2. Haytham Ragaa Kamel
Page 2 of 5
‐ Develop work breakdown structure, method statements and monitor
the project progress and milestones.
‐ Study the contracts conditions and specifications.
‐ Prepare the monthly payment certificate and negotiate it with the
consultant.
‐ Review the interim payments of subcontractors against the payment
terms and the conditions of subcontract agreements.
‐ Provide comments, recommendations & identify the project cost
loading and forward to management for comments, negotiation, update
and approval.
‐ Coordinates closely with Planning and QS staff.
‐ Follow up inspection reports and payment certifacates.
‐ Prepare periodical progress reports.
‐ Sub‐contractors (German companies: Premier Composite Materials,
Riva, Light of Vienna and Strassacker).
ARABIAN CONSTRUCTION COMPANY LTD., JEDDAH, KSA
SITE ENGINEER, PROJECT OF HARAMIN HIGH SPEED RAILS – JEDDAH STATION
From May 2013 to April 2014
Responsible for the followings :
‐ Finishing Works (Paints) and Hardscape works (Interlock and Kerbstone).
‐ Checking plans, drawings and quantities for accuracy of calculations.
‐ Setting out, levelling, surveying and evaluating the work progress.
‐ Material arrangement, Manpower allocation and Management.
‐ Prepare surface for paints and follow up all paints phases for walls and
ceiling.
‐ Hardscape Works (Interlock and Kerbstone) around buildings.
‐ Site Inspections to insure quality of work and adequate progress of
work.
‐ Make invoices and payment certificate.
KHATIB & ALAMI ENGINEERING CONSULTING COMPANY, CAIRO, EGYPT
From February 2012 to April 2013
Co‐ordination Engineer Responsible for the followings:
‐ Aware of strategy for how to approach the design approval process and
be knowledgeable of design approval procedures.
‐ Review all plans, design elements (drawings, report, etc.) to ensure
compliance with client requirements and that all authorities’ comments
have been addressed.
3. Haytham Ragaa Kamel
Page 3 of 5
‐ Co‐ordinate between Structural design team and Mechanical design
team for shafts places, beams depth, Slabs openings and rafts pits for
pumps.
‐ Helping in internal plumbing and firefighting design.
‐ Obtain the approvals for any design changes might occurred during the
construction or design development.
‐ Prepare BOQ’s and other submittals documents.
‐ Maintaining Project Documentation Control.
‐ Attending project management and design review meetings.
Projects:
Marasi (IMAAR Egypt)
Park Avenue (IMAAR Egypt)
Port of Duqm (Oman)
Dar Al‐Wasl (UAE)
Ajlan Towers (KSA)
Al Jawhara Towers (UAE)
EGYPTIAN MINISTRY OF DEFENSE, MAJOR PROJECTS MANAGEMENT :
From December 2008 to January 2012
Site Engineer for Huge Residential Buildings in Maadi, Egypt
Scope of Work:
‐ Excavation.
‐ Replacement.
‐ RC Works.
‐ Some of Finishing works.
Responsible for the followings:
‐ Study the approved drawings and the relevant method statement and
risk assessments and follow–up execution of work accordingly.
‐ Revising Bill of Quantity.
‐ Coordinate with the site surveyor to carry out activity as built survey for
major elements of work such as finished floor levels – door and window
openings – slabs – lift shaft etc.
‐ Coordinate and conduct for final inspection with consultant for
obtaining the approval.
‐ Day‐to‐day management of the site, including supervising and
monitoring the site manpower and the work of any subcontractors.
‐ Resolving any unexpected technical difficulties and other problems that
may arise.
‐ Supervising the requirements of the projects such as materials,
equipment and manpower.
4. Haytham Ragaa Kamel
Page 4 of 5
‐ Overseeing quality control, health and safety matters on site.
‐ Supervising the execution of elements of the project
according to the time plan set.
‐ Full awareness of Project Quality plan (PQP), Inspection and Test Plans
(ITPs), Project HSE Plan and Risk Assessments.
PART TIME WORKS:
Plumbing and Firefighting Designer
From September 2008 to January 2012
Responsible for the followings:
‐ Preparing Drainage & Water Supply Schematic and Design Development
Drawing.
‐ Making details of valve chambers, valves, pumps, sleeves, trenches,
hangers, sump pit and supports.
‐ Making Coordination drawing for Plumbing, HVAC and Firefighting.
‐ Prepares Material submittals and properly checked before submitting to
the Clients.
‐ Prepare Bill of Quantities (BOQ) Plumbing System, Fire Fighting System.
Projects:
‐ Police Ministry Residential, Commercial and Administrative Buildings in
Alexandria.
‐ Police Ministry Residential, Commercial and Administrative Buildings in
Sohag.
‐ Police Ministry Residential, Commercial and Administrative Buildings in
Menia.
‐ Naba Al Hamra Resort in Wady Al Natron.
‐ Businessmen Resort in Damietta.
SUMMER TRAINING DURING STUDYING
‐ CAIRO AIRPORT TERMINAL THREE
2006 – 2007, Nile Engineering Consultant Office (N.E.C.B)
EXPERTISE HOUSE OF ENGINEERING CONSULTANT
Type of Work : Surveying , Management , Technical office .
‐ CONSTRUCTION OF MIDICAL FACTORY IN AL OBOUR CITY
2005 ‐ 2006, Nile Engineering Consultant Office (N.E.C.B)
Type of Work : Surveying , Foundations and Structural Works
‐ CIVIL TRAINING CENTER IN PETROLUM PIPES COPMPANY
2005 – 2006, Petroleum Pipes Company
Type of Work : Structural Design and Monitoring Progress