SlideShare a Scribd company logo
1 of 63
Download to read offline
Duework
(Responsible Engineers)
dueworkresponsibleengineers@gmail.com
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
• Welcome, and thank you for taking
the time to view my portfolio.
• The Goal of this portfolio is to give
you a deeper insight into my
experiences and skills I have gained
over my recent history.
• It is my hope that this will allow you
to better assess how my skills can be
applied to your company.
• I would be happy to talk in more detail
and can be reached using the contact
information at the bottom of this page.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Mechanical and Electrical
New product Development
Reversing Engineering
Engineering Changes (ECN/ECO)
Redraw Activity
Manufacturing Drawing Creation as per ASME Std
Documentation preparing /Quality checklist preparation
Prototype
Simulation (Testing)
Civil
Structural engineering
Construction drawings
Architectural services
Drafting
CAD services
2D and 3D rendering
Benchmarking
Automobile
Reverse engineering of Speedo meters
2D and 3D rendering
Manufacturing Drawing Creation as per ASME
Benchmarking
Simulation (Testing and Analysis)
CFD
FEA
Automobile component
Mechanical component
Electro Mechanical Component
Civil Structure
Brochure and logo
Logo creation
Photoshop work
E-manual
Attractive Rendering
What We Do
Content of Project- Mechanical
 Iphone 5,6 mobile - Case 3D modelling created-Stl for 3D printing-Idan,New York
 Galaxy Mobile case created-Stl for 3D printing-Idan, New York
 Concept Design-Cable tension assembly created. David, London.
 Concept Design-Tic tagg 3D model created-3D print-Kcc llc, New York.
 Concept Boat design-“Riva 27 aquarama” boat created from images-Mark, USA.
 Studium light Assembly design 3D model created-Nuno, USA
 One hitter Bat 3D model created for 3D printing-Nuno, USA
 Piping model 3D model Created.
 Poultry Nesting boxes-Ryan, USA
 Well head design 3D model created from Image. Siva, India
 Cement factory design - 3D print – STL
 Watch Design-3D model-Drawing-John-USA
 Galaxy mobile cover – Mikel- Newyork
 Electrical Equipment- William – UK
 Octopus sheet metal equipment- KCC LCC- Australia
 Award Statue- Sunny- Canada
 Oven frame Structure Design-Smith-Newyork
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Watch Design-3D model-Drawing
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Galaxy mobile cover – Mikel- Newyork
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Electrical Equipment- Mikel - Newyork
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Octopus sheet metal equipment- KCC LCC- Australia
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Award Statue- Sunny- Canada
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Oven frame Structure Design-Smith-Newyork
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Content of Civil Projects
layout creation
Modeling with Rendering
Autocad Layout creation
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Layout Creation
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Modeling with Rendering
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Modeling with Rendering
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Modeling with Rendering
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Space plane
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Autocad Layout creation
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Autocad Layout creation
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Autocad Layout creation
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Autocad Layout creation
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Autocad Layout creation
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Autocad Layout creation
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Logo Design
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Brochures Design
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Simulation (Testing and Analysis)
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post Impact Analysis
19-11-2016 Version : 01
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Objective
The objective of the simulation is to verify weather the proposed soccer post
design withstands the impact force of the soccer ball during impact.
Material Data:
The Material is considered to be PA6 with 30% GF and PA6 35%GF
Material Name
Density Young's Modulus
Poission Ratio
tonnes/mm3 MPa
PA6 30%GF 1.36E-09 9380 0.32
PA6 35%GF 1.36E-09 11400 0.32
Impact velocity:
The impact velocity is considered to be 126km/hr(35833.333mm/s), which is
taken from the internet.
This velocity considered is to be the worst case.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Load Case:
• The ball is assumed to hit the bottom Corner post & the Top corner post,
which are simulated separately.
• Load case 1a: Bottom Post - PA6 30% GF
• Load case 1a: Bottom Post - PA6 35% GF
• Load case 2a: Top Post - PA6 30% GF
• Load case 2b: Top Post – PA6 35% GF
• Since the post is symmetry only left side of the post is tested by impacting the
ball. The other side say right will have the same scenario as of the left corner
posts.
• The initial velocity is taken as 35833.333mm/s (126km/hr)
• Results are plotted in the following slides.
Load case 1: Bottom Post Load case 2: Top Post
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Results Bottom Post
PA6 30% GF
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Behaviour Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Displacement Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
vonMises stress Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Observation:
The stress in the corner post is higher than the material yield strength, there is a
possibility for the corner post to yield and have permanent deformation.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Strain Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Observation:
The strain in the corner post is almost reached the material's % elongation, there
is a possibility for the corner post to break during repeated loading.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Results Top Post
PA6 30% GF
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Behaviour Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Displacement Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Observation:
The stress in the corner post is higher than the material yield strength, there is a
possibility for the corner post to yield and have permanent deformation.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
vonMises stress Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Strain Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Observation:
The strain in the corner post is almost reached the material's % elongation, there
is a possibility for the corner post to break during repeated loading.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Results Top Post
PA6 30% GF
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Behaviour Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Displacement Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
vonMises stress Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Observation:
The stress in the corner post is higher than the material yield strength, there is a
possibility for the corner post to yield and have permanent deformation.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Strain Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Observation:
The strain in the corner post is almost reached the material's % elongation, there
is a possibility for the corner post to break during repeated loading.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Results Top Post
PA6 35% GF
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Behaviour Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Displacement Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
vonMises stress Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Observation:
The stress in the corner post is higher than the material yield strength, there is a
possibility for the corner post to yield and have permanent deformation.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Soccer Corner Post
Strain Animation
The results shown here is the behaviour of the
post in millisecond after impact of the ball
Observation:
The strain in the corner post is almost reached the material's % elongation, there
is a possibility for the corner post to break during repeated loading.
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973
Now, I hope you understood What We do
Duework (Responsible Engineers)-
dueworkresponsibleengineers@gmail.com +91-
9597387973
Please feel free to contact me
Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com
+91-9597387973

More Related Content

Similar to DueWork (Responsible Engineers)

Capstone Experience
Capstone ExperienceCapstone Experience
Capstone Experience
Seth Popo
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
Teow Beng Hur
 
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
pierdole
 
Presentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPSPresentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPS
Teow Beng Hur
 
Cross section analysis and design: Worked examples
Cross section analysis and design: Worked examplesCross section analysis and design: Worked examples
Cross section analysis and design: Worked examples
Engin Soft-Solutions
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
kiransuresh7
 

Similar to DueWork (Responsible Engineers) (20)

Kevin MacDonald - ARM Convention 2016 presentation
Kevin MacDonald - ARM Convention 2016 presentationKevin MacDonald - ARM Convention 2016 presentation
Kevin MacDonald - ARM Convention 2016 presentation
 
357502268-C-clamp-ppt.pptx
357502268-C-clamp-ppt.pptx357502268-C-clamp-ppt.pptx
357502268-C-clamp-ppt.pptx
 
Allen Ramsey's Engineering Career Presentation (Version 7-15-20)
Allen Ramsey's Engineering Career Presentation (Version 7-15-20)Allen Ramsey's Engineering Career Presentation (Version 7-15-20)
Allen Ramsey's Engineering Career Presentation (Version 7-15-20)
 
Finite Element Analysis of Disk brake assembly.
Finite Element Analysis of Disk brake assembly.Finite Element Analysis of Disk brake assembly.
Finite Element Analysis of Disk brake assembly.
 
M1
M1M1
M1
 
JSW Summer Internship Report 2017
JSW Summer Internship Report  2017JSW Summer Internship Report  2017
JSW Summer Internship Report 2017
 
DESIGN AND ANALYSIS OF NEW COUPLING SYSTEM IN INJECTION MOLDING MACHINE TO IM...
DESIGN AND ANALYSIS OF NEW COUPLING SYSTEM IN INJECTION MOLDING MACHINE TO IM...DESIGN AND ANALYSIS OF NEW COUPLING SYSTEM IN INJECTION MOLDING MACHINE TO IM...
DESIGN AND ANALYSIS OF NEW COUPLING SYSTEM IN INJECTION MOLDING MACHINE TO IM...
 
Capstone Experience
Capstone ExperienceCapstone Experience
Capstone Experience
 
Basement wall design
Basement wall designBasement wall design
Basement wall design
 
Project final edited
Project final editedProject final edited
Project final edited
 
Project final edited
Project final editedProject final edited
Project final edited
 
Project final edited
Project final editedProject final edited
Project final edited
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
 
Simulation of Deep-Drawing Process of Large Panels
Simulation of Deep-Drawing Process of Large PanelsSimulation of Deep-Drawing Process of Large Panels
Simulation of Deep-Drawing Process of Large Panels
 
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
 
Presentation. jkr lawatan IBS kilang HC Precast System
Presentation.   jkr lawatan IBS kilang HC Precast SystemPresentation.   jkr lawatan IBS kilang HC Precast System
Presentation. jkr lawatan IBS kilang HC Precast System
 
Presentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPSPresentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPS
 
Cross section analysis and design: Worked examples
Cross section analysis and design: Worked examplesCross section analysis and design: Worked examples
Cross section analysis and design: Worked examples
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 

DueWork (Responsible Engineers)

  • 1. Duework (Responsible Engineers) dueworkresponsibleengineers@gmail.com Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 2. • Welcome, and thank you for taking the time to view my portfolio. • The Goal of this portfolio is to give you a deeper insight into my experiences and skills I have gained over my recent history. • It is my hope that this will allow you to better assess how my skills can be applied to your company. • I would be happy to talk in more detail and can be reached using the contact information at the bottom of this page. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 3. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973 Mechanical and Electrical New product Development Reversing Engineering Engineering Changes (ECN/ECO) Redraw Activity Manufacturing Drawing Creation as per ASME Std Documentation preparing /Quality checklist preparation Prototype Simulation (Testing) Civil Structural engineering Construction drawings Architectural services Drafting CAD services 2D and 3D rendering Benchmarking Automobile Reverse engineering of Speedo meters 2D and 3D rendering Manufacturing Drawing Creation as per ASME Benchmarking Simulation (Testing and Analysis) CFD FEA Automobile component Mechanical component Electro Mechanical Component Civil Structure Brochure and logo Logo creation Photoshop work E-manual Attractive Rendering What We Do
  • 4. Content of Project- Mechanical  Iphone 5,6 mobile - Case 3D modelling created-Stl for 3D printing-Idan,New York  Galaxy Mobile case created-Stl for 3D printing-Idan, New York  Concept Design-Cable tension assembly created. David, London.  Concept Design-Tic tagg 3D model created-3D print-Kcc llc, New York.  Concept Boat design-“Riva 27 aquarama” boat created from images-Mark, USA.  Studium light Assembly design 3D model created-Nuno, USA  One hitter Bat 3D model created for 3D printing-Nuno, USA  Piping model 3D model Created.  Poultry Nesting boxes-Ryan, USA  Well head design 3D model created from Image. Siva, India  Cement factory design - 3D print – STL  Watch Design-3D model-Drawing-John-USA  Galaxy mobile cover – Mikel- Newyork  Electrical Equipment- William – UK  Octopus sheet metal equipment- KCC LCC- Australia  Award Statue- Sunny- Canada  Oven frame Structure Design-Smith-Newyork Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 5. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 6. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 7. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 8. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 9. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 10. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 11. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 12. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 13. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 14. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 15. Watch Design-3D model-Drawing Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 16. Galaxy mobile cover – Mikel- Newyork Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 17. Electrical Equipment- Mikel - Newyork Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 18. Octopus sheet metal equipment- KCC LCC- Australia Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 19. Award Statue- Sunny- Canada Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 20. Oven frame Structure Design-Smith-Newyork Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 21. Content of Civil Projects layout creation Modeling with Rendering Autocad Layout creation Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 22. Layout Creation Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 23. Modeling with Rendering Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 24. Modeling with Rendering Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 25. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 26. Modeling with Rendering Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 27. Space plane Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 28. Autocad Layout creation Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 29. Autocad Layout creation Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 30. Autocad Layout creation Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 31. Autocad Layout creation Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 32. Autocad Layout creation Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 33. Autocad Layout creation Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 34. Logo Design Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 35. Brochures Design Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 36. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 37. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 38. Simulation (Testing and Analysis) Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 39. Soccer Corner Post Impact Analysis 19-11-2016 Version : 01 Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 40. Soccer Corner Post Objective The objective of the simulation is to verify weather the proposed soccer post design withstands the impact force of the soccer ball during impact. Material Data: The Material is considered to be PA6 with 30% GF and PA6 35%GF Material Name Density Young's Modulus Poission Ratio tonnes/mm3 MPa PA6 30%GF 1.36E-09 9380 0.32 PA6 35%GF 1.36E-09 11400 0.32 Impact velocity: The impact velocity is considered to be 126km/hr(35833.333mm/s), which is taken from the internet. This velocity considered is to be the worst case. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 41. Soccer Corner Post Load Case: • The ball is assumed to hit the bottom Corner post & the Top corner post, which are simulated separately. • Load case 1a: Bottom Post - PA6 30% GF • Load case 1a: Bottom Post - PA6 35% GF • Load case 2a: Top Post - PA6 30% GF • Load case 2b: Top Post – PA6 35% GF • Since the post is symmetry only left side of the post is tested by impacting the ball. The other side say right will have the same scenario as of the left corner posts. • The initial velocity is taken as 35833.333mm/s (126km/hr) • Results are plotted in the following slides. Load case 1: Bottom Post Load case 2: Top Post Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 42. Soccer Corner Post Results Bottom Post PA6 30% GF Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 43. Soccer Corner Post Behaviour Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 44. Soccer Corner Post Displacement Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 45. Soccer Corner Post vonMises stress Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Observation: The stress in the corner post is higher than the material yield strength, there is a possibility for the corner post to yield and have permanent deformation. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 46. Soccer Corner Post Strain Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Observation: The strain in the corner post is almost reached the material's % elongation, there is a possibility for the corner post to break during repeated loading. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 47. Soccer Corner Post Results Top Post PA6 30% GF Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 48. Soccer Corner Post Behaviour Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 49. Soccer Corner Post Displacement Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Observation: The stress in the corner post is higher than the material yield strength, there is a possibility for the corner post to yield and have permanent deformation. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 50. Soccer Corner Post vonMises stress Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 51. Soccer Corner Post Strain Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Observation: The strain in the corner post is almost reached the material's % elongation, there is a possibility for the corner post to break during repeated loading. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 52. Soccer Corner Post Results Top Post PA6 30% GF Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 53. Soccer Corner Post Behaviour Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 54. Soccer Corner Post Displacement Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 55. Soccer Corner Post vonMises stress Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Observation: The stress in the corner post is higher than the material yield strength, there is a possibility for the corner post to yield and have permanent deformation. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 56. Soccer Corner Post Strain Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Observation: The strain in the corner post is almost reached the material's % elongation, there is a possibility for the corner post to break during repeated loading. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 57. Soccer Corner Post Results Top Post PA6 35% GF Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 58. Soccer Corner Post Behaviour Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 59. Soccer Corner Post Displacement Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 60. Soccer Corner Post vonMises stress Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Observation: The stress in the corner post is higher than the material yield strength, there is a possibility for the corner post to yield and have permanent deformation. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 61. Soccer Corner Post Strain Animation The results shown here is the behaviour of the post in millisecond after impact of the ball Observation: The strain in the corner post is almost reached the material's % elongation, there is a possibility for the corner post to break during repeated loading. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973
  • 62. Now, I hope you understood What We do Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91- 9597387973 Please feel free to contact me
  • 63. Duework (Responsible Engineers)- dueworkresponsibleengineers@gmail.com +91-9597387973