SlideShare a Scribd company logo
1 of 28
Download to read offline
TSXV: FPC | www.falcores.com
1
TSXV: FPC | www.falcores.com
January 2015
Rediscovering the Rouyn-Noranda Mining District
Rebirth of the Horne Mine
TSXV: FPC | www.falcores.com
2
CORPORATE SUMMARY
Cautionary Statement
Disclaimer
This presentation contains a review of the Company’s properties in Canada. Viewers are cautioned that the projects are at an early stage of exploration and that estimates and
projections contained herein are based on limited and incomplete data. More work is required before the mineralization on the projects and their economic aspects can be
confidentially modeled. Therefore, the work results and estimates herein may be considered to be generally indicative only of the nature and quality of the projects. No
representation or prediction is intended as to the results of future work, nor can there be any promise that the estimates herein will be confirmed by future exploration or analysis,
or that the projects will otherwise prove to be economic.
The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this presentation, which has been prepared by management. There
can be no assurance that any of the assumptions in the resource estimates will be supported by a Pre-feasibility or Feasibility Study or that any forward looking event will come to
pass. The data is incomplete and considerable additional work will be required to complete further evaluation, including but not limited to drilling, engineering and socio-economic
studies and investment.
This presentation contains information with respect to adjacent or similar mineral properties in respect of which the Company has no interest or rights to explore or mine. Readers
are cautioned that the Company has no interest in or right to acquire any interest in any such properties, and that mineral deposits on adjacent or similar properties are not
indicative of mineral deposits on the Company’s properties. Past performance is no guarantee of future performance and all investors are urged to consult their investment
professionals before making an investment decision. Investors are further cautioned that past performance is no guarantee of future performance
Forward-Looking Statements
Certain information included in this presentation constitutes forward-looking statements, including any information as to our projects, plans and future performance. All statements,
other than statements of historical fact, are forward-looking statements. The words “expect”, “believe”, “anticipate”, “will”, “intend”, “estimate”, “forecast”, “budget”, “schedule”
and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered
reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause
actual results to differ materially from those projected in the forward-looking statements.
Such factors include, but are not limited to: changes to current estimates of mineral reserves and resources; labour availability; litigation; availability of and increased costs
associated with contractors and exploration equipment; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses and
permits; contests over title to properties; uncertainty with the Company’s ability to secure capital to execute its business plans; changes in national and local government legislation
in Canada; risk of loss due to sabotage and civil disturbances; risks arising from holding derivative instruments; and business opportunities that may be pursued by the company.
Many of these uncertainties and contingencies can affect our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking
statements made by, or on behalf of, us. Readers are cautioned that forward-looking statements are not guarantees of future performance.
The company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as
required by applicable law.
Cautionary Note to U.S Investors Concerning Measured, Indicated and Inferred Resources
This presentation uses the terms “measured,” “indicated” and “inferred resources. We advise investors that while those terms are recognized and required by Canadian regulations,
the United States Securities and Exchange commission does not recognize them. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility
or other economic studies. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral
reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable.
TSXV: FPC | www.falcores.com
3
Rebirth of the Horne Mine
• Targeting 5 million ounces gold equivalent at Horne Project
• Highly desirable asset given size, grade, jurisdiction and infrastructure
District Play – Quebec’s Abitibi Region
• 74,000 hectares (740 km2) and 13 former mines in a world-class VMS system &
along Cadillac and Destor-Porcupine faults
• Last of the large Abitibi Greenstone Belt mining camps
• Never before controlled or explored by a major gold producer
Management Track Record
• Past involvement with LaRonde, Goldex, and Young-Davidson mines
• Exploration, discovery, permitting, construction, M&A and capital markets
• Osisko Gold Royalties a large shareholder
CORPORATE SUMMARY
Investment Thesis
TSXV: FPC | www.falcores.com
4
Over 100 Years of Mining History
SOUTHERN ABITIBI GREENSTONE BELT
Strong Gold Pedigree
Larder Lake
13 Moz Au
Kirkland Lake
24 Moz Au
Timmins
71 Moz Au
Rouyn-Noranda
19 Moz Au
Malartic
14 Moz Au
Bousquet
21 Moz Au
Lennox Creek Fault Zone
Porcupine Destor Fault Zone
Cadillac
Fault Zone
ONTARIO
QUEBEC
Rouyn-Noranda
Timiskaming Sediments
Cobalt Plate
Felsic Intrusive
Kap High
Mafic/Ultramafic Volcanics
Geology
Val d’Or
14 Moz Au
Major gold mining camp
• 50 current and former gold and base metal mines in the Rouyn-Noranda camp
• Rouyn-Noranda camp has produced 19 Moz of gold and 2.9 Blbs of copper, but
underexplored for gold
0 25 50 75 100
Kilometres
TSXV: FPC | www.falcores.com
5
CORPORATE SUMMARY
Senior Leadership Team
Sean Roosen, Chairman
• President & CEO of Osisko Royalties
René Marion, Lead Director
• Former President & CEO of AuRico Gold
Trent Mell, President & CEO, Director
• Former Executive VP of AuRico Gold
Jim Davidson, CFO, Director
• Co-Founder of Falco Resources
• Former CFO of Western Minerals Group
Claude Ferron, Director
• Former COO of Xstrata Copper Canada
Paul Henri-Girard, Director
• Former VP of Canadian Operations at Agnico
Eagle Mines
Luc Lessard, Director
• Former COO of Osisko Mining
BOARD OF DIRECTORS
Trent Mell, President & CEO, Director
• Former Executive VP of AuRico Gold
Jim Davidson, CFO, Director
• Co-Founder of Falco Resources
• Former CFO of Western Minerals Group
Dr. Michael Byron, Vice-President Exploration
• Co-Founder of Falco Resources
• Former VP Exploration at Lake Shore Gold
Claude Léveillée, Vice-President Community
Relations & Human Resources
• Former Corporate Director, Human
Resources/Organizational Development at
Agnico Eagle Mines
Dean Linden, Senior Vice-President Business
Development
• Over 16 years of corporate development and
public market expertise
OFFICERS
TSXV: FPC | www.falcores.com
6
Capital Structure
Shareholder Registry
CORPORATE SUMMARY
A New Abitibi Exploration Company
Osisko Gold Royalties 11.4%
Goodman & Company 8.7%
Other Institutions 19.7%
Insiders 8.0%
Shares Outstanding (basic) 94,170,857
Stock Options 8,008,388
Warrants 7,871,438
Shares Outstanding (fully diluted} 110,050,683
Cash (October 20, 2014) C$12,100,000
(23%)
5%
12%
21%
TSX Venture
Gold
S&P/TSX Gold Index
Falco Share Price
Relative Performance (Since Equity Financing – 10/2/2014)
TSXV: FPC | www.falcores.com
7
Highly Prospective Land in a Top Jurisdiction
LAND PACKAGE
Dominant Position in Established Camp
• 13 former mines on 740 km2 of Falco properties
• Over 80 years of data archives
TSXV: FPC | www.falcores.com
8
City of
Rouyn-Noranda
Glencore
Smelter
Horne Mine
Quemont Mine
Falco Surface
Rights
Horne West
HORNE PROJECT
Located North of the City
Located in an Industrial Park - Away from residential areas
TSXV: FPC | www.falcores.com
9
Initial production
• Horne mine operated for over 50 years
• Since 1976, focus had been on the Horne smelter (Glencore)
• What has changed: higher gold price, bulk underground mining & new exploration
techniques
End of Mining
(2.5 Blbs Cu &
11.5 Moz Au)
Falco acquires
properties
(Sep 2012)
Discovery of
Horne Mine
Digitization & compilation of
Horne historical drill results
(Aug 2013)
NI 43-101 Horne 5
resource estimate
(Mar 2014)
1923 1927 1976 1985 2012 2013 2014
Remnant mining
(102,000 oz Au)
History of Horne
HORNE PROJECT
38 Years Later
$2.2M Regional
Exploration
(Jun 2014)
TSXV: FPC | www.falcores.com
10
(1) Please refer to footnotes in the Appendix
HORNE PROJECT
Maiden Resource Estimate
• Inferred resource estimate from historic drilling
Open at depth and along strike
Discovery costs of <$0.25/oz Au
• 1,200m strike length; 40-120m thick; 1,700m
vertical extent
• En echelon stacked tabular body; well defined
metal zonation (gold, copper, zinc)
• Extensively developed (1930s to 1960s)
4,386 drill holes at 15m spacing (305,000m)
40 working levels & 55km of underground
development
TSXV: FPC | www.falcores.com
11
ENV_B
ENV_C
ENV_D
NSR Assumptions and Parameters • Maiden resource of 2.8 Moz AuEq at 3.4 g/t
• Opportunity to increase the resource:
 Conservative NSR & base metal payabilities
 Silver content not considered
Commodity Payable
Metal
Metal Price
($US)
Gold 87% $1,300.00
Copper 65% $3.30
Zinc 37% $0.95
Resource
Class
Cut-off
(NSR $C)
Tonnes
(Millions)
AuEq
(g/t)
Au
(g/t)
Cu
(%)
Zn
(%)
Contained
AuEq (Moz)
Contained
Au (Moz)
Contained
Cu (Mlbs)
Contained
Zn (Mlbs)
Inferred
>50 67.6 2.48 1.8 0.17 0.72 5.4 4.0 261 1,073
>60 50.4 2.75 2.1 0.19 0.73 4.5 3.3 214 814
>70 35.9 3.07 2.3 0.21 0.72 3.5 2.7 168 573
>80 25.3 3.41 2.6 0.23 0.70 2.8 2.2 131 393
>90 17.9 3.77 3.0 0.26 0.69 2.2 1.7 102 272
>100 12.8 4.17 3.4 0.28 0.67 1.7 1.4 79 190
>110 9.5 4.57 3.7 0.30 0.66 1.4 1.1 63 138
Exchange Rate: CAD/USD = 1.05
HORNE PROJECT
Resource Estimate – Upside Opportunities
TSXV: FPC | www.falcores.com
12
Goldex
(Agnico-Eagle)
Young-Davidson
(AuRico)
LaRonde
(Agnico-Eagle)
Horne 5 **
(Falco)
Resource Grade
(g/t AuEq) 1.8 2.8 5.1 3.4
Mining Method Long hole Transverse long hole
Longitudinal Retreat /
Transverse Open
Stoping
Long hole **
Depth (m) 800 - 1,500 750 - 1,500 2,000-3,000 600 - 2,300
Stope Size 15-38 x 30 x 50 20-25 x 20 x 30 5-25 x 15 x 30 15 x 15 x 38 **
Mining Rate 5,100 tpd 8,000 tpd * 7,200 tpd >8,000 tpd **
Operating Cost/NSR $41/t * $53.50/t * $95/t Under review
Annual Production (koz) 71,000 * 200,000 * 230,000 *
* Projected life-of-mine (LOM)
** Horne 5 tonnes and grades per 43-101 report; balance is conceptual
COMPARABLE MINE ANALYSIS
High Margin Potential
Horne 5 $80 NSR Cutoff in Maiden 43-101 Resource Estimate Under Review
Source: Company website and filings
TSXV: FPC | www.falcores.com
13
HORNE PROJECT
Confirmatory Drill Program
• 16,000m drilling program
 9-hole drill program from surface
 Metallurgical work
 Updated 43-101
• Primary objectives of confirmation drilling:
1. Upgrade resource category from Inferred to Indicated
2. Confirm metallurgical parameters (improve payability)
3. Confirm historic silver grades of >15 g/t
• Targeted Results
 Increase tonnes by >30%
 Increase AuEq to >3.5 Moz
• >$3M cost (est.)
• Completion by H2 2015
Main Envelope
(Transparent)
High Grade Zones
(full)
N S
TSXV: FPC | www.falcores.com
14
HORNE PROJECT
Additional Targets in Horne Complex
Potential to increase Mineral Resources in the Horne Complex
• 11 gold targets within the shadow of the old mines
• Identified potential Horne West extension at depth
TSXV: FPC | www.falcores.com
15
HORNE PROJECT
Near Surface Targets
Horne West Gatehouse
Au g/t
• Several near-surface
mineralized zones
close to Horne
• Drilled by Noranda but
smelter sought higher
copper values
• Would provide early
cash flow during
production ramp-up
• Horne West
mineralization believed
to extend from surface
to 1,500m
Horne 5
Deposit
Horne
Mine
Possible
Extension
TSXV: FPC | www.falcores.com
16
0
2
4
6
8
10
12
14
-
1
2
3
4
5
6
7
8
9
GradeAuEq(g/t)
ContainedAuEq(Moz)
Source: Company Reports
(1) Underground operations only
Compares favourably to other modern bulk underground mines
HORNE PROJECT
Good Grades for Bulk Mining
Producer
Developer
Grade
Higher grade
than Goldex and
Young-Davidson
TSXV: FPC | www.falcores.com
17
0
500
1,000
1,500
2,000
2,500
3,000
3,500
Reserve/ResourceDepth(m)
Exploration Potential
Resource Depth of Regional Mine Comparables
(West to East)
Source: Company Reports
HORNE PROJECT
Horne Mine not Deep
Mined out
Horne 5
TSXV: FPC | www.falcores.com
18
Regional
Exploration
TSXV: FPC | www.falcores.com
19
• 15 km northeast of Rouyn-
Noranda
• 15 km of highly prospective
felsic volcanic stratigraphy
for potential new VMS
discoveries
• A single hole targeting a
large anomaly intersected
3.8m of sulphide stringer
zone material – target
related to sulphide
mineralization
• Borehole EM survey
modeling in progress
• Drilling planned for Q1
2015
Rouyn-Noranda
Horne Mine
Lac Hervé
Property
LAC HERVE - VMS
Large Anomaly Identified
VMS Style Mineralization Intersected
TSXV: FPC | www.falcores.com
20
• 12 km northwest of Rouyn-
Noranda
• Four former gold producers
(1 Moz)
• Favorable underexplored
structural settings
• Numerous gold showings and
prospects (see map)
• Potential for large tonnage bulk
mineable deposits
FLAVRIAN - GOLD
New Gold Opportunities
TSXV: FPC | www.falcores.com
21
Background
Status
• Cu-Zn-Au property, located 25km northwest of
Rouyn-Noranda
• One of the most significant VMS properties in the
Camp
• Lithogeochemically similar to Horne Complex rocks
• Falco identified numerous near-surface conductors
related to stratigraphy with the chemical
characteristics of Horne Complex
• Over 2km of laterally extensive untested exhalative
sequence, akin to VMS systems
• 3 drill holes with pulse-EM completed
• Geophysical compilation in progress
RIVIÈRE MOUILLEUSE (RIMO) – VMS
Similar Signature as Horne
Distribution Map of High Probability
“Horne Type” Samples
Rimo
Horne Complex
TSXV: FPC | www.falcores.com
22
Appendix
TSXV: FPC | www.falcores.com
23
NSR (and gold equivalent calculations) cut-off are based on the following parameters: Exchange rate = C$1.05 for US$1.00,
Gold price=$1,300 US/oz, Copper price = $3.30 US/lbs, Zinc price = $0.95 US/lbs; Payable Metals = 87% for gold, 65% for
copper and 37% for zinc based on historic data and peer comparisons.
Resources were evaluated from drill hole data using an ID2 interpolation method in a block model (block size = 5 x 5 x 5
metres).
Densities were determined from historic drill hole iron assay data using a 3-pass ID2 interpolation method for the ENV_A
and HG_A to E sub-zones. The average densities for these blocks range from 3.17 to 3.54 g/cm3. A fixed density of 2.88
g/cm3, representing the average of the available data, was used for ENV_B to D, because of too few data.
Source: NI 43-101 Report, February 17, 2014, InnovExplo
APPENDIX
Resource Summary
Resource Estimate
Cut-off
(NSR C$)
Tonnes
Au Eq
(g/t)
Au
(g/t)
Cu
(%)
Zn
(%)
Contained
AuEq (Moz)
Contained
Au (Moz)
Contained
Cu (Mlbs)
Contained
Zn (Mlbs)
> 50 67.6 2.48 1.8 0.17 0.72 5.4 4.0 261 1,073
> 60 50.4 2.75 2.1 0.19 0.73 4.5 3.3 214 814
> 70 35.9 3.07 2.3 0.21 0.72 3.5 2.7 168 573
> 80 25.3 3.41 2.6 0.23 0.70 2.8 2.2 131 393
> 90 17.9 3.77 3.0 0.26 0.69 2.2 1.7 102 272
> 100 12.8 4.17 3.4 0.28 0.67 1.7 1.4 79 190
> 100 9.5 4.57 3.7 0.30 0.66 1.4 1.1 63 138
Inferred
110> 110
Tonnes
(Mt)
Qualified Person
Stéphane Poitras, Exploration Manager, (P.Geo.) is a qualified person as defined by National Instrument 43-101 -- Standards of
Disclosure for Mineral Projects and has reviewed and verified the technical information contained in this presentation. Mr.
Poitras is an employee of Falco and is non-independent.
TSXV: FPC | www.falcores.com
24
Trent Mell
B.C.L., LL.B., LL.M., MBA
President & CEO, Director
Dr. Michael Byron
B.Sc., M.Sc., PhD. & P. Geo.
VP Exploration
Jim Davidson
B.Comm & C.A.
CFO, Director
• Former EVP at AuRico Gold
• Extensive international transactional experience (over 100 deals and $2 billion in financings)
• Previously with precious and base metal producers, including Barrick and AuRico Gold (Young-Davidson)
• Co-founder of Falco Resources and former VP Exploration for Lake Shore Gold and Aurora Platinum
• Instrumental role in sale of Aurora to FNX Mining and resource expansion at Lake Shore leading to
development of Timmins West Gold Mine, Director & Chief Geologist of Nighthawk Gold Corp, led
acquisition and expansion of Colomac mine to more than 2.1 million ounces of gold
• Co-founder of Falco Resources, former VP Finance and CFO of Western Minerals Group, and Former CFO of
Athabasca Potash (acquired by BHP Billiton)
• Over 35 years experience, including senior roles with Weyerhaeuser Company and with Deloitte and Touche
APPENDIX
Senior Leadership Team - Management
Dean Linden
B.Comm & C.A.
SVP, Business Development
• Over 16 years of corporate development and public market expertise
• Eight years with ID Biomedical which was sold to GlaxoSmithKline for $1.7 billion
Claude Léveillée
CRIA
VP Community Relations &
Human Resources
• Over than 30 years experience on a national and international level in Human Resources and Community
Relations
• Former Corporate Director, Human Resources - Organizational Development at Agnico-Eagle Mines
Paul-Henri Girard
B.A.Sc., Mining Eng.
Consulting Engineer
• Former Vice-President of Canadian Operations for Agnico Eagle Mines
• Instrumental in the development of the Agnico’s LaRonde mine and in the advancement of the Goldex and
Lapa mines in Quebec
TSXV: FPC | www.falcores.com
25
APPENDIX
Non-Executive Directors
Sean Roosen
Chairman
• Chairman and CEO of Osisko Gold Royalties
• Former President, CEO & Co-founder of Osisko Mining Corporation, where he was instrumental in
permitting and financing the development of the $1 billion Canadian Malartic Mine
René Marion
P. Eng
Lead Director
Luc Lessard
Director
• COO of Canadian Malartic Partnership and former COO of Osisko Mining
• Former VP Engineering and Construction for IAMGOLD
• 25 years of experience designing, building and operating mines
Paul-Henri Girard
BASc, Mining Eng.
Director
Claude Ferron
P. Eng
Director
• Former COO for Xstrata Copper Canada
• Former metallurgist at the Horne operations and later assumed a number of technical and managerial roles
with increasing responsibility at Noranda, Falconbridge and Xstrata
• Over 30 years of experience in mining and mineral processing
• Former President and CEO of AuRico Gold
• From 1995 to 2007, held a variety of roles with increasing responsibility at Barrick Gold
• Business executive and mining engineer with approximately 30 years of industry experience
• Former Vice-President of Canadian Operations for Agnico Eagle Mines
• Instrumental in the development of Agnico’s LaRonde mine and in the advancement of the Goldex and
Lapa mines in Quebec
TSXV: FPC | www.falcores.com
26
$0
$20
$40
$60
$80
$100
$120
Harte Gold Integra Gold Yorbeau
Resources
Pure Gold Eastmain
Resources
Lexam VG
Gold
Alexandria
Minerals
Falco
Resources
Temex Gowest Gold
EV/AuEqResource(US$/oz)
Source: Company Reports
EV / RESOURCE FOR REGIONAL UNDERGROUND PROJECTS
Valuation Relative to Peers
Median: US$29/oz
Falco trades at a discount to peers despite extensive infrastructure,
a known ore body, and significant upside potential
TSXV: FPC | www.falcores.com
27
Significant M&A Activity in the Region
Source: Company Reports, S&P Capital IQ
REGIONAL GOLD M&A TRANSACTIONS
Strategic Importance of Abitibi Greenstone Belt
Jan-15 Goldcorp Probe Mines Developer $437 $96
Apr-14 Yamana / Agnico Eagle Osisko Mining Producer $3,493 $125
Dec-13 Primero Mining Brigus Gold Producer $217 $154
May-13 New Gold Rainy River Resources Developer $380 $35
Jan-13 Hecla Mining Aurizon Mines Producer $791 $109
Nov-12 Osisko Mining Queenston Mining Developer $550 $98
Oct-12 Argonaut Gold Prodigy Gold Developer $352 $43
Apr-12 IAMGOLD Trelawney Mining & Exploration Developer $624 $80
Sep-11 Detour Gold Trade Winds Ventures Developer $81 $35
Aug-11 AuRico Gold Northgate Minerals Developer $1,543 $153
Aug-11 Lake Shore Gold Fenn-Gib Project Developer $58 $29
EV / AuEq
Resource
(US$/oz)
Announcement
Date
Acquiror Target Producer/Developer
Equity Value
(US$M)
TSXV: FPC | www.falcores.com
28
Executive Office
Falco Resources Ltd.
Suite 1440 – 155 University Ave
Toronto, ON M5H 3B7
Tel: +1.416.703.1611
Toll-free: +1.888.915.2009
Email: info@falcores.com
Investor Inquiries
Vera Janakievski
Director, Investor Relations
Tel: +1.416.703.1611 x222
Email: vjanakievski@falcores.com
Dean Linden
SVP, Business Development
Tel: +1.425.449.9442
Email: dlinden@falcores.com
Contact Us

More Related Content

What's hot

March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised coverFalcoCorporate
 
February 2016 Corporate Presentation
February 2016 Corporate PresentationFebruary 2016 Corporate Presentation
February 2016 Corporate PresentationFalcoCorporate
 
Rebirth of the Horne Mine - A Company Maker
Rebirth of the Horne Mine - A Company MakerRebirth of the Horne Mine - A Company Maker
Rebirth of the Horne Mine - A Company MakerFalcoCorporate
 
August Investor presentation
August Investor presentationAugust Investor presentation
August Investor presentationFalcoCorporate
 
30.2 falco presentation rbc august 2017 100dpi
30.2 falco presentation   rbc august 2017 100dpi30.2 falco presentation   rbc august 2017 100dpi
30.2 falco presentation rbc august 2017 100dpiFalcoCorporate
 
30.3 falco presentation osisko days - sept 2017 125dpi
30.3 falco presentation   osisko days - sept 2017 125dpi30.3 falco presentation   osisko days - sept 2017 125dpi
30.3 falco presentation osisko days - sept 2017 125dpiFalcoCorporate
 
Investor presentation june 2018 final.compressed
Investor presentation june 2018 final.compressedInvestor presentation june 2018 final.compressed
Investor presentation june 2018 final.compressedasanko6699
 
Harfang Exploration - 2019 Vancouver Investment Resource Conference
Harfang Exploration - 2019 Vancouver Investment Resource ConferenceHarfang Exploration - 2019 Vancouver Investment Resource Conference
Harfang Exploration - 2019 Vancouver Investment Resource ConferenceHarfangEx
 
Precious metals summit 2019, beaver creek
Precious metals summit 2019, beaver creekPrecious metals summit 2019, beaver creek
Precious metals summit 2019, beaver creekProbe Gold
 
Probe presentation final
Probe presentation finalProbe presentation final
Probe presentation finalProbe Gold
 
2019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 20192019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 2019Probe Gold
 
2019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 20192019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 2019Probe Gold
 
2019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 20192019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 2019Probe Gold
 
Usha Resources Corporate Presentation
Usha Resources Corporate PresentationUsha Resources Corporate Presentation
Usha Resources Corporate PresentationMomentumPR
 
Investor Presentation - November 2010
Investor Presentation - November 2010Investor Presentation - November 2010
Investor Presentation - November 2010dalradianresources
 
Corporate Presentation September
Corporate Presentation SeptemberCorporate Presentation September
Corporate Presentation SeptemberCarolynGraham14
 
Fourth Quarter and Year End 2014 Financial Results
Fourth Quarter and Year End 2014 Financial ResultsFourth Quarter and Year End 2014 Financial Results
Fourth Quarter and Year End 2014 Financial ResultsCrocodile Gold Corp
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Joe Gray
 
Dalradian Presentation February 2015
Dalradian Presentation February 2015Dalradian Presentation February 2015
Dalradian Presentation February 2015DalradianResource
 

What's hot (19)

March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised cover
 
February 2016 Corporate Presentation
February 2016 Corporate PresentationFebruary 2016 Corporate Presentation
February 2016 Corporate Presentation
 
Rebirth of the Horne Mine - A Company Maker
Rebirth of the Horne Mine - A Company MakerRebirth of the Horne Mine - A Company Maker
Rebirth of the Horne Mine - A Company Maker
 
August Investor presentation
August Investor presentationAugust Investor presentation
August Investor presentation
 
30.2 falco presentation rbc august 2017 100dpi
30.2 falco presentation   rbc august 2017 100dpi30.2 falco presentation   rbc august 2017 100dpi
30.2 falco presentation rbc august 2017 100dpi
 
30.3 falco presentation osisko days - sept 2017 125dpi
30.3 falco presentation   osisko days - sept 2017 125dpi30.3 falco presentation   osisko days - sept 2017 125dpi
30.3 falco presentation osisko days - sept 2017 125dpi
 
Investor presentation june 2018 final.compressed
Investor presentation june 2018 final.compressedInvestor presentation june 2018 final.compressed
Investor presentation june 2018 final.compressed
 
Harfang Exploration - 2019 Vancouver Investment Resource Conference
Harfang Exploration - 2019 Vancouver Investment Resource ConferenceHarfang Exploration - 2019 Vancouver Investment Resource Conference
Harfang Exploration - 2019 Vancouver Investment Resource Conference
 
Precious metals summit 2019, beaver creek
Precious metals summit 2019, beaver creekPrecious metals summit 2019, beaver creek
Precious metals summit 2019, beaver creek
 
Probe presentation final
Probe presentation finalProbe presentation final
Probe presentation final
 
2019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 20192019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 2019
 
2019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 20192019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 2019
 
2019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 20192019.09.03 probe metals presentation sep, 2019
2019.09.03 probe metals presentation sep, 2019
 
Usha Resources Corporate Presentation
Usha Resources Corporate PresentationUsha Resources Corporate Presentation
Usha Resources Corporate Presentation
 
Investor Presentation - November 2010
Investor Presentation - November 2010Investor Presentation - November 2010
Investor Presentation - November 2010
 
Corporate Presentation September
Corporate Presentation SeptemberCorporate Presentation September
Corporate Presentation September
 
Fourth Quarter and Year End 2014 Financial Results
Fourth Quarter and Year End 2014 Financial ResultsFourth Quarter and Year End 2014 Financial Results
Fourth Quarter and Year End 2014 Financial Results
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021
 
Dalradian Presentation February 2015
Dalradian Presentation February 2015Dalradian Presentation February 2015
Dalradian Presentation February 2015
 

Viewers also liked

Safeguard Scientifics (NYSE: SFE) Investor Relations Presentation - October 2012
Safeguard Scientifics (NYSE: SFE) Investor Relations Presentation - October 2012Safeguard Scientifics (NYSE: SFE) Investor Relations Presentation - October 2012
Safeguard Scientifics (NYSE: SFE) Investor Relations Presentation - October 2012Safeguard Scientifics
 
Fusion investor presentation september 2013 final 1
Fusion investor presentation september 2013 final 1Fusion investor presentation september 2013 final 1
Fusion investor presentation september 2013 final 1Henry Val
 
Investor presentation july 2013
Investor presentation july 2013Investor presentation july 2013
Investor presentation july 2013ores_
 
Common technique in Bypassing Stuff in Python.
Common technique in Bypassing Stuff in Python.Common technique in Bypassing Stuff in Python.
Common technique in Bypassing Stuff in Python.Shahriman .
 
7islands Unseen in Thailand.
7islands Unseen in Thailand.7islands Unseen in Thailand.
7islands Unseen in Thailand.PongPang Mazakoh
 
What Tech Startups Should Be Doing Next
What Tech Startups Should Be Doing NextWhat Tech Startups Should Be Doing Next
What Tech Startups Should Be Doing Nextjessicahlawrence
 
Android Accessibility
Android AccessibilityAndroid Accessibility
Android AccessibilityAscii Huang
 
Walk This Way
Walk This WayWalk This Way
Walk This WayRay Pack
 
Amethyst Crystal Suppliers in UK
Amethyst Crystal Suppliers in UKAmethyst Crystal Suppliers in UK
Amethyst Crystal Suppliers in UKKabeeragate
 
Turbine blades cbf isotropic finishing
Turbine blades   cbf isotropic finishingTurbine blades   cbf isotropic finishing
Turbine blades cbf isotropic finishingDave Davidson
 
Working capital management
Working capital managementWorking capital management
Working capital managementawnee123
 
14,clasi actualizada 2013 14. 14ª jor -
14,clasi actualizada 2013 14. 14ª jor -14,clasi actualizada 2013 14. 14ª jor -
14,clasi actualizada 2013 14. 14ª jor -Tomás Carrión Lázaro
 
Portfolio Magazine
Portfolio MagazinePortfolio Magazine
Portfolio Magazineguestaf8bad
 

Viewers also liked (16)

Safeguard Scientifics (NYSE: SFE) Investor Relations Presentation - October 2012
Safeguard Scientifics (NYSE: SFE) Investor Relations Presentation - October 2012Safeguard Scientifics (NYSE: SFE) Investor Relations Presentation - October 2012
Safeguard Scientifics (NYSE: SFE) Investor Relations Presentation - October 2012
 
Fusion investor presentation september 2013 final 1
Fusion investor presentation september 2013 final 1Fusion investor presentation september 2013 final 1
Fusion investor presentation september 2013 final 1
 
Investor presentation july 2013
Investor presentation july 2013Investor presentation july 2013
Investor presentation july 2013
 
Common technique in Bypassing Stuff in Python.
Common technique in Bypassing Stuff in Python.Common technique in Bypassing Stuff in Python.
Common technique in Bypassing Stuff in Python.
 
7islands Unseen in Thailand.
7islands Unseen in Thailand.7islands Unseen in Thailand.
7islands Unseen in Thailand.
 
What Tech Startups Should Be Doing Next
What Tech Startups Should Be Doing NextWhat Tech Startups Should Be Doing Next
What Tech Startups Should Be Doing Next
 
Android Accessibility
Android AccessibilityAndroid Accessibility
Android Accessibility
 
Walk This Way
Walk This WayWalk This Way
Walk This Way
 
World's Biggest Project
World's Biggest ProjectWorld's Biggest Project
World's Biggest Project
 
Amethyst Crystal Suppliers in UK
Amethyst Crystal Suppliers in UKAmethyst Crystal Suppliers in UK
Amethyst Crystal Suppliers in UK
 
Turbine blades cbf isotropic finishing
Turbine blades   cbf isotropic finishingTurbine blades   cbf isotropic finishing
Turbine blades cbf isotropic finishing
 
ISO
ISOISO
ISO
 
Working capital management
Working capital managementWorking capital management
Working capital management
 
14,clasi actualizada 2013 14. 14ª jor -
14,clasi actualizada 2013 14. 14ª jor -14,clasi actualizada 2013 14. 14ª jor -
14,clasi actualizada 2013 14. 14ª jor -
 
Portfolio Magazine
Portfolio MagazinePortfolio Magazine
Portfolio Magazine
 
The Future of Work
The Future of WorkThe Future of Work
The Future of Work
 

Similar to January 2015 Investor Presentation

March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised coverFalcoCorporate
 
March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised coverFalcoCorporate
 
March 2015 Corporate Presentation
March 2015 Corporate Presentation March 2015 Corporate Presentation
March 2015 Corporate Presentation FalcoCorporate
 
2015 investor-presentation-vancouver-april v001-s68iw2
2015 investor-presentation-vancouver-april v001-s68iw22015 investor-presentation-vancouver-april v001-s68iw2
2015 investor-presentation-vancouver-april v001-s68iw2FalcoCorporate
 
2015 Investor Presentation - Vancouver
2015 Investor Presentation - Vancouver2015 Investor Presentation - Vancouver
2015 Investor Presentation - VancouverFalcoCorporate
 
12.3 2016 investor presentation
12.3 2016 investor presentation12.3 2016 investor presentation
12.3 2016 investor presentationFalcoCorporate
 
2015 investor presentation june
2015 investor presentation   june2015 investor presentation   june
2015 investor presentation juneFalcoCorporate
 
17.7 falco presentation bmo
17.7 falco presentation   bmo17.7 falco presentation   bmo
17.7 falco presentation bmoFalcoCorporate
 
210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3Adnet Communications
 
September 2015 Corporate Presentation
September 2015 Corporate PresentationSeptember 2015 Corporate Presentation
September 2015 Corporate PresentationFalcoCorporate
 
2015.01.12 probe mines presentation_website
2015.01.12 probe mines presentation_website2015.01.12 probe mines presentation_website
2015.01.12 probe mines presentation_websiteAdnet Communications
 
20.1 falco presentation may 2017
20.1 falco presentation   may 201720.1 falco presentation   may 2017
20.1 falco presentation may 2017FalcoCorporate
 
Lodestar Investor Presentation July
Lodestar Investor Presentation JulyLodestar Investor Presentation July
Lodestar Investor Presentation JulyAdnet Communications
 
Lodestar Corporate Presentation May 2023 v7
Lodestar Corporate Presentation May 2023 v7Lodestar Corporate Presentation May 2023 v7
Lodestar Corporate Presentation May 2023 v7Adnet Communications
 
Oz march 2021_final_soar
Oz march 2021_final_soarOz march 2021_final_soar
Oz march 2021_final_soarZhalaRahim
 
21.1 falco presentation august 2017 100dpi
21.1 falco presentation   august 2017 100dpi21.1 falco presentation   august 2017 100dpi
21.1 falco presentation august 2017 100dpiFalcoCorporate
 

Similar to January 2015 Investor Presentation (19)

March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised cover
 
March 2015 investor presentation revised cover
March 2015 investor presentation revised coverMarch 2015 investor presentation revised cover
March 2015 investor presentation revised cover
 
March 2015 Corporate Presentation
March 2015 Corporate Presentation March 2015 Corporate Presentation
March 2015 Corporate Presentation
 
2015 investor-presentation-vancouver-april v001-s68iw2
2015 investor-presentation-vancouver-april v001-s68iw22015 investor-presentation-vancouver-april v001-s68iw2
2015 investor-presentation-vancouver-april v001-s68iw2
 
2015 Investor Presentation - Vancouver
2015 Investor Presentation - Vancouver2015 Investor Presentation - Vancouver
2015 Investor Presentation - Vancouver
 
12.3 2016 investor presentation
12.3 2016 investor presentation12.3 2016 investor presentation
12.3 2016 investor presentation
 
2015 investor presentation june
2015 investor presentation   june2015 investor presentation   june
2015 investor presentation june
 
17.7 falco presentation bmo
17.7 falco presentation   bmo17.7 falco presentation   bmo
17.7 falco presentation bmo
 
210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3210426 silverton metals corp simplified_jun2021_v3
210426 silverton metals corp simplified_jun2021_v3
 
September 2015 Corporate Presentation
September 2015 Corporate PresentationSeptember 2015 Corporate Presentation
September 2015 Corporate Presentation
 
2015.01.12 probe mines presentation_website
2015.01.12 probe mines presentation_website2015.01.12 probe mines presentation_website
2015.01.12 probe mines presentation_website
 
20.1 falco presentation may 2017
20.1 falco presentation   may 201720.1 falco presentation   may 2017
20.1 falco presentation may 2017
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Lodestar Investor Presentation July
Lodestar Investor Presentation JulyLodestar Investor Presentation July
Lodestar Investor Presentation July
 
Lodestar Corporate Presentation May 2023 v7
Lodestar Corporate Presentation May 2023 v7Lodestar Corporate Presentation May 2023 v7
Lodestar Corporate Presentation May 2023 v7
 
Oz march 2021_final_soar
Oz march 2021_final_soarOz march 2021_final_soar
Oz march 2021_final_soar
 
2018 Falco Presentation
2018 Falco Presentation2018 Falco Presentation
2018 Falco Presentation
 
Falco jan2018
Falco jan2018Falco jan2018
Falco jan2018
 
21.1 falco presentation august 2017 100dpi
21.1 falco presentation   august 2017 100dpi21.1 falco presentation   august 2017 100dpi
21.1 falco presentation august 2017 100dpi
 

More from FalcoCorporate

50.1 falco presentation feasibility - final - v2
50.1 falco presentation   feasibility - final - v250.1 falco presentation   feasibility - final - v2
50.1 falco presentation feasibility - final - v2FalcoCorporate
 
50.1 falco presentation feasibility - final(1)
50.1 falco presentation   feasibility - final(1)50.1 falco presentation   feasibility - final(1)
50.1 falco presentation feasibility - final(1)FalcoCorporate
 
12.6 2016 investor presentation
12.6 2016 investor presentation12.6 2016 investor presentation
12.6 2016 investor presentationFalcoCorporate
 
10.3 2016 investor presentation pea
10.3 2016 investor presentation   pea10.3 2016 investor presentation   pea
10.3 2016 investor presentation peaFalcoCorporate
 
9.2 2016 investor presentation
9.2 2016 investor presentation9.2 2016 investor presentation
9.2 2016 investor presentationFalcoCorporate
 
9.1 2016 investor presentation
9.1 2016 investor presentation9.1 2016 investor presentation
9.1 2016 investor presentationFalcoCorporate
 
Septembre 2015 Présentation
Septembre 2015 PrésentationSeptembre 2015 Présentation
Septembre 2015 PrésentationFalcoCorporate
 
2015 presentation-investisseurs-juin
2015 presentation-investisseurs-juin2015 presentation-investisseurs-juin
2015 presentation-investisseurs-juinFalcoCorporate
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation frFalcoCorporate
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation frFalcoCorporate
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation frFalcoCorporate
 

More from FalcoCorporate (11)

50.1 falco presentation feasibility - final - v2
50.1 falco presentation   feasibility - final - v250.1 falco presentation   feasibility - final - v2
50.1 falco presentation feasibility - final - v2
 
50.1 falco presentation feasibility - final(1)
50.1 falco presentation   feasibility - final(1)50.1 falco presentation   feasibility - final(1)
50.1 falco presentation feasibility - final(1)
 
12.6 2016 investor presentation
12.6 2016 investor presentation12.6 2016 investor presentation
12.6 2016 investor presentation
 
10.3 2016 investor presentation pea
10.3 2016 investor presentation   pea10.3 2016 investor presentation   pea
10.3 2016 investor presentation pea
 
9.2 2016 investor presentation
9.2 2016 investor presentation9.2 2016 investor presentation
9.2 2016 investor presentation
 
9.1 2016 investor presentation
9.1 2016 investor presentation9.1 2016 investor presentation
9.1 2016 investor presentation
 
Septembre 2015 Présentation
Septembre 2015 PrésentationSeptembre 2015 Présentation
Septembre 2015 Présentation
 
2015 presentation-investisseurs-juin
2015 presentation-investisseurs-juin2015 presentation-investisseurs-juin
2015 presentation-investisseurs-juin
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation fr
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation fr
 
March 2015 investor presentation fr
March 2015 investor presentation frMarch 2015 investor presentation fr
March 2015 investor presentation fr
 

January 2015 Investor Presentation

  • 1. TSXV: FPC | www.falcores.com 1 TSXV: FPC | www.falcores.com January 2015 Rediscovering the Rouyn-Noranda Mining District Rebirth of the Horne Mine
  • 2. TSXV: FPC | www.falcores.com 2 CORPORATE SUMMARY Cautionary Statement Disclaimer This presentation contains a review of the Company’s properties in Canada. Viewers are cautioned that the projects are at an early stage of exploration and that estimates and projections contained herein are based on limited and incomplete data. More work is required before the mineralization on the projects and their economic aspects can be confidentially modeled. Therefore, the work results and estimates herein may be considered to be generally indicative only of the nature and quality of the projects. No representation or prediction is intended as to the results of future work, nor can there be any promise that the estimates herein will be confirmed by future exploration or analysis, or that the projects will otherwise prove to be economic. The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this presentation, which has been prepared by management. There can be no assurance that any of the assumptions in the resource estimates will be supported by a Pre-feasibility or Feasibility Study or that any forward looking event will come to pass. The data is incomplete and considerable additional work will be required to complete further evaluation, including but not limited to drilling, engineering and socio-economic studies and investment. This presentation contains information with respect to adjacent or similar mineral properties in respect of which the Company has no interest or rights to explore or mine. Readers are cautioned that the Company has no interest in or right to acquire any interest in any such properties, and that mineral deposits on adjacent or similar properties are not indicative of mineral deposits on the Company’s properties. Past performance is no guarantee of future performance and all investors are urged to consult their investment professionals before making an investment decision. Investors are further cautioned that past performance is no guarantee of future performance Forward-Looking Statements Certain information included in this presentation constitutes forward-looking statements, including any information as to our projects, plans and future performance. All statements, other than statements of historical fact, are forward-looking statements. The words “expect”, “believe”, “anticipate”, “will”, “intend”, “estimate”, “forecast”, “budget”, “schedule” and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements. Such factors include, but are not limited to: changes to current estimates of mineral reserves and resources; labour availability; litigation; availability of and increased costs associated with contractors and exploration equipment; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses and permits; contests over title to properties; uncertainty with the Company’s ability to secure capital to execute its business plans; changes in national and local government legislation in Canada; risk of loss due to sabotage and civil disturbances; risks arising from holding derivative instruments; and business opportunities that may be pursued by the company. Many of these uncertainties and contingencies can affect our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned that forward-looking statements are not guarantees of future performance. The company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law. Cautionary Note to U.S Investors Concerning Measured, Indicated and Inferred Resources This presentation uses the terms “measured,” “indicated” and “inferred resources. We advise investors that while those terms are recognized and required by Canadian regulations, the United States Securities and Exchange commission does not recognize them. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable.
  • 3. TSXV: FPC | www.falcores.com 3 Rebirth of the Horne Mine • Targeting 5 million ounces gold equivalent at Horne Project • Highly desirable asset given size, grade, jurisdiction and infrastructure District Play – Quebec’s Abitibi Region • 74,000 hectares (740 km2) and 13 former mines in a world-class VMS system & along Cadillac and Destor-Porcupine faults • Last of the large Abitibi Greenstone Belt mining camps • Never before controlled or explored by a major gold producer Management Track Record • Past involvement with LaRonde, Goldex, and Young-Davidson mines • Exploration, discovery, permitting, construction, M&A and capital markets • Osisko Gold Royalties a large shareholder CORPORATE SUMMARY Investment Thesis
  • 4. TSXV: FPC | www.falcores.com 4 Over 100 Years of Mining History SOUTHERN ABITIBI GREENSTONE BELT Strong Gold Pedigree Larder Lake 13 Moz Au Kirkland Lake 24 Moz Au Timmins 71 Moz Au Rouyn-Noranda 19 Moz Au Malartic 14 Moz Au Bousquet 21 Moz Au Lennox Creek Fault Zone Porcupine Destor Fault Zone Cadillac Fault Zone ONTARIO QUEBEC Rouyn-Noranda Timiskaming Sediments Cobalt Plate Felsic Intrusive Kap High Mafic/Ultramafic Volcanics Geology Val d’Or 14 Moz Au Major gold mining camp • 50 current and former gold and base metal mines in the Rouyn-Noranda camp • Rouyn-Noranda camp has produced 19 Moz of gold and 2.9 Blbs of copper, but underexplored for gold 0 25 50 75 100 Kilometres
  • 5. TSXV: FPC | www.falcores.com 5 CORPORATE SUMMARY Senior Leadership Team Sean Roosen, Chairman • President & CEO of Osisko Royalties René Marion, Lead Director • Former President & CEO of AuRico Gold Trent Mell, President & CEO, Director • Former Executive VP of AuRico Gold Jim Davidson, CFO, Director • Co-Founder of Falco Resources • Former CFO of Western Minerals Group Claude Ferron, Director • Former COO of Xstrata Copper Canada Paul Henri-Girard, Director • Former VP of Canadian Operations at Agnico Eagle Mines Luc Lessard, Director • Former COO of Osisko Mining BOARD OF DIRECTORS Trent Mell, President & CEO, Director • Former Executive VP of AuRico Gold Jim Davidson, CFO, Director • Co-Founder of Falco Resources • Former CFO of Western Minerals Group Dr. Michael Byron, Vice-President Exploration • Co-Founder of Falco Resources • Former VP Exploration at Lake Shore Gold Claude Léveillée, Vice-President Community Relations & Human Resources • Former Corporate Director, Human Resources/Organizational Development at Agnico Eagle Mines Dean Linden, Senior Vice-President Business Development • Over 16 years of corporate development and public market expertise OFFICERS
  • 6. TSXV: FPC | www.falcores.com 6 Capital Structure Shareholder Registry CORPORATE SUMMARY A New Abitibi Exploration Company Osisko Gold Royalties 11.4% Goodman & Company 8.7% Other Institutions 19.7% Insiders 8.0% Shares Outstanding (basic) 94,170,857 Stock Options 8,008,388 Warrants 7,871,438 Shares Outstanding (fully diluted} 110,050,683 Cash (October 20, 2014) C$12,100,000 (23%) 5% 12% 21% TSX Venture Gold S&P/TSX Gold Index Falco Share Price Relative Performance (Since Equity Financing – 10/2/2014)
  • 7. TSXV: FPC | www.falcores.com 7 Highly Prospective Land in a Top Jurisdiction LAND PACKAGE Dominant Position in Established Camp • 13 former mines on 740 km2 of Falco properties • Over 80 years of data archives
  • 8. TSXV: FPC | www.falcores.com 8 City of Rouyn-Noranda Glencore Smelter Horne Mine Quemont Mine Falco Surface Rights Horne West HORNE PROJECT Located North of the City Located in an Industrial Park - Away from residential areas
  • 9. TSXV: FPC | www.falcores.com 9 Initial production • Horne mine operated for over 50 years • Since 1976, focus had been on the Horne smelter (Glencore) • What has changed: higher gold price, bulk underground mining & new exploration techniques End of Mining (2.5 Blbs Cu & 11.5 Moz Au) Falco acquires properties (Sep 2012) Discovery of Horne Mine Digitization & compilation of Horne historical drill results (Aug 2013) NI 43-101 Horne 5 resource estimate (Mar 2014) 1923 1927 1976 1985 2012 2013 2014 Remnant mining (102,000 oz Au) History of Horne HORNE PROJECT 38 Years Later $2.2M Regional Exploration (Jun 2014)
  • 10. TSXV: FPC | www.falcores.com 10 (1) Please refer to footnotes in the Appendix HORNE PROJECT Maiden Resource Estimate • Inferred resource estimate from historic drilling Open at depth and along strike Discovery costs of <$0.25/oz Au • 1,200m strike length; 40-120m thick; 1,700m vertical extent • En echelon stacked tabular body; well defined metal zonation (gold, copper, zinc) • Extensively developed (1930s to 1960s) 4,386 drill holes at 15m spacing (305,000m) 40 working levels & 55km of underground development
  • 11. TSXV: FPC | www.falcores.com 11 ENV_B ENV_C ENV_D NSR Assumptions and Parameters • Maiden resource of 2.8 Moz AuEq at 3.4 g/t • Opportunity to increase the resource:  Conservative NSR & base metal payabilities  Silver content not considered Commodity Payable Metal Metal Price ($US) Gold 87% $1,300.00 Copper 65% $3.30 Zinc 37% $0.95 Resource Class Cut-off (NSR $C) Tonnes (Millions) AuEq (g/t) Au (g/t) Cu (%) Zn (%) Contained AuEq (Moz) Contained Au (Moz) Contained Cu (Mlbs) Contained Zn (Mlbs) Inferred >50 67.6 2.48 1.8 0.17 0.72 5.4 4.0 261 1,073 >60 50.4 2.75 2.1 0.19 0.73 4.5 3.3 214 814 >70 35.9 3.07 2.3 0.21 0.72 3.5 2.7 168 573 >80 25.3 3.41 2.6 0.23 0.70 2.8 2.2 131 393 >90 17.9 3.77 3.0 0.26 0.69 2.2 1.7 102 272 >100 12.8 4.17 3.4 0.28 0.67 1.7 1.4 79 190 >110 9.5 4.57 3.7 0.30 0.66 1.4 1.1 63 138 Exchange Rate: CAD/USD = 1.05 HORNE PROJECT Resource Estimate – Upside Opportunities
  • 12. TSXV: FPC | www.falcores.com 12 Goldex (Agnico-Eagle) Young-Davidson (AuRico) LaRonde (Agnico-Eagle) Horne 5 ** (Falco) Resource Grade (g/t AuEq) 1.8 2.8 5.1 3.4 Mining Method Long hole Transverse long hole Longitudinal Retreat / Transverse Open Stoping Long hole ** Depth (m) 800 - 1,500 750 - 1,500 2,000-3,000 600 - 2,300 Stope Size 15-38 x 30 x 50 20-25 x 20 x 30 5-25 x 15 x 30 15 x 15 x 38 ** Mining Rate 5,100 tpd 8,000 tpd * 7,200 tpd >8,000 tpd ** Operating Cost/NSR $41/t * $53.50/t * $95/t Under review Annual Production (koz) 71,000 * 200,000 * 230,000 * * Projected life-of-mine (LOM) ** Horne 5 tonnes and grades per 43-101 report; balance is conceptual COMPARABLE MINE ANALYSIS High Margin Potential Horne 5 $80 NSR Cutoff in Maiden 43-101 Resource Estimate Under Review Source: Company website and filings
  • 13. TSXV: FPC | www.falcores.com 13 HORNE PROJECT Confirmatory Drill Program • 16,000m drilling program  9-hole drill program from surface  Metallurgical work  Updated 43-101 • Primary objectives of confirmation drilling: 1. Upgrade resource category from Inferred to Indicated 2. Confirm metallurgical parameters (improve payability) 3. Confirm historic silver grades of >15 g/t • Targeted Results  Increase tonnes by >30%  Increase AuEq to >3.5 Moz • >$3M cost (est.) • Completion by H2 2015 Main Envelope (Transparent) High Grade Zones (full) N S
  • 14. TSXV: FPC | www.falcores.com 14 HORNE PROJECT Additional Targets in Horne Complex Potential to increase Mineral Resources in the Horne Complex • 11 gold targets within the shadow of the old mines • Identified potential Horne West extension at depth
  • 15. TSXV: FPC | www.falcores.com 15 HORNE PROJECT Near Surface Targets Horne West Gatehouse Au g/t • Several near-surface mineralized zones close to Horne • Drilled by Noranda but smelter sought higher copper values • Would provide early cash flow during production ramp-up • Horne West mineralization believed to extend from surface to 1,500m Horne 5 Deposit Horne Mine Possible Extension
  • 16. TSXV: FPC | www.falcores.com 16 0 2 4 6 8 10 12 14 - 1 2 3 4 5 6 7 8 9 GradeAuEq(g/t) ContainedAuEq(Moz) Source: Company Reports (1) Underground operations only Compares favourably to other modern bulk underground mines HORNE PROJECT Good Grades for Bulk Mining Producer Developer Grade Higher grade than Goldex and Young-Davidson
  • 17. TSXV: FPC | www.falcores.com 17 0 500 1,000 1,500 2,000 2,500 3,000 3,500 Reserve/ResourceDepth(m) Exploration Potential Resource Depth of Regional Mine Comparables (West to East) Source: Company Reports HORNE PROJECT Horne Mine not Deep Mined out Horne 5
  • 18. TSXV: FPC | www.falcores.com 18 Regional Exploration
  • 19. TSXV: FPC | www.falcores.com 19 • 15 km northeast of Rouyn- Noranda • 15 km of highly prospective felsic volcanic stratigraphy for potential new VMS discoveries • A single hole targeting a large anomaly intersected 3.8m of sulphide stringer zone material – target related to sulphide mineralization • Borehole EM survey modeling in progress • Drilling planned for Q1 2015 Rouyn-Noranda Horne Mine Lac Hervé Property LAC HERVE - VMS Large Anomaly Identified VMS Style Mineralization Intersected
  • 20. TSXV: FPC | www.falcores.com 20 • 12 km northwest of Rouyn- Noranda • Four former gold producers (1 Moz) • Favorable underexplored structural settings • Numerous gold showings and prospects (see map) • Potential for large tonnage bulk mineable deposits FLAVRIAN - GOLD New Gold Opportunities
  • 21. TSXV: FPC | www.falcores.com 21 Background Status • Cu-Zn-Au property, located 25km northwest of Rouyn-Noranda • One of the most significant VMS properties in the Camp • Lithogeochemically similar to Horne Complex rocks • Falco identified numerous near-surface conductors related to stratigraphy with the chemical characteristics of Horne Complex • Over 2km of laterally extensive untested exhalative sequence, akin to VMS systems • 3 drill holes with pulse-EM completed • Geophysical compilation in progress RIVIÈRE MOUILLEUSE (RIMO) – VMS Similar Signature as Horne Distribution Map of High Probability “Horne Type” Samples Rimo Horne Complex
  • 22. TSXV: FPC | www.falcores.com 22 Appendix
  • 23. TSXV: FPC | www.falcores.com 23 NSR (and gold equivalent calculations) cut-off are based on the following parameters: Exchange rate = C$1.05 for US$1.00, Gold price=$1,300 US/oz, Copper price = $3.30 US/lbs, Zinc price = $0.95 US/lbs; Payable Metals = 87% for gold, 65% for copper and 37% for zinc based on historic data and peer comparisons. Resources were evaluated from drill hole data using an ID2 interpolation method in a block model (block size = 5 x 5 x 5 metres). Densities were determined from historic drill hole iron assay data using a 3-pass ID2 interpolation method for the ENV_A and HG_A to E sub-zones. The average densities for these blocks range from 3.17 to 3.54 g/cm3. A fixed density of 2.88 g/cm3, representing the average of the available data, was used for ENV_B to D, because of too few data. Source: NI 43-101 Report, February 17, 2014, InnovExplo APPENDIX Resource Summary Resource Estimate Cut-off (NSR C$) Tonnes Au Eq (g/t) Au (g/t) Cu (%) Zn (%) Contained AuEq (Moz) Contained Au (Moz) Contained Cu (Mlbs) Contained Zn (Mlbs) > 50 67.6 2.48 1.8 0.17 0.72 5.4 4.0 261 1,073 > 60 50.4 2.75 2.1 0.19 0.73 4.5 3.3 214 814 > 70 35.9 3.07 2.3 0.21 0.72 3.5 2.7 168 573 > 80 25.3 3.41 2.6 0.23 0.70 2.8 2.2 131 393 > 90 17.9 3.77 3.0 0.26 0.69 2.2 1.7 102 272 > 100 12.8 4.17 3.4 0.28 0.67 1.7 1.4 79 190 > 100 9.5 4.57 3.7 0.30 0.66 1.4 1.1 63 138 Inferred 110> 110 Tonnes (Mt) Qualified Person Stéphane Poitras, Exploration Manager, (P.Geo.) is a qualified person as defined by National Instrument 43-101 -- Standards of Disclosure for Mineral Projects and has reviewed and verified the technical information contained in this presentation. Mr. Poitras is an employee of Falco and is non-independent.
  • 24. TSXV: FPC | www.falcores.com 24 Trent Mell B.C.L., LL.B., LL.M., MBA President & CEO, Director Dr. Michael Byron B.Sc., M.Sc., PhD. & P. Geo. VP Exploration Jim Davidson B.Comm & C.A. CFO, Director • Former EVP at AuRico Gold • Extensive international transactional experience (over 100 deals and $2 billion in financings) • Previously with precious and base metal producers, including Barrick and AuRico Gold (Young-Davidson) • Co-founder of Falco Resources and former VP Exploration for Lake Shore Gold and Aurora Platinum • Instrumental role in sale of Aurora to FNX Mining and resource expansion at Lake Shore leading to development of Timmins West Gold Mine, Director & Chief Geologist of Nighthawk Gold Corp, led acquisition and expansion of Colomac mine to more than 2.1 million ounces of gold • Co-founder of Falco Resources, former VP Finance and CFO of Western Minerals Group, and Former CFO of Athabasca Potash (acquired by BHP Billiton) • Over 35 years experience, including senior roles with Weyerhaeuser Company and with Deloitte and Touche APPENDIX Senior Leadership Team - Management Dean Linden B.Comm & C.A. SVP, Business Development • Over 16 years of corporate development and public market expertise • Eight years with ID Biomedical which was sold to GlaxoSmithKline for $1.7 billion Claude Léveillée CRIA VP Community Relations & Human Resources • Over than 30 years experience on a national and international level in Human Resources and Community Relations • Former Corporate Director, Human Resources - Organizational Development at Agnico-Eagle Mines Paul-Henri Girard B.A.Sc., Mining Eng. Consulting Engineer • Former Vice-President of Canadian Operations for Agnico Eagle Mines • Instrumental in the development of the Agnico’s LaRonde mine and in the advancement of the Goldex and Lapa mines in Quebec
  • 25. TSXV: FPC | www.falcores.com 25 APPENDIX Non-Executive Directors Sean Roosen Chairman • Chairman and CEO of Osisko Gold Royalties • Former President, CEO & Co-founder of Osisko Mining Corporation, where he was instrumental in permitting and financing the development of the $1 billion Canadian Malartic Mine René Marion P. Eng Lead Director Luc Lessard Director • COO of Canadian Malartic Partnership and former COO of Osisko Mining • Former VP Engineering and Construction for IAMGOLD • 25 years of experience designing, building and operating mines Paul-Henri Girard BASc, Mining Eng. Director Claude Ferron P. Eng Director • Former COO for Xstrata Copper Canada • Former metallurgist at the Horne operations and later assumed a number of technical and managerial roles with increasing responsibility at Noranda, Falconbridge and Xstrata • Over 30 years of experience in mining and mineral processing • Former President and CEO of AuRico Gold • From 1995 to 2007, held a variety of roles with increasing responsibility at Barrick Gold • Business executive and mining engineer with approximately 30 years of industry experience • Former Vice-President of Canadian Operations for Agnico Eagle Mines • Instrumental in the development of Agnico’s LaRonde mine and in the advancement of the Goldex and Lapa mines in Quebec
  • 26. TSXV: FPC | www.falcores.com 26 $0 $20 $40 $60 $80 $100 $120 Harte Gold Integra Gold Yorbeau Resources Pure Gold Eastmain Resources Lexam VG Gold Alexandria Minerals Falco Resources Temex Gowest Gold EV/AuEqResource(US$/oz) Source: Company Reports EV / RESOURCE FOR REGIONAL UNDERGROUND PROJECTS Valuation Relative to Peers Median: US$29/oz Falco trades at a discount to peers despite extensive infrastructure, a known ore body, and significant upside potential
  • 27. TSXV: FPC | www.falcores.com 27 Significant M&A Activity in the Region Source: Company Reports, S&P Capital IQ REGIONAL GOLD M&A TRANSACTIONS Strategic Importance of Abitibi Greenstone Belt Jan-15 Goldcorp Probe Mines Developer $437 $96 Apr-14 Yamana / Agnico Eagle Osisko Mining Producer $3,493 $125 Dec-13 Primero Mining Brigus Gold Producer $217 $154 May-13 New Gold Rainy River Resources Developer $380 $35 Jan-13 Hecla Mining Aurizon Mines Producer $791 $109 Nov-12 Osisko Mining Queenston Mining Developer $550 $98 Oct-12 Argonaut Gold Prodigy Gold Developer $352 $43 Apr-12 IAMGOLD Trelawney Mining & Exploration Developer $624 $80 Sep-11 Detour Gold Trade Winds Ventures Developer $81 $35 Aug-11 AuRico Gold Northgate Minerals Developer $1,543 $153 Aug-11 Lake Shore Gold Fenn-Gib Project Developer $58 $29 EV / AuEq Resource (US$/oz) Announcement Date Acquiror Target Producer/Developer Equity Value (US$M)
  • 28. TSXV: FPC | www.falcores.com 28 Executive Office Falco Resources Ltd. Suite 1440 – 155 University Ave Toronto, ON M5H 3B7 Tel: +1.416.703.1611 Toll-free: +1.888.915.2009 Email: info@falcores.com Investor Inquiries Vera Janakievski Director, Investor Relations Tel: +1.416.703.1611 x222 Email: vjanakievski@falcores.com Dean Linden SVP, Business Development Tel: +1.425.449.9442 Email: dlinden@falcores.com Contact Us