SlideShare a Scribd company logo
1 of 2
MUHAMMAD ABBAS
Hussain Town near Bypass Tehsil Ahmed pur Sial
District Jhang, Pakistan.
Contact No: +923338839702
E-Mail: Engabbasmeps@gmail.com
Objective:
 To acquire good position in a fast growing concern where I could prove my skills by sharing in
growth with the organization.
 To get the optimal level of achievement by applying the theoretical knowledge with practical
experience.
Personal Information
Father’s Name : Akhtar Ali
Date of Birth : 15-04-1990
Nationality : Pakistani
N.I.C No : 33204-0381951-1
Academic Qualification:
1 Metric from Faisalabad Board Pakistan.
2 D.A.E (Electrical) from Punjab Board of Technical Education Lahore.
3 BS Mass communication from AIOU Islamabad.
4 B.S.C Electrical from IAEOU Lahore
5 1 years Diploma in Computers IT Software’s.
WORKING EXPERIENCE:
Izhar Construction Pvt. Ltd
1. 1 Year working experience as a Site Supervisor at Izhar Construction Pvt. Ltd. Since 08-jan-
2010 to 12-jan-2011.
HABIB RAFIQ Pvt. Ltd.
2. 1 Year working experience as an Electrical Site Supervisor at HRL Lahore. Sicne 01-Feb-
2012 to 30-Feb-2013.
Guarantee Engineers Lahore.
3. 2 Years working experience as an Electrical Engineer at Project Emporium Mall Nishat
Hotel Lahore. Since 01 – Feb- 2013 to 05- Dec-2014
Client
Nishaat Group
4. MEP Solutions Pvt Ltd
2 Year Working experience as an Electrical Quantity Surveyor at Project Emporium Mall
Nishat Hotel Lahore Since 10-Dec-2014 to 25-Oct-2016
1 of 2
PROJECT
Emporium Mall Nishat Hotel Lahore
Service Experience
• Fault Detection, Control & Maintenance of 3-Phase & 1-Phase Motors, Testing, Installation
and commissioning of all kinds of Inverter Control Motors,
• Engineering, installation and Commissioning of all kinds of Motor Control Circuits,
• Planning and performing scheduled of daily energy consumption and reporting
• Building management system
• Electrical building wirings
• Building Fault detection
• Power Generation control system handling
• MCC Control panels
• Troubleshooting and Fault Detection, Repair & Maintenance of Motors and Generators
control Systems
References
Will be furnished on demand
2 of 2

More Related Content

What's hot (20)

LOHGESH2
LOHGESH2LOHGESH2
LOHGESH2
 
Resume
ResumeResume
Resume
 
Electrical Supervisor
Electrical  SupervisorElectrical  Supervisor
Electrical Supervisor
 
Mansoor Ali Resume
Mansoor Ali ResumeMansoor Ali Resume
Mansoor Ali Resume
 
Ankish Resume
Ankish ResumeAnkish Resume
Ankish Resume
 
Sherli's Resume
Sherli's ResumeSherli's Resume
Sherli's Resume
 
Nithn CV
Nithn CVNithn CV
Nithn CV
 
azhar_pro_resume_02
azhar_pro_resume_02azhar_pro_resume_02
azhar_pro_resume_02
 
Vasabjit B.tech in EEE
Vasabjit B.tech in EEEVasabjit B.tech in EEE
Vasabjit B.tech in EEE
 
UPDATED CV 07.06.2016
UPDATED CV 07.06.2016UPDATED CV 07.06.2016
UPDATED CV 07.06.2016
 
Kiran S
Kiran SKiran S
Kiran S
 
CV (2)
CV (2)CV (2)
CV (2)
 
piyus
piyuspiyus
piyus
 
English lanuange resume
English lanuange resumeEnglish lanuange resume
English lanuange resume
 
RESUME 1
RESUME 1RESUME 1
RESUME 1
 
ManeeshSolankiResume
ManeeshSolankiResumeManeeshSolankiResume
ManeeshSolankiResume
 
Faiz Rasool CV
Faiz Rasool CVFaiz Rasool CV
Faiz Rasool CV
 
Resume -
Resume -Resume -
Resume -
 
SRIKANTH- B.E.(EEE)- 2010
SRIKANTH- B.E.(EEE)- 2010SRIKANTH- B.E.(EEE)- 2010
SRIKANTH- B.E.(EEE)- 2010
 
Debadatta Nayak
Debadatta NayakDebadatta Nayak
Debadatta Nayak
 

Similar to Muhammad Abbas.doc new (20)

CV ( Muzamil)
CV ( Muzamil)  CV ( Muzamil)
CV ( Muzamil)
 
danish resume
danish resumedanish resume
danish resume
 
MY Resume
MY Resume MY Resume
MY Resume
 
CV
CVCV
CV
 
Resume Bhaskar
Resume BhaskarResume Bhaskar
Resume Bhaskar
 
Rama Rao MW CV
Rama Rao  MW CVRama Rao  MW CV
Rama Rao MW CV
 
electrical cvupdated
electrical cvupdatedelectrical cvupdated
electrical cvupdated
 
Engr Noor New CV
Engr Noor New CVEngr Noor New CV
Engr Noor New CV
 
Lalit Resume 915
Lalit Resume  915Lalit Resume  915
Lalit Resume 915
 
AHSAN
AHSANAHSAN
AHSAN
 
Ahsan
AhsanAhsan
Ahsan
 
Dilip bhag resume
Dilip bhag resumeDilip bhag resume
Dilip bhag resume
 
CV---Saurabh_Saxena__Update
CV---Saurabh_Saxena__UpdateCV---Saurabh_Saxena__Update
CV---Saurabh_Saxena__Update
 
My resume
My resumeMy resume
My resume
 
Resume
ResumeResume
Resume
 
Shabbir - Curriculum Vitae
Shabbir - Curriculum VitaeShabbir - Curriculum Vitae
Shabbir - Curriculum Vitae
 
S.M.Imran Cv
S.M.Imran CvS.M.Imran Cv
S.M.Imran Cv
 
Engr Qamar R
Engr Qamar REngr Qamar R
Engr Qamar R
 
cv-Mansoor Engineering-New
cv-Mansoor Engineering-Newcv-Mansoor Engineering-New
cv-Mansoor Engineering-New
 
cv-Mansoor Engineering-New
cv-Mansoor Engineering-Newcv-Mansoor Engineering-New
cv-Mansoor Engineering-New
 

Muhammad Abbas.doc new

  • 1. MUHAMMAD ABBAS Hussain Town near Bypass Tehsil Ahmed pur Sial District Jhang, Pakistan. Contact No: +923338839702 E-Mail: Engabbasmeps@gmail.com Objective:  To acquire good position in a fast growing concern where I could prove my skills by sharing in growth with the organization.  To get the optimal level of achievement by applying the theoretical knowledge with practical experience. Personal Information Father’s Name : Akhtar Ali Date of Birth : 15-04-1990 Nationality : Pakistani N.I.C No : 33204-0381951-1 Academic Qualification: 1 Metric from Faisalabad Board Pakistan. 2 D.A.E (Electrical) from Punjab Board of Technical Education Lahore. 3 BS Mass communication from AIOU Islamabad. 4 B.S.C Electrical from IAEOU Lahore 5 1 years Diploma in Computers IT Software’s. WORKING EXPERIENCE: Izhar Construction Pvt. Ltd 1. 1 Year working experience as a Site Supervisor at Izhar Construction Pvt. Ltd. Since 08-jan- 2010 to 12-jan-2011. HABIB RAFIQ Pvt. Ltd. 2. 1 Year working experience as an Electrical Site Supervisor at HRL Lahore. Sicne 01-Feb- 2012 to 30-Feb-2013. Guarantee Engineers Lahore. 3. 2 Years working experience as an Electrical Engineer at Project Emporium Mall Nishat Hotel Lahore. Since 01 – Feb- 2013 to 05- Dec-2014 Client Nishaat Group 4. MEP Solutions Pvt Ltd 2 Year Working experience as an Electrical Quantity Surveyor at Project Emporium Mall Nishat Hotel Lahore Since 10-Dec-2014 to 25-Oct-2016 1 of 2
  • 2. PROJECT Emporium Mall Nishat Hotel Lahore Service Experience • Fault Detection, Control & Maintenance of 3-Phase & 1-Phase Motors, Testing, Installation and commissioning of all kinds of Inverter Control Motors, • Engineering, installation and Commissioning of all kinds of Motor Control Circuits, • Planning and performing scheduled of daily energy consumption and reporting • Building management system • Electrical building wirings • Building Fault detection • Power Generation control system handling • MCC Control panels • Troubleshooting and Fault Detection, Repair & Maintenance of Motors and Generators control Systems References Will be furnished on demand 2 of 2