IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
SCM_COC PLANNING AND MONITORING _Newbuilding
1. CERTIFICATE OF COMPETENCE-SHIPS NEWBUILDING VER.1
Managed by Marby
Last update 26.08.2008
Update by KYUZRI
Remarks : X - Competent Confirmed ; X' - Competent Yet to be Confirmed ; X"- Under Training, K - Knowledge Training for Plan Approval
FIELD OF COMPETENCE COMPETENCE ELEMENT TRAINING ELEMENT NEWBUILDING SURVEYOR
COC PLANNNING AND SCM No. Text No. Text KYUZRI MARBY SANTO PETER MDNOR HISSAM HAMZAH RUZMI FUAD KAMLESD BINTORO HARRY NGAINU DEBET HILMY NASRUL AZIZAN SAHRIL TERRY CHONG SYAMSUL
3.5 SHIPS NEWBUILDING
3.5.1 Documentation A3.5.1 Contract between shipyard and class X X X X X' X" X" X' X' X' K X" K X" K X" X"
Class workscope X X X X X' X" X" X' X' X' K X" K X" K X" X"
QA System at Shipyard X X X X X' X" X" X' X' X' K X" K X" K X" X"
3.5.2 General Surveyor A3.5.2 Material and Welding Welding procedures X X X X X' X" X" X' X' X' K X" K K X" X" X'
Welding preparation X X X X X' X" X" X' X' X' K X" K K X" X" X'
Material grade/dimension X X X X X' X" X" X' X' X' K X" K K X" X" X'
Erection joints X X X X X' X" X" X' X' X' K X" K K X" X" X"
Leak test/air test X X X X X' X" X" X' X' X' K X" K K X" X" X"
Weld complete (visual) X X X X X' X" X" X' X' X' K X" K K X" X" X"
X-Ray X X X X X' X" X" X' X' X' K X" K K X" X" X"
B3.5.2 Structural Strength Block inspection/weld inpection X X X X X' X" X" X' X' X' K X" K K X" X" X"
Erection (continuity and alignment) X X X X X' X" X" X' X' X' K X" K K X" X" X"
Structural Check X X X X X' X" X" X' X' X' K X" K K X" X" X"
Internal Tanks/cargo holds X X X X X' X" X" X' X' X' K X" K K X" X" X"
Coaming and hatches X X X X X' X" X" X' X' X' K X" K K X" X" X"
Rudder/appendages X X X X X' X" X" X' X' X' K X" K K X" X" K
Hydraulic tests X X X X X' X" X" X' X' X' K X" K K X" X" K
C3.5.2 Hull Equipment Hull penetrations X X X X X' X" X" X' X' X' K X" K K X" X" K
Strength/tightness of closing appliances X X X X X' X" X" X' X' X' K X" K K X" X" K
Air/sounding pipes and vents X X X X X' X" X" X' X' X' K X" K K X" X" K
Rudder/steering gear mountings X X X X X' X" X" X' X' X' K X" K K X" X" K
Anchoring and mooring equpiment X X X X X' X" X" X' X' X' K X" K K X" X" K
Stability and inclining experiment X X X X X' X" X" X' X' X' K X" K K X" X" K
Sea Trials X X X X X' X" X" X' X' X' K X" K X" K X" X" K
D3.5.2 Corrosion protection Paint system X X X' X X' X" X" X' X' X' K X" K K X" X" X"
SEATRAQS
Tank coating X X X' X X' X" X" X' X' X' K X" K K X" X" X"
Cathodic protection X X X' X X' X" X" X' X' X' K X" K K X" X" X"
E3.5.2 Machinery System Bilge/ballast system X X X' X X' X" X" X' X' X' K K X" K X" X" K
Relief/safety valve X X X' X X' X" X" X' X' X' K K X" K X" X" K
Fuel/lub. Oil system X X X' X X' X" X" X' X' X' K K X" K X" X" K
Hydraulic oil system X X X' X X' X" X" X' X' X' K K X" K X" X" K
Engine cooling system X X X' X X' X" X" X' X' X' K K X" K X" X" K
Pressurised air system X X X' X X' X" X" X' X' X' K K X" K X" X" K
Function testing/commissioning X X X' X X' X" X" X' X' X' K K X" K X" X" K
F3.5.2 Propulsion System Engine foundation/chocks X X X' X X' X" X" X' X' X' K K X" K X" X" K
Alignement/bearings X X X' X X' X" X" X' X' X' K K X" K X" X" K
Watertight seals X X X' X X' X" X" X' X' X' K K X" K X" X" K
Pressure vessels/starting air X X X' X X' X" X" X' X' X' K K X" K X" X" K
G3.5.2 Fire Safety System Structural Fire Protection X X X' X X' X" X" X' X' X' K K X" K X" X" X' X" X" K
Fire detection and alarm system X X X' X X' X" X" X' X' X' K K X" K X" X" X' X" X" K
Fire fighting system and equipment X X X' X X' X" X" X' X' X' K K X" K X" X" K
Flammable liquid protection X X X' X X' X" X" X' X' X' K K X" K X" X" K
Insulation X X X' X X' X" X" X' X' X' K K X" K X" X" X' X" X" K
H3.5.2 Electrical Installation Equipment location and enclosure X X X X" X" K K K X" X" X' X" X" K
Main and emergency installation X X X X" X" K K K X" X" X' X" X" K
Statutory
2. Cable types and installation X X X X" X" K K K X" X" X' X" X" K
Motor control gears and starters X X X X" X" K K K X" X" X' X" X" K
Earthing principles X X X X" X" K K K X" X" X' X" X" K
Battery installation X X X X" X" K K K X" X" X' X" X" K
Circuit protection X X X X" X" K K K X" X" X' X" X" K
Lighting and heating X X X X" X" K K K X" X" X' X" X" K
High voltage installation X X X X" X" K K K X" X" X' X" X" K
Switchboards X X X X" X" K K K X" X" X' X" X" K
Testing requirements X X X X" X" K K K X" X" X' X" X" K
I3.5.2 Instrumentation and Equipment location and enclosure X X X X" X" K K K X" X" X' X" X" K
Automations Installation of sensors and components X X X X" X" K K K X" X" X' X" X" K
Computer X X X X" X" K K K X" X" X' X" X" K
Alarm system X X X X" X" K K K X" X" X' X" X" K
Remote/Automatic control system X X X X" X" K K K X" X" X' X" X" K
Safety Systems X X X X" X" K K K X" X" X' X" X" K
J3.5.2 Radio Communication/ Satellite commuinication/EGC X X X X" X" K K K X" X" X' X" X" K
GMDSS MF/HF Radio Comm with DSC X X X X" X" K K K X" X" X' X" X" K
Radio life-saving aplliances X X X X" X" K K K X" X" X' X" X" K
Radio safety informations X X X X" X" K K K X" X" X' X" X" K
Power supply X X X X" X" K K K X" X" X' X" X" K
Antennae sysytem X X X X" X" K K K X" X" X' X" X" K
Testing requirements X X X X" X" K K K X" X" X' X" X" K
K.3.5.2 Load Line Condition of assignment X X X' X X' X" X" X' X' X' K X" K X' X' X" K
Load line marking verification X X X' X X' X" X" X' X' X' K X" K X' X' X" K
Load line item surveys and report X X X' X X' X" X" X' X' X' K X" K X' X' X" K
L3.5.2 Stability Intact stability/lightship survey X X X X X' X" X" X' X' X' K X" K X' X' X" K
Intact stability/inclining test X X X X X' X" X" X' X' X' K X" K X' X' X" K
M3.5.2 Tonnage Tonnage measurement X X X X X' X" X" X' X' X' K X" K X' X' X" K
Marking survey and report X X X X X' X" X" X' X' X' K X" K X' X' X" K
N3.5.2 Navigational Eqpt. Standard/Steering/Gyro Compass X X X X X' X" X" X' X' X' K X" K K X" X" X' X" X" K
Radar X X X X X' X" X" X' X' X' K X" K K X" X" X' X" X" K
Auto pilot X X X X X' X" X" X' X' X' K X" K K X" X" X' X" X" K
Echosounder X X X X X' X" X" X' X' X' K X" K K X" X" X' X" X" K
Nautical publications X X X X X' X" X" X' X' X' K X" K K X" X" X' X" X" K
Misc. equipment X X X X X' X" X" X' X' XX'' KK XX"" KK XX"" XX"" XX"" XX'' XX"" XX"" KK
X" X"
X" X"
Note:
Statutory
Statutory