POISED FOR GROWTH
April 2014
1
Legal and Other Matters
SAFE HARBOR: Some statements contained in this presentation are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of
1995 and applicable Canadian securities laws. Investors are cautioned that forward-looking statements are inherently uncertain and involve risks and uncertainties that could
cause actual results to differ materially. Such statements include comments regarding: our production expectations for 2014 and 2015 including our production guidance;
the impact of cost cutting initiatives; grade, recovery rates and timelines for production from our tailings reclaim facility and the impact of such production on the
Company’s performance; the timing for the completion of push backs trends on cash and all-in sustaining costs; predictions regarding cash costs per ounce; haulage costs;
improved access to ore in 2014; duration of mining at Father Brown pit; strip ratios after push backs; average planned head grades for refractory ore; sustaining capital
budgeted for 2014; ability to generate cash; timing for moving equipment from Bogoso to Wassa; the life of mine at Bogoso; pumping capacity at the Bogoso tailings facility;
timing of Mineral Resource and Mineral Reserve estimates for the Bogoso tailings facility and at Wassa; timing of drilling and recovery of assays; timing for completion of a
feasibility study at Wassa underground; timing to commercial production at Wassa underground; plans to pursue a low cost production strategy focused on non-refractory
ore sources; updated mineral reserve and mineral resource estimates at Wassa; capital expenditures; and our 2014 and 2015 outlook and objectives for the remainder of
2014 and 2015 and our medium term objectives. Factors that could cause actual results to differ materially include timing of and unexpected events at the Bogoso oxide and
sulfide processing plants and/or at the Wassa processing plant; variations in ore grade, tonnes mined, crushed or milled; variations in relative amounts of refractory, non-
refractory and transition ores; delay or failure to receive board or government approvals and permits; the availability and cost of electrical power; timing and availability of
external financing on acceptable terms; technical, permitting, mining or processing issues; changes in U.S. and Canadian securities markets; and fluctuations in gold price and
input costs and general economic conditions. There can be no assurance that future developments affecting the Company will be those anticipated by management. Please
refer to the discussion of these and other factors in our Annual Report on Form 10-K for 2012. The forecasts contained in this presentation constitute management's
current estimates, as of the date of this presentation, with respect to the matters covered thereby. We expect that these estimates will change as new information is
received and that actual results will vary from these estimates, possibly by material amounts. While we may elect to update these estimates at any time, we do not
undertake to update any estimate at any particular time or in response to any particular event. Investors and others should not assume that any forecasts in this
presentation represent management's estimate as of any date other than the date of this presentation.
NON-GAAP FINANCIAL MEASURES: In this presentation, we use the terms "cash operating cost per ounce“ and “all-in sustaining cost per ounce”. These measures
should be considered as Non-GAAP Financial Measures as defined in applicable securities laws and should not be considered in isolation or as a substitute for measures of
performance prepared in accordance with GAAP. We use cash operating cost per ounce as a key operating indicator. We monitor these measures monthly, comparing
each month's values to prior period's values to detect trends that may indicate increases or decreases in operating efficiencies. This measure is also compared against
budget to alert management to trends that may cause actual results to deviate from planned operational results. We provide this measure to our investors to allow them to
also monitor operational efficiencies of our mines. We calculate these measures for both individual operating units and on a consolidated basis. There are material
limitations associated with the use of such non-GAAP financial measures. These measures are not necessarily indicative of operating profit or cash flow from operations as
determined under IFRS. Changes in numerous factors including, but not limited to, mining rates, milling rates, gold grade, gold recovery, and the costs of labor, consumables
and mine site general and administrative activities can cause these measures to increase or decrease. We believe that these measures are the same or similar to the
measures of other gold mining companies, but may not be comparable to similarly titled measures in every instance.
INFORMATION: The information contained in this presentation has been obtained by Golden Star from its own records and from other sources deemed reliable,
however no representation or warranty is made as to its accuracy or completeness. The technical information relating to Golden Star’s material properties disclosed herein
is based upon technical reports prepared and filed pursuant to National Instrument 43-101 (“NI 43-101”) and other publicly available information regarding the Company,
including the following: (i) “NI 43-101 Technical Report on Mineral Resources and Mineral Reserves Golden Star Resources Ltd, Wassa Gold Mine, Ghana Effective
Date December 31, 2012”, prepared by SRK Consulting (UK) Limited; (ii) “NI 43-101 Preliminary Economic Assessment, Mechanized Mining of the West Reef Resource,
Prestea Underground Mine, Prestea, Ghana”, dated May 3, 2012 and prepared under the supervision of Martin P. Raffield and S. Mitchel Wasel; and (iii) Golden Star’s Annual
Report of Form 10-K for 2012. Additional information will be included in Golden Star’s Annual Information From for the year ended December 31, 2013 which will be filed
on SEDAR. Mineral Reserves were prepared under the supervision of Dr. Martin Raffield, Senior Vice President Technical Services for the Company. Dr. Raffield is a
"Qualified Person" as defined by Canada's National Instrument 43-101. The Qualified Person reviewing and validating the estimation of the Mineral Resources is S. Mitchel
Wasel, Golden Star Resources Vice President of Exploration.
CURRENCY: All monetary amounts refer to United States dollars unless otherwise indicated.
Golden Star Resources April 2014 Investor Presentation 2
• Located in stable jurisdiction with
long mining history
• Two producing mines – Wassa and
Bogoso
• Wassa Mineral Reserves1 of
1.97M oz at 1.75 g/t Au
• Bogoso Mineral Reserves1 of
1.98M oz at 3.17 g/t Au
• Prestea Underground mine awaiting
development
• Three processing plants – 7 mtpa
• 2013 production 331,000 oz.
• 2014 guidance 295 – 320,000 oz.
3
Golden Star unlocking value in Ghana
(1) Based on December 31, 2013 Mineral Reserve and Resource estimate. Please refer to Company's press release dated 10 February 2014.
Golden Star Resources April 2014 Investor Presentation
2013 Highlights
• Achieved production guidance for 2013
• Achieved cash cost guidance for 2013 at low end of range
• EstablishedWassa Main pit and grew Mineral Reserves and Resources at
this mine
• Largely completed push backs at Bogoso, well prepared for low cost
production in 2014 and 2015
• Commenced tailings retreatment at Bogoso, ramp up underway
• Completed Feasibility Study on Prestea Underground with successful
conclusion
• Reduced capex significantly whilst maintaining sound operations and
development project pipeline
• Raised debt finance with $50 million Ecobank loan
• Cash on hand at year end of $65.6 million
4Golden Star Resources April 2014 Investor Presentation
2013 Production Performance
5
$75.0 $72.1
$59.5 $56.5
$58.0
$48.6
$58.7
$39.5
$0
$20
$40
$60
$80
$100
$120
$140
Q1 2013 Q2 2013 Q3 2013 Q4 2013
Wassa Bogoso
46
51
45 44
35
34 44
31
0
10
20
30
40
50
60
70
80
90
100
Q1 2013 Q2 2013 Q3 2013 Q4 2013
Wassa Bogoso
Revenue ($ million) Production (k oz.)
• Average realized gold price of $1,414 per ounce (FY 2012: $1,662)
Golden Star Resources April 2014 Investor Presentation
Costs per Ounce1
$1,044 $1,049
$950-1,000
FY 2012 FY 2013 FY 2014
AISC:
$1,318
6
(1) See note on slide 2 regarding non-GAAP financial measures
AISC:
$1,326
AISC:
$1,150 -1,200
• Cash costs per ounce in line with guidance for 2013
• Downward trend expected in 2014 on both cash and all-in sustaining
costs
Golden Star Resources April 2014 Investor Presentation
Bogoso
Sustaining
Capex, $21.7
Wassa
Development
Capex, $15.9
Wassa
Sustaining
Capex, $17.7
Bogoso
Development
Capex, $47.4
Capital Expenditures
7
Total Capex $102.7 million
Bogoso
Sustaining
Capex,
$8.0M
Wassa
Sustaining
Capex,
$13.0M
Bogoso
Development
Capex, $23.0M
Total capex $50.0 million
2013 2014
Wassa
Development
Capex, $6.0M
Golden Star Resources April 2014 Investor Presentation
• Two operational pits – Wassa Main and
Father Brown
• Mining at Father Brown pit to end in
Q2 2014
• Non-refractory plant with current
capacity of 2.7 mtpa
• Large and growing mineral resource,
evaluating underground potential
• 2014 planned head grade of 1.7 g/t Au
• 2014 strip ratio of 4.5:1
8
Wassa Mine Demonstrating Strong Potential
Ownership 90%
2013 gold production 185,807 oz.
Mineral Reserves(1) 1.97 M oz.Au
P&P Reserve grade(1) 1.75 g/t Au
2013 cash operating costs/ oz. $805
(1) Based on December 31, 2013 Mineral Reserve and Resource estimate. Please refer to Company's press release dated 10 February 2014.
Golden Star Resources April 2014 Investor Presentation
Wassa Operational Review
• Cash costs per ounce declined in
2013 with higher head grade and
less stripping
• Cash costs per ounce increasing in
2014 as head grade decreases
• Mining fromWassa Main pit only
• Lower grade loss offset by savings
on haulage costs
• Q1 2014 production of 34,838
ounces
9
(1) See note on slide 2 regarding non-GAAP financial measures
159,000
186,000
135,000
$890
$805
$925
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
2012A 2013A 2014E
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
$1,800
$2,000
Ouncesproduced
Cashoperatingcosts
• Golden Star Resources April 2014 Investor Presentation
• Large pit now formed at Wassa
• Larger trucks
• Productivity gains
• Mining $1,000 pit shell from
January 2014
• From May 2014, entire ore
source 500m from plant,
reducing haulage costs
• Equipment transferred on lease
arrangement from Bogoso to
Wassa
Wassa Main Development
10Golden Star Resources April 2014 Investor Presentation
Wassa Main Grade Thickness Contour (gt)*m
Wassa Growth – Dec 2011
11Golden Star Resources April 2014 Investor Presentation
Wassa Main Grade Thickness Contour (gt)*m
Wassa Growth – Dec 2013
• Mineral Reserve and Resource update for year end 2013
• Wassa Mineral Reserve increased 34% to 2.0 million oz; 22% higher average grade of 1.75 g/t Au
• Wassa Measured and Indicated Mineral Resources increased 29% to 3.3 million oz; 25% higher
average grade of 2.0 g/t Au
$1,300 Pit Shell
Golden Star Resources April 2014 Investor Presentation 12
Wassa Main Grade Thickness Contour (gt)*m
Wassa Growth – March 2014
$1,300 Pit Shell
• New drilling campaign commenced November 2013 - infill and step out
• Significant grades and widths intercepted on step out holes, confirming ore body is open down
plunge
• In-fill drilling shows wide zones of significant grades between existing high grade drill intercepts
Golden Star Resources April 2014 Investor Presentation 13
14
Wassa –Way Forward
• PEA of underground mine at Wassa
complete Q2 2014
• Drilling completed and assays received
by mid 2014
• Revised Mineral Resource estimate Q3
2014
• Feasibility Study (based on revised
Resource estimates) to commence Q3
2014
• 18 months to commercial production at
underground mine thereafter
• Wassa processing capacity adequate for
deeper ore
Golden Star Resources April 2014 Investor Presentation
• Mining in Bogoso North and Chujah pits
• Two processing plants with combined capacity of
3.2 mtpa
• Bogoso refractory plant – 2.7 mtpa Biox®
• Bogoso non-refractory plant – 1.5 mtpa CIL
• 2014 average head grade refractory ore of 2.6 g/t
Au
• 2014 strip ratio, after pushback, of 3:1
• Sustaining capital of $8 million budgeted for 2014
15
Bogoso to Deliver Returns in NearTerm
Ownership 90%
2013 gold production 144,999 oz.
Mineral Reserves(1) 1.98 M oz Au
P&P Reserve grade(1) 3.17 g/t Au
2013 cash operating costs/ oz. $1,361
(1) Based on December 31, 2013 Mineral Reserve and Resource estimate. Please refer to Company's press release dated 10 February 2014.
Golden Star Resources April 2014 Investor Presentation
172,000
145,000
173,000
$1,186
$1,361
$1,025
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
2012A 2013A 2014E
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
$1,800
$2,000
Ouncesproduced
Cashoperatingcosts
Bogoso Operational Review
• Cash costs increased in 2013 with
lower grade and reduced access
to ore during push backs
• Mine operating expenses reduced
7% with lower contractor,
consumable and electricity costs
• Improved access to ore in 2014/
2015 will drive costs per ounce
down
• Q1 2014 production of 30,974
ounces
16
(1) See note on slide 2 regarding non-GAAP financial measures
Golden Star Resources April 2014 Investor Presentation
Bogoso push backs improving ore access
• Push backs substantially complete by end of Q1 2014
• Remaining LOM strip ratio post completion of push backs is 2:1
17
Grade g/t
0 100
meters
Chujah
End of 2012 surface
End of 2013 surface
Pushback mined in 2013
Final pit design
West
Final pit design
End of 2012 surface
End of 2013 surface
Pushback mined in 2013
Bogoso North
East
Golden Star Resources April 2014 Investor Presentation
• Reprocessing of tailings in TSF1 at
Bogoso non-refractory plant
• 9,200 ounces produced in H2 2013
• Achieved grade of 0.96 g/t Au,
with recovery of 42.5%
• Doubled pumping capacity in late
2013
• Targeting 5,000 tpd in 2014
• Exceeding target on regular basis
• Simple operation and low capex ore
source, opex of $8-10/tonne
• Mineral Resource and Reserve
estimate on tailings expected in
2014
18
Bogoso Tailings Deliver Low Cost Ounces
Golden Star Resources April 2014 Investor Presentation
• Established underground mine 100 years of
production, care and maintenance since 2002
• M&I Mineral Resource of 630k ounces, Inferred
Mineral Resource of further 850k ounces
• Located 15km from Bogoso plant
• Positive feasibility study concluded in May 2013
• 50,000 – 80,000 oz over 6 year LOM
• Cash operating costs $650 - 700/oz
• Initial capex of $90m
• Evaluating high grade lower capex, cost and
production alternative
19
Prestea Underground offers long
term growth
Ownership 90%
Mineral Reserves(1) 0.44 M oz Au
P&P Reserve grade(1) 9.6 g/t Au
(1) Based on December 31, 2013 Mineral Reserve and Resource estimate. Please refer to Company's press release dated 10 February 2014. Mineral Reserves and Resources for Prestea
Underground are included in the total Mineral Reserves and Resources reported for Bogoso.
Golden Star Resources April 2014 Investor Presentation
Medium term Outlook
2014
• Production for 2014 expected to be between 295,000 - 320,000 ounces
• Production to vary between quarters – Q2 and Q4 2014 will be stronger
• Father Brown pit to supply ore until end Q1 2014
• Cash operating costs of $950-1,000 per ounce
2015
• Production for 2015 expected to be between 260,000 - 280,000 ounces
• Hard rock mining to continue at Bogoso until Q3 2015
• Costs at Bogoso expected to reduce over remainder of life of mine
• Tailings retreatment to continue for next five years
• Cash costs of $900-950 per ounce
20Golden Star Resources April 2014 Investor Presentation
Company Strategy
21
• Pursue growth from non-refractory ounces
• Wassa Underground
• Bogoso tailings
• Prestea Underground
• Drive costs down through active management and mine planning
• Leverage off existing infrastructure to maintain low capex levels
• Favour operating margin over total ounces produced
Golden Star Resources April 2014 Investor Presentation
Investment Case
22
Golden Star is focusing operations on low cost non-refractory ounces
Costs are reducing through active management and as a result of strategy
New management team demonstrated capabilities and will continue to
deliver to shareholders
Company is adequately funded to achieve its near term objectives
Significant optionality to increase production if gold price rises
Historic infrastructure investment allows for lower capex in 2014
Development of Wassa is central to this strategy
Golden Star Resources April 2014 Investor Presentation
APPENDICES
(1) Includes US$47.3M of 5% Convertible Debentures at fair value
(2) As accessed on April 23, 2014 from Bloomberg
(3) As a group, beneficially owned, or controlled or directed, directly or indirectly as at December 31, 2013
24
Major Shareholders2
Heartland Advisors Inc. 12.11%
Sentry Select Capital Corp. 11.53%
Van Eck Associates Corp. 8.0%
Directors and Executive Officers3 2.8%
DE Shaw & Co 1.8%
Acadian Asset Management 1.2%
Share Price (Last close) (US$) (as of April 23, 2014) 61 cents
Shares Outstanding 259.1M
Market Capitalization (US$) 161M
Cash and Equivalents (US$) (March 31 2014) 58M
Total Debt (US$) (December 31,2013)1 94.2M
EnterpriseValue (US$) 197.2M
Daily AverageVolume
TSX: 140K
NYSE MKT: 2.6M
Strong Sponsorship, Good Liquidity
Golden Star Resources April 2014 Investor Presentation
• Tim Baker, Chairman, former COO of Kinross Gold Corp., extensive experience in
operating mines and projects around the world
• Sam Coetzer, President and CEO, mining engineer with over 26 years of
international mining experience including Kinross, Xstrata, Xstrata Coal, and Placer
Dome
• Anu Dhir, lawyer with corporate affairs and legal experiences in the mining, oil and gas
and technology sectors
• Rob Doyle, more than 30 years of experience in all facets of international resource
exploration, development and production
• Tony Jensen, over 25 years of mining industry experience; is President and CEO for
Royal Gold Inc
• Craig Nelsen, geologist with over 30 years of experience in the mining business
• Chris Thompson, 40 years of mining company and fund management experience.
Former Chairman of the World Gold Council
• Bill Yeates, audit partner for Hein & Associates and has 35 years of experience
working with public companies
25
New Team, New Focus – Board
2014 Guidance
Combined Operations in 2014
Production (oz) 295,000 – 320,000
Cash operating cost ($/oz.)1 950 – 1,000
Capital expenditure (millions)
Sustaining:
Development:
Total:
$21
$29(2)
$50
26
0
50
100
150
200
250
300
350
2014E
Wassa Bogoso
165 – 180k oz
130 – 140k oz
295 – 320k oz
(1) Power and fuel prices used in the guidance are US$0.18 per kilowatt hour and US$1.30 per liter, respectively.
(2) The development capital expenditure forecast for Bogoso for 2014 is inclusive of approximately US$12 million of development expenditures incurred at the Prestea Underground Mine.
Production
Golden Star Resources April 2014 Investor Presentation
WASSA MAIN DRILL HOLE PLANVIEW
BSDD292A
4.1m @
17.6g/t
BSDD290B 18.5m
@ 6.8g/t
BSDD224
17.6m @
3.9g/t
BSDD225
18.4m @
4.6g/t
BSDD241
5.9m @
12.1g/t
BSDD246
19.0m @ 10.2g/t
BSDD220
29.0m @
7.5g/t
BSDD285
27.9m @
5.0g/t
BSDD246
12.9m @
10.7g/t
BSDD2274
2.9m @
3.8g/t
BSDD218
32.4m @
3.5g/t
BSDD262
47.1 m @
7.2g/t
BSDD212
75.6m @
1.7g/t
BSDD264
16.9 @
5.5g/t
BSDD260
62.8m @ 4.1g/t
BSDD256
52.9m @
4.3g/t
BSDD226
32.6m @
7.5g/t
STDD033
24.0m@
4.3g/t
BSDD219
4.8m @
27.4g/t
BSDD233
11.2m @
20.0g/t
BSDD239B
22.2m @
4.1g/t
BSDD210
17.2m @
5.2g/t
BSDD209
10.2m @
12.1g/t
242DD068
31.7m @
7.3g/t
BSDD293
17.5m @
4.9g/t
BSDD295M 20.3m
@
3.5g/t
BSDD296
19.9m @
15.3g/t
BSDD298A
58.6m @ 4.0g/t
BSDD299
38.2m @ 3.5g/t
242DD080
11.7m @ 2.4g/t
WASSA MAIN DRILL HOLE PLANVIEW
BSDD301
19.2m
@11.35g/t
BSDD302
3.39m @
5.99g/t
BSDD305M
12.1m @ 6.53g/t
BSDD305D2
48.02m @
3.70g/t
BSDD305D1
17.11m @
2.35g/t
BSDD307
10.96m @
4.0g/t
BSDD308M
23.09m @
9.66g/t BSDD308D1
13.60m @
5.99g/t
BSDD295M
20.3m @ 3.5g/t
BSDD306
29.93m @
17.36g/t
BSDD309
5.36m @
2.28g/t
BSDD310
19.07m @
5.61g/t
BSDD311
5.74m @
2.40g/t
242DD080
11.7m @
2.4g/t

More Related Content

What's hot

Egf presentation 2018 final meetings
Egf presentation 2018 final   meetingsEgf presentation 2018 final   meetings
Egf presentation 2018 final meetingsGoldenStarResources
 
Golden star investor presentation - sept 2015
Golden star   investor presentation - sept 2015Golden star   investor presentation - sept 2015
Golden star investor presentation - sept 2015GoldenStarResources
 
Fy 2017 results presentation final
Fy 2017 results presentation finalFy 2017 results presentation final
Fy 2017 results presentation finalGoldenStarResources
 
Fy 2016 results presentation final
Fy 2016 results presentation finalFy 2016 results presentation final
Fy 2016 results presentation finalGoldenStarResources
 
Claude Resources Inc. 2014 Annual Conference Call and Webcast
Claude Resources Inc. 2014 Annual Conference Call and Webcast Claude Resources Inc. 2014 Annual Conference Call and Webcast
Claude Resources Inc. 2014 Annual Conference Call and Webcast Claude Resources Inc.
 
2016 june investor presentation update as at 18 jul16
2016 june investor presentation   update as at 18 jul162016 june investor presentation   update as at 18 jul16
2016 june investor presentation update as at 18 jul16GoldenStarResources
 
2016 june investor presentation update as at 17 jul16
2016 june investor presentation   update as at 17 jul162016 june investor presentation   update as at 17 jul16
2016 june investor presentation update as at 17 jul16GoldenStarResources
 
Investor presentation may 2018 final updated
Investor presentation may 2018 final updatedInvestor presentation may 2018 final updated
Investor presentation may 2018 final updatedGoldenStarResources
 
Claude Resources Inc. October 2015 Corporate Presentation
Claude Resources Inc. October 2015 Corporate Presentation Claude Resources Inc. October 2015 Corporate Presentation
Claude Resources Inc. October 2015 Corporate Presentation Claude Resources Inc.
 
Claude Resources Inc. Corporate Presentation NYC November 2015
Claude Resources Inc. Corporate Presentation NYC November 2015 Claude Resources Inc. Corporate Presentation NYC November 2015
Claude Resources Inc. Corporate Presentation NYC November 2015 Claude Resources Inc.
 
Claude Resources Inc. Corporate Presentation - January 2016
Claude Resources Inc. Corporate Presentation - January 2016Claude Resources Inc. Corporate Presentation - January 2016
Claude Resources Inc. Corporate Presentation - January 2016Claude Resources Inc.
 
2016 TD Conference Toronto
2016 TD Conference Toronto2016 TD Conference Toronto
2016 TD Conference TorontoKinrossGold
 
Claude Resources Inc. 2015 Denver Gold Forum Presentation
Claude Resources Inc. 2015 Denver Gold Forum Presentation Claude Resources Inc. 2015 Denver Gold Forum Presentation
Claude Resources Inc. 2015 Denver Gold Forum Presentation Claude Resources Inc.
 
Kinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast PresentationKinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast PresentationKinrossGold
 

What's hot (20)

Egf presentation 2018 final meetings
Egf presentation 2018 final   meetingsEgf presentation 2018 final   meetings
Egf presentation 2018 final meetings
 
2016 q1 financial results final
2016 q1 financial results final2016 q1 financial results final
2016 q1 financial results final
 
Golden star investor presentation - sept 2015
Golden star   investor presentation - sept 2015Golden star   investor presentation - sept 2015
Golden star investor presentation - sept 2015
 
2016 zurich london april
2016 zurich london april2016 zurich london april
2016 zurich london april
 
Investor presentation oct 2017
Investor presentation oct 2017Investor presentation oct 2017
Investor presentation oct 2017
 
Bmo meetings presentation final
Bmo meetings presentation finalBmo meetings presentation final
Bmo meetings presentation final
 
Fy 2017 results presentation final
Fy 2017 results presentation finalFy 2017 results presentation final
Fy 2017 results presentation final
 
Fy 2016 results presentation final
Fy 2016 results presentation finalFy 2016 results presentation final
Fy 2016 results presentation final
 
Claude Resources Inc. 2014 Annual Conference Call and Webcast
Claude Resources Inc. 2014 Annual Conference Call and Webcast Claude Resources Inc. 2014 Annual Conference Call and Webcast
Claude Resources Inc. 2014 Annual Conference Call and Webcast
 
2016 june investor presentation update as at 18 jul16
2016 june investor presentation   update as at 18 jul162016 june investor presentation   update as at 18 jul16
2016 june investor presentation update as at 18 jul16
 
2016 june investor presentation update as at 17 jul16
2016 june investor presentation   update as at 17 jul162016 june investor presentation   update as at 17 jul16
2016 june investor presentation update as at 17 jul16
 
Investor presentation may 2018 final updated
Investor presentation may 2018 final updatedInvestor presentation may 2018 final updated
Investor presentation may 2018 final updated
 
Claude Resources Inc. October 2015 Corporate Presentation
Claude Resources Inc. October 2015 Corporate Presentation Claude Resources Inc. October 2015 Corporate Presentation
Claude Resources Inc. October 2015 Corporate Presentation
 
Claude Resources Inc. Corporate Presentation NYC November 2015
Claude Resources Inc. Corporate Presentation NYC November 2015 Claude Resources Inc. Corporate Presentation NYC November 2015
Claude Resources Inc. Corporate Presentation NYC November 2015
 
2014 dgg conference draft final
2014 dgg conference draft final2014 dgg conference draft final
2014 dgg conference draft final
 
Claude Resources Inc. Corporate Presentation - January 2016
Claude Resources Inc. Corporate Presentation - January 2016Claude Resources Inc. Corporate Presentation - January 2016
Claude Resources Inc. Corporate Presentation - January 2016
 
2015 q1 financial results final
2015 q1 financial results final2015 q1 financial results final
2015 q1 financial results final
 
2016 TD Conference Toronto
2016 TD Conference Toronto2016 TD Conference Toronto
2016 TD Conference Toronto
 
Claude Resources Inc. 2015 Denver Gold Forum Presentation
Claude Resources Inc. 2015 Denver Gold Forum Presentation Claude Resources Inc. 2015 Denver Gold Forum Presentation
Claude Resources Inc. 2015 Denver Gold Forum Presentation
 
Kinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast PresentationKinross Gold Corp Q4 2015 Earnings Webcast Presentation
Kinross Gold Corp Q4 2015 Earnings Webcast Presentation
 

Similar to 2014 Investor Presentation April 2

Q1 2014 financial results may 2014 final
Q1 2014 financial results may 2014 finalQ1 2014 financial results may 2014 final
Q1 2014 financial results may 2014 finalGoldenStarResources
 
2014 investor presentation june v3
2014 investor presentation   june v32014 investor presentation   june v3
2014 investor presentation june v3GoldenStarResources
 
2015 december investor presentation web
2015 december investor presentation web2015 december investor presentation web
2015 december investor presentation webGoldenStarResources
 
Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold
 
Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014Crocodile Gold
 
July 2014 Corporate Presentation
July 2014 Corporate PresentationJuly 2014 Corporate Presentation
July 2014 Corporate PresentationCrocodile Gold
 
Dgc 14 11_07 - corporate presentation
Dgc 14 11_07 - corporate presentationDgc 14 11_07 - corporate presentation
Dgc 14 11_07 - corporate presentationDetourGold
 
Dgc 14 11_06 - corporate presentation
Dgc 14 11_06 - corporate presentationDgc 14 11_06 - corporate presentation
Dgc 14 11_06 - corporate presentationDetourGold
 
Third Quarter 2014 Results Webcast
Third Quarter 2014 Results WebcastThird Quarter 2014 Results Webcast
Third Quarter 2014 Results WebcastDetourGold
 
Presentation dgc 14-11_04 _ q3 2014 webcast
Presentation   dgc 14-11_04 _ q3 2014 webcastPresentation   dgc 14-11_04 _ q3 2014 webcast
Presentation dgc 14-11_04 _ q3 2014 webcastDetourGold
 
Third Quarter 2014 Results Webcast
Third Quarter 2014 Results WebcastThird Quarter 2014 Results Webcast
Third Quarter 2014 Results WebcastDetourGold
 
Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014Crocodile Gold
 
August 2014 Corporate Presentation
August 2014 Corporate PresentationAugust 2014 Corporate Presentation
August 2014 Corporate PresentationCrocodile Gold
 
Dgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conferenceDgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conferenceDetourGold
 
2016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul162016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul16GoldenStarResources
 
Investor presentation june 2017 final
Investor presentation june 2017 finalInvestor presentation june 2017 final
Investor presentation june 2017 finalGoldenStarResources
 

Similar to 2014 Investor Presentation April 2 (20)

Q1 2014 financial results may 2014 final
Q1 2014 financial results may 2014 finalQ1 2014 financial results may 2014 final
Q1 2014 financial results may 2014 final
 
2014 investor presentation june v3
2014 investor presentation   june v32014 investor presentation   june v3
2014 investor presentation june v3
 
2015 december investor presentation web
2015 december investor presentation web2015 december investor presentation web
2015 december investor presentation web
 
2015 Q3 Financial Results Final
2015 Q3 Financial Results Final2015 Q3 Financial Results Final
2015 Q3 Financial Results Final
 
Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014
 
Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014
 
July 2014 Corporate Presentation
July 2014 Corporate PresentationJuly 2014 Corporate Presentation
July 2014 Corporate Presentation
 
Dgc 14 11_07 - corporate presentation
Dgc 14 11_07 - corporate presentationDgc 14 11_07 - corporate presentation
Dgc 14 11_07 - corporate presentation
 
Dgc 14 11_06 - corporate presentation
Dgc 14 11_06 - corporate presentationDgc 14 11_06 - corporate presentation
Dgc 14 11_06 - corporate presentation
 
Third Quarter 2014 Results Webcast
Third Quarter 2014 Results WebcastThird Quarter 2014 Results Webcast
Third Quarter 2014 Results Webcast
 
Presentation dgc 14-11_04 _ q3 2014 webcast
Presentation   dgc 14-11_04 _ q3 2014 webcastPresentation   dgc 14-11_04 _ q3 2014 webcast
Presentation dgc 14-11_04 _ q3 2014 webcast
 
Third Quarter 2014 Results Webcast
Third Quarter 2014 Results WebcastThird Quarter 2014 Results Webcast
Third Quarter 2014 Results Webcast
 
Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014
 
August 2014 Corporate Presentation
August 2014 Corporate PresentationAugust 2014 Corporate Presentation
August 2014 Corporate Presentation
 
Q3 Results Presentation
Q3 Results PresentationQ3 Results Presentation
Q3 Results Presentation
 
Dgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conferenceDgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conference
 
Egf meetings presentation final
Egf meetings presentation finalEgf meetings presentation final
Egf meetings presentation final
 
2016 june investor presentation
2016 june investor presentation2016 june investor presentation
2016 june investor presentation
 
2016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul162016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul16
 
Investor presentation june 2017 final
Investor presentation june 2017 finalInvestor presentation june 2017 final
Investor presentation june 2017 final
 

More from GoldenStarResources

Q1 2018 results presentation final pdf
Q1 2018 results presentation final pdfQ1 2018 results presentation final pdf
Q1 2018 results presentation final pdfGoldenStarResources
 
Bmo conference presentation meetings version final
Bmo conference presentation   meetings version finalBmo conference presentation   meetings version final
Bmo conference presentation meetings version finalGoldenStarResources
 
Investor presentation jan 2018 final
Investor presentation jan 2018 finalInvestor presentation jan 2018 final
Investor presentation jan 2018 finalGoldenStarResources
 
Investor presentation dec 2017 final
Investor presentation dec 2017 finalInvestor presentation dec 2017 final
Investor presentation dec 2017 finalGoldenStarResources
 
Gsr merged nov_2017_presentation
Gsr merged nov_2017_presentationGsr merged nov_2017_presentation
Gsr merged nov_2017_presentationGoldenStarResources
 
Jefferies presentation aug 2017 final
Jefferies presentation aug 2017 finalJefferies presentation aug 2017 final
Jefferies presentation aug 2017 finalGoldenStarResources
 
Investor Presentation - January 2017
Investor Presentation - January 2017Investor Presentation - January 2017
Investor Presentation - January 2017GoldenStarResources
 
Prestea underground presentation final
Prestea underground presentation finalPrestea underground presentation final
Prestea underground presentation finalGoldenStarResources
 
Investor presentation oct 2016 final
Investor presentation oct 2016 finalInvestor presentation oct 2016 final
Investor presentation oct 2016 finalGoldenStarResources
 
Denver meetings presentation final
Denver meetings presentation finalDenver meetings presentation final
Denver meetings presentation finalGoldenStarResources
 
GSR August 2016 Investor Presentation
GSR August 2016 Investor PresentationGSR August 2016 Investor Presentation
GSR August 2016 Investor PresentationGoldenStarResources
 

More from GoldenStarResources (15)

Investor presentation june 2018
Investor presentation june 2018Investor presentation june 2018
Investor presentation june 2018
 
Q1 2018 results presentation final pdf
Q1 2018 results presentation final pdfQ1 2018 results presentation final pdf
Q1 2018 results presentation final pdf
 
Bmo conference presentation meetings version final
Bmo conference presentation   meetings version finalBmo conference presentation   meetings version final
Bmo conference presentation meetings version final
 
Investor presentation jan 2018 final
Investor presentation jan 2018 finalInvestor presentation jan 2018 final
Investor presentation jan 2018 final
 
Investor presentation dec 2017 final
Investor presentation dec 2017 finalInvestor presentation dec 2017 final
Investor presentation dec 2017 final
 
Wassa Presentation
Wassa PresentationWassa Presentation
Wassa Presentation
 
Gsr merged nov_2017_presentation
Gsr merged nov_2017_presentationGsr merged nov_2017_presentation
Gsr merged nov_2017_presentation
 
Q3 2017 presentation final
Q3 2017 presentation finalQ3 2017 presentation final
Q3 2017 presentation final
 
Jefferies presentation aug 2017 final
Jefferies presentation aug 2017 finalJefferies presentation aug 2017 final
Jefferies presentation aug 2017 final
 
Investor Presentation - January 2017
Investor Presentation - January 2017Investor Presentation - January 2017
Investor Presentation - January 2017
 
Investor presentation dec 2016
Investor presentation dec 2016Investor presentation dec 2016
Investor presentation dec 2016
 
Prestea underground presentation final
Prestea underground presentation finalPrestea underground presentation final
Prestea underground presentation final
 
Investor presentation oct 2016 final
Investor presentation oct 2016 finalInvestor presentation oct 2016 final
Investor presentation oct 2016 final
 
Denver meetings presentation final
Denver meetings presentation finalDenver meetings presentation final
Denver meetings presentation final
 
GSR August 2016 Investor Presentation
GSR August 2016 Investor PresentationGSR August 2016 Investor Presentation
GSR August 2016 Investor Presentation
 

Recently uploaded

High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...SUHANI PANDEY
 
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024Kweku Zurek
 
💚😋 jamshedpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 jamshedpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 jamshedpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 jamshedpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋nirzagarg
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna SpA
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...tanu pandey
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...tanu pandey
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024TeckResourcesLtd
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationLeonardo
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxMollyBrown86
 
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋nirzagarg
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024nicola_mining
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanurdharasingh5698
 

Recently uploaded (20)

High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
💚😋 jamshedpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 jamshedpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 jamshedpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 jamshedpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
 
Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings Results
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Saharanpur Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 

2014 Investor Presentation April 2

  • 2. Legal and Other Matters SAFE HARBOR: Some statements contained in this presentation are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Investors are cautioned that forward-looking statements are inherently uncertain and involve risks and uncertainties that could cause actual results to differ materially. Such statements include comments regarding: our production expectations for 2014 and 2015 including our production guidance; the impact of cost cutting initiatives; grade, recovery rates and timelines for production from our tailings reclaim facility and the impact of such production on the Company’s performance; the timing for the completion of push backs trends on cash and all-in sustaining costs; predictions regarding cash costs per ounce; haulage costs; improved access to ore in 2014; duration of mining at Father Brown pit; strip ratios after push backs; average planned head grades for refractory ore; sustaining capital budgeted for 2014; ability to generate cash; timing for moving equipment from Bogoso to Wassa; the life of mine at Bogoso; pumping capacity at the Bogoso tailings facility; timing of Mineral Resource and Mineral Reserve estimates for the Bogoso tailings facility and at Wassa; timing of drilling and recovery of assays; timing for completion of a feasibility study at Wassa underground; timing to commercial production at Wassa underground; plans to pursue a low cost production strategy focused on non-refractory ore sources; updated mineral reserve and mineral resource estimates at Wassa; capital expenditures; and our 2014 and 2015 outlook and objectives for the remainder of 2014 and 2015 and our medium term objectives. Factors that could cause actual results to differ materially include timing of and unexpected events at the Bogoso oxide and sulfide processing plants and/or at the Wassa processing plant; variations in ore grade, tonnes mined, crushed or milled; variations in relative amounts of refractory, non- refractory and transition ores; delay or failure to receive board or government approvals and permits; the availability and cost of electrical power; timing and availability of external financing on acceptable terms; technical, permitting, mining or processing issues; changes in U.S. and Canadian securities markets; and fluctuations in gold price and input costs and general economic conditions. There can be no assurance that future developments affecting the Company will be those anticipated by management. Please refer to the discussion of these and other factors in our Annual Report on Form 10-K for 2012. The forecasts contained in this presentation constitute management's current estimates, as of the date of this presentation, with respect to the matters covered thereby. We expect that these estimates will change as new information is received and that actual results will vary from these estimates, possibly by material amounts. While we may elect to update these estimates at any time, we do not undertake to update any estimate at any particular time or in response to any particular event. Investors and others should not assume that any forecasts in this presentation represent management's estimate as of any date other than the date of this presentation. NON-GAAP FINANCIAL MEASURES: In this presentation, we use the terms "cash operating cost per ounce“ and “all-in sustaining cost per ounce”. These measures should be considered as Non-GAAP Financial Measures as defined in applicable securities laws and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. We use cash operating cost per ounce as a key operating indicator. We monitor these measures monthly, comparing each month's values to prior period's values to detect trends that may indicate increases or decreases in operating efficiencies. This measure is also compared against budget to alert management to trends that may cause actual results to deviate from planned operational results. We provide this measure to our investors to allow them to also monitor operational efficiencies of our mines. We calculate these measures for both individual operating units and on a consolidated basis. There are material limitations associated with the use of such non-GAAP financial measures. These measures are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Changes in numerous factors including, but not limited to, mining rates, milling rates, gold grade, gold recovery, and the costs of labor, consumables and mine site general and administrative activities can cause these measures to increase or decrease. We believe that these measures are the same or similar to the measures of other gold mining companies, but may not be comparable to similarly titled measures in every instance. INFORMATION: The information contained in this presentation has been obtained by Golden Star from its own records and from other sources deemed reliable, however no representation or warranty is made as to its accuracy or completeness. The technical information relating to Golden Star’s material properties disclosed herein is based upon technical reports prepared and filed pursuant to National Instrument 43-101 (“NI 43-101”) and other publicly available information regarding the Company, including the following: (i) “NI 43-101 Technical Report on Mineral Resources and Mineral Reserves Golden Star Resources Ltd, Wassa Gold Mine, Ghana Effective Date December 31, 2012”, prepared by SRK Consulting (UK) Limited; (ii) “NI 43-101 Preliminary Economic Assessment, Mechanized Mining of the West Reef Resource, Prestea Underground Mine, Prestea, Ghana”, dated May 3, 2012 and prepared under the supervision of Martin P. Raffield and S. Mitchel Wasel; and (iii) Golden Star’s Annual Report of Form 10-K for 2012. Additional information will be included in Golden Star’s Annual Information From for the year ended December 31, 2013 which will be filed on SEDAR. Mineral Reserves were prepared under the supervision of Dr. Martin Raffield, Senior Vice President Technical Services for the Company. Dr. Raffield is a "Qualified Person" as defined by Canada's National Instrument 43-101. The Qualified Person reviewing and validating the estimation of the Mineral Resources is S. Mitchel Wasel, Golden Star Resources Vice President of Exploration. CURRENCY: All monetary amounts refer to United States dollars unless otherwise indicated. Golden Star Resources April 2014 Investor Presentation 2
  • 3. • Located in stable jurisdiction with long mining history • Two producing mines – Wassa and Bogoso • Wassa Mineral Reserves1 of 1.97M oz at 1.75 g/t Au • Bogoso Mineral Reserves1 of 1.98M oz at 3.17 g/t Au • Prestea Underground mine awaiting development • Three processing plants – 7 mtpa • 2013 production 331,000 oz. • 2014 guidance 295 – 320,000 oz. 3 Golden Star unlocking value in Ghana (1) Based on December 31, 2013 Mineral Reserve and Resource estimate. Please refer to Company's press release dated 10 February 2014. Golden Star Resources April 2014 Investor Presentation
  • 4. 2013 Highlights • Achieved production guidance for 2013 • Achieved cash cost guidance for 2013 at low end of range • EstablishedWassa Main pit and grew Mineral Reserves and Resources at this mine • Largely completed push backs at Bogoso, well prepared for low cost production in 2014 and 2015 • Commenced tailings retreatment at Bogoso, ramp up underway • Completed Feasibility Study on Prestea Underground with successful conclusion • Reduced capex significantly whilst maintaining sound operations and development project pipeline • Raised debt finance with $50 million Ecobank loan • Cash on hand at year end of $65.6 million 4Golden Star Resources April 2014 Investor Presentation
  • 5. 2013 Production Performance 5 $75.0 $72.1 $59.5 $56.5 $58.0 $48.6 $58.7 $39.5 $0 $20 $40 $60 $80 $100 $120 $140 Q1 2013 Q2 2013 Q3 2013 Q4 2013 Wassa Bogoso 46 51 45 44 35 34 44 31 0 10 20 30 40 50 60 70 80 90 100 Q1 2013 Q2 2013 Q3 2013 Q4 2013 Wassa Bogoso Revenue ($ million) Production (k oz.) • Average realized gold price of $1,414 per ounce (FY 2012: $1,662) Golden Star Resources April 2014 Investor Presentation
  • 6. Costs per Ounce1 $1,044 $1,049 $950-1,000 FY 2012 FY 2013 FY 2014 AISC: $1,318 6 (1) See note on slide 2 regarding non-GAAP financial measures AISC: $1,326 AISC: $1,150 -1,200 • Cash costs per ounce in line with guidance for 2013 • Downward trend expected in 2014 on both cash and all-in sustaining costs Golden Star Resources April 2014 Investor Presentation
  • 7. Bogoso Sustaining Capex, $21.7 Wassa Development Capex, $15.9 Wassa Sustaining Capex, $17.7 Bogoso Development Capex, $47.4 Capital Expenditures 7 Total Capex $102.7 million Bogoso Sustaining Capex, $8.0M Wassa Sustaining Capex, $13.0M Bogoso Development Capex, $23.0M Total capex $50.0 million 2013 2014 Wassa Development Capex, $6.0M Golden Star Resources April 2014 Investor Presentation
  • 8. • Two operational pits – Wassa Main and Father Brown • Mining at Father Brown pit to end in Q2 2014 • Non-refractory plant with current capacity of 2.7 mtpa • Large and growing mineral resource, evaluating underground potential • 2014 planned head grade of 1.7 g/t Au • 2014 strip ratio of 4.5:1 8 Wassa Mine Demonstrating Strong Potential Ownership 90% 2013 gold production 185,807 oz. Mineral Reserves(1) 1.97 M oz.Au P&P Reserve grade(1) 1.75 g/t Au 2013 cash operating costs/ oz. $805 (1) Based on December 31, 2013 Mineral Reserve and Resource estimate. Please refer to Company's press release dated 10 February 2014. Golden Star Resources April 2014 Investor Presentation
  • 9. Wassa Operational Review • Cash costs per ounce declined in 2013 with higher head grade and less stripping • Cash costs per ounce increasing in 2014 as head grade decreases • Mining fromWassa Main pit only • Lower grade loss offset by savings on haulage costs • Q1 2014 production of 34,838 ounces 9 (1) See note on slide 2 regarding non-GAAP financial measures 159,000 186,000 135,000 $890 $805 $925 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 2012A 2013A 2014E $0 $200 $400 $600 $800 $1,000 $1,200 $1,400 $1,600 $1,800 $2,000 Ouncesproduced Cashoperatingcosts • Golden Star Resources April 2014 Investor Presentation
  • 10. • Large pit now formed at Wassa • Larger trucks • Productivity gains • Mining $1,000 pit shell from January 2014 • From May 2014, entire ore source 500m from plant, reducing haulage costs • Equipment transferred on lease arrangement from Bogoso to Wassa Wassa Main Development 10Golden Star Resources April 2014 Investor Presentation
  • 11. Wassa Main Grade Thickness Contour (gt)*m Wassa Growth – Dec 2011 11Golden Star Resources April 2014 Investor Presentation
  • 12. Wassa Main Grade Thickness Contour (gt)*m Wassa Growth – Dec 2013 • Mineral Reserve and Resource update for year end 2013 • Wassa Mineral Reserve increased 34% to 2.0 million oz; 22% higher average grade of 1.75 g/t Au • Wassa Measured and Indicated Mineral Resources increased 29% to 3.3 million oz; 25% higher average grade of 2.0 g/t Au $1,300 Pit Shell Golden Star Resources April 2014 Investor Presentation 12
  • 13. Wassa Main Grade Thickness Contour (gt)*m Wassa Growth – March 2014 $1,300 Pit Shell • New drilling campaign commenced November 2013 - infill and step out • Significant grades and widths intercepted on step out holes, confirming ore body is open down plunge • In-fill drilling shows wide zones of significant grades between existing high grade drill intercepts Golden Star Resources April 2014 Investor Presentation 13
  • 14. 14 Wassa –Way Forward • PEA of underground mine at Wassa complete Q2 2014 • Drilling completed and assays received by mid 2014 • Revised Mineral Resource estimate Q3 2014 • Feasibility Study (based on revised Resource estimates) to commence Q3 2014 • 18 months to commercial production at underground mine thereafter • Wassa processing capacity adequate for deeper ore Golden Star Resources April 2014 Investor Presentation
  • 15. • Mining in Bogoso North and Chujah pits • Two processing plants with combined capacity of 3.2 mtpa • Bogoso refractory plant – 2.7 mtpa Biox® • Bogoso non-refractory plant – 1.5 mtpa CIL • 2014 average head grade refractory ore of 2.6 g/t Au • 2014 strip ratio, after pushback, of 3:1 • Sustaining capital of $8 million budgeted for 2014 15 Bogoso to Deliver Returns in NearTerm Ownership 90% 2013 gold production 144,999 oz. Mineral Reserves(1) 1.98 M oz Au P&P Reserve grade(1) 3.17 g/t Au 2013 cash operating costs/ oz. $1,361 (1) Based on December 31, 2013 Mineral Reserve and Resource estimate. Please refer to Company's press release dated 10 February 2014. Golden Star Resources April 2014 Investor Presentation
  • 16. 172,000 145,000 173,000 $1,186 $1,361 $1,025 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 2012A 2013A 2014E $0 $200 $400 $600 $800 $1,000 $1,200 $1,400 $1,600 $1,800 $2,000 Ouncesproduced Cashoperatingcosts Bogoso Operational Review • Cash costs increased in 2013 with lower grade and reduced access to ore during push backs • Mine operating expenses reduced 7% with lower contractor, consumable and electricity costs • Improved access to ore in 2014/ 2015 will drive costs per ounce down • Q1 2014 production of 30,974 ounces 16 (1) See note on slide 2 regarding non-GAAP financial measures Golden Star Resources April 2014 Investor Presentation
  • 17. Bogoso push backs improving ore access • Push backs substantially complete by end of Q1 2014 • Remaining LOM strip ratio post completion of push backs is 2:1 17 Grade g/t 0 100 meters Chujah End of 2012 surface End of 2013 surface Pushback mined in 2013 Final pit design West Final pit design End of 2012 surface End of 2013 surface Pushback mined in 2013 Bogoso North East Golden Star Resources April 2014 Investor Presentation
  • 18. • Reprocessing of tailings in TSF1 at Bogoso non-refractory plant • 9,200 ounces produced in H2 2013 • Achieved grade of 0.96 g/t Au, with recovery of 42.5% • Doubled pumping capacity in late 2013 • Targeting 5,000 tpd in 2014 • Exceeding target on regular basis • Simple operation and low capex ore source, opex of $8-10/tonne • Mineral Resource and Reserve estimate on tailings expected in 2014 18 Bogoso Tailings Deliver Low Cost Ounces Golden Star Resources April 2014 Investor Presentation
  • 19. • Established underground mine 100 years of production, care and maintenance since 2002 • M&I Mineral Resource of 630k ounces, Inferred Mineral Resource of further 850k ounces • Located 15km from Bogoso plant • Positive feasibility study concluded in May 2013 • 50,000 – 80,000 oz over 6 year LOM • Cash operating costs $650 - 700/oz • Initial capex of $90m • Evaluating high grade lower capex, cost and production alternative 19 Prestea Underground offers long term growth Ownership 90% Mineral Reserves(1) 0.44 M oz Au P&P Reserve grade(1) 9.6 g/t Au (1) Based on December 31, 2013 Mineral Reserve and Resource estimate. Please refer to Company's press release dated 10 February 2014. Mineral Reserves and Resources for Prestea Underground are included in the total Mineral Reserves and Resources reported for Bogoso. Golden Star Resources April 2014 Investor Presentation
  • 20. Medium term Outlook 2014 • Production for 2014 expected to be between 295,000 - 320,000 ounces • Production to vary between quarters – Q2 and Q4 2014 will be stronger • Father Brown pit to supply ore until end Q1 2014 • Cash operating costs of $950-1,000 per ounce 2015 • Production for 2015 expected to be between 260,000 - 280,000 ounces • Hard rock mining to continue at Bogoso until Q3 2015 • Costs at Bogoso expected to reduce over remainder of life of mine • Tailings retreatment to continue for next five years • Cash costs of $900-950 per ounce 20Golden Star Resources April 2014 Investor Presentation
  • 21. Company Strategy 21 • Pursue growth from non-refractory ounces • Wassa Underground • Bogoso tailings • Prestea Underground • Drive costs down through active management and mine planning • Leverage off existing infrastructure to maintain low capex levels • Favour operating margin over total ounces produced Golden Star Resources April 2014 Investor Presentation
  • 22. Investment Case 22 Golden Star is focusing operations on low cost non-refractory ounces Costs are reducing through active management and as a result of strategy New management team demonstrated capabilities and will continue to deliver to shareholders Company is adequately funded to achieve its near term objectives Significant optionality to increase production if gold price rises Historic infrastructure investment allows for lower capex in 2014 Development of Wassa is central to this strategy Golden Star Resources April 2014 Investor Presentation
  • 24. (1) Includes US$47.3M of 5% Convertible Debentures at fair value (2) As accessed on April 23, 2014 from Bloomberg (3) As a group, beneficially owned, or controlled or directed, directly or indirectly as at December 31, 2013 24 Major Shareholders2 Heartland Advisors Inc. 12.11% Sentry Select Capital Corp. 11.53% Van Eck Associates Corp. 8.0% Directors and Executive Officers3 2.8% DE Shaw & Co 1.8% Acadian Asset Management 1.2% Share Price (Last close) (US$) (as of April 23, 2014) 61 cents Shares Outstanding 259.1M Market Capitalization (US$) 161M Cash and Equivalents (US$) (March 31 2014) 58M Total Debt (US$) (December 31,2013)1 94.2M EnterpriseValue (US$) 197.2M Daily AverageVolume TSX: 140K NYSE MKT: 2.6M Strong Sponsorship, Good Liquidity Golden Star Resources April 2014 Investor Presentation
  • 25. • Tim Baker, Chairman, former COO of Kinross Gold Corp., extensive experience in operating mines and projects around the world • Sam Coetzer, President and CEO, mining engineer with over 26 years of international mining experience including Kinross, Xstrata, Xstrata Coal, and Placer Dome • Anu Dhir, lawyer with corporate affairs and legal experiences in the mining, oil and gas and technology sectors • Rob Doyle, more than 30 years of experience in all facets of international resource exploration, development and production • Tony Jensen, over 25 years of mining industry experience; is President and CEO for Royal Gold Inc • Craig Nelsen, geologist with over 30 years of experience in the mining business • Chris Thompson, 40 years of mining company and fund management experience. Former Chairman of the World Gold Council • Bill Yeates, audit partner for Hein & Associates and has 35 years of experience working with public companies 25 New Team, New Focus – Board
  • 26. 2014 Guidance Combined Operations in 2014 Production (oz) 295,000 – 320,000 Cash operating cost ($/oz.)1 950 – 1,000 Capital expenditure (millions) Sustaining: Development: Total: $21 $29(2) $50 26 0 50 100 150 200 250 300 350 2014E Wassa Bogoso 165 – 180k oz 130 – 140k oz 295 – 320k oz (1) Power and fuel prices used in the guidance are US$0.18 per kilowatt hour and US$1.30 per liter, respectively. (2) The development capital expenditure forecast for Bogoso for 2014 is inclusive of approximately US$12 million of development expenditures incurred at the Prestea Underground Mine. Production Golden Star Resources April 2014 Investor Presentation
  • 27. WASSA MAIN DRILL HOLE PLANVIEW BSDD292A 4.1m @ 17.6g/t BSDD290B 18.5m @ 6.8g/t BSDD224 17.6m @ 3.9g/t BSDD225 18.4m @ 4.6g/t BSDD241 5.9m @ 12.1g/t BSDD246 19.0m @ 10.2g/t BSDD220 29.0m @ 7.5g/t BSDD285 27.9m @ 5.0g/t BSDD246 12.9m @ 10.7g/t BSDD2274 2.9m @ 3.8g/t BSDD218 32.4m @ 3.5g/t BSDD262 47.1 m @ 7.2g/t BSDD212 75.6m @ 1.7g/t BSDD264 16.9 @ 5.5g/t BSDD260 62.8m @ 4.1g/t BSDD256 52.9m @ 4.3g/t BSDD226 32.6m @ 7.5g/t STDD033 24.0m@ 4.3g/t BSDD219 4.8m @ 27.4g/t BSDD233 11.2m @ 20.0g/t BSDD239B 22.2m @ 4.1g/t BSDD210 17.2m @ 5.2g/t BSDD209 10.2m @ 12.1g/t 242DD068 31.7m @ 7.3g/t BSDD293 17.5m @ 4.9g/t BSDD295M 20.3m @ 3.5g/t BSDD296 19.9m @ 15.3g/t BSDD298A 58.6m @ 4.0g/t BSDD299 38.2m @ 3.5g/t 242DD080 11.7m @ 2.4g/t
  • 28. WASSA MAIN DRILL HOLE PLANVIEW BSDD301 19.2m @11.35g/t BSDD302 3.39m @ 5.99g/t BSDD305M 12.1m @ 6.53g/t BSDD305D2 48.02m @ 3.70g/t BSDD305D1 17.11m @ 2.35g/t BSDD307 10.96m @ 4.0g/t BSDD308M 23.09m @ 9.66g/t BSDD308D1 13.60m @ 5.99g/t BSDD295M 20.3m @ 3.5g/t BSDD306 29.93m @ 17.36g/t BSDD309 5.36m @ 2.28g/t BSDD310 19.07m @ 5.61g/t BSDD311 5.74m @ 2.40g/t 242DD080 11.7m @ 2.4g/t