Interrand Engineering Ltd is handling reinforcement and internal plumbing and electrical services pipe installation work on the Diamond Block as well as ongoing filling works in the Jasmine Block. An aerial view shows the extent of work on site for both Interrand Engineering Ltd and BolbethSynergy Consult Ltd on the Jasmine and Diamond Blocks.