1. Ian Kelly
Coded Welder
Curriculum Vitae
Relevant Courses
10, Broadacres SCATS-1518595, Expires: 6/10/2017
High Harrington MST-Vesell Transfer-517629,
Workington Expires: 8/5/2016
CA14 5RL GWO Sea Survival-5176296
Tel. 07970178690 Expires: 8/5/2016
First Aid at Work-5178872
Expires: 13/5/2017
Defibrillator Training -5229683
Offshore medical
Expires: 11/4/2016
Lifting and Slinging Level 1
Expires: May 2017
Confined Space Entry (escape BA)
Expires 29/04/2017
Experience
I am a time served coded welder with over twenty years experience of welding pipe
work to the highest standards. During my career I have worked in numerous
environments including Off-Shore wind turbines, petro-chem, power station boilers,
turbines, nuclear and off-shore installations.
I am coded in all processes including Tig, Mig ( flux core) and MMA as well as Orbital
Tig welding. I am coded on a range of materials including carbon, carbon alloys and
stainless steels as well as having experience of more exotic materials such as cunifer.
I have been a nominated competent person in charge of a squad of men. My duties
included planning the work ahead,dealing with permit request, risk assessments and
method statements.
1
2. Welding Codings Achieved to EN 286/287, ASME IX & BNFL Standards
• 2” Inconell Tig root, Tig fill & Cap also MMA fill & cap
• ½ “ ,3/4” , 1”, 2”,6”,8” 304L,308l,316L Stainless steel Tig root, fill & cap
• 2”,6” 304L,308L,316L Stainless Steel Tig root, MMA fill & cap
• 2”&6” 304L,316L Orbital Tig
• ½”,3/4”,2”,6” Carbon steel Tig root ,fill & cap
• 2”, 6”,8”,12” Carbon steel. Tig root, MMA fill & Cap. Both low hydrogen &rutile rods
• 6” Carbon Steel M.M.A. low hydrogen root ,fill& cap
• ½”,2” ,6”- 2 ¼ chrome Tig root ,fill & cap- also MMA fill & cap
• 8” sch 120 -2 ¼ chrome Tig root, MMA fill & cap
• 2” ,6”- 9% Chrome Tig root ,fill & cap, Also MMA fill & cap
• Sch. Ranges varies from Sch 5 to Sch 180
2
3. Ian Kelly CV
Coded Welder
Employment History
Alstom Power Services
Robin Rigg offshore wind farm, Thetford power station, Redcar steel works
May 2014 to September 2015
Shepley Engineers
Sellafield Nuclear Plant, EVAP-D Project
November 2013 to April 2014
Doosan Babcock
Grangemouth Oil Refinery
January 2013 to October 2013
Alstom Power Services
Connahs Quay, West Burton, Cottam, Kings North,
Rings End, Killingholme, Shoreham power stations.
February 2008 to December 2012
Pro-Weld Engineering
Refrigeration Unit in Bury ST. Edmunds
Fabrication Shop in Ellesmere Port
October 2007 to February 2008
Alstom Power Services
West Burton, Cottam, Kings North, Lockerbie Power Stations
February 2007 to October 2007
Alstom Power Services
3
4. August 2006 to November 2006
Kings North Power Station, Enfield Power Station
PJD Engineering
June 2006 to August 2006
Fiddlers Ferry & Rugeley Power Stations
FULL HISTORY DATING BACK TO 1990 AVAILABLE ON REQUEST
4