepda
 
PERSONAL INFORMATION
PERSONAL INFORMATIONPERSONAL INFORMATION
PERSONAL INFORMATION
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
Ahmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineerAhmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineer
 
Agr Field Operations Pipeline Inspection
Agr Field Operations Pipeline InspectionAgr Field Operations Pipeline Inspection
Agr Field Operations Pipeline Inspection
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
CV Yasin
CV YasinCV Yasin
CV Yasin
 
Ahmed-Abdel-aziz-osman
Ahmed-Abdel-aziz-osmanAhmed-Abdel-aziz-osman
Ahmed-Abdel-aziz-osman
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
 
Mina Ezzat CV
Mina Ezzat CVMina Ezzat CV
Mina Ezzat CV
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
Abraham CV 03.06.2015
Abraham CV 03.06.2015Abraham CV 03.06.2015
Abraham CV 03.06.2015
 
Standards_Technical Seminar for Cathodic Protection to GOGC Design.pdf
Standards_Technical Seminar for Cathodic Protection to GOGC Design.pdfStandards_Technical Seminar for Cathodic Protection to GOGC Design.pdf
Standards_Technical Seminar for Cathodic Protection to GOGC Design.pdf
 

Islam Abdul naby general cv 2016

  • 1. | P a g e 1 Islam Abd El Naby Khalil Youssif. Building (2),fayrouzet smouha compound-EL NAKL WEL HANDASA street- Smouha – Alexandria, Egypt. Telephone: 03/4224158, Mobile phone: (+2)01005042625. E-mail: islam_naby@hotmail.com Job Responsibilities:  Development and implementation of Preventive maintenance schedules for equipment.  Review of Project specifications and P&ID in the contract.  Supervising on receipt, inspection, checking and storage of materials.  Reviewing piping Isometric drawings and Receipt of the piping systems (supports, hydro- test, insulation &painting).  Supervising on hydrostatic, flushing, and start-up testing for piping.  Follow-up performance and operation of the equipment.  Preparation of spare parts needed for preventive maintenance and overhauls.  Preparation of field piping system test packages; including system limits on P&ID and piping Isometrics at construction of the project.  Help in temporary site services layout and design. Educational Background:  Arab Academy for science and technology and maritime transport.  Faculty of Engineering - Bachelor degree in Electro-mechanical engineering.  Graduation Year : July 2010  Grade : very good  Graduation Project: Electric Elevator.  Project Grade: Excellent. Work Experience:  Current Job Title: Mechanical Maintenance Engineer  Employer: West Delta Electricity Production – Abu Qir Power Station new project 2*650MW.  Plant description: Abu Qir Thermal Power Plant consists of the following major Components: Two steam turbine generating units 650 MW each, two dual fuel fired steam generators. Desalination Plant: This consists of 2 units using MED technology with capacity of 10,000 m3/day.  From: October 2011 till present time.
  • 2. | P a g e 2 Islam Abd El Naby Khalil Youssif. Job description  Supervising on receipt, inspection, Reviewing piping Isometric drawings and Receipt of the piping systems (supports, hydro-test, insulation &painting)for the following contracts:  CP-106: Steam Turbine Generator and Condenser, Consortium of Mitsubishi Heavy Industries, Ltd, and Toyota Tsusho Corporation  CP-107: Yard Tanks, The port said engineering works (PSEW)  PO-109: Pumps and Drives, SULZER  PO-110: Feed water Heaters, Consortium of LG International Corp. and BHI CO, LTD.  PO-112: Critical Piping, Seonghwa Industrial Co., Ltd, South Korea  CP-118: Mechanical equipment / Pipe installation, Consortium of AVIC and ZTPC.  Firefighting contract:  Wet pipe automatic sprinklers system.  Automatic INERGEN system for the control building (INERT Natural Gases).  Foam water system & cooling system for tanks.  Wet Standpipe and Hose Systems.  Water deluge system for (9) Electrical transformers"500kv" & steam turbine lube oil.  Per-action system for steam turbine and generator.  Underground fire piping and private Hydrant.  Follow up & supervising of repair, scheduled and preventive maintenance for the following equipment:  Air Compressors (Reciprocating – Centrifugal), Air Receiver &Air Dryers.  Hydrogen compressors.  Steam Turbine and generator: Mitsubishi heavy industries, LTD (2*650 MW) (three cylinder HP-IP, LP1 and LP2 with 24 KV generator hydrogen and stator cooling water system and turbine auxiliaries).  Centrifugal Pumps (Single Stage – Multi Stage).  Axial Flow Pumps, Vertical & sump Pumps.  Positive Displacement Pumps (Gear – piston -screw).  Reciprocating engine (diesel generator & diesel fire pump).  Heat Exchangers (Heaters – Coolers).  Ultrasonic inspection &scheduled thickness survey for all plant piping.  Supervision for HVAC and Firefighting Systems for the following equipment:  30 DX package units- type (240000 BTU/H & 180000BTU/H).  72 DX wall split units- type (60000 BTU/H, 36000BTU/H & 24000BTU/H).  54 exhaust fan units-type (axial-vertical).  3 Air handing units-type (55000 m3/hr).  5 chilled water units- type (45 TR).  50 fan coil units- type (600 CFM).  33 fan coil units-type (400 CFM).  6 Centrifugal pumps (106 GPM).
  • 3. | P a g e 3 Islam Abd El Naby Khalil Youssif. (From September2010 to October 2011) Inspection Engineer INSPECTA Middle East Company for Quality Service MIDDLE EAST OIL REFINARY COMPANY (MIDOR) NDT Inspector  Thickness survey for tanks, pipe lines & equipment’s.  Ultrasonic test for pipe lines welds with different thickness.  Magnetic Particle Test.  Liquid Penetrating Testing.  Heat treatment for pipes welding. Certifications:  Completed an English Conversation Course at the British Academy with grad Excellent.  Visual testing –Level II according to SNT-TC-1A.  Cartronics work shop at AAST from 2/2/2008 to 13/2/2008.  Infinity Training & Development ,Alexandria ,Egypt from 15/12/2011 to 28/1/2012 training on HVAC system( Design ,Installation and Maintenance).  Preparation course for API 570 authorized piping inspector from 20/5/2013 to 3/6/2013.  On shore Turbine maintenance and operation training at Mitsubishi Heavy Industries, Ltd. Nagasaki Shipyard & machinery from 12/2/2012 to 18/4/2012.  Diesel engines course at West delta Electricity company training center from February 2015 till March. Training:  Mercedes-Benz (MCV) from 1/7/2008 to 30/8/2008.  MANTRAC Company (CAT) from 26/7/2009 to 13/8/2009. Language skills:  Arabic: Mother tongue  English: very good Spoken & Written. Computer Skills:  Microsoft office.  Auto Cad 2013 (2D).  HAP software. Personal Data  Nationality : Egyptian  Marital status :Married  Military service : Exempted  Driving License : Valid References are available upon your request.