SlideShare a Scribd company logo
1 of 2
Download to read offline
IGORDRAGOSLAVIC Mountain Bike Park Developer
B-706 Highpoint Avenue • Waterloo • Ontario • 519-725-5259 • igor@leaddog.ca
HIGHLIGHTS of SKILLS and QUALIFICATIONS
• 16 years of experience in mountain bike trail design, building, and management
• Highly accomplished mountain bike racer
• 25 years of employment in marketing and advertising
• Friendly and communicative personality with strong interpersonal and leadership skills
RELEVANT EXPERIENCE
Subcontract Trail Designer and Builder
Transitions Bike Park Design & Development Inc., Kitchener, Ontario 2013 - Present
• Prepared trail development estimates and proposals for summer camps and municipalities
• Designed and built cross-country single-track mountain bike trails
• Hired builders and supervised complex projects
• Shaped BMX jumps
• Operated construction machinery and power tools
Accomplishments:
• Created a mini mountain bike park that became an attraction, in one of the most respected
premier residential camps in North America
Mountain Bike Park Developer
Hydrocut Mountain Bike Trails, Waterloo, Ontario 2001 - 2014
• Responsible for the management and maintenance of the MTB park and it’s 25 km trail network
• Planned and led complex projects, delegated tasks, supervised the quality of work and progress
• Prepared and coordinated the communications materials, including the website
( http://hydrocut.ca/ ), trail maps, trail signage and information kiosks
• Successfully promoted membership, volunteering and sponsorship involvement
• Organized events such as trail days, board meetings, negotiations, conferences and fund-raising
- continued -
IGORDRAGOSLAVIC Page 2
igor@leaddog.ca
Accomplishments:
• Conceptualized and created the Hydrocut Mountain Bike Trails park; a highly renowned prime
quality trail network, valued tourist destination, which attracts 500+ users daily
• Laid-out and built trails in an environmentally sustainable and erosion safe way, with minimal
impact on the surrounding natural environment, while greatly reducing the maintenance
requirements
• Initiated and facilitated the signing of an unprecedented legal Stewardship Agreement between
the Region of Waterloo (the landowner) and the Waterloo Cycling Club (the stakeholder)
• In 2013-2016 the Hydocut was chosen by the Singletracks.com as the best mountain bike trails
in Ontario, and in 2017 was ranked the 27th in the world
AWARDS / PRIZES
• Named Eastern Trail Ambassador in 2012 by the IMBA (International Mountain Bike
Association) Canada
• Most notable XC mountain bike racing results: 2005/2009 Master Expert Ontario Champion
2009 Master Expert Ontario Cup Series Winner
2009 Master Expert Canada Cup Race Winner
EDUCATION / COURSES
• Four completed IMBA (International Mountain Bike Association) courses for sustainable trail
building and management
• Graphic Design College Diploma

More Related Content

Similar to Resume_TrailDeveloper

Scotland - Cycling
Scotland - Cycling Scotland - Cycling
Scotland - Cycling Danny Cowe
 
Bicycle Friendly Community presentation to IRC MPO Board - June 2015
Bicycle Friendly Community presentation to IRC MPO Board - June 2015Bicycle Friendly Community presentation to IRC MPO Board - June 2015
Bicycle Friendly Community presentation to IRC MPO Board - June 2015Vero Cycling, Inc.
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventDesign South East
 
Cyclesafe
Cyclesafe Cyclesafe
Cyclesafe shartger
 
ATS14- Bike grease + elbow grease = economic vitality for Oregon: Success wit...
ATS14- Bike grease + elbow grease = economic vitality for Oregon: Success wit...ATS14- Bike grease + elbow grease = economic vitality for Oregon: Success wit...
ATS14- Bike grease + elbow grease = economic vitality for Oregon: Success wit...BTAOregon
 
Bicycle Parking Guidelines
Bicycle Parking GuidelinesBicycle Parking Guidelines
Bicycle Parking GuidelinesFairfax County
 
AITPM Conference Presentation - Sarah Macaulay
AITPM Conference Presentation - Sarah MacaulayAITPM Conference Presentation - Sarah Macaulay
AITPM Conference Presentation - Sarah MacaulayJumpingJaq
 
Eubike Introduction_with results
Eubike Introduction_with resultsEubike Introduction_with results
Eubike Introduction_with resultsEuBike Project
 
2013 Fat Bike Summit & Festival Main Presentation
2013 Fat Bike Summit & Festival Main Presentation2013 Fat Bike Summit & Festival Main Presentation
2013 Fat Bike Summit & Festival Main PresentationFitzgerald's Bicycles
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyTim Pheby
 
Mcg suggestions on whitireia park management plan, nov 2014
Mcg suggestions on whitireia park management plan, nov 2014Mcg suggestions on whitireia park management plan, nov 2014
Mcg suggestions on whitireia park management plan, nov 2014Mana Cycle Group Inc.
 
Measurable Bike Commuting for EO 13514
Measurable Bike Commuting for EO 13514Measurable Bike Commuting for EO 13514
Measurable Bike Commuting for EO 13514Mike Bordenaro
 

Similar to Resume_TrailDeveloper (20)

Existing Conditions
Existing Conditions Existing Conditions
Existing Conditions
 
Scotland - Cycling
Scotland - Cycling Scotland - Cycling
Scotland - Cycling
 
A Systematic Approach to Bicycle Parking Planning for Cities
A Systematic Approach to Bicycle Parking Planning for CitiesA Systematic Approach to Bicycle Parking Planning for Cities
A Systematic Approach to Bicycle Parking Planning for Cities
 
Bicycle Friendly Community presentation to IRC MPO Board - June 2015
Bicycle Friendly Community presentation to IRC MPO Board - June 2015Bicycle Friendly Community presentation to IRC MPO Board - June 2015
Bicycle Friendly Community presentation to IRC MPO Board - June 2015
 
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
 
Des Moines Bike Planning Overview
Des Moines Bike Planning OverviewDes Moines Bike Planning Overview
Des Moines Bike Planning Overview
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
 
Cyclesafe
Cyclesafe Cyclesafe
Cyclesafe
 
ATS14- Bike grease + elbow grease = economic vitality for Oregon: Success wit...
ATS14- Bike grease + elbow grease = economic vitality for Oregon: Success wit...ATS14- Bike grease + elbow grease = economic vitality for Oregon: Success wit...
ATS14- Bike grease + elbow grease = economic vitality for Oregon: Success wit...
 
Bicycle Parking Guidelines
Bicycle Parking GuidelinesBicycle Parking Guidelines
Bicycle Parking Guidelines
 
AITPM Conference Presentation - Sarah Macaulay
AITPM Conference Presentation - Sarah MacaulayAITPM Conference Presentation - Sarah Macaulay
AITPM Conference Presentation - Sarah Macaulay
 
Eubike Introduction_with results
Eubike Introduction_with resultsEubike Introduction_with results
Eubike Introduction_with results
 
2013 Fat Bike Summit & Festival Main Presentation
2013 Fat Bike Summit & Festival Main Presentation2013 Fat Bike Summit & Festival Main Presentation
2013 Fat Bike Summit & Festival Main Presentation
 
State of Fat Bike Access
State of Fat Bike AccessState of Fat Bike Access
State of Fat Bike Access
 
BIKE DOCK
BIKE DOCKBIKE DOCK
BIKE DOCK
 
Bike Friendly Summit presentation package with video.
Bike Friendly Summit presentation package with video.Bike Friendly Summit presentation package with video.
Bike Friendly Summit presentation package with video.
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
 
Web project portfolio v3
Web project portfolio v3Web project portfolio v3
Web project portfolio v3
 
Mcg suggestions on whitireia park management plan, nov 2014
Mcg suggestions on whitireia park management plan, nov 2014Mcg suggestions on whitireia park management plan, nov 2014
Mcg suggestions on whitireia park management plan, nov 2014
 
Measurable Bike Commuting for EO 13514
Measurable Bike Commuting for EO 13514Measurable Bike Commuting for EO 13514
Measurable Bike Commuting for EO 13514
 

Resume_TrailDeveloper

  • 1. IGORDRAGOSLAVIC Mountain Bike Park Developer B-706 Highpoint Avenue • Waterloo • Ontario • 519-725-5259 • igor@leaddog.ca HIGHLIGHTS of SKILLS and QUALIFICATIONS • 16 years of experience in mountain bike trail design, building, and management • Highly accomplished mountain bike racer • 25 years of employment in marketing and advertising • Friendly and communicative personality with strong interpersonal and leadership skills RELEVANT EXPERIENCE Subcontract Trail Designer and Builder Transitions Bike Park Design & Development Inc., Kitchener, Ontario 2013 - Present • Prepared trail development estimates and proposals for summer camps and municipalities • Designed and built cross-country single-track mountain bike trails • Hired builders and supervised complex projects • Shaped BMX jumps • Operated construction machinery and power tools Accomplishments: • Created a mini mountain bike park that became an attraction, in one of the most respected premier residential camps in North America Mountain Bike Park Developer Hydrocut Mountain Bike Trails, Waterloo, Ontario 2001 - 2014 • Responsible for the management and maintenance of the MTB park and it’s 25 km trail network • Planned and led complex projects, delegated tasks, supervised the quality of work and progress • Prepared and coordinated the communications materials, including the website ( http://hydrocut.ca/ ), trail maps, trail signage and information kiosks • Successfully promoted membership, volunteering and sponsorship involvement • Organized events such as trail days, board meetings, negotiations, conferences and fund-raising - continued -
  • 2. IGORDRAGOSLAVIC Page 2 igor@leaddog.ca Accomplishments: • Conceptualized and created the Hydrocut Mountain Bike Trails park; a highly renowned prime quality trail network, valued tourist destination, which attracts 500+ users daily • Laid-out and built trails in an environmentally sustainable and erosion safe way, with minimal impact on the surrounding natural environment, while greatly reducing the maintenance requirements • Initiated and facilitated the signing of an unprecedented legal Stewardship Agreement between the Region of Waterloo (the landowner) and the Waterloo Cycling Club (the stakeholder) • In 2013-2016 the Hydocut was chosen by the Singletracks.com as the best mountain bike trails in Ontario, and in 2017 was ranked the 27th in the world AWARDS / PRIZES • Named Eastern Trail Ambassador in 2012 by the IMBA (International Mountain Bike Association) Canada • Most notable XC mountain bike racing results: 2005/2009 Master Expert Ontario Champion 2009 Master Expert Ontario Cup Series Winner 2009 Master Expert Canada Cup Race Winner EDUCATION / COURSES • Four completed IMBA (International Mountain Bike Association) courses for sustainable trail building and management • Graphic Design College Diploma