Montala Alviera by Alveo Ayala Land
For availability of units please message
IRISH SIMEON
Senior Property Investment Consultant
+63956 672 0776
irish.alveo@gmail.com
2. AYALA LAND’S HERITAGE OF
MASTERPLANNING TOWNSHIPS
Makati Central Business District (MCBD)
Ayala Alabang / Alabang Town Center
(1958) Today
(1977) Today
3. AYALA LAND’S HERITAGE OF
MASTERPLANNING TOWNSHIPS
Cebu Business Park
Bonifacio Global City (BGC)
(1990) Today
(2003) Today
6. ALVIERA is a
1,100+ hectare
joint venture development of
Ayala Land and Leonio Land
that is envisioned to be the
growth center of Central Luzon.
Industrial Park
Commercial, Retail & Recreational Centers
Hotels & Offices
Universities
7. It is strategically located
and easily accessible from
key cities:
5 mins from Clark
20 mins from Angeles &
San Fernando
40 mins from Subic
1.5 hrs from Quezon City
2 hrs from La Union
2.5 hrs from Baguio
14. Estate Construction Updates
ITEMS STATUS
Embankment works on
priority Phase 1A areas
completed
Phase 1A land dev’t
works
60%
completed
Utilities 10%
completed
17. MASTERPLAN
Area
(in ha.)
%
Total Land Area 40.5 100%
Saleable 22.3 55%
Non-saleable 18.2 45%
Parks and
Open Spaces
6.0
Easements 0.2
Utilities 0.4
Roads 11.8
Area
(in ha.)
%
Total Land Area 39.4 100%
Saleable 22.2 56%
Non-saleable 17.2 44%
Parks and
Open Spaces
5.3
Easements 0.02
Utilities 0.04
Roads 11.4
main entrance
secondary entrance
21. SITE DEVELOPMENT PLAN
Phase 2
No. of Lots 195
Lot Size 250-433 sqm
Ave. Size 274 sqm
Selling Price
(w/ VAT)
TCP: P3.6m-P7.2m
P/sqm: P14k-P19k
main entrance
secondary entrance
CENTRAL
PARK
22. AMENITIES
• Main and Secondary
Entrance Gates with guardhouse
• Pocket Parks
• Central Park
- Clubhouse
- Kids’ play area
- Viewing deck
- Camping/Picnic/Meditation Parks
- Jogging Trails
27. SUSTAINABILITY FEATURES
• Water Consumption
- Landscaping with indigenous plants
• Waste Management
- Materials Recovery Facility (MRF)
• Energy Conservation
- Tree-shaded walks/pedestrian lanes
- Distributed park system
- Walkable community
- Natural ventilation
- Natural lighting
28. CONSULTANTS
TRADE CONSULTANTS
• Master Planning Design • Alveo Land Corp.
• Clubhouse Architectural
Consultant
• C.T. Onglao Architects
• Landscape Design • Inspira Design Core
• Electrical Design • Makati Development Corp.
• Sanitary and Plumbing
Design
• Makati Development Corp.
• Land Development Design • Makati Development Corp.
29. REASONS TO INVEST
• Located in Alviera, the upcoming growth center of Central
Luzon
• A unique, highly-interactive community with majestic mountain
views where one can enjoy the outdoors through nature-inspired
amenities (central amenity area of approx. 4 has)
• First and only community to offer eco-active urban living in
Pampanga
• Innovative living spaces that appreciate in value over time
30. PAYMENT TERMS
Cash 60 (with 5% discount)
Bank 20-80 (with 5% discount)
50% DP / 50% over 30 months (with 2% discount)
30% DP / 70% over 30 months (with 1% discount)
20% DP / 80% over 30 months
10% DP / 90% over 30 months
10% DP / 40% over 30 months / Balance
10% DP / 10% over 24 months / Balance*
TURNOVER
Starting 3Q 2018
*upon sell-out of Phase 1
31. eLOI Guidelines:
• Reservation is P50k per lot.
• Check should be payable to NUEVOCENTRO, INC.
• Send eLOIs to inventory.asst@alveoland.com.ph starting
December 14, 2015, at 10am, with the following requirements:
- scanned Letter of Intent (LOI)
- scanned priority selling agreement form signed by client
- scanned check payable to Nuevocentro, Inc.