SlideShare a Scribd company logo
1 of 9
Download to read offline
SPECIAL MATERIAL REQUEST FORM Thermal Block (5/21/2015)
Job No.:
Fab Week:
Detailer: Ext:
EDDIE REYEZ Ext:
CSC: Ext:
N
PRELIMINARY X FINAL REVISION
Order request shipping to the plant MUST be received by Purchasing 2 weeks prior to fab week
Nominal Insulation Thickness (over purlin) Nominal Insulation Thickness (over purlin) Nominal Insulation Thickness (over purlin)
Thermal Block Size Required (T X W X L) Thermal Block Size Required (T X W X L) Thermal Block Size Required (T X W X L)
Comments:
JENNIFER HARKNESS CSC Loc.:
Checker:
EL PASO, IL
11/4/2015M15N0508A Date:
11/22/2015 Ship Week:
SHIP TO ADDRESS
COUNTRY FRESH MEATS
12/4/2015 9902 WESTON AVE
WESTON, WI 54476
EL PASO, IL 1427DONGZE DI Det. Loc.:
Contact: TROY SCHWABENLANDER
EL PASO, IL 1403 Phone: (920)766-5795Chk. Loc.:
Quantity Thickness
1524
Rev #
BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department)
R-19, 6 1/2 In.
354 1"3/8 3" 23"1/2
Standing Seam II / 360 Roof Panel 16" Wide Loc Seam Panel 12" Wide Loc Seam Panel
Width Length
Mark. No.
(if applicable)
R-10, 3 1/4 In.
1 1/4 X 3 X 23 1/2 (SMRF REQUIRED) TB2T (NO SMRF REQUIRED)
SPECIAL MATERIAL REQUEST FORM "Premium" Pre-assembled Personnel Door (8/31/2015)
(PKDD Packages)
Job No.:
Fab Week:
Detailer: Ext:
Ext:
CSC: Ext:
N
PRELIMINARY X FINAL REVISION
Rev #
All fire doors must have a closer to meet requirements.
Ball-bearing hinges are standard.
** Notes: (1.) All doors are 18 GA., textured.
(2.) Standard offerings are listed in the selection boxes - all other options must be noted at "Comments".
(3.) Sub-jamb width = 8 1/4", length = 7'-0 5/8".
Wire glass is available for fire doors only (note at "Comments" when required.)
There Is a 2 week lead time prior to job shipping.
S/S
Hinge
1 A (LHO) No
2
3
4
5
6
7
8
9
10
Comments:
Swing Chart
No
El Paso, IL
Closer Unit Price
Contact:
M15E0419A Date: 10/14/2015
11/1/2015 Ship Week: 11/13/2015
SHIP TO ADDRESS
EL PASO PLANT
Size
Latch
Guard
Qty.
1
Dongze Di Det. Loc.: 1427
Checker: Kristen Guisti Chk. Loc.: El Paso, IL 1407
Swing Panel
L3P
Lockset (Hardware)
HM = Lever Handle Mortise Lockset
All Doors to be Keyed Alike
3070
Color
White
BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department)
Door Keys :
Door Type
Standard
Builder Clarification Form
Double click on
picture to open up a
.pdf
Leaf
SD = Solid (Flush)
Phone:
El Paso, IL 1528Chris Meller CSC Loc.:
DI
(RHI)(LHI)
CIBI
(RHI)(LHI)
AI
E
(Both leaves Out)
OUTSIDE OF BUILDING
A
(LHO) (RHO)
B C
(LHO) (RHO)
D
SPECIAL MATERIAL REQUEST FORM Accessories, Roof Jax Flexible Flashing (x/x/2015)
Job No.:
Fab Week:
Detailer: Ext:
Ext:
CSC: Ext:
N
PRELIMINARY X FINAL REVISION
Orders requesting shipping to the plant MUST be received by Purchasing 2 weeks prior to fab week.
Note:
Each roll of Flexible Flashing contains 2 termination strips.
Comments:
#802 (2" to 7 1/4")#16 (16" to 24")
#8 (7" to 13")
#9 (10" to 13"
BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department)
#803 (3/4" to 10")
#5 (4" to 7")
#3 (1/4" to 4")
Quantity
3
Regular High Temperature Red
SizeQuantity
Rev #
QuantitySize
Retrofit-Grey
M15G0440A Date: 9/30/2015
10/4/2015 Ship Week:
1515Mike Zimmerman
Contact:
Phone:Checker: Jordan Marti Chk. Loc.: El Paso, IL 1416
10/23/2015
Dongze Di Det. Loc.: El Paso, IL 1427
SHIP TO ADDRESS
EL PASO PLANT
CSC Loc.: El Paso, IL
#801 (3/4" to 2 3/4")
Roof Jax:
#9 (10" to 18")
Size
18"x50'
7"x75'
9"x75'
Flexible Flashing:
Size Quantity
SPECIAL MATERIAL REQUEST FORM Fasteners (4/4/2014)
Job No.:
Fab Week:
Detailer: Ext:
Ext:
CSC: Ext:
N
PRELIMINARY X FINAL REVISION
Minimum order 250
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Dawn Davis CSC Loc.:
M15P0383A Date:
8/16/2015 Ship Week:
Dongze Di Det. Loc.:
Checker:
El Paso, IL
SHIP TO ADDRESS
1519
BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department)
8/21/2015
Contact:
Rev #
EL PASO PLANT
9/18/2015
El Paso, IL 1427
Phone:Chk. Loc.:
Orders requesting shipping to the plant MUST be received by Purchasing 2 weeks prior to fab week.
Description
Comments:
Quantity
250 #12X1 1/2 SDHHT5
ColorType
Wall Fastener POWH
SPECIAL MATERIAL REQUEST FORM Thermal Break Windows (x/xx/2014)
(PKDN Packages)
Job No.:
Fab Week:
Detailer: Ext: 1427
Contact:
Checker: Ext: 130 Phone:
CSC: Ext: 1519
N
PRELIMINARY X FINAL REVISION
Rev #
1. Windows ordered without subframes are "self-framing". Select the Long Span III or Architectural III/"V" Rib jamb fin to match the wall
panel type or Flat fin for Insulated or Flat Wall Panels. Shadow Panel Walls Must use Universal jamb fin. Windows can also be
ordered without jamb fins for MASONRY applications.
2. *Sub-Frames (by Window Manufacturer) are only available with the Universal Jamb Fin, which can accommodate any standard 1 1/4" wall panel type.
3. Windows ordered without sub-frames must be installed on 12" centers (Except Shadow Panel, 16" centers). Windows ordered with
sub-frames (by Window Manufacturer) have the flexibility of being installed anywhere along the wall panel because of the Universal Jamb Fin.
Shadow Panel windows DO NOT require the use of sub-frames.
4. If windows are to be installed at Insulated or Flat Wall Panels specify panel thickness.
5. Shadow Panel windows are 43.25" x 33.82", Universal Fin allows window out to out dimension to be 48".
6. There is a 3 week lead time prior to job shipping (Additional 2 week lead time for White).
8 White
*Sub-Frames supplied by Window Manufacturer*
Special Conditions: Sub-total:
Discount:
Sub-total:
Tax:
S&H:
Total:
8/12/2015
9/4/2015
El Paso, IL
Jamestown, OH
El Paso, IL
Sub-Frame
Req'd
Girt Spacing Lower Girt Height
If Sub-Frame is required (Fill in boxes below)
3'6 7'6 0'
Option
A
B
C
D
Sill Height
Wall Panel
Architectural IIIYes
Jambs attach to Finished Floor.
SHIP TO ADDRESS
Qty
*Sub-Frame
Dawn Davis
8/16/2015
Dongze Di
Steve Dailey
El PASO PLANT
Universal
CSC Loc.:
Date:
Color Jamb Fin
Chk. Loc.:
BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department)
Size / Girt Depth
Window Type
Ship Week:
Det. Loc.:
M15G0328A
8"
Insulated Wall Panel
Thickness (If Req'd)
Unit PriceSize
4' x 3'Horizontal Sliding Window
Sub-Frame
Spacing Info
A
SPECIAL MATERIAL REQUEST FORM Angle, Tubing & Pipe (3/30/2012)
Job No.:
Fab Week:
Detailer: Ext:
Ext:
CSC: Ext:
N
PRELIMINARY X FINAL REVISION
Items must be delivered prior to "In Plant" date
Order request shipping to the plant MUST be received by Purchasing 2 weeks prior to load week
Angle:
1 X X X 2 X X X
3 X X X 4 X X X
5 X X X 6 X X X
7 X X X 8 X X X
Tubing:
1 X X X 2 X X X
3 X X X 4 X X X
5 X X X 6 X X X
7 X X X 8 X X X
Pipe:
1 X X 2 X X
3 X X 4 X X
5 X X 6 X X
7 X X 8 X X
Comments:
BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department)
1519
Rev #
(in.)
Grade
Qty GradeGrade
46
Grade
Phone:
SHIP TO ADDRESS
DAWN DAVIS CSC Loc.: EL PASO
EL PASO 1427
Contact:
Checker: SCOTT BAKER Chk. Loc.: EL PASO 1411
M15P0258A Date: 7/23/2015
8/2/2015 Ship Week: 9/4/2015
EL PASO PLANTDONGZE DI Det. Loc.:
(ft.)
Dim 1
8 23'
Wall
Thk.
Qty
(ft.) (in.)(ft.) (in.)
Thk. Thk.
Length:
Qty Dim 2Dim 1Grade
Length:
(ft.) (in.)
Dim 2
9 3/8
Qty
Length:
Dim 1
Dim 1 Dim 2
Wall
Thk.
Length:
(ft.) (in.)
Dim 2
Wall
Thk.
Length:
Qty
6 1/4 1
(OD) Outside
Diameter
Wall
Thk.
Grade
(OD) Outside
Diameter
Length:
Qty
(ft.) (in.)
Beam and Channel - W, S, C and MC (3/30/2012)
Fab Week:
Ext: 1427
Contact:
Ext: 1422 Phone:
Ext: 1519
N
PRELIMINARY X FINAL REVISION
Rev #
Items must be delivered prior to "In Plant" date
Order request shipping to the plant MUST be received by Purchasing 2 weeks prior to load week
Weight Min. Yield Weight Min. Yield
Per Ft. Strength (KSI) Ft. In. Per Ft. Strength (KSI) Ft. In.
1 W 10 X 12 50 X 24 8 2 2 W 10 X 12 50 X 39 11 1/4
3 W 10 X 12 50 X 34 4 X X
5 X X 6 X X
7 X X 8 X X
9 X X 10 X X
11 X X 12 X X
13 X X 14 X X
15 X X 16 X X
17 X X 18 X X
19 X X 20 X X
21 X X 22 X X
23 X X 24 X X
25 X X 26 X X
27 X X 28 X X
29 X X 30 X X
31 X X 32 X X
33 X X 34 X X
35 X X 36 X X
37 X X 38 X X
39 X X 40 X X
41 X X 42 X X
43 X X 44 X X
45 X X 46 X X
Comments:
El Paso
LengthLength
Qty Shape
SPECIAL MATERIAL REQUEST FORM
El Paso
M15G0330A
8/2/2015
Dongze Di Det. Loc.:
Ship Week:
Date: 7/22/2015
8/21/2015
Beam and Channel:
EL PASO PLANTDetailer:
Job No.:
Checker:
Shape Depth
Chk. Loc.:
BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department)
Depth
El PasoCSC Loc.:Dawn Davis
Lorie Snyder
CSC:
2
Qty
2
SPECIAL MATERIAL REQUEST FORM Coil, Panel - Flashing (5/31/2013)
Job No.:
Fab Week:
Detailer: Ext:
Ext:
CSC: Ext:
N
PRELIMINARY X FINAL REVISION
There is a 3 to 4 week lead time for standard colors.
There is a 4 to 5 week lead time for custom colors.
Orders requesting shipping to the plant MUST be received by Purchasing 3 weeks / 5 weeks prior to load week.
Comments:
20 3/4
20 3/4
CS Type B LTBZ
26 Ga. 500 CS Type B LTST
26 Ga. 1920
Flashing:
Gauge Linear Feet Grade Color Color No.Coil Width
Color
LTST
LTBZ80 KSI
Gauge
26 Ga.
Color No.
0014
0008
Panel Coil:
A3P
L3P
Panel Type
1700
14026 Ga.
Linear Feet
Contact:
Rev #
Grade
80 KSI
DONGZE DI Det. Loc.:
JAMESTOWN,OH 127 Phone:
7/27/2015
EL PASO, IL 1427
6/2/2015 SHIP TO ADDRESS
1524
M15N0247A Date:
7/19/2015 Ship Week:
EL PASO PLANT
Checker:
EL PASO, IL
BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department)
DAN PRICE Chk. Loc.:
JENNIFER HARKNESS CSC Loc.:
SPECIAL MATERIAL REQUEST FORM Insulation (4/4/2014)
Job No.:
Fab Week:
Detailer: Ext:
Ext:
CSC: Ext:
N
PRELIMINARY X FINAL REVISION
Erection drawings MUST be included with material request to Purchasing.
There is a 4 week lead time.
Building Dimensions: Standard Blanket Insulation
of OptiLiner - Banded Liner System
Single Slope
or Ridge:
Tabs:
M15B0198A Date:
5/24/2015 Ship Week:
Dongze Di Det. Loc.:
6/5/2015 4148 Rockingham Circle
5/4/2015 SHIP TO ADDRESS
RC Autobody
Checker:
Saint George, KS 66535
EL PASO, IL 1424
Scott Baker Chk. Loc.: 1411
EL PASO, IL
Contact: Rick Dulaney
Phone: 785 537 9789EL PASO, IL
Comments:
60'
Facing Type:
(If Needed-See Job File)
PSP
Eave to Eave
4'
Facing Color:
Width:
Roof Cut:
6'
4'
Roof Pitch:
(If Needed-See Job File)
6"
Starter Roll Width:
4 to 12
Thickness:
BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department)
Rev #
1
1505
Width:
David Baxter
12' Length:
CSC Loc.:
Building:
40' Eave Height:
1
Ridge
6'
4"
Roof: Walls:
White
Thickness:
Width: 1 Tab @ 6" (one side only)
WMP-VR-R Plus®
Poly Scrim Poly
Starter Roll Width:
Insulation
Nomenclature

More Related Content

Featured

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 

Featured (20)

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 

smrf

  • 1. SPECIAL MATERIAL REQUEST FORM Thermal Block (5/21/2015) Job No.: Fab Week: Detailer: Ext: EDDIE REYEZ Ext: CSC: Ext: N PRELIMINARY X FINAL REVISION Order request shipping to the plant MUST be received by Purchasing 2 weeks prior to fab week Nominal Insulation Thickness (over purlin) Nominal Insulation Thickness (over purlin) Nominal Insulation Thickness (over purlin) Thermal Block Size Required (T X W X L) Thermal Block Size Required (T X W X L) Thermal Block Size Required (T X W X L) Comments: JENNIFER HARKNESS CSC Loc.: Checker: EL PASO, IL 11/4/2015M15N0508A Date: 11/22/2015 Ship Week: SHIP TO ADDRESS COUNTRY FRESH MEATS 12/4/2015 9902 WESTON AVE WESTON, WI 54476 EL PASO, IL 1427DONGZE DI Det. Loc.: Contact: TROY SCHWABENLANDER EL PASO, IL 1403 Phone: (920)766-5795Chk. Loc.: Quantity Thickness 1524 Rev # BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department) R-19, 6 1/2 In. 354 1"3/8 3" 23"1/2 Standing Seam II / 360 Roof Panel 16" Wide Loc Seam Panel 12" Wide Loc Seam Panel Width Length Mark. No. (if applicable) R-10, 3 1/4 In. 1 1/4 X 3 X 23 1/2 (SMRF REQUIRED) TB2T (NO SMRF REQUIRED)
  • 2. SPECIAL MATERIAL REQUEST FORM "Premium" Pre-assembled Personnel Door (8/31/2015) (PKDD Packages) Job No.: Fab Week: Detailer: Ext: Ext: CSC: Ext: N PRELIMINARY X FINAL REVISION Rev # All fire doors must have a closer to meet requirements. Ball-bearing hinges are standard. ** Notes: (1.) All doors are 18 GA., textured. (2.) Standard offerings are listed in the selection boxes - all other options must be noted at "Comments". (3.) Sub-jamb width = 8 1/4", length = 7'-0 5/8". Wire glass is available for fire doors only (note at "Comments" when required.) There Is a 2 week lead time prior to job shipping. S/S Hinge 1 A (LHO) No 2 3 4 5 6 7 8 9 10 Comments: Swing Chart No El Paso, IL Closer Unit Price Contact: M15E0419A Date: 10/14/2015 11/1/2015 Ship Week: 11/13/2015 SHIP TO ADDRESS EL PASO PLANT Size Latch Guard Qty. 1 Dongze Di Det. Loc.: 1427 Checker: Kristen Guisti Chk. Loc.: El Paso, IL 1407 Swing Panel L3P Lockset (Hardware) HM = Lever Handle Mortise Lockset All Doors to be Keyed Alike 3070 Color White BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department) Door Keys : Door Type Standard Builder Clarification Form Double click on picture to open up a .pdf Leaf SD = Solid (Flush) Phone: El Paso, IL 1528Chris Meller CSC Loc.: DI (RHI)(LHI) CIBI (RHI)(LHI) AI E (Both leaves Out) OUTSIDE OF BUILDING A (LHO) (RHO) B C (LHO) (RHO) D
  • 3. SPECIAL MATERIAL REQUEST FORM Accessories, Roof Jax Flexible Flashing (x/x/2015) Job No.: Fab Week: Detailer: Ext: Ext: CSC: Ext: N PRELIMINARY X FINAL REVISION Orders requesting shipping to the plant MUST be received by Purchasing 2 weeks prior to fab week. Note: Each roll of Flexible Flashing contains 2 termination strips. Comments: #802 (2" to 7 1/4")#16 (16" to 24") #8 (7" to 13") #9 (10" to 13" BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department) #803 (3/4" to 10") #5 (4" to 7") #3 (1/4" to 4") Quantity 3 Regular High Temperature Red SizeQuantity Rev # QuantitySize Retrofit-Grey M15G0440A Date: 9/30/2015 10/4/2015 Ship Week: 1515Mike Zimmerman Contact: Phone:Checker: Jordan Marti Chk. Loc.: El Paso, IL 1416 10/23/2015 Dongze Di Det. Loc.: El Paso, IL 1427 SHIP TO ADDRESS EL PASO PLANT CSC Loc.: El Paso, IL #801 (3/4" to 2 3/4") Roof Jax: #9 (10" to 18") Size 18"x50' 7"x75' 9"x75' Flexible Flashing: Size Quantity
  • 4. SPECIAL MATERIAL REQUEST FORM Fasteners (4/4/2014) Job No.: Fab Week: Detailer: Ext: Ext: CSC: Ext: N PRELIMINARY X FINAL REVISION Minimum order 250 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Dawn Davis CSC Loc.: M15P0383A Date: 8/16/2015 Ship Week: Dongze Di Det. Loc.: Checker: El Paso, IL SHIP TO ADDRESS 1519 BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department) 8/21/2015 Contact: Rev # EL PASO PLANT 9/18/2015 El Paso, IL 1427 Phone:Chk. Loc.: Orders requesting shipping to the plant MUST be received by Purchasing 2 weeks prior to fab week. Description Comments: Quantity 250 #12X1 1/2 SDHHT5 ColorType Wall Fastener POWH
  • 5. SPECIAL MATERIAL REQUEST FORM Thermal Break Windows (x/xx/2014) (PKDN Packages) Job No.: Fab Week: Detailer: Ext: 1427 Contact: Checker: Ext: 130 Phone: CSC: Ext: 1519 N PRELIMINARY X FINAL REVISION Rev # 1. Windows ordered without subframes are "self-framing". Select the Long Span III or Architectural III/"V" Rib jamb fin to match the wall panel type or Flat fin for Insulated or Flat Wall Panels. Shadow Panel Walls Must use Universal jamb fin. Windows can also be ordered without jamb fins for MASONRY applications. 2. *Sub-Frames (by Window Manufacturer) are only available with the Universal Jamb Fin, which can accommodate any standard 1 1/4" wall panel type. 3. Windows ordered without sub-frames must be installed on 12" centers (Except Shadow Panel, 16" centers). Windows ordered with sub-frames (by Window Manufacturer) have the flexibility of being installed anywhere along the wall panel because of the Universal Jamb Fin. Shadow Panel windows DO NOT require the use of sub-frames. 4. If windows are to be installed at Insulated or Flat Wall Panels specify panel thickness. 5. Shadow Panel windows are 43.25" x 33.82", Universal Fin allows window out to out dimension to be 48". 6. There is a 3 week lead time prior to job shipping (Additional 2 week lead time for White). 8 White *Sub-Frames supplied by Window Manufacturer* Special Conditions: Sub-total: Discount: Sub-total: Tax: S&H: Total: 8/12/2015 9/4/2015 El Paso, IL Jamestown, OH El Paso, IL Sub-Frame Req'd Girt Spacing Lower Girt Height If Sub-Frame is required (Fill in boxes below) 3'6 7'6 0' Option A B C D Sill Height Wall Panel Architectural IIIYes Jambs attach to Finished Floor. SHIP TO ADDRESS Qty *Sub-Frame Dawn Davis 8/16/2015 Dongze Di Steve Dailey El PASO PLANT Universal CSC Loc.: Date: Color Jamb Fin Chk. Loc.: BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department) Size / Girt Depth Window Type Ship Week: Det. Loc.: M15G0328A 8" Insulated Wall Panel Thickness (If Req'd) Unit PriceSize 4' x 3'Horizontal Sliding Window Sub-Frame Spacing Info A
  • 6. SPECIAL MATERIAL REQUEST FORM Angle, Tubing & Pipe (3/30/2012) Job No.: Fab Week: Detailer: Ext: Ext: CSC: Ext: N PRELIMINARY X FINAL REVISION Items must be delivered prior to "In Plant" date Order request shipping to the plant MUST be received by Purchasing 2 weeks prior to load week Angle: 1 X X X 2 X X X 3 X X X 4 X X X 5 X X X 6 X X X 7 X X X 8 X X X Tubing: 1 X X X 2 X X X 3 X X X 4 X X X 5 X X X 6 X X X 7 X X X 8 X X X Pipe: 1 X X 2 X X 3 X X 4 X X 5 X X 6 X X 7 X X 8 X X Comments: BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department) 1519 Rev # (in.) Grade Qty GradeGrade 46 Grade Phone: SHIP TO ADDRESS DAWN DAVIS CSC Loc.: EL PASO EL PASO 1427 Contact: Checker: SCOTT BAKER Chk. Loc.: EL PASO 1411 M15P0258A Date: 7/23/2015 8/2/2015 Ship Week: 9/4/2015 EL PASO PLANTDONGZE DI Det. Loc.: (ft.) Dim 1 8 23' Wall Thk. Qty (ft.) (in.)(ft.) (in.) Thk. Thk. Length: Qty Dim 2Dim 1Grade Length: (ft.) (in.) Dim 2 9 3/8 Qty Length: Dim 1 Dim 1 Dim 2 Wall Thk. Length: (ft.) (in.) Dim 2 Wall Thk. Length: Qty 6 1/4 1 (OD) Outside Diameter Wall Thk. Grade (OD) Outside Diameter Length: Qty (ft.) (in.)
  • 7. Beam and Channel - W, S, C and MC (3/30/2012) Fab Week: Ext: 1427 Contact: Ext: 1422 Phone: Ext: 1519 N PRELIMINARY X FINAL REVISION Rev # Items must be delivered prior to "In Plant" date Order request shipping to the plant MUST be received by Purchasing 2 weeks prior to load week Weight Min. Yield Weight Min. Yield Per Ft. Strength (KSI) Ft. In. Per Ft. Strength (KSI) Ft. In. 1 W 10 X 12 50 X 24 8 2 2 W 10 X 12 50 X 39 11 1/4 3 W 10 X 12 50 X 34 4 X X 5 X X 6 X X 7 X X 8 X X 9 X X 10 X X 11 X X 12 X X 13 X X 14 X X 15 X X 16 X X 17 X X 18 X X 19 X X 20 X X 21 X X 22 X X 23 X X 24 X X 25 X X 26 X X 27 X X 28 X X 29 X X 30 X X 31 X X 32 X X 33 X X 34 X X 35 X X 36 X X 37 X X 38 X X 39 X X 40 X X 41 X X 42 X X 43 X X 44 X X 45 X X 46 X X Comments: El Paso LengthLength Qty Shape SPECIAL MATERIAL REQUEST FORM El Paso M15G0330A 8/2/2015 Dongze Di Det. Loc.: Ship Week: Date: 7/22/2015 8/21/2015 Beam and Channel: EL PASO PLANTDetailer: Job No.: Checker: Shape Depth Chk. Loc.: BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department) Depth El PasoCSC Loc.:Dawn Davis Lorie Snyder CSC: 2 Qty 2
  • 8. SPECIAL MATERIAL REQUEST FORM Coil, Panel - Flashing (5/31/2013) Job No.: Fab Week: Detailer: Ext: Ext: CSC: Ext: N PRELIMINARY X FINAL REVISION There is a 3 to 4 week lead time for standard colors. There is a 4 to 5 week lead time for custom colors. Orders requesting shipping to the plant MUST be received by Purchasing 3 weeks / 5 weeks prior to load week. Comments: 20 3/4 20 3/4 CS Type B LTBZ 26 Ga. 500 CS Type B LTST 26 Ga. 1920 Flashing: Gauge Linear Feet Grade Color Color No.Coil Width Color LTST LTBZ80 KSI Gauge 26 Ga. Color No. 0014 0008 Panel Coil: A3P L3P Panel Type 1700 14026 Ga. Linear Feet Contact: Rev # Grade 80 KSI DONGZE DI Det. Loc.: JAMESTOWN,OH 127 Phone: 7/27/2015 EL PASO, IL 1427 6/2/2015 SHIP TO ADDRESS 1524 M15N0247A Date: 7/19/2015 Ship Week: EL PASO PLANT Checker: EL PASO, IL BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department) DAN PRICE Chk. Loc.: JENNIFER HARKNESS CSC Loc.:
  • 9. SPECIAL MATERIAL REQUEST FORM Insulation (4/4/2014) Job No.: Fab Week: Detailer: Ext: Ext: CSC: Ext: N PRELIMINARY X FINAL REVISION Erection drawings MUST be included with material request to Purchasing. There is a 4 week lead time. Building Dimensions: Standard Blanket Insulation of OptiLiner - Banded Liner System Single Slope or Ridge: Tabs: M15B0198A Date: 5/24/2015 Ship Week: Dongze Di Det. Loc.: 6/5/2015 4148 Rockingham Circle 5/4/2015 SHIP TO ADDRESS RC Autobody Checker: Saint George, KS 66535 EL PASO, IL 1424 Scott Baker Chk. Loc.: 1411 EL PASO, IL Contact: Rick Dulaney Phone: 785 537 9789EL PASO, IL Comments: 60' Facing Type: (If Needed-See Job File) PSP Eave to Eave 4' Facing Color: Width: Roof Cut: 6' 4' Roof Pitch: (If Needed-See Job File) 6" Starter Roll Width: 4 to 12 Thickness: BUY AMERICAN REQUIRED (This selection must be confirmed for SMRF to be accepted by the ABC Purchasing Department) Rev # 1 1505 Width: David Baxter 12' Length: CSC Loc.: Building: 40' Eave Height: 1 Ridge 6' 4" Roof: Walls: White Thickness: Width: 1 Tab @ 6" (one side only) WMP-VR-R Plus® Poly Scrim Poly Starter Roll Width: Insulation Nomenclature