1. FAHAD NAZEER
Objective
I Keen to work with National and Multi-national companies in order to consume all
my abilities and knowledge for the betterment of the organization. To serve an
organization with target oriented, challenging and result oriented environment
where I can boost my career .L
Perconal Details
Nazeer Hussain
Male
20 June 1993
FE982477t
37105-63L0477-7
Single
Pakistani
Urdu, English & Punjabi
Islam
Father Name:
Gender:
Date of Birth:
Passport Nor
N.I.C No:
Marital status:
Nationa lity:
Lang uage:
Contact Details
Address: VILLAGE & P.OFFICE AHMEDALTEHSIL PINDI GHEB,
DISTRICT ATTOCIC PU NJAB PAKISTAN.
Mobile: +92-332-5582382
Home: +92-302-896768s
E-Mail: fahad.nazeer92@vahoo.com
Computer Skills & Courses
o Qomputer Skills: MS Office (Excel, Word, PowerPoint,)
o Operating Systems: MS. Windows 9B/2000/XP/Vista/ Window 7
etc...
I Backgrcund
Matriculation
2. Drilling Safety Trainings
H2s Safety Training
Rigging & Slinging
First Aid
Basic Fire Fighting
Work Experience
Designation
POL Pakistan Oilfield
Limited
Roustabout 14th oct 2o1o , to 2nd Jan
2012
Duties Performedr
The Roustabout position is responsible for suppofting the oil and gas operations. The
position is diverse and may vary on a daily basis.
. General cleanup, most of the painting and take care of other work.
. Tank installation and repairs.
o Install motors on equipment.
. Chips paint and buff it.
. Cleans the generator, store, and pump rooms.
r Install and repair pipelines such as steel, and PVC.
Must be proficient with all tools.
POL Pakistan Oilfield
Limited
Promoted in
same 60mDanv
FLOORMAN
3'd Jan 2Ol2 to 22nd Dec
20L2
1*Jan 2013 to untill now.O.G.D.C Drilling
Co.Paksiatn
Duties Performed:
. Using proper Personal Protective Equipment (PPE).
. Ensure all operations are proceeding in a safe manner.
. Ensure the drill floor is kept clean and that all equipment is in its proper place.
. During tripping operations work assigned duties:
. Make up / Break out tong operator. Back up tong operator. Pull and set slips.
. Make up and break out tool joints. Replace tong dies.
Conduct mud viscoslty and mud weight checks of the drilling mud at the shaker