We thank Mr. Hamada Mohamed Hassan, the head of NSF (National Steel Fabrication Co.)
Surveying in Kurymat solar energy project.
He has developed a practicable Surveying Method Statement for alignment of pylon rows {80
rowslthat must follow one centre line located in a circle of 10mm (25 pylons/row) distance
between pylon approx. !2,Om with a tolerance +/- 5mm, rotation of the pylon in any direction
+f - O.Zmm, and under his responsibility and with the help of his surveyor staff he performed
very accurate job.
He has shown that he has a capability to lead a surveying team to work in such critical project;
just he has a good communicationlrelation with his staff and a good knowledge of the surveying
equipment/tools.
For allthose reason, we recommend him to work in similar accuracy projects.