SlideShare a Scribd company logo
1 of 57
Coating Inspection Nomination
ID DNV no.
PLACE
33327
Tulcea
SHIP No. N 822
TYPE OSCV 07
OWNER FARSTADSHIPPING ASA
CLASS DET NORSKE VERITAS
SHIPYARD VARDTulceaSA
COATING MANUFACTURER InternationalPaint
We, the ship-owner, the shipyard and coating manufacturer mutually agree to
designate for the above stated ship the following persons as the coating inspectors
according to PSPC (IMO MSC 215. (82)).
Coating inspector:
Name: Ionut Varneanu
Certification:FROSIOinspector level III, certificate no. 7963.
Coating inspector:
Name: Elena Maxim
Certification:FROSIOinspector level III, certificate no. 6187
Assistantcoating inspector:
Name: Cristina Miron
Certification:FROSIOinspector level III, certificate no. 6606
Area of responsibility:spotprimarysurface preparation, steelwork, secondary
surfacepreparation, stripecoats, fullcoats,DFT
Name:Maria Rîcu
Area of responsibility: primarysurfacepreparation
Name:GheorgheRadu
Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary
surfacepreparation.
Name:DragutaNistor
Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary
surfacepreparation.
Ship Yard Coating Inspectors
The inspections are to be carried out by the Builder’s coating inspectors:
Ionut Varneanu, certified to FROSIO Inspector Level III, which will be in charge
of the coating inspection and will be the one to confirm the result from inspections.
He has been trained to have knowledge of the PSPC.
Gheorghe Raduhas been trained by a PhValue trainer and will be
responsibleforspotprimary surfacepreparation, steelwork and secondarysurface
preparation.
Draguta Nistor has been trained to have knowledge of the PSPC and will be
responsibleforsteel work and secondarysurfacepreparation.
Vasilica Agache has been trained to have knowledge of the PSPC and
will beresponsibleforstripe coats, full coats.
Maria Rîcuhas been trained to have knowledge of the PSPC and will be
responsibleforprimary surfacepreparation
Deviations / Non Conformity
Should any deviations be found during the inspections, these shall be
reported as partof CTF and correctivemeasures taken as soonas possible. All repairs
will be checked by the builder’s coating inspector.
3. INSPECTION AGREEMENT
Hull number N829
IMO No 9707716
Owner Farstad Shipping ASA
Hull builder Vard Tulcea SA
Coating manufacturer International Paint
Class DET NORSKE VERITAS
GENERAL
The dedicated sea water ballast tank coating work will be carried out as per
the Builders inspection plan and Coating manufacturer’s specification.
Location of spaces relative to heated surfaces: ballast tanks no.
1,9,10,11,12,13,14,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,35,36,87,88,8
9,90,91,92,93,95,96,97,98,99,100,101,102,103,104,105,106,107,108,109,110,111,
115,116,117,118,127,141,142 can be washed with water at 60 degrees C.
Frequency of ballasting and de-ballasting operations: the ballasting of
various tanks is done on a daily basis as various cargos are discharged and loaded
as the rigs require. There are two ballast pumps rated at 150 m3/h each.
Supplementary cathodic protection: no additional system will be fitted.
Scope of Inspection
The inspection plan surface preparation and application process must as a
minimum as comply to IMO Resolution MSC 215(82) (PSPC).
To ensure compliance with this Standard, the following shall be carried out
by qualified coating inspectors certified to NACE Coating Inspector Level 2,
FROSIO Inspector Level III or equivalent as verified by the Administration.
Coating inspectors shall inspect surface preparation and coating application
during the coating process by carrying out, as a minimum, those inspection items
identified in section 6.2 to ensure compliance with this Standard. Emphasis shall
be placed on initiation of each stage of surface preparation and coatings application
as improper work is extremely difficult to correct later in the coating progress.
Representative structural members shall be non-destructively examined for coating
thickness. The inspector shall verify that appropriate collective measures have been
carried out.
Results from the inspection shall be recorded by the inspector and shall be
included in the CTF file.
The above are responsible for carry out inspections and completing the
necessary reports that will be included in this Coating Technical File.
Coating Inspection Nomination
ID DNV no.
PLACE
33752
Tulcea
SHIP No. N 829
TYPE OSCV 07
OWNER FARSTADSHIPPING ASA
CLASS DET NORSKE VERITAS
SHIPYARD VARDTulceaSA
COATING MANUFACTURER InternationalPaint
We, the ship-owner, the shipyard and coating manufacturer mutually agree to
designate for the above stated ship the following persons as the coating inspectors
according to PSPC (IMO MSC 215. (82)).
Coating inspector:
Name: Ionut Varneanu
Certification:FROSIOinspector level III, certificate no. 7963.
Coating inspector:
Name: Elena Maxim
Certification:FROSIOinspectorlevel III, certificate no. 6187
Assistantcoating inspector:
Name: Cristina Miron
Certification:FROSIOinspector level III, certificate no. 6606
Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary
surfacepreparation, stripecoats, fullcoats,DFT
Name:Maria Rîcu
Area of responsibility: primarysurfacepreparation
Name:GheorgheRadu
Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary
surfacepreparation.
Name:DragutaNistor
Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary
surfacepreparation.
Name: Vasilica Agache
Area of responsibility: stripecoats, full coats, DFT.
Ship Yard Coating Inspectors
The inspections are to be carried out by the Builder’s coating inspectors: Ionut
Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the
coating inspection and will be the one to confirm the result from inspections. He
has been trained to have knowledge of the PSPC.
Coating Inspection Nomination
ID DNV No. 33802
PLACE Tulcea
SHIP No. N 823
TYPE VARD 3 05 Pipelayer
OWNER DOF - TECHNIP
CLASS DET NORSKE
VERITAS
SHIPYARD VARD Tulcea SA
COATING MANUFACTURER InternationalPaint
We, the ship-owner, the shipyard and coating manufacturer mutually agree to
designate for the above stated ship the following persons as the coating inspectors
according to PSPC (IMO MSC 215. (82)).
Coating inspector:
Name: Ionut Varneanu
Certification:FROSIOinspector level III, certificate no. 7963
Name: Marius Stoica
Certification:FROSIOinspector level III, certificate no. 8548
Name: Elena Maxim
Certification:FROSIOinspector level III, certificate no. 6187
Assistantcoating inspector:
Name:Maria Rîcu
Area of responsibility: primarysurfacepreparation
Name:ConstantinLiciu
Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary
surfacepreparation.
Name: Vasilica Agache
Area of responsibility: stripecoats, full coats, DFT
Name:GheorgheRadu
Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full
coats, DFT
Name:VasileCovalea
Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full
coats, DFT.
Name: Ana Luca
Area of responsibility: stripecoats, full coats, DFT.
Name:DragutaNistor
Area of responsibility: steel work, secondarysurfacepreparation.
Name:DanielAndronachi
Area of responsibility: steel work, secondarysurfacepreparation.
Ship Yard Coating Inspectors VARD
Tulcea
The inspections are to be carried out by the Builder’s coating inspectors: Ionut
Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the
coating inspection and will be the one to confirm the result from inspections. He
has been trained to have knowledge of the PSPC.
Assistant coatings inspectors:
Maria Rîcu has been trained to have knowledge of the PSPC and will be
responsible for primary surface preparation.
Constantin Liciu has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Vasilica Agache has been trained to have knowledge of the PSPC and will be
responsible for stripe coats, full coats and DFT.
Gheorghe Raduhas been trained bya PH Value trainer and will be responsiblefor :
steel work, secondarysurfacepreparation, stripecoats, full coats, DFT.
Covalea Vasile has been trained to have knowledge of the PSPC and will be
responsiblefor : steel work, secondarysurfacepreparation, stripecoats,full coats,
DFT.
Ana Luca has been trained to have knowledge of the PSPC and will be
responsible for: stripe coats, full coats and DFT.
Draguta Nistor has been trained to have knowledge of the PSPC and will be
responsibleforsteel work and secondarysurfacepreparation.
Daniel Andronachi has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Deviations / Non Conformity
Should any deviations be found during the inspections, these shall be
reported as partof CTF and correctivemeasures taken as soonas possible. All repairs
will be checked by the builder’s coating inspector.
Coating Inspection Nomination
ID DNV No. 34037
PLACE Tulcea
SHIP No. N 801
TYPE DSCV03
OWNER HarkandGroup
CLASS DET NORSKE
VERITAS
SHIPYARD VARD Tulcea SA
COATING MANUFACTURER InternationalPaint
We, the ship-owner, the shipyard and coating manufacturer mutually agree to
designate for the above stated ship the following persons as the coating inspectors
according to PSPC (IMO MSC 215. (82)).
Coating inspector:
Name: Ionut Varneanu
Certification:FROSIOinspector level III, certificate no. 7963
Name: Marius Stoica
Certification:FROSIOinspectorlevel III, certificate no. 8548
Assistantcoating inspector:
Name:Maria Rîcu
Area of responsibility: primarysurfacepreparation.
Name:IulianaGrosu
Area of responsibility: primarysurfacepreparation.
Name:DragutaNistor
Area of responsibility:steel work, secondarysurfacepreparation.
Name:Liciu Constantin
Area of responsibility: steel work, secondarysurfacepreparation.
Name:DanielAndronachi
Area of responsibility: steel work, secondarysurfacepreparation.
Name: Vasilica Agache
Area of responsibility: secondarysurfacepreparation, stripecoats, fullcoats, DFT.
Name: Ana Luca
Area of responsibility: stripecoats, full coats, DFT.
Name:GheorgheRadu
Area of responsibility: spotprimarysurfacepreparation, steelwork, secondary
surfacepreparation, stripecoats, fullcoats, DFT.
Name:VasileCovalea
Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full
coats, DFT.
Ship Yard Coating Inspectors Vard Tulcea
The inspections are to be carried out by the Builder’s coating
inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will
be in charge of the coating inspection and will be the one to confirm the result
from inspections. He has been trained to have knowledge of the PSPC.
Assistantcoatings inspectors:
Maria Rîcu has been trained to have knowledge of the PSPC and will be
responsible for primary surface preparation.
Iuliana Grosu has been trained to have knowledge of the PSPC and will be
responsible for primary surface preparation.
Draguta Nistor has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Liciu Constantin has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Daniel Andronachi has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Vasilica Agache has been trained to have knowledge of the PSPC and will be
responsible for: secondary surface preparation, stripe coats, full coats and DFT.
Ana Luca has been trained to have knowledge of the PSPC and will be
responsible for stripe coats, full coats and DFT.
Gheorghe Raduhas been trained by a PhValue trainer and will beresponsiblefor :
spotprimary surfacepreparation, steelwork, secondarysurfacepreparation, stripe
coats, full coats, DFT.
Covalea Vasile has been trained to have knowledge of the PSPC and will be
responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats,
DFT.
Deviations / Non Conformity
Should any deviations be found during the inspections, these shall be
reported as partof CTF and correctivemeasures taken as soonas possible. All repairs
will be checked by the builder’s coating inspector.
3. INSPECTION AGREEMENT
Hull number N818
IMO No 9729726
Owner TECHNIP
Hull builder Vard Tulcea SA
Coating manufacturer International Paint
Class DET NORSKE VERITAS
GENERAL
The dedicated sea water ballast tank coating work will be carried out as per
the Builders inspection plan and Coating manufacturer’s specification.
Location of spaces relative to heated surfaces: ballast tanks no.
1,7,8,9,10,11,12,13,14,15,17,18,19,20,21,22,25,26,31,32,33,34,37,38,40,41,42,45,
46,49, 50,52,53,54,55,56,59,60,61,62,63,64,65,66,67,69,70,73,74 can be washed
with water at 60 degrees C.
Frequency of ballasting and de-ballasting operations: the ballasting of
various tanks is done on a daily basis as various cargos are discharged and loaded
as the rigs require. There are two ballast pumps rated at 300 m3/h each.
Supplementary cathodic protection: no additional system will be fitted.
Scope of Inspection
The inspection plan surface preparation and application process must as a
minimum as comply to IMO Resolution MSC 215(82) (PSPC).
To ensure compliance with this Standard, the following shall be carried out
by qualified coating inspectors certified to NACE Coating Inspector Level 2,
FROSIO Inspector Level III or equivalent as verified by the Administration.
Coating inspectors shall inspect surface preparation and coating application
during the coating process by carrying out, as a minimum, those inspection items
identified in section 6.2 to ensure compliance with this Standard. Emphasis shall
be placed on initiation of each stage of surface preparation and coatings application
as improper work is extremely difficult to correct later in the coating progress.
Representative structural members shall be non-destructively examined for coating
thickness. The inspector shall verify that appropriate collective measures have been
carried out.
Results from the inspection shall be recorded by the inspector and shall be
included in the CTF file.
The above are responsible for carry out inspections and completing the
necessary reports that will be included in this Coating Technical File.
Coating Inspection Nomination
ID DNV No. 34142
PLACE Tulcea
SHIP No. N 818
TYPE DSV
OWNER TECHNIP
CLASS DET NORSKE
VERITAS
SHIPYARD VARD Tulcea SA
COATING MANUFACTURER InternationalPaint
We, the ship-owner, the shipyard and coating manufacturer mutually agree to
designate for the above stated ship the following persons as the coating inspectors
according to PSPC (IMO MSC 215. (82)).
Coating inspector:
Name: Ionut Varneanu
Certification:FROSIOinspector level III, certificate no. 7963
Name: Marius Stoica
Certification:FROSIOinspector level III, certificate no. 8548
Assistantcoating inspector:
Name:Maria Rîcu
Area of responsibility:primarysurfacepreparation.
Name:IulianaGrosu
Area of responsibility: primarysurfacepreparation.
Name:DragutaNistor
Area of responsibility: steelwork, secondarysurfacepreparation.
Name:ConstantinLiciu
Area of responsibility: steelwork, secondarysurfacepreparation.
Name:DanielAndronachi
Area of responsibility: steel work, secondarysurfacepreparation.
Name: Vasilica Agache
Area of responsibility: secondarysurfacepreparation, stripecoats, fullcoats, DFT.
Name: Ana Luca
Area of responsibility: stripecoats, full coats, DFT.
Name:GheorgheRadu
Area of responsibility: spotprimarysurfacepreparation, steelwork, secondary
surfacepreparation, stripecoats, fullcoats, DFT.
Name:VasileCovalea
Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full
coats, DFT.
Ship Yard Coating Inspectors Vard Tulcea
The inspections are to be carried out by the Builder’s coating
inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will
be in charge of the coating inspection and will be the one to confirm the result
from inspections. He has been trained to have knowledge of the PSPC.
Assistantcoatings inspectors:
Maria Rîcu has been trained to have knowledge of the PSPC and will be
responsible for primary surface preparation.
Iuliana Grosu has been trained to have knowledge of the PSPC and will be
responsible for primary surface preparation.
Draguta Nistor has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Constantin Liciu has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Daniel Andronachi has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Vasilica Agache has been trained to have knowledge of the PSPC and will be
responsible for: secondary surface preparation, stripe coats, full coats and DFT.
Gheorghe Raduhas been trained by a PhValue trainer and will beresponsiblefor :
spotprimary surfacepreparation, steelwork, secondarysurfacepreparation, stripe
coats, full coats, DFT.
Ana Luca has been trained to have knowledge of the PSPC and will be
responsible for stripe coats, full coats and DFT.
Covalea Vasile has been trained to have knowledge of the PSPC and will be
responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats,
DFT.
Deviations / Non Conformity
Should any deviations be found during the inspections, these shall be
reported as partof CTF and correctivemeasures taken as soonas possible. All repairs
will be checked by the builder’s coating inspector.
3. INSPECTION AGREEMENT
Hull number N830
IMO No 9744518
Owner Solstad Offshore
Hull builder Vard Tulcea SA
Coating manufacturer International Paint
Class DET NORSKE VERITAS
GENERAL
The dedicated sea water ballast tank coating work will be carried out as per
the Builders inspection plan and Coating manufacturer’s specification.
Location of spaces relative to heated surfaces: ballast tanks no.
1;9;10;11;12;13;14;15;16;17;18;19;20;22;27;28;29;30;31;32;33;34;35;36;37;38;39
;40;44;45;46;47;49;50;51;52;55;56;59;61;62;63;64;65;66;67;68;69;70;71;72;73;74
;86 can be washed with water at 60 degrees C.
Frequency of ballasting and de-ballasting operations: the ballasting of
various tanks is done on a daily basis as various cargos are discharged and loaded
as the rigs require. There are two ballast pumps rated at 250 m3/h each.
Supplementary cathodic protection: no additional system will be fitted.
Scope of Inspection
The inspection plan surface preparation and application process must as a
minimum as comply to IMO Resolution MSC 215(82) (PSPC).
To ensure compliance with this Standard, the following shall be carried out
by qualified coating inspectors certified to NACE Coating Inspector Level 2,
FROSIO Inspector Level III or equivalent as verified by the Administration.
Coating inspectors shall inspect surface preparation and coating application
during the coating process by carrying out, as a minimum, those inspection items
identified in section 6.2 to ensure compliance with this Standard. Emphasis shall
be placed on initiation of each stage of surface preparation and coatings application
as improper work is extremely difficult to correct later in the coating progress.
Representative structural members shall be non-destructively examined for coating
thickness. The inspector shall verify that appropriate collective measures have been
carried out.
Results from the inspection shall be recorded by the inspector and shall be
included in the CTF file.
The above are responsible for carry out inspections and completing the
necessary reports that will be included in this Coating Technical File.
Coating Inspection Nomination
ID DNV No. 34248
PLACE Tulcea
SHIP No. N 830
TYPE VARD 3 19
OWNER SOLSTAD OFFSHORE
CLASS DET NORSKE VERITAS
SHIPYARD VARD Tulcea SA
COATING MANUFACTURER International Paint
We, the ship-owner, the shipyard and coating manufacturer mutually agree to
designate for the above stated ship the following persons as the coating inspectors
according to PSPC (IMO MSC 215. (82)).
Coating inspector:
Name: Ionut Varneanu
Certification:FROSIOinspector level III, certificate no. 7963
Name: Marius Stoica
Certification:FROSIOinspector level III, certificate no. 8548
Assistantcoating inspector:
Name:Maria Rîcu
Area of responsibility: primarysurfacepreparation
Name:IulianaGrosu
Area of responsibility: primarysurfacepreparation
Name:DragutaNistor
Area of responsibility: steel work, secondarysurfacepreparation.
Name:ConstantinLiciu
Area of responsibility: steel work, secondarysurfacepreparation.
Name:DanielAndronachi
Area of responsibility: steel work, secondarysurfacepreparation.
Name: Vasilica Agache
Area of responsibility: stripecoats, full coats, DFT.
Name: Ana Luca
Area of responsibility: stripecoats, full coats, DFT.
Name:GheorgheRadu
Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full
coats, DFT.
Name:VasileCovalea
Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full
coats, DFT.
Ship Yard Coating Inspectors VARD
Tulcea
The inspections are to be carried out by the Builder’s coating inspectors: Ionut
Varneanu, certified to FROSIO Inspector Level III, which will be in charge of
the coating inspection and will be the one to confirm the result from
inspections. He has been trained to have knowledge of the PSPC.
Assistantcoatings inspectors:
Maria Rîcu has been trained to have knowledge of the PSPC and will be
responsible for primary surface preparation.
Iuliana Grosu has been trained to have knowledge of the PSPC and will be
responsible for primary surface preparation.
Draguta Nistor has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Constantin Liciu has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Daniel Andronachi has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Vasilica Agache has been trained to have knowledge of the PSPC and will be
responsible for stripe coats, full coats and DFT.
Ana Luca has been trained to have knowledge of the PSPC and will be
responsible for stripe coats, full coats and DFT.
Gheorghe Raduhas been trained by a PhValue trainer and will beresponsiblefor :
steel work, secondarysurfacepreparation, stripecoats,full coats, DFT.
Covalea Vasile has been trained to have knowledge of the PSPC and will be
responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats,
DFT.
Deviations / Non Conformity
Should any deviations be found during the inspections, theseshall be
reported as partof CTF and correctivemeasures taken as soonas possible. All repairs
will bechecked bythe builder’s coating inspector.
3. INSPECTION AGREEMENT
Hull number N824
IMO No. 9706528
Owner DOF - Technip
Hull builder Vard Tulcea SA
Coating manufacturer International Paint
Class DET NORSKE VERITAS
GENERAL
The dedicated sea water ballast tank coating work will be carried out as per
the Builders inspection plan and Coating manufacturer’s specification.
Location of spaces relative to heated surfaces: ballast tanks no.
1,5,7,8,9,10,11,12,13,14,15,16,19,20,23,24,25,26,29,30,31,32,33,34,35,36,37,38,3
9,41,42,43,44,45,46,47,48,50,51,52,55,56,57,58,59,60,61,62,63,64,65,66,67,68,70,
85,86,87,88. can be washed with water at 60 degrees C.
Frequency of ballasting and de-ballasting operations: the ballasting of
various tanks is done on a daily basis as various cargos are discharged and loaded
as the rigs require. There are two ballast pumps rated at 150 m3/h each.
Supplementary cathodic protection: no additional system will be fitted.
Scope of Inspection
The inspection plan surface preparation and application process must as a
minimum as comply to IMO Resolution MSC 215(82) (PSPC).
To ensure compliance with this Standard, the following shall be carried out
by qualified coating inspectors certified to NACE Coating Inspector Level 2,
FROSIO Inspector Level III or equivalent as verified by the Administration.
Coating inspectors shall inspect surface preparation and coating application
during the coating process by carrying out, as a minimum, those inspection items
identified in section 6.2 to ensure compliance with this Standard. Emphasis shall
be placed on initiation of each stage of surface preparation and coatings application
as improper work is extremely difficult to correct later in the coating progress.
Representative structural members shall be non-destructively examined for coating
thickness. The inspector shall verify that appropriate collective measures have been
carried out.
Results from the inspection shall be recorded by the inspector and shall be
included in the CTF file.
The above are responsible for carry out inspections and completing the
necessary reports that will be included in this Coating Technical File.
Coating Inspection Nomination
ID DNV No. 33803
PLACE Tulcea
SHIP No. N 824
TYPE VARD 3 05 Pipelayer
OWNER DOF - Technip
CLASS DET NORSKE
VERITAS
SHIPYARD VARD TulceaSA
COATING MANUFACTURER InternationalPaint
We, the ship-owner, the shipyard and coating manufacturer mutually agree to
designate for the above stated ship the following persons as the coating inspectors
according to PSPC (IMO MSC 215. (82)).
Coating inspector:
Name: Ionut Varneanu
Certification:FROSIOinspector level III, certificate no. 7963
Name: Marius Stoica
Certification:FROSIOinspectorlevel III, certificate no. 8548
Assistantcoatingsinspectors:
Name:IulianaGrosu
Area of responsibility: primarysurfacepreparation
Name:DragutaNistor
Area of responsibility: steel work, secondarysurfacepreparation.
Name:ConstantinLiciu
Area of responsibility: steel work, secondarysurfacepreparation.
Name:DanielAndronachi
Area of responsibility: steel work, secondarysurfacepreparation.
Name: Vasilica Agache
Area of responsibility: stripecoats, full coats, DFT.
Name: Ana Luca
Area of responsibility: stripecoats, full coats, DFT.
Name:GheorgheRadu
Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full
coats, DFT.
Name:VasileCovalea
Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full
coats, DFT.
Ship Yard Coating Inspectors VARD
Tulcea
The inspections are to be carried out by the Builder’s coating inspectors: Ionut
Varneanu, certified to FROSIO Inspector Level III, which will be in charge of
the coating inspection and will be the one to confirm the result from
inspections. He has been trained to have knowledge of the PSPC.
Assistantcoatings inspectors:
Iuliana Grosu has been trained to have knowledge of the PSPC and will be
responsible for primary surface preparation.
Draguta Nistor has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Constantin Liciu has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Daniel Andronachi has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Vasilica Agache has been trained to have knowledge of the PSPC and will be
responsible for stripe coats, full coats and DFT.
Ana Luca has been trained to have knowledge of the PSPC and will be
responsible for stripe coats, full coats and DFT.
Gheorghe Raduhas been trained by a PhValue trainer and will beresponsiblefor :
steel work, secondarysurfacepreparation, stripecoats,full coats, DFT.
Covalea Vasile has been trained to have knowledge of the PSPC and will be
responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats,
DFT.
Deviations / Non Conformity
Should any deviations be found during the inspections, these shall be
reported as partof CTF and correctivemeasures taken as soonas possible. All repairs
will be checked by the builder’s coating inspector.
3. INSPECTION AGREEMENT
Hull number N831
IMO No 9745615
Owner Island Offshore
Hull builder Vard Tulcea SA
Coating manufacturer International Paint
Class DET NORSKE VERITAS
GENERAL
The dedicated sea water ballast tank coating work will be carried out as per
the Builders inspection plan and Coating manufacturer’s specification.
Location of spaces relative to heated surfaces: ballast tanks no. 142,
143,144, 145 can be washed with water at 60 degrees C.
Frequency of ballasting and de-ballasting operations: the ballasting of
various tanks is done on a daily basis as various cargos are discharged and loaded
as the rigs require. There are two ballast pumps rated at 250 m3/h each.
Supplementary cathodic protection: no additional system will be fitted.
Scope of Inspection
The inspection plan surface preparation and application process must as a
minimum as comply to IMO Resolution MSC 215(82) (PSPC).
To ensure compliance with this Standard, the following shall be carried out
by qualified coating inspectors certified to NACE Coating Inspector Level 2,
FROSIO Inspector Level III or equivalent as verified by the Administration.
Coating inspectors shall inspect surface preparation and coating application
during the coating process by carrying out, as a minimum, those inspection items
identified in section 6.2 to ensure compliance with this Standard. Emphasis shall
be placed on initiation of each stage of surface preparation and coatings application
as improper work is extremely difficult to correct later in the coating progress.
Representative structural members shall be non-destructively examined for coating
thickness. The inspector shall verify that appropriate collective measures have been
carried out.
Results from the inspection shall be recorded by the inspector and shall be
included in the CTF file.
The above are responsible for carry out inspections and completing the
necessary reports that will be included in this Coating Technical File.
Coating Inspection Nomination
ID DNV No. 34405
PLACE Tulcea
SHIP No. N 831
TYPE UT 797
OWNER ISLAND OFFSHORE
CLASS DET NORSKE
VERITAS
SHIPYARD VARD Tulcea SA
COATING MANUFACTURER InternationalPaint
We, the ship-owner, the shipyard and coating manufacturer mutually agree to
designate for the above stated ship the following persons as the coating inspectors
according to PSPC (IMO MSC 215. (82)).
Coating inspector:
Name: Ionut Varneanu
Certification:FROSIOinspector level III, certificate no. 7963
Name: Marius Stoica
Certification:FROSIOinspector level III, certificate no. 8548
Assistantcoating inspectors:
Name:IulianaGrosu
Area of responsibility: primarysurfacepreparation
Name:ConstantinLiciu
Area of responsibility: steel work, secondarysurfacepreparation.
Name:DanielAndronachi
Area of responsibility:steel work, secondarysurfacepreparation.
Name: Vasilica Agache
Area of responsibility: stripecoats, full coats, DFT.
Name: Ana Luca
Area of responsibility: stripecoats, full coats, DFT.
Name:VasileCovalea
Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full
coats, DFT.
Ship Yard Coating Inspectors VARD
Tulcea
The inspections are to be carried out by the Builder’s coating inspectors: Ionut
Varneanu, certified to FROSIO Inspector Level III, which will be in charge of
the coating inspection and will be the one to confirm the result from
inspections. He has been trained to have knowledge of the PSPC.
Assistantcoatings inspectors:
Iuliana Grosu has been trained to have knowledge of the PSPC and will be
responsible for primary surface preparation.
Constantin Liciu has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Daniel Andronachi has been trained to have knowledge of the PSPC and will be
responsible for steel work and secondary surface preparation.
Vasilica Agache has been trained to have knowledge of the PSPC and will be
responsible for stripe coats, full coats and DFT.
Ana Luca has been trained to have knowledge of the PSPC and will be
responsible for stripe coats, full coats and DFT.
Covalea Vasile has been trained to have knowledge of the PSPC and will be
responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats,
DFT.
Deviations / Non Conformity
Should any deviations be found during the inspections, theseshall be
reported as partof CTF and correctivemeasures taken as soonas possible. All repairs
will bechecked bythe builder’s coating inspector.

More Related Content

Similar to nave pspc (8)

To whom it may concern
To whom it may concernTo whom it may concern
To whom it may concern
 
DNV Survey Report_HALIA_Renewal Survey Class and Statutory
DNV Survey Report_HALIA_Renewal Survey Class and StatutoryDNV Survey Report_HALIA_Renewal Survey Class and Statutory
DNV Survey Report_HALIA_Renewal Survey Class and Statutory
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015
 
AHMED SOLIMAN.C.V.
AHMED SOLIMAN.C.V.AHMED SOLIMAN.C.V.
AHMED SOLIMAN.C.V.
 
Piotr_Kordowski_Experience_Description
Piotr_Kordowski_Experience_DescriptionPiotr_Kordowski_Experience_Description
Piotr_Kordowski_Experience_Description
 
Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016
 
VGCE Profile Jan 2016
VGCE Profile Jan 2016VGCE Profile Jan 2016
VGCE Profile Jan 2016
 
ANDREW CARTWRIGHT CV 2016
ANDREW CARTWRIGHT CV 2016ANDREW CARTWRIGHT CV 2016
ANDREW CARTWRIGHT CV 2016
 

nave pspc

  • 1.
  • 2.
  • 3. Coating Inspection Nomination ID DNV no. PLACE 33327 Tulcea SHIP No. N 822 TYPE OSCV 07 OWNER FARSTADSHIPPING ASA CLASS DET NORSKE VERITAS SHIPYARD VARDTulceaSA COATING MANUFACTURER InternationalPaint We, the ship-owner, the shipyard and coating manufacturer mutually agree to designate for the above stated ship the following persons as the coating inspectors according to PSPC (IMO MSC 215. (82)). Coating inspector: Name: Ionut Varneanu Certification:FROSIOinspector level III, certificate no. 7963. Coating inspector: Name: Elena Maxim Certification:FROSIOinspector level III, certificate no. 6187 Assistantcoating inspector: Name: Cristina Miron Certification:FROSIOinspector level III, certificate no. 6606 Area of responsibility:spotprimarysurface preparation, steelwork, secondary surfacepreparation, stripecoats, fullcoats,DFT Name:Maria Rîcu Area of responsibility: primarysurfacepreparation
  • 4. Name:GheorgheRadu Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary surfacepreparation. Name:DragutaNistor Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary surfacepreparation.
  • 5. Ship Yard Coating Inspectors The inspections are to be carried out by the Builder’s coating inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the coating inspection and will be the one to confirm the result from inspections. He has been trained to have knowledge of the PSPC. Gheorghe Raduhas been trained by a PhValue trainer and will be responsibleforspotprimary surfacepreparation, steelwork and secondarysurface preparation. Draguta Nistor has been trained to have knowledge of the PSPC and will be responsibleforsteel work and secondarysurfacepreparation. Vasilica Agache has been trained to have knowledge of the PSPC and will beresponsibleforstripe coats, full coats. Maria Rîcuhas been trained to have knowledge of the PSPC and will be responsibleforprimary surfacepreparation
  • 6. Deviations / Non Conformity Should any deviations be found during the inspections, these shall be reported as partof CTF and correctivemeasures taken as soonas possible. All repairs will be checked by the builder’s coating inspector.
  • 7. 3. INSPECTION AGREEMENT Hull number N829 IMO No 9707716 Owner Farstad Shipping ASA Hull builder Vard Tulcea SA Coating manufacturer International Paint Class DET NORSKE VERITAS
  • 8.
  • 9.
  • 10. GENERAL The dedicated sea water ballast tank coating work will be carried out as per the Builders inspection plan and Coating manufacturer’s specification. Location of spaces relative to heated surfaces: ballast tanks no. 1,9,10,11,12,13,14,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,35,36,87,88,8 9,90,91,92,93,95,96,97,98,99,100,101,102,103,104,105,106,107,108,109,110,111, 115,116,117,118,127,141,142 can be washed with water at 60 degrees C. Frequency of ballasting and de-ballasting operations: the ballasting of various tanks is done on a daily basis as various cargos are discharged and loaded as the rigs require. There are two ballast pumps rated at 150 m3/h each. Supplementary cathodic protection: no additional system will be fitted. Scope of Inspection The inspection plan surface preparation and application process must as a minimum as comply to IMO Resolution MSC 215(82) (PSPC). To ensure compliance with this Standard, the following shall be carried out by qualified coating inspectors certified to NACE Coating Inspector Level 2, FROSIO Inspector Level III or equivalent as verified by the Administration. Coating inspectors shall inspect surface preparation and coating application during the coating process by carrying out, as a minimum, those inspection items identified in section 6.2 to ensure compliance with this Standard. Emphasis shall be placed on initiation of each stage of surface preparation and coatings application as improper work is extremely difficult to correct later in the coating progress.
  • 11. Representative structural members shall be non-destructively examined for coating thickness. The inspector shall verify that appropriate collective measures have been carried out. Results from the inspection shall be recorded by the inspector and shall be included in the CTF file. The above are responsible for carry out inspections and completing the necessary reports that will be included in this Coating Technical File.
  • 12. Coating Inspection Nomination ID DNV no. PLACE 33752 Tulcea SHIP No. N 829 TYPE OSCV 07 OWNER FARSTADSHIPPING ASA CLASS DET NORSKE VERITAS SHIPYARD VARDTulceaSA COATING MANUFACTURER InternationalPaint We, the ship-owner, the shipyard and coating manufacturer mutually agree to designate for the above stated ship the following persons as the coating inspectors according to PSPC (IMO MSC 215. (82)). Coating inspector: Name: Ionut Varneanu Certification:FROSIOinspector level III, certificate no. 7963. Coating inspector: Name: Elena Maxim Certification:FROSIOinspectorlevel III, certificate no. 6187 Assistantcoating inspector: Name: Cristina Miron Certification:FROSIOinspector level III, certificate no. 6606 Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary surfacepreparation, stripecoats, fullcoats,DFT Name:Maria Rîcu Area of responsibility: primarysurfacepreparation Name:GheorgheRadu
  • 13. Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary surfacepreparation. Name:DragutaNistor Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary surfacepreparation. Name: Vasilica Agache Area of responsibility: stripecoats, full coats, DFT.
  • 14. Ship Yard Coating Inspectors The inspections are to be carried out by the Builder’s coating inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the coating inspection and will be the one to confirm the result from inspections. He has been trained to have knowledge of the PSPC.
  • 15. Coating Inspection Nomination ID DNV No. 33802 PLACE Tulcea SHIP No. N 823 TYPE VARD 3 05 Pipelayer OWNER DOF - TECHNIP CLASS DET NORSKE VERITAS SHIPYARD VARD Tulcea SA COATING MANUFACTURER InternationalPaint We, the ship-owner, the shipyard and coating manufacturer mutually agree to designate for the above stated ship the following persons as the coating inspectors according to PSPC (IMO MSC 215. (82)). Coating inspector: Name: Ionut Varneanu Certification:FROSIOinspector level III, certificate no. 7963 Name: Marius Stoica Certification:FROSIOinspector level III, certificate no. 8548 Name: Elena Maxim Certification:FROSIOinspector level III, certificate no. 6187 Assistantcoating inspector: Name:Maria Rîcu Area of responsibility: primarysurfacepreparation Name:ConstantinLiciu
  • 16. Area of responsibility:spotprimarysurfacepreparation, steelwork, secondary surfacepreparation. Name: Vasilica Agache Area of responsibility: stripecoats, full coats, DFT Name:GheorgheRadu Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full coats, DFT Name:VasileCovalea Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full coats, DFT. Name: Ana Luca Area of responsibility: stripecoats, full coats, DFT. Name:DragutaNistor Area of responsibility: steel work, secondarysurfacepreparation. Name:DanielAndronachi Area of responsibility: steel work, secondarysurfacepreparation.
  • 17.
  • 18. Ship Yard Coating Inspectors VARD Tulcea The inspections are to be carried out by the Builder’s coating inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the coating inspection and will be the one to confirm the result from inspections. He has been trained to have knowledge of the PSPC. Assistant coatings inspectors: Maria Rîcu has been trained to have knowledge of the PSPC and will be responsible for primary surface preparation. Constantin Liciu has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Vasilica Agache has been trained to have knowledge of the PSPC and will be responsible for stripe coats, full coats and DFT. Gheorghe Raduhas been trained bya PH Value trainer and will be responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats, DFT. Covalea Vasile has been trained to have knowledge of the PSPC and will be responsiblefor : steel work, secondarysurfacepreparation, stripecoats,full coats, DFT.
  • 19. Ana Luca has been trained to have knowledge of the PSPC and will be responsible for: stripe coats, full coats and DFT. Draguta Nistor has been trained to have knowledge of the PSPC and will be responsibleforsteel work and secondarysurfacepreparation. Daniel Andronachi has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Deviations / Non Conformity Should any deviations be found during the inspections, these shall be reported as partof CTF and correctivemeasures taken as soonas possible. All repairs will be checked by the builder’s coating inspector.
  • 20. Coating Inspection Nomination ID DNV No. 34037 PLACE Tulcea SHIP No. N 801 TYPE DSCV03 OWNER HarkandGroup CLASS DET NORSKE VERITAS SHIPYARD VARD Tulcea SA COATING MANUFACTURER InternationalPaint We, the ship-owner, the shipyard and coating manufacturer mutually agree to designate for the above stated ship the following persons as the coating inspectors according to PSPC (IMO MSC 215. (82)). Coating inspector: Name: Ionut Varneanu Certification:FROSIOinspector level III, certificate no. 7963 Name: Marius Stoica Certification:FROSIOinspectorlevel III, certificate no. 8548 Assistantcoating inspector: Name:Maria Rîcu Area of responsibility: primarysurfacepreparation. Name:IulianaGrosu Area of responsibility: primarysurfacepreparation.
  • 21. Name:DragutaNistor Area of responsibility:steel work, secondarysurfacepreparation. Name:Liciu Constantin Area of responsibility: steel work, secondarysurfacepreparation. Name:DanielAndronachi Area of responsibility: steel work, secondarysurfacepreparation. Name: Vasilica Agache Area of responsibility: secondarysurfacepreparation, stripecoats, fullcoats, DFT. Name: Ana Luca Area of responsibility: stripecoats, full coats, DFT. Name:GheorgheRadu Area of responsibility: spotprimarysurfacepreparation, steelwork, secondary surfacepreparation, stripecoats, fullcoats, DFT. Name:VasileCovalea Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full coats, DFT.
  • 22.
  • 23. Ship Yard Coating Inspectors Vard Tulcea The inspections are to be carried out by the Builder’s coating inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the coating inspection and will be the one to confirm the result from inspections. He has been trained to have knowledge of the PSPC. Assistantcoatings inspectors: Maria Rîcu has been trained to have knowledge of the PSPC and will be responsible for primary surface preparation. Iuliana Grosu has been trained to have knowledge of the PSPC and will be responsible for primary surface preparation. Draguta Nistor has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Liciu Constantin has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation.
  • 24. Daniel Andronachi has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Vasilica Agache has been trained to have knowledge of the PSPC and will be responsible for: secondary surface preparation, stripe coats, full coats and DFT. Ana Luca has been trained to have knowledge of the PSPC and will be responsible for stripe coats, full coats and DFT. Gheorghe Raduhas been trained by a PhValue trainer and will beresponsiblefor : spotprimary surfacepreparation, steelwork, secondarysurfacepreparation, stripe coats, full coats, DFT. Covalea Vasile has been trained to have knowledge of the PSPC and will be responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats, DFT. Deviations / Non Conformity Should any deviations be found during the inspections, these shall be reported as partof CTF and correctivemeasures taken as soonas possible. All repairs will be checked by the builder’s coating inspector.
  • 25. 3. INSPECTION AGREEMENT Hull number N818 IMO No 9729726 Owner TECHNIP Hull builder Vard Tulcea SA Coating manufacturer International Paint Class DET NORSKE VERITAS
  • 26.
  • 27. GENERAL The dedicated sea water ballast tank coating work will be carried out as per the Builders inspection plan and Coating manufacturer’s specification. Location of spaces relative to heated surfaces: ballast tanks no. 1,7,8,9,10,11,12,13,14,15,17,18,19,20,21,22,25,26,31,32,33,34,37,38,40,41,42,45, 46,49, 50,52,53,54,55,56,59,60,61,62,63,64,65,66,67,69,70,73,74 can be washed with water at 60 degrees C. Frequency of ballasting and de-ballasting operations: the ballasting of various tanks is done on a daily basis as various cargos are discharged and loaded as the rigs require. There are two ballast pumps rated at 300 m3/h each. Supplementary cathodic protection: no additional system will be fitted. Scope of Inspection The inspection plan surface preparation and application process must as a minimum as comply to IMO Resolution MSC 215(82) (PSPC). To ensure compliance with this Standard, the following shall be carried out by qualified coating inspectors certified to NACE Coating Inspector Level 2, FROSIO Inspector Level III or equivalent as verified by the Administration. Coating inspectors shall inspect surface preparation and coating application during the coating process by carrying out, as a minimum, those inspection items identified in section 6.2 to ensure compliance with this Standard. Emphasis shall be placed on initiation of each stage of surface preparation and coatings application as improper work is extremely difficult to correct later in the coating progress. Representative structural members shall be non-destructively examined for coating thickness. The inspector shall verify that appropriate collective measures have been carried out. Results from the inspection shall be recorded by the inspector and shall be included in the CTF file.
  • 28. The above are responsible for carry out inspections and completing the necessary reports that will be included in this Coating Technical File.
  • 29. Coating Inspection Nomination ID DNV No. 34142 PLACE Tulcea SHIP No. N 818 TYPE DSV OWNER TECHNIP CLASS DET NORSKE VERITAS SHIPYARD VARD Tulcea SA COATING MANUFACTURER InternationalPaint We, the ship-owner, the shipyard and coating manufacturer mutually agree to designate for the above stated ship the following persons as the coating inspectors according to PSPC (IMO MSC 215. (82)). Coating inspector: Name: Ionut Varneanu Certification:FROSIOinspector level III, certificate no. 7963 Name: Marius Stoica Certification:FROSIOinspector level III, certificate no. 8548 Assistantcoating inspector: Name:Maria Rîcu Area of responsibility:primarysurfacepreparation. Name:IulianaGrosu Area of responsibility: primarysurfacepreparation. Name:DragutaNistor
  • 30. Area of responsibility: steelwork, secondarysurfacepreparation. Name:ConstantinLiciu Area of responsibility: steelwork, secondarysurfacepreparation. Name:DanielAndronachi Area of responsibility: steel work, secondarysurfacepreparation. Name: Vasilica Agache Area of responsibility: secondarysurfacepreparation, stripecoats, fullcoats, DFT. Name: Ana Luca Area of responsibility: stripecoats, full coats, DFT. Name:GheorgheRadu Area of responsibility: spotprimarysurfacepreparation, steelwork, secondary surfacepreparation, stripecoats, fullcoats, DFT. Name:VasileCovalea Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full coats, DFT.
  • 31.
  • 32. Ship Yard Coating Inspectors Vard Tulcea The inspections are to be carried out by the Builder’s coating inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the coating inspection and will be the one to confirm the result from inspections. He has been trained to have knowledge of the PSPC. Assistantcoatings inspectors: Maria Rîcu has been trained to have knowledge of the PSPC and will be responsible for primary surface preparation. Iuliana Grosu has been trained to have knowledge of the PSPC and will be responsible for primary surface preparation. Draguta Nistor has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Constantin Liciu has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation.
  • 33. Daniel Andronachi has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Vasilica Agache has been trained to have knowledge of the PSPC and will be responsible for: secondary surface preparation, stripe coats, full coats and DFT. Gheorghe Raduhas been trained by a PhValue trainer and will beresponsiblefor : spotprimary surfacepreparation, steelwork, secondarysurfacepreparation, stripe coats, full coats, DFT. Ana Luca has been trained to have knowledge of the PSPC and will be responsible for stripe coats, full coats and DFT. Covalea Vasile has been trained to have knowledge of the PSPC and will be responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats, DFT. Deviations / Non Conformity Should any deviations be found during the inspections, these shall be reported as partof CTF and correctivemeasures taken as soonas possible. All repairs will be checked by the builder’s coating inspector.
  • 34. 3. INSPECTION AGREEMENT Hull number N830 IMO No 9744518 Owner Solstad Offshore Hull builder Vard Tulcea SA Coating manufacturer International Paint Class DET NORSKE VERITAS
  • 35. GENERAL The dedicated sea water ballast tank coating work will be carried out as per the Builders inspection plan and Coating manufacturer’s specification. Location of spaces relative to heated surfaces: ballast tanks no. 1;9;10;11;12;13;14;15;16;17;18;19;20;22;27;28;29;30;31;32;33;34;35;36;37;38;39 ;40;44;45;46;47;49;50;51;52;55;56;59;61;62;63;64;65;66;67;68;69;70;71;72;73;74 ;86 can be washed with water at 60 degrees C. Frequency of ballasting and de-ballasting operations: the ballasting of various tanks is done on a daily basis as various cargos are discharged and loaded as the rigs require. There are two ballast pumps rated at 250 m3/h each. Supplementary cathodic protection: no additional system will be fitted. Scope of Inspection The inspection plan surface preparation and application process must as a minimum as comply to IMO Resolution MSC 215(82) (PSPC). To ensure compliance with this Standard, the following shall be carried out by qualified coating inspectors certified to NACE Coating Inspector Level 2, FROSIO Inspector Level III or equivalent as verified by the Administration. Coating inspectors shall inspect surface preparation and coating application during the coating process by carrying out, as a minimum, those inspection items identified in section 6.2 to ensure compliance with this Standard. Emphasis shall be placed on initiation of each stage of surface preparation and coatings application as improper work is extremely difficult to correct later in the coating progress. Representative structural members shall be non-destructively examined for coating thickness. The inspector shall verify that appropriate collective measures have been carried out. Results from the inspection shall be recorded by the inspector and shall be included in the CTF file.
  • 36. The above are responsible for carry out inspections and completing the necessary reports that will be included in this Coating Technical File.
  • 37. Coating Inspection Nomination ID DNV No. 34248 PLACE Tulcea SHIP No. N 830 TYPE VARD 3 19 OWNER SOLSTAD OFFSHORE CLASS DET NORSKE VERITAS SHIPYARD VARD Tulcea SA COATING MANUFACTURER International Paint We, the ship-owner, the shipyard and coating manufacturer mutually agree to designate for the above stated ship the following persons as the coating inspectors according to PSPC (IMO MSC 215. (82)). Coating inspector: Name: Ionut Varneanu Certification:FROSIOinspector level III, certificate no. 7963 Name: Marius Stoica Certification:FROSIOinspector level III, certificate no. 8548 Assistantcoating inspector: Name:Maria Rîcu Area of responsibility: primarysurfacepreparation Name:IulianaGrosu Area of responsibility: primarysurfacepreparation
  • 38. Name:DragutaNistor Area of responsibility: steel work, secondarysurfacepreparation. Name:ConstantinLiciu Area of responsibility: steel work, secondarysurfacepreparation. Name:DanielAndronachi Area of responsibility: steel work, secondarysurfacepreparation. Name: Vasilica Agache Area of responsibility: stripecoats, full coats, DFT. Name: Ana Luca Area of responsibility: stripecoats, full coats, DFT. Name:GheorgheRadu Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full coats, DFT. Name:VasileCovalea Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full coats, DFT.
  • 39.
  • 40. Ship Yard Coating Inspectors VARD Tulcea The inspections are to be carried out by the Builder’s coating inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the coating inspection and will be the one to confirm the result from inspections. He has been trained to have knowledge of the PSPC. Assistantcoatings inspectors: Maria Rîcu has been trained to have knowledge of the PSPC and will be responsible for primary surface preparation. Iuliana Grosu has been trained to have knowledge of the PSPC and will be responsible for primary surface preparation. Draguta Nistor has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation.
  • 41. Constantin Liciu has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Daniel Andronachi has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Vasilica Agache has been trained to have knowledge of the PSPC and will be responsible for stripe coats, full coats and DFT. Ana Luca has been trained to have knowledge of the PSPC and will be responsible for stripe coats, full coats and DFT. Gheorghe Raduhas been trained by a PhValue trainer and will beresponsiblefor : steel work, secondarysurfacepreparation, stripecoats,full coats, DFT. Covalea Vasile has been trained to have knowledge of the PSPC and will be responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats, DFT. Deviations / Non Conformity Should any deviations be found during the inspections, theseshall be reported as partof CTF and correctivemeasures taken as soonas possible. All repairs will bechecked bythe builder’s coating inspector.
  • 42. 3. INSPECTION AGREEMENT Hull number N824 IMO No. 9706528 Owner DOF - Technip Hull builder Vard Tulcea SA Coating manufacturer International Paint Class DET NORSKE VERITAS
  • 43. GENERAL The dedicated sea water ballast tank coating work will be carried out as per the Builders inspection plan and Coating manufacturer’s specification. Location of spaces relative to heated surfaces: ballast tanks no. 1,5,7,8,9,10,11,12,13,14,15,16,19,20,23,24,25,26,29,30,31,32,33,34,35,36,37,38,3 9,41,42,43,44,45,46,47,48,50,51,52,55,56,57,58,59,60,61,62,63,64,65,66,67,68,70, 85,86,87,88. can be washed with water at 60 degrees C. Frequency of ballasting and de-ballasting operations: the ballasting of various tanks is done on a daily basis as various cargos are discharged and loaded as the rigs require. There are two ballast pumps rated at 150 m3/h each. Supplementary cathodic protection: no additional system will be fitted. Scope of Inspection The inspection plan surface preparation and application process must as a minimum as comply to IMO Resolution MSC 215(82) (PSPC). To ensure compliance with this Standard, the following shall be carried out by qualified coating inspectors certified to NACE Coating Inspector Level 2, FROSIO Inspector Level III or equivalent as verified by the Administration. Coating inspectors shall inspect surface preparation and coating application during the coating process by carrying out, as a minimum, those inspection items identified in section 6.2 to ensure compliance with this Standard. Emphasis shall be placed on initiation of each stage of surface preparation and coatings application
  • 44. as improper work is extremely difficult to correct later in the coating progress. Representative structural members shall be non-destructively examined for coating thickness. The inspector shall verify that appropriate collective measures have been carried out. Results from the inspection shall be recorded by the inspector and shall be included in the CTF file. The above are responsible for carry out inspections and completing the necessary reports that will be included in this Coating Technical File.
  • 45. Coating Inspection Nomination ID DNV No. 33803 PLACE Tulcea SHIP No. N 824 TYPE VARD 3 05 Pipelayer OWNER DOF - Technip CLASS DET NORSKE VERITAS SHIPYARD VARD TulceaSA COATING MANUFACTURER InternationalPaint We, the ship-owner, the shipyard and coating manufacturer mutually agree to designate for the above stated ship the following persons as the coating inspectors according to PSPC (IMO MSC 215. (82)). Coating inspector: Name: Ionut Varneanu Certification:FROSIOinspector level III, certificate no. 7963 Name: Marius Stoica Certification:FROSIOinspectorlevel III, certificate no. 8548 Assistantcoatingsinspectors: Name:IulianaGrosu Area of responsibility: primarysurfacepreparation Name:DragutaNistor Area of responsibility: steel work, secondarysurfacepreparation. Name:ConstantinLiciu
  • 46. Area of responsibility: steel work, secondarysurfacepreparation. Name:DanielAndronachi Area of responsibility: steel work, secondarysurfacepreparation. Name: Vasilica Agache Area of responsibility: stripecoats, full coats, DFT. Name: Ana Luca Area of responsibility: stripecoats, full coats, DFT. Name:GheorgheRadu Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full coats, DFT. Name:VasileCovalea Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full coats, DFT.
  • 47.
  • 48. Ship Yard Coating Inspectors VARD Tulcea The inspections are to be carried out by the Builder’s coating inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the coating inspection and will be the one to confirm the result from inspections. He has been trained to have knowledge of the PSPC. Assistantcoatings inspectors: Iuliana Grosu has been trained to have knowledge of the PSPC and will be responsible for primary surface preparation. Draguta Nistor has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Constantin Liciu has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Daniel Andronachi has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation.
  • 49. Vasilica Agache has been trained to have knowledge of the PSPC and will be responsible for stripe coats, full coats and DFT. Ana Luca has been trained to have knowledge of the PSPC and will be responsible for stripe coats, full coats and DFT. Gheorghe Raduhas been trained by a PhValue trainer and will beresponsiblefor : steel work, secondarysurfacepreparation, stripecoats,full coats, DFT. Covalea Vasile has been trained to have knowledge of the PSPC and will be responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats, DFT. Deviations / Non Conformity Should any deviations be found during the inspections, these shall be reported as partof CTF and correctivemeasures taken as soonas possible. All repairs will be checked by the builder’s coating inspector.
  • 50. 3. INSPECTION AGREEMENT Hull number N831 IMO No 9745615 Owner Island Offshore Hull builder Vard Tulcea SA Coating manufacturer International Paint Class DET NORSKE VERITAS
  • 51. GENERAL The dedicated sea water ballast tank coating work will be carried out as per the Builders inspection plan and Coating manufacturer’s specification. Location of spaces relative to heated surfaces: ballast tanks no. 142, 143,144, 145 can be washed with water at 60 degrees C. Frequency of ballasting and de-ballasting operations: the ballasting of various tanks is done on a daily basis as various cargos are discharged and loaded as the rigs require. There are two ballast pumps rated at 250 m3/h each. Supplementary cathodic protection: no additional system will be fitted. Scope of Inspection The inspection plan surface preparation and application process must as a minimum as comply to IMO Resolution MSC 215(82) (PSPC).
  • 52. To ensure compliance with this Standard, the following shall be carried out by qualified coating inspectors certified to NACE Coating Inspector Level 2, FROSIO Inspector Level III or equivalent as verified by the Administration. Coating inspectors shall inspect surface preparation and coating application during the coating process by carrying out, as a minimum, those inspection items identified in section 6.2 to ensure compliance with this Standard. Emphasis shall be placed on initiation of each stage of surface preparation and coatings application as improper work is extremely difficult to correct later in the coating progress. Representative structural members shall be non-destructively examined for coating thickness. The inspector shall verify that appropriate collective measures have been carried out. Results from the inspection shall be recorded by the inspector and shall be included in the CTF file. The above are responsible for carry out inspections and completing the necessary reports that will be included in this Coating Technical File.
  • 53. Coating Inspection Nomination ID DNV No. 34405 PLACE Tulcea SHIP No. N 831 TYPE UT 797 OWNER ISLAND OFFSHORE CLASS DET NORSKE VERITAS SHIPYARD VARD Tulcea SA COATING MANUFACTURER InternationalPaint We, the ship-owner, the shipyard and coating manufacturer mutually agree to designate for the above stated ship the following persons as the coating inspectors according to PSPC (IMO MSC 215. (82)). Coating inspector: Name: Ionut Varneanu Certification:FROSIOinspector level III, certificate no. 7963 Name: Marius Stoica Certification:FROSIOinspector level III, certificate no. 8548 Assistantcoating inspectors: Name:IulianaGrosu Area of responsibility: primarysurfacepreparation Name:ConstantinLiciu Area of responsibility: steel work, secondarysurfacepreparation.
  • 54. Name:DanielAndronachi Area of responsibility:steel work, secondarysurfacepreparation. Name: Vasilica Agache Area of responsibility: stripecoats, full coats, DFT. Name: Ana Luca Area of responsibility: stripecoats, full coats, DFT. Name:VasileCovalea Area of responsibility:steel work, secondarysurfacepreparation,stripecoats, full coats, DFT.
  • 55.
  • 56. Ship Yard Coating Inspectors VARD Tulcea The inspections are to be carried out by the Builder’s coating inspectors: Ionut Varneanu, certified to FROSIO Inspector Level III, which will be in charge of the coating inspection and will be the one to confirm the result from inspections. He has been trained to have knowledge of the PSPC. Assistantcoatings inspectors: Iuliana Grosu has been trained to have knowledge of the PSPC and will be responsible for primary surface preparation. Constantin Liciu has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Daniel Andronachi has been trained to have knowledge of the PSPC and will be responsible for steel work and secondary surface preparation. Vasilica Agache has been trained to have knowledge of the PSPC and will be responsible for stripe coats, full coats and DFT.
  • 57. Ana Luca has been trained to have knowledge of the PSPC and will be responsible for stripe coats, full coats and DFT. Covalea Vasile has been trained to have knowledge of the PSPC and will be responsiblefor : steel work, secondarysurfacepreparation, stripecoats, full coats, DFT. Deviations / Non Conformity Should any deviations be found during the inspections, theseshall be reported as partof CTF and correctivemeasures taken as soonas possible. All repairs will bechecked bythe builder’s coating inspector.