Learning professional with around 9 years of experience in the area of Project
management and ISO Audit. Project Management is a challenging field which
involves 360° involvement in all types of activities related to project since its
inception to commissioning and finally handing over to the client. Some
actitivtes which carried out during the process are co-ordination (Internal as
well as external), organizing meeting, presentations, schedules, billing etc.
Along with the experience of all above work related to Project mgmt. ISO Audit
Involves a through involvement with processes of various departments. It is
imperative for the successful completion of audit and to maintain quality
assurance within the organization. I have good communication skill with
analytical, logical, negotiation & relationship management are some of the
strongest points.
Education
Pursuing MBA.
BE (Mechanical) from SLIET (Deemed University)
Senior Secondary from KV Air Force, Saharanpur
Higher Secondary from KV Air Force, Saharanpur
Career Highlights in chronological order.
1. Presently working as Deputy Chief Engineer (Projects) at Projects &
development India Ltd. (PDIL) - (Miniratna PSU) – (From Nov. 2007–
continued)
Company Profile: - PDIL is premier design engineering and consultancy
organization a govt. of India Undertaking associated with fertilizer and allied
Page 1 of 5
2. PROJECT EXECUTED / UNDER EXECUTION
chemical industries off site and utility facilities, Oil & Gas Sector viz. Product
pipelines, LPG Terminals, Oil terminals, LPG Bottling Plants, LPG mounded
Storages, Methanol Plants, Hydrogen Plants and various acid Plants.
JOB PROFILE
Review of basic & detailed engineering documents
Finalization of clear scope of working during kick of meeting by consulting all
the departments.
Compiling of tender document for issuance to the LSTK Bidder.
Organizing and Participation in various meetings related to project.
Internal department co-ordination along with co-ordination with client.
Preparation of Progress report on the basis of Project schedule along with
other departments.
Motoring the project and try to clear the obstacles through meeting and
reviews.
Preparation of Project presentation on monthly basis showing overall project
status.
Raising Invoices on the basis milestones fixed for the project.
Participation in the tendering procedure and recommendation for ordering
after discussion with technical and commercial departments.
Organizing and participation in Pre-bid meeting
Preparation of Minutes of meeting
Follow up with vendors for getting reply over technical and commercial
queries raised against the deviation taken by them
Site deployment after internal discussion and discussion with client.
Site co-ordination and settlements of Bills and expenses
Preparation of co-ordination procedure for the project
Calculation and recommendation of man-hours for new projects from project
department to Business development deptt.
S.No. Name of Client Description Year of Execution
1. Rashtriya Chemical
and Fertilizers Ltd.,
Mumbai
Preparation of DFR (Detailed
Feasibility Report), Preparation for
Tender document for 2 X 32MW GTG
& 2 X 100 MTPH HRSG and issuance
till finalization of LSTK contractor,
EPCM services for rest of the work
(Motors, Mechanical , electrical
erection work)
2014-coninued
2. Chambal Fertilizers
Project, CFCL,
Energy Saving Project involved detail
Engineering, procurement, Inspection
2006-2009
Page 2 of 5
3. Gadepan,
Rajasthan
& Expediting and supervision services
from PDIL side.
A. Installation of New Ammonia
Convertor at Ammonia-I Plant
B. Engineering Services for by-pass
arrangement for New Ammonia
convertor in A-I & II Plants
2013- 2014
A. DE Services for Add-on Ammonia
Convertor (R-502) in A-I Plant
B. DE Services for Add-on Ammonia
Convertor (R-702) in A-II Plant
C. Review and Check of Foundation
adequacy for Ammonia Convertor in
A-II Plant
2015 - continued
3. Tatrsatan Fertilizer
Project (MHI),
Japan
Site Deployment of Engineers to
Japan
2009
4. Energy saving and
Capacity
Enhancement
Project for
Ammonia-I & II,
Urea-I & II for NFL ,
Vijaipur fertilizer
Plants
Energy Saving Project involved detail
Engineering, procurement, Inspection
& Expediting and supervision services
from PDIL side.
2009 – continued
5. Ammonia Storage
Tank of 5000MT
Capacity for KSFL
(Kribhco Shyam
Fertilizers Ltd.)
Preparation of Tender and selection of
LSTK Bidder for Ammonia storage
Tank of 5000MT Capacity at KSFL,
Shahjahanpur
2013-2014
6. JIFCO Phosphoric
Acid storage Plant
at Amman, Jordan
Energy Saving Project involved detail
Engineering, procurement, Inspection
& Expediting and supervision services
from PDIL side.
2011 - Continued
7. PVFCCo, Vietnam Preparation of Tender for Ammonia
Revamp Project
2013- Continued
2. Worked as Executive (Projects) at Dharampal Satyapal (DS Group),
Noida (From Jan 2007 -Nov 2007)
Company Profile: - DS Group is Rs. 2200 crore rapidly growing multi-diversified
conglomerate that has a strong presence in sectors such as F&B, Hospitality,
Mouth Fresheners, Tobacco, Packaging, Agro forestry, Rubber Thread and
Infrastructure. The Group has Steel, Cement and Power in the Infrastructure
basket.
JOB PROFILE
Selection of Consultant for the preparation of Feasibility Report for Cement
Plant at Meghalaya.
Organizing and Participation in various meetings related to project.
Page 3 of 5
4. Clearance of the payments against the Invoices raised by the consultant.
Site visit along with consultant and collection of data during site visit.
Making presentation in front of directors related to project.
Organizing and Planning ISO audit within organization.
3. Worked as Engineer (Projects) at Hydel Power Projects (HPP), New
Delhi (From Aug 2005 -Jan 2007)
Company Profile: - HPP Energy (India) Pvt. Ltd. established in India on EPC
basis for implementation of Small Hydro Power Projects, as a Joint Venture
Company in Technical Collaboration with Hydro Power Plant, France - one of
the renowned Companies in Europe for design as well as manufacture of hydro
turbines and peripheral equipment for manual/ automatic operations since 1972.
JOB PROFILE
Finalization of clear scope of working during kick of meeting by consulting all
the departments.
Compiling of tender document for issuance to the LSTK Bidder.
Organizing and Participation in various meetings related to project.
Internal department co-ordination along with co-ordination with client.
Preparation of Progress report on the basis of Project schedule along with
other departments.
Motoring the project and try to clear the obstacles through meeting and
reviews.
Preparation of Project presentation on monthly basis showing overall project
status.
Raising Invoices on the basis milestones fixed for the project.
Participation in the tendering procedure and recommendation for ordering
after discussion with technical and commercial departments.
Organizing and participation in Pre-bid meeting
Preparation of Minutes of meeting
Follow up with vendors for getting reply over technical and commercial
queries raised against the deviation taken by them
Site deployment after internal discussion and discussion with client.
Site co-ordination and settlements of Bills and expenses
Preparation of co-ordination procedure for the project
Training and courses Undertaken
Lead Auditor of ISO 9001:2008 from BSI, India
Training at BHEL, Haridwar during Engineering
Training at Irrigation workshop at Meerut during Engineering
C++ training of 3 months at IIT Roorkee during Engineering.
Page 4 of 5
5. AutoCAD training of 3 months at IIT Roorkee during Engineering.
Soft skills
MS-Word, Ms-Excel.
MS Project
Ares of Interest.
Writing Blog, Reading fiction & non-fiction novels, Business magazines,
surfing internet, travelling.
Projects.
Designing of Movable Gears using IDEA’s Software.
Making of Overhead Crane under the guidance of JP Industry.
Designing of solar bicycle during engineering
Extracurricular Activities.
Selected for regional in cricket at school level.
Participated in blood donation camp 2 times during engineering
Selected for zonal in badminton & football at school level.
Personal Information.
Date of Birth - 18th
August 1982
Marital Status - Married
Father’s Name – Sh. R.P. Singh Pundir.
Mother’s Name – Smt. Kusum Pundir.
Brother - Mr. Nitesh Pundir (HSE Engineer at TUV, Abu Dhabi)
Passport No. – G0875273
Address – C-255,Govindpuram, Ghaziabad (U.P)
References.
Mr. D.K.Sant - DGM at PDIL, Noida
Mr. Sachin Pawar – Haldor Topsoe, Marketing Head.
Page 5 of 5
6. AutoCAD training of 3 months at IIT Roorkee during Engineering.
Soft skills
MS-Word, Ms-Excel.
MS Project
Ares of Interest.
Writing Blog, Reading fiction & non-fiction novels, Business magazines,
surfing internet, travelling.
Projects.
Designing of Movable Gears using IDEA’s Software.
Making of Overhead Crane under the guidance of JP Industry.
Designing of solar bicycle during engineering
Extracurricular Activities.
Selected for regional in cricket at school level.
Participated in blood donation camp 2 times during engineering
Selected for zonal in badminton & football at school level.
Personal Information.
Date of Birth - 18th
August 1982
Marital Status - Married
Father’s Name – Sh. R.P. Singh Pundir.
Mother’s Name – Smt. Kusum Pundir.
Brother - Mr. Nitesh Pundir (HSE Engineer at TUV, Abu Dhabi)
Passport No. – G0875273
Address – C-255,Govindpuram, Ghaziabad (U.P)
References.
Mr. D.K.Sant - DGM at PDIL, Noida
Mr. Sachin Pawar – Haldor Topsoe, Marketing Head.
Page 5 of 5