Brazilian	
  Imperial	
  Topaz	
  Project	
  	
  

                                                    1	
  
Brazilian	
  Imperial	
  Topaz	
  Project	
  
Highlights	
  	
  
•  Biggest	
  Imperial	
  Topaz	
  producer	
  and	
  world-­‐class	
  
   gems	
  project;	
  	
  
•  Only	
  region	
  in	
  the	
  world	
  with	
  occurrence	
  of	
  
   Imperial	
  Topaz;	
  	
  
•  Alluvial	
  deposit	
  with	
  gems	
  of	
  great	
  quality,	
  
   colors	
  and	
  size;	
  	
  
•  Low	
  CAPEX	
  and	
  low	
  OPEX;	
  
•  Fashion	
  (low	
  quality	
  stones)	
  -­‐	
  Up	
  grade	
  
•  Project	
  licensed	
  and	
  granted;	
  	
  
•  Pre	
  producKon	
  stage	
  since	
  Jan/2012;	
  
                                                                          2	
  
•  Project	
  with	
  high	
  generaKon	
  of	
  shareholder	
  
   value.	
  	
  
Market	
  Overview	
  	
  	
  
•  The	
  total	
  producKon	
  of	
  eye-­‐clean	
  ware	
  is	
  100	
  k	
  ct/y;	
  	
  
	
  
•  A	
  majority	
  of	
  the	
  imperial	
  topaz	
  producKon	
  goes	
  to	
  
     customers	
  in	
  Japan	
  and	
  the	
  United	
  States;	
  
	
  
•  The	
  premier	
  source	
  is	
  near	
  Ouro	
  Preto	
  in	
  Brazil’s;	
  
	
  
•  The	
  region	
  has	
  become	
  the	
  only	
  one	
  capable	
  to	
  
     provide	
  the	
  world	
  market	
  with	
  this	
  mineral.	
  	
  	
  
                                                                                               3	
  
Market	
  Overview	
  	
  	
  

•  Brazilian	
  Imperial	
  Topaz	
  mines	
  are	
  under	
  pressure	
  
     due	
  to	
  Kghtened	
  requirements	
  by	
  Brazilian	
  
     environmental;	
  	
  
	
  
•  The	
  world's	
  enKre	
  supply	
  of	
  Imperial	
  Topaz	
  is	
  mined	
  
     from	
  two	
  mines	
  at	
  Ouro	
  Preto	
  in	
  Brazil,	
  where	
  the	
  
     deposit	
  will	
  be	
  exhausted	
  very	
  soon.	
  


                                                                                        4	
  
Overview	
  
•  The	
  40	
  ́s	
  –	
  Topaz	
  being	
  used	
  by	
  children	
  for	
  
         scratching	
  car	
  glasses	
  and	
  schools;	
  
	
  	
  
•  The	
  90	
  ́s	
  –	
  Invasion	
  of	
  gold	
  washers	
  in	
  the	
  regions	
  
         with	
  Topaz	
  occurrence;	
  
	
  	
  
•  June	
  2005	
  –	
  surface	
  ́s	
  acquisiKon	
  by	
  the	
  current	
  
         owners	
  and	
  expulsion	
  of	
  the	
  pick	
  golders	
  ;	
  
	
  	
  
•  September	
  2006	
  -­‐	
  Research	
  ApplicaKon	
  filed	
  with	
  
         the	
  DNPM	
  (	
  Brazilian	
  Mining	
  Rights	
  InsKtute).	
  	
             5	
  


	
  
Overview	
  
•  April	
  2007	
  –	
  Brazilian	
  Mining	
  Rights	
  InsKtute	
  -­‐	
  DNPM	
  
         issues	
  the	
  Research	
  Permit	
  /	
  	
  GranKng	
  of	
  Water	
  Use-­‐	
  
         issued	
  by	
  Brazilian	
  Water	
  InsKtute	
  -­‐	
  IGAM;	
  
	
  	
  
•  September	
  2009	
  -­‐	
  User	
  Guide	
  issued	
  by	
  DNPM;	
  
	
  	
  
•  August	
  2011	
  –	
  Research	
  Report	
  approved	
  by	
  DNPM;	
  
	
  
•  August	
  2012	
  –	
  Economic	
  Viability	
  Report	
  -­‐	
  PAE	
  filed	
  
         at	
  the	
  DNPM;	
  

•  January	
  2012	
  –	
  Project	
  Start	
  Up.	
                                            6	
  
	
  
Location	
  &	
  Infrastructure	
  	
  
                    PRATINHA	
  
                                                                              Alto	
  Paranaíba	
  Alkaline	
  Province	
  
                                                                                Imperial	
  Topaz	
  Project	
  	
  




Location	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
     	
  Distance	
  
Ouro	
  Preto	
  (MG)	
                                    	
  23km	
  
                                                                                                     Infrastructure	
  installed	
  :	
  
Belo	
  Horizonte	
  (MG)	
                                	
  67km	
                                •  Electricity	
  	
                   7	
  
Vitória	
  (ES)	
  	
                                      	
  564km	
  
Rio	
  de	
  Janeiro	
  (RJ)	
  
                                                                                                     •  water	
  supply	
  
                                                           	
  456km	
  
São	
  Paulo	
  (SP)	
                                     	
  605km	
  
                                                                                                     •  Pavements	
  roads	
  
	
  
    	
  Current	
  Process	
  Flow	
  	
  




                                                8	
  
Pictures	
  -­‐	
  Raw	
  Stones	
  




                                       9	
  
Resources	
  Statement	
  	
  
	
  




                                 10	
  
Balance	
  Production	
  -­‐	
  Year	
  2012	
  




                                                   11	
  
Base	
  Case	
  	
  
   Average	
  price	
  and	
  production	
  of	
  Imperial	
  Topaz	
  	
  




COSTS	
  (US$/ct)	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  31,88	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  31,88	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  31,88	
  

                                                                                                                                                                                                                                                                           12	
  
Base	
  Case	
  	
  -­‐	
  370.000	
  m3	
  
• Beginning	
  of	
  OperaKon	
  :	
  2013
• LifeKme	
  :	
  	
  20	
  years
• Discount	
  rate	
  	
  :	
  9%
• Stripping	
  raKo	
  (m3/m3)	
  :	
  3.65
• Total	
  ProducKon	
  (peak)	
  :	
  77,000	
  ct	
  per	
  year	
  
• ROM	
  :	
  18,500	
  m3	
  
• Average	
  content	
  :	
  4.17	
  ct/m3	
  (Marketable)	
  
                                                                         13	
  
Valuation	
  
• PROJECT	
  NPV:	
  US$	
  134.6	
  M	
  
• EBITDA:	
  US$	
  23.6	
  M	
  
• Margin	
  EBITDA:	
  90.4%	
  
• PV	
  of	
  Investments:	
  US$	
  7.2	
  M	
  
• Project	
  NPV	
  /	
  PV	
  of	
  Investments:	
  18.8	
  

                                                                14	
  
FASHION	
  (low	
  quality	
  material)	
  	
  
	
  
	
   	
   	
  Base	
  Case	
  -­‐	
  370,000	
  m3	
  	
  




  Average	
  content	
  :	
  34,52	
  ct/m3	
  	
            15	
  
Valuation	
  +	
  Fashion	
  




                                16	
  
Summary	
  	
  
• Biggest	
  Imperial	
  Topaz	
  producer;	
  
• World-­‐class	
  gems	
  project;	
  	
  
• Low	
  CAPEX	
  and	
  low	
  OPEX;	
  
• Fashion	
  Up	
  grade	
  
• Project	
  licensed	
  and	
  granted;	
  	
  
• Pre	
  producKon	
  stage	
  since	
  Jan/2012;	
  
                                                        17	
  
Brazilian	
  Imperial	
  Topaz	
  Project	
  	
  




                                                    18	
  

More Related Content

Similar to Brazilian imperial topaz project last version, Irina Klimova

Llave oro presentation jul. 2012
Llave oro presentation jul. 2012Llave oro presentation jul. 2012
Llave oro presentation jul. 2012Llave Oro Inc.
 
Corporate Presentation October 2012
Corporate Presentation October 2012Corporate Presentation October 2012
Corporate Presentation October 2012Llave Oro Inc.
 
Llave Oro Presentation March 2012
Llave Oro Presentation March 2012Llave Oro Presentation March 2012
Llave Oro Presentation March 2012Llave Oro Inc.
 
Llave oro presentation apr.10.12
Llave oro presentation apr.10.12Llave oro presentation apr.10.12
Llave oro presentation apr.10.12Llave Oro Inc.
 
Llave oro Presentation Mar.21.12
Llave oro Presentation Mar.21.12Llave oro Presentation Mar.21.12
Llave oro Presentation Mar.21.12Llave Oro Inc.
 
Llave oro presentation mar.21.12
Llave oro presentation mar.21.12Llave oro presentation mar.21.12
Llave oro presentation mar.21.12Llave Oro Inc.
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012FirstQuantum
 
Potash ridge august 2015
Potash ridge august 2015 Potash ridge august 2015
Potash ridge august 2015 PotashRidge
 
Rio oil and gas peregrino field development
Rio oil and gas   peregrino field developmentRio oil and gas   peregrino field development
Rio oil and gas peregrino field developmentStatoil
 
Oag presentation jan q1 2013
Oag presentation jan q1 2013Oag presentation jan q1 2013
Oag presentation jan q1 2013OremexSilver
 
March 2013 Corporate Presentation
March 2013 Corporate PresentationMarch 2013 Corporate Presentation
March 2013 Corporate PresentationLlave Oro Inc.
 
Llave oro presentation march 11 2013 ii
Llave oro presentation march 11 2013 iiLlave oro presentation march 11 2013 ii
Llave oro presentation march 11 2013 iiLlave Oro Inc.
 
January.2012.CorporatePresentation
January.2012.CorporatePresentationJanuary.2012.CorporatePresentation
January.2012.CorporatePresentationWestern Potash Corp.
 
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)Rare Earths / Rare Metals
 
Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story PresentationTVI_Pacific
 
18 09-2008 José Miranda Formigli Filho na Rio oil and Gas Expo Conference no ...
18 09-2008 José Miranda Formigli Filho na Rio oil and Gas Expo Conference no ...18 09-2008 José Miranda Formigli Filho na Rio oil and Gas Expo Conference no ...
18 09-2008 José Miranda Formigli Filho na Rio oil and Gas Expo Conference no ...Petrobras
 
Presentation INNGEO skolkovo short for site
Presentation INNGEO skolkovo short for sitePresentation INNGEO skolkovo short for site
Presentation INNGEO skolkovo short for siteIgor Samborsky
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015TVI_Pacific
 

Similar to Brazilian imperial topaz project last version, Irina Klimova (20)

Llave oro presentation jul. 2012
Llave oro presentation jul. 2012Llave oro presentation jul. 2012
Llave oro presentation jul. 2012
 
Corporate Presentation October 2012
Corporate Presentation October 2012Corporate Presentation October 2012
Corporate Presentation October 2012
 
Llave Oro Presentation March 2012
Llave Oro Presentation March 2012Llave Oro Presentation March 2012
Llave Oro Presentation March 2012
 
Llave oro presentation apr.10.12
Llave oro presentation apr.10.12Llave oro presentation apr.10.12
Llave oro presentation apr.10.12
 
Llave oro Presentation Mar.21.12
Llave oro Presentation Mar.21.12Llave oro Presentation Mar.21.12
Llave oro Presentation Mar.21.12
 
Llave oro presentation mar.21.12
Llave oro presentation mar.21.12Llave oro presentation mar.21.12
Llave oro presentation mar.21.12
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012
 
Potash ridge august 2015
Potash ridge august 2015 Potash ridge august 2015
Potash ridge august 2015
 
Rio oil and gas peregrino field development
Rio oil and gas   peregrino field developmentRio oil and gas   peregrino field development
Rio oil and gas peregrino field development
 
Brixton presentation 2015 June
Brixton presentation 2015 JuneBrixton presentation 2015 June
Brixton presentation 2015 June
 
Oag presentation jan q1 2013
Oag presentation jan q1 2013Oag presentation jan q1 2013
Oag presentation jan q1 2013
 
March 2013 Corporate Presentation
March 2013 Corporate PresentationMarch 2013 Corporate Presentation
March 2013 Corporate Presentation
 
Llave oro presentation march 11 2013 ii
Llave oro presentation march 11 2013 iiLlave oro presentation march 11 2013 ii
Llave oro presentation march 11 2013 ii
 
January.2012.CorporatePresentation
January.2012.CorporatePresentationJanuary.2012.CorporatePresentation
January.2012.CorporatePresentation
 
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
 
Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story Presentation
 
18 09-2008 José Miranda Formigli Filho na Rio oil and Gas Expo Conference no ...
18 09-2008 José Miranda Formigli Filho na Rio oil and Gas Expo Conference no ...18 09-2008 José Miranda Formigli Filho na Rio oil and Gas Expo Conference no ...
18 09-2008 José Miranda Formigli Filho na Rio oil and Gas Expo Conference no ...
 
Presentation INNGEO skolkovo short for site
Presentation INNGEO skolkovo short for sitePresentation INNGEO skolkovo short for site
Presentation INNGEO skolkovo short for site
 
Niobium in the American heartland
Niobium in the American heartlandNiobium in the American heartland
Niobium in the American heartland
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015
 

Brazilian imperial topaz project last version, Irina Klimova

  • 1. Brazilian  Imperial  Topaz  Project     1  
  • 2. Brazilian  Imperial  Topaz  Project   Highlights     •  Biggest  Imperial  Topaz  producer  and  world-­‐class   gems  project;     •  Only  region  in  the  world  with  occurrence  of   Imperial  Topaz;     •  Alluvial  deposit  with  gems  of  great  quality,   colors  and  size;     •  Low  CAPEX  and  low  OPEX;   •  Fashion  (low  quality  stones)  -­‐  Up  grade   •  Project  licensed  and  granted;     •  Pre  producKon  stage  since  Jan/2012;   2   •  Project  with  high  generaKon  of  shareholder   value.    
  • 3. Market  Overview       •  The  total  producKon  of  eye-­‐clean  ware  is  100  k  ct/y;       •  A  majority  of  the  imperial  topaz  producKon  goes  to   customers  in  Japan  and  the  United  States;     •  The  premier  source  is  near  Ouro  Preto  in  Brazil’s;     •  The  region  has  become  the  only  one  capable  to   provide  the  world  market  with  this  mineral.       3  
  • 4. Market  Overview       •  Brazilian  Imperial  Topaz  mines  are  under  pressure   due  to  Kghtened  requirements  by  Brazilian   environmental;       •  The  world's  enKre  supply  of  Imperial  Topaz  is  mined   from  two  mines  at  Ouro  Preto  in  Brazil,  where  the   deposit  will  be  exhausted  very  soon.   4  
  • 5. Overview   •  The  40  ́s  –  Topaz  being  used  by  children  for   scratching  car  glasses  and  schools;       •  The  90  ́s  –  Invasion  of  gold  washers  in  the  regions   with  Topaz  occurrence;       •  June  2005  –  surface  ́s  acquisiKon  by  the  current   owners  and  expulsion  of  the  pick  golders  ;       •  September  2006  -­‐  Research  ApplicaKon  filed  with   the  DNPM  (  Brazilian  Mining  Rights  InsKtute).     5    
  • 6. Overview   •  April  2007  –  Brazilian  Mining  Rights  InsKtute  -­‐  DNPM   issues  the  Research  Permit  /    GranKng  of  Water  Use-­‐   issued  by  Brazilian  Water  InsKtute  -­‐  IGAM;       •  September  2009  -­‐  User  Guide  issued  by  DNPM;       •  August  2011  –  Research  Report  approved  by  DNPM;     •  August  2012  –  Economic  Viability  Report  -­‐  PAE  filed   at  the  DNPM;   •  January  2012  –  Project  Start  Up.   6    
  • 7. Location  &  Infrastructure     PRATINHA   Alto  Paranaíba  Alkaline  Province   Imperial  Topaz  Project     Location                          Distance   Ouro  Preto  (MG)    23km   Infrastructure  installed  :   Belo  Horizonte  (MG)    67km   •  Electricity     7   Vitória  (ES)      564km   Rio  de  Janeiro  (RJ)   •  water  supply    456km   São  Paulo  (SP)    605km   •  Pavements  roads    
  • 8.    Current  Process  Flow     8  
  • 9. Pictures  -­‐  Raw  Stones   9  
  • 11. Balance  Production  -­‐  Year  2012   11  
  • 12. Base  Case     Average  price  and  production  of  Imperial  Topaz     COSTS  (US$/ct)                                    31,88                                        31,88                                      31,88   12  
  • 13. Base  Case    -­‐  370.000  m3   • Beginning  of  OperaKon  :  2013 • LifeKme  :    20  years • Discount  rate    :  9% • Stripping  raKo  (m3/m3)  :  3.65 • Total  ProducKon  (peak)  :  77,000  ct  per  year   • ROM  :  18,500  m3   • Average  content  :  4.17  ct/m3  (Marketable)   13  
  • 14. Valuation   • PROJECT  NPV:  US$  134.6  M   • EBITDA:  US$  23.6  M   • Margin  EBITDA:  90.4%   • PV  of  Investments:  US$  7.2  M   • Project  NPV  /  PV  of  Investments:  18.8   14  
  • 15. FASHION  (low  quality  material)            Base  Case  -­‐  370,000  m3     Average  content  :  34,52  ct/m3     15  
  • 17. Summary     • Biggest  Imperial  Topaz  producer;   • World-­‐class  gems  project;     • Low  CAPEX  and  low  OPEX;   • Fashion  Up  grade   • Project  licensed  and  granted;     • Pre  producKon  stage  since  Jan/2012;   17  
  • 18. Brazilian  Imperial  Topaz  Project     18