S/No
Prepared By:
Date:
Legend
1
1.1
People
–In–
Charge
BR /
ADOS
Stages
Prior to
Start
Work
Records
Approved
Submission
Inspection
Method
Verified By:
Date:
BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel
Review
Frequency
Each unit
type
Requirement
Reference
-
Acceptance
Criteria
Approved By
Date:
As per
Specification
& Approved
Drawings
Activity
Sample of Inspection and Test Plan (ITP)
Project:
Scope of Work: Engineered Wood Flooring
This form serves as a guide only.
Appendix A
Submission (Shop Drawing / Method Statement)
Shop Drawings
1.2 BR /
ADOS
Prior to
Start
Work
Approved
Submission
Review Each unit
type
- As per
Specification
Method Statement
1.3 BR /
ADOS
Prior to
Start
Work
Approved
Submission
Review Each unit
type
Section 2 As per
Specification
Method Statement
	 •	 Engineered Wood
	 •	 Underlay
	 •	 Skirting
	 •	 Wood Filler
	 •	 Moisture Barrier
	 •	 Adhesive
	 •	 Accessories
	 •	 Protection
43
Legend BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel
Types of Material Delivered
	 •	 Engineered Wood
	 •	 Skirting
	 •	 Underlay
	 •	 Moisture Barrier
	 •	 Wood Filler
	 •	 Adhesive
	 •	 Accessories
	 •	 Protection
2 Incoming Material Inspection
S/No
Prepared By:
Date:
People
–In–
Charge
Stages
Inspection
Method
Verified By:
Date:
Frequency
Requirement
Reference
Acceptance
Criteria
Approved By
Date:
Activity
Sample of Inspection and Test Plan (ITP)
Project:
Scope of Work: Engineered Wood Flooring
This form serves as a guide only.
Appendix A
1.4 BR /
ADOS
Prior to
Start
Work
Review Each unit
type
Section 2 As per
Specification
Sample Submission
	 •	 Engineered Wood
	 •	 Underlay
	 •	 Skirting
	 •	 Wood Filler
	 •	 Moisture Barrier
	 •	 Adhesive
	 •	 Accessories
	 •	 Protection
Approved
Submission
Records
2.1 BR /
ADOS
Prior to
Start
Work
Visual /
Specifications
Each
Delivery
Section 3 As per
Specification
Delivery
Document
44
Legend BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel
Selection of Material for Testing
	 •	 Engineered Timber
	 •	 Skirting
	 •	 Moisture Barrier
	 •	 Adhesive
S/No
Prepared By:
Date:
People
–In–
Charge
Stages
Inspection
Method
Verified By:
Date:
Frequency
Requirement
Reference
Acceptance
Criteria
Approved By
Date:
Activity
Sample of Inspection and Test Plan (ITP)
Project:
Scope of Work: Engineered Wood Flooring
This form serves as a guide only.
Appendix A
2.2 BR /
ADOS
Prior to
Start
Work
Visual /
Specifications
Each
Delivery
Section 3 As per
Specification
Storage and Handling of
Material
	 •	 Engineered Wood
	 •	 Skirting
	 •	 Underlay
	 •	 Moisture Barrier
	 •	 Wood Filler
	 •	 Adhesive
	 •	 Accessories
	 •	 Protection
Delivery
Document
Records
3 Preparation
2.3 BR /
ADOS
Prior to
Start
Work
Visual /
Testing
Random
Selection
Section 3 As per
Specification
Delivery
Document
3.1 BR /
ADOS
Prior to
Start
Work
Visual /
Specifications
Each
Location
Section 4 As per
approved
submission
Method of Installation Approved
Submission
3.2 BR /
ADOS
Prior to
Start
Work
Visual /
Measurement
Each
Location
Section 4 As per
approved
submission
Mock Up Unit Approved
Submission
45
Legend BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel
S/No
Prepared By:
Date:
People
–In–
Charge
Stages
Inspection
Method
Verified By:
Date:
Frequency
Requirement
Reference
Acceptance
Criteria
Approved By
Date:
Activity
Sample of Inspection and Test Plan (ITP)
Project:
Scope of Work: Engineered Wood Flooring
Appendix A
3.3 BR /
ADOS
Before
Installation
Visual /
Specifications
Each
Delivery
Section 3 As per
Specification
Surface Preparation Check
	 •	 Moisture content
	 •	 Surface evenness
	 •	 Hollowness
	 •	 Squareness at corners
	 •	 Interfacing joint
Checklist
Records
4 Installation
4.1 BR /
ADOS
Before
Installation
Visual /
Specifications
Each
Location
Section 5 As per
approved
submission
Apply Moisture Barrier
(Optional) (Allow to cure)
Checklist
4.2 BR /
ADOS
Before
Installation
Visual /
Measurement
Each
Location
Section 5 As per
approved
submission
Apply Adhesive with Notched
Trowel
Checklist
3.4 BR /
ADOS
Before
Installation
Visual /
Measurement
Each
Location
Section 4 As per
approved
submission
Setting Out Check Checklist
3.5 BR /
ADOS
Before
Installation
Visual /
Measurement
Each
Location
Section 4 As per
approved
submission
Cleanliness of Floor Checklist
This form serves as a guide only.
46
Legend BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel
Prepared By:
Date:
Verified By:
Date:
Approved By
Date:
S/No People
–In–
Charge
Stages
Inspection
Method
Frequency
Requirement
Reference
Acceptance
Criteria
Activity
Sample of Inspection and Test Plan (ITP)
Project:
Scope of Work: Engineered Wood Flooring
Appendix A
Records
This form serves as a guide only.
4.5
4.6
BR /
ADOS
BR /
ADOS
Installation
Installation
Visual /
Measurement
Visual /
Measurement
Each
Location
Each
Location
Section 6
Section 5
As per
approved
submission
As per
approved
submission
Protection
Install Skirting
Checklist
Checklist
4.3 BR /
ADOS
Installation
Visual /
Measurement
Each
Location
Section 5 As per
approved
submission
Install Underlay (if applicable) Checklist
4.4 BR /
ADOS
Installation
Visual /
Measurement
Each
Location
Section 5 As per
approved
submission
Install Engineered Wood Checklist
4.7 BR /
ADOS
Quality
Check
Visual /
Measurement
Each
Unit
Section 8 As per
Specification
Quality Checks Checklist

More Related Content

Similar to Eng wood appa

ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)Anne Arundel Community College
 
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)Anne Arundel Community College
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1
Ramdani Diningrat
 
K to 12 TLE Curriculum Guide for RAC Servicing (DOMRAC)
K to 12 TLE Curriculum Guide for RAC Servicing (DOMRAC)K to 12 TLE Curriculum Guide for RAC Servicing (DOMRAC)
K to 12 TLE Curriculum Guide for RAC Servicing (DOMRAC)
Dr. Joy Kenneth Sala Biasong
 
Specification writing
Specification writingSpecification writing
Specification writing
BSRIA
 
WTP 1043 REINFORCEMENT WORKS.pdf
WTP 1043 REINFORCEMENT WORKS.pdfWTP 1043 REINFORCEMENT WORKS.pdf
WTP 1043 REINFORCEMENT WORKS.pdf
hazwanisapar
 
Corrosion protection
Corrosion protectionCorrosion protection
Corrosion protection
Abdullah Ansari
 
Nfmt vegas14 how to specify commercial flooring
Nfmt vegas14 how to specify commercial flooringNfmt vegas14 how to specify commercial flooring
Nfmt vegas14 how to specify commercial flooring
Lew Migliore
 
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdfStandard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
ParmeshworVetwal1
 
W1.pdf
W1.pdfW1.pdf
Ananda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCVAnanda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCVmariyan dsouza
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
Frank Cunha
 
Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Chintan Gohil
 
WTP 1012 INTRODUCTION OF SITE PREPARATION.pdf
WTP 1012 INTRODUCTION OF SITE  PREPARATION.pdfWTP 1012 INTRODUCTION OF SITE  PREPARATION.pdf
WTP 1012 INTRODUCTION OF SITE PREPARATION.pdf
hazwanisapar
 
Specifications of process parameters and general ipc and finish product controls
Specifications of process parameters and general ipc and finish product controlsSpecifications of process parameters and general ipc and finish product controls
Specifications of process parameters and general ipc and finish product controls
Guru Balaji .S
 
Construction Technology I Presentation Slides
Construction Technology I Presentation SlidesConstruction Technology I Presentation Slides
Construction Technology I Presentation Slides
JiaYu36
 

Similar to Eng wood appa (20)

ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
 
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
ACH 216 Lecture 10 (Materials Mgmt & Quality Assurance)
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1
 
K to 12 TLE Curriculum Guide for RAC Servicing (DOMRAC)
K to 12 TLE Curriculum Guide for RAC Servicing (DOMRAC)K to 12 TLE Curriculum Guide for RAC Servicing (DOMRAC)
K to 12 TLE Curriculum Guide for RAC Servicing (DOMRAC)
 
Specification writing
Specification writingSpecification writing
Specification writing
 
WTP 1043 REINFORCEMENT WORKS.pdf
WTP 1043 REINFORCEMENT WORKS.pdfWTP 1043 REINFORCEMENT WORKS.pdf
WTP 1043 REINFORCEMENT WORKS.pdf
 
Corrosion protection
Corrosion protectionCorrosion protection
Corrosion protection
 
Nfmt vegas14 how to specify commercial flooring
Nfmt vegas14 how to specify commercial flooringNfmt vegas14 how to specify commercial flooring
Nfmt vegas14 how to specify commercial flooring
 
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdfStandard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
Standard Operating Procedures SOP for Prestressed Concrete Members facility.pdf
 
W1.pdf
W1.pdfW1.pdf
W1.pdf
 
Ananda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCVAnanda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCV
 
Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
 
Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Resume_Chintan_Gohil_
Resume_Chintan_Gohil_
 
WTP 1012 INTRODUCTION OF SITE PREPARATION.pdf
WTP 1012 INTRODUCTION OF SITE  PREPARATION.pdfWTP 1012 INTRODUCTION OF SITE  PREPARATION.pdf
WTP 1012 INTRODUCTION OF SITE PREPARATION.pdf
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
Nivin Joseph- resume
Nivin Joseph- resumeNivin Joseph- resume
Nivin Joseph- resume
 
Specifications of process parameters and general ipc and finish product controls
Specifications of process parameters and general ipc and finish product controlsSpecifications of process parameters and general ipc and finish product controls
Specifications of process parameters and general ipc and finish product controls
 
AHMED MOHIY 21
AHMED MOHIY 21 AHMED MOHIY 21
AHMED MOHIY 21
 
Construction Technology I Presentation Slides
Construction Technology I Presentation SlidesConstruction Technology I Presentation Slides
Construction Technology I Presentation Slides
 

Recently uploaded

What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
Tanner Motors
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
Excavator
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Hyundai Motor Group
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
Excavator
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
psavhef
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
amvovau
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
4thzenzstar
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Motor Cars International
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 

Recently uploaded (19)

What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 

Eng wood appa

  • 1. 42 S/No Prepared By: Date: Legend 1 1.1 People –In– Charge BR / ADOS Stages Prior to Start Work Records Approved Submission Inspection Method Verified By: Date: BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel Review Frequency Each unit type Requirement Reference - Acceptance Criteria Approved By Date: As per Specification & Approved Drawings Activity Sample of Inspection and Test Plan (ITP) Project: Scope of Work: Engineered Wood Flooring This form serves as a guide only. Appendix A Submission (Shop Drawing / Method Statement) Shop Drawings 1.2 BR / ADOS Prior to Start Work Approved Submission Review Each unit type - As per Specification Method Statement 1.3 BR / ADOS Prior to Start Work Approved Submission Review Each unit type Section 2 As per Specification Method Statement • Engineered Wood • Underlay • Skirting • Wood Filler • Moisture Barrier • Adhesive • Accessories • Protection
  • 2. 43 Legend BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel Types of Material Delivered • Engineered Wood • Skirting • Underlay • Moisture Barrier • Wood Filler • Adhesive • Accessories • Protection 2 Incoming Material Inspection S/No Prepared By: Date: People –In– Charge Stages Inspection Method Verified By: Date: Frequency Requirement Reference Acceptance Criteria Approved By Date: Activity Sample of Inspection and Test Plan (ITP) Project: Scope of Work: Engineered Wood Flooring This form serves as a guide only. Appendix A 1.4 BR / ADOS Prior to Start Work Review Each unit type Section 2 As per Specification Sample Submission • Engineered Wood • Underlay • Skirting • Wood Filler • Moisture Barrier • Adhesive • Accessories • Protection Approved Submission Records 2.1 BR / ADOS Prior to Start Work Visual / Specifications Each Delivery Section 3 As per Specification Delivery Document
  • 3. 44 Legend BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel Selection of Material for Testing • Engineered Timber • Skirting • Moisture Barrier • Adhesive S/No Prepared By: Date: People –In– Charge Stages Inspection Method Verified By: Date: Frequency Requirement Reference Acceptance Criteria Approved By Date: Activity Sample of Inspection and Test Plan (ITP) Project: Scope of Work: Engineered Wood Flooring This form serves as a guide only. Appendix A 2.2 BR / ADOS Prior to Start Work Visual / Specifications Each Delivery Section 3 As per Specification Storage and Handling of Material • Engineered Wood • Skirting • Underlay • Moisture Barrier • Wood Filler • Adhesive • Accessories • Protection Delivery Document Records 3 Preparation 2.3 BR / ADOS Prior to Start Work Visual / Testing Random Selection Section 3 As per Specification Delivery Document 3.1 BR / ADOS Prior to Start Work Visual / Specifications Each Location Section 4 As per approved submission Method of Installation Approved Submission 3.2 BR / ADOS Prior to Start Work Visual / Measurement Each Location Section 4 As per approved submission Mock Up Unit Approved Submission
  • 4. 45 Legend BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel S/No Prepared By: Date: People –In– Charge Stages Inspection Method Verified By: Date: Frequency Requirement Reference Acceptance Criteria Approved By Date: Activity Sample of Inspection and Test Plan (ITP) Project: Scope of Work: Engineered Wood Flooring Appendix A 3.3 BR / ADOS Before Installation Visual / Specifications Each Delivery Section 3 As per Specification Surface Preparation Check • Moisture content • Surface evenness • Hollowness • Squareness at corners • Interfacing joint Checklist Records 4 Installation 4.1 BR / ADOS Before Installation Visual / Specifications Each Location Section 5 As per approved submission Apply Moisture Barrier (Optional) (Allow to cure) Checklist 4.2 BR / ADOS Before Installation Visual / Measurement Each Location Section 5 As per approved submission Apply Adhesive with Notched Trowel Checklist 3.4 BR / ADOS Before Installation Visual / Measurement Each Location Section 4 As per approved submission Setting Out Check Checklist 3.5 BR / ADOS Before Installation Visual / Measurement Each Location Section 4 As per approved submission Cleanliness of Floor Checklist This form serves as a guide only.
  • 5. 46 Legend BR – Builder Rep. ADOS – Architect /Designer / Owner / Supervisory Personnel Prepared By: Date: Verified By: Date: Approved By Date: S/No People –In– Charge Stages Inspection Method Frequency Requirement Reference Acceptance Criteria Activity Sample of Inspection and Test Plan (ITP) Project: Scope of Work: Engineered Wood Flooring Appendix A Records This form serves as a guide only. 4.5 4.6 BR / ADOS BR / ADOS Installation Installation Visual / Measurement Visual / Measurement Each Location Each Location Section 6 Section 5 As per approved submission As per approved submission Protection Install Skirting Checklist Checklist 4.3 BR / ADOS Installation Visual / Measurement Each Location Section 5 As per approved submission Install Underlay (if applicable) Checklist 4.4 BR / ADOS Installation Visual / Measurement Each Location Section 5 As per approved submission Install Engineered Wood Checklist 4.7 BR / ADOS Quality Check Visual / Measurement Each Unit Section 8 As per Specification Quality Checks Checklist