Presentation on SASSA’s
Strategic Plan for the fiscal Years 2012/13-2016/17
and Annual Performance Plan 2012/13-2014/15
Outline of the presentation
• Purpose of the presentation
• Background
• Strategic overview;
– Key strategic challenges
– Key priority for 2012/13 – 2016/17
– Strategic objectives for the next 5 years
– Branch Strategic objectives and objective statement
• Annual Performance Plan
– Financial plan
– Branch strategic objective & Performance Indicators
• Recommendation
2
Purpose of the presentation
• To present to the Portfolio Committee on Social
Development:
– SASSA’s Strategic Plan for the financial Years
2012/13-2016/17; and
– Annual Performance Plan 2012/13.
3
Strategic Overview
Mandate
The mandate of SASSA is to ensure the provision of
comprehensive social security services against
vulnerability and poverty within the constitutional and
legislative framework.
Vision
A leader in the delivery of social security services.
Mission
To administer quality customer centric social security
services to eligible and potential beneficiaries.
4
Values
• Social cohesion;
• Transparency;
• Equity;
• Integrity;
• Confidentiality; and
• Customer Care- centered
5
Background
• SASSA has been consistent in the provision of monthly
income support to a significant number of South Africans.
• As at end of March 2012, over 15.5 million South Africans
are benefiting from social grants; These are as follows:
– Child support – 10 927 731
– Older Persons – 2 750 857
– Disability – 1 198 131
– Foster Care Grant - 536 747
– Card Dependency - 114 993
– War Veteran - 753
These are figures as at 31 March 2012
6
Situational Analysis
• The Agency has over the last year intensified its efforts
towards improving service delivery. Our initiative include:
– Appointment of service provider to effect payment of
social grants in all provinces. Through this initiative,
• the Agency will re-register all beneficiaries by
capturing biometrics,
• issue all beneficiaries with SASSA smart card that
can operate in formal banking environment and
designated SASSA cash pay-points.
• The Agency will also achieve a saving of R800m per
annum
7
Situational Analysis
• Other initiatives include:
– Standardisation of the Application process;
– Improvement of Local offices and pay-point
infrastructure;
– Automation of services;
– Improved management of reviews and life
certification processes; and
– Improvement in combating fraud and corruption.
8
Situational Analysis cont.…
• The following grant administration exceptions were noted during the
2010/11 FY and were the main reasons for DSD qualification:
– There were about 545 508 files that could not be obtained;
– There were 159 302 items of loose correspondence which still
has to be placed on the files and captured on the Management
Information System;
– There were 209 302 files which were missing the critical
documents;
– There were 62 153 files which still needed to be transferred
between regions; and
– There were more than 2 million old inactive files that needed to
be destroyed.
• However, significant progress has been made in addressing the
AG findings as indicated in the following slide:
9
Progress Achieved Against Audit Action Plan Targets
April 2011 to 29 February 2012
Areas of Concern Target Progress to
Date
Reviews 900 000 324 941
Life Certificates 700 000 989 762
Missing files 372 370 275 094
Missing Critical Documents 142 681 118 181
Transfer of Files 155 767 90 767
File Destruction 2.2m 1.2m
10
Key priorities for 2012/13 - 2016/17
• To deliver quality social security services by
focusing on the following:
– Excellent customer care;
– The automation of systems;
– Improving organisational capacity; and
– Promoting good governance.
11
Strategic Objective
• Strategic Objectives for SASSA over the next 5
Years are:
– To ensure that eligible beneficiaries receive benefits
due to them;
– To improve the quality of service delivery to our
customers;
– To achieve a fully integrated and automated social
assistance service; and
– To ensure that the Agency is optimally capacitated for
optimal service delivery.
12
Strategic Objective
13
Strategic
Objective
To improve the effectiveness and efficiency of the
administration of the social assistance
programme.
Objective
Statement
• To ensure that eligible beneficiaries receive
their benefits timeously with respect to: OAG,
DG, CDG, FCG, CSG, WVG and GIA
• To provide quality customer- centric services
at all times.
Branch: Grants Administration
Strategic Objective
14
Strategic
Objective
To improve the effectiveness and efficiency of the
administration of the social assistance
programme.
Objective
Statement
• To provide strategic direction for the effective
implementation of the social assistance
programme.
Branch: Strategy and Business Development
Strategic Objective cont..
Branch: Information and Communication Technology
Strategic
Objective
To improve the effectiveness and efficiency
of the administration of the social
assistance programme.
Objective
Statement
To achieve a fully secured, integrated and
automated end –to- end system.
To improve operational efficiency and the
quality of ICT service delivery to our customers.
15
Strategic Objective cont…
Branch: Internal Audit and Risk Management
Strategic
Objective
To promote good governance in the
administration of the Agency
Objective
Statement
To provide independent assurance on the
adequacy, effectiveness and efficiency of
management implemented controls.
To facilitate and monitor the development and
implementation of the risk management
strategy.
To entrench a culture of integrity in the Agency.
16
Strategic Objective cont…
Branch: Corporate Services
Strategic
Objective
To improve the effectiveness and efficiency of the
administration of the social assistance programme.
Objective
Statement
To promote and ensure sound human capital management
systems.
Provide efficient and effective legal services to the Agency
To provide facilities and auxiliary support services that enable
the Agency to function optimally.
Security: To promote security risk management practices in
the Agency.
Communication: To market, inform and educate internal and
external stakeholders on the social assistance programme.
17
Strategic Objective cont…
Branch: Finance
Strategic
Objective
To provide financial management services to the Agency.
Objective Statement To provide effective, efficient and economical financial
management service.
18
APP Presentation
19
Overview of the 2012/13 budget and medium-term
expenditure framework estimates
Revised
Audited outcome estimate Medium-term estimate
R thousand 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15
Executive Management 46,901 235,020 257,438 193,557 203,235 213,396 224,066
Corporate Services 618,214 739,288 699,370 941,442 989,404 1,038,917 1,090,862
Finance 3,096,964 2,770,030 2,539,350 2,941,084 2,772,425 2,911,520 3,058,262
Information Technology 443,102 472,505 347,396 425,195 446,455 468,778 492,217
Grants Administration and
Customer Services
1,151,169 1,140,345 1,224,458 1,538,883 1,671,160 1,775,160 1,880,138
Strategy & Business
Development
43,257 21,453 22,468 45,485 47,759 50,147 52,653
Internal Audit 81,130 86,818 85,840 67,575 70,948 74,495 78,220
Total expense
5,480,737 5,465,459 5,176,320 6,153,221 6,201,386 6,532,414 6,876,419
20
Medium Term Expenditure Estimates
Overview of the 2012/13 budget
• The Agency receives its administration budget transfers from the
Department of Social Development and the transfers in respect of
the grants disbursed to grant beneficiaries (referred to as the “big
money”) is managed through the Department.
• The bulk of the administration budget goes towards payments to
cash contractors who are contracted to the Agency to disburse grant
monies to beneficiaries.
• The second largest allocation on the budget is on personnel
expenditure while the remaining balance caters for other operational
expenses, which include various contractual obligations.
21
Budgeted key priorities/cost drivers
• Compensation of Employees
- The budget allocation for CoE caters for current posts, and critical additional posts (In particular level 5-8 posts at
the regions to ensure the recruitment of sufficient and appropriately skilled human capital for improved and more
efficient service delivery.
• Cash Payment Contractors’ fees
- Awarding of the new 5 year contract to service provider Cash Paymaster Services, which caps the cost per grant at
R16.50 will assist in realising savings on this expenditure item.
• Grants Process Automation
- A specific ring-fenced allocation has been made available for the automation of the grant business process. The
model aims to standardise a part of the application process by centralising the registry and decentralising the
verification and approval of applications. This will introduce a substantial improvement to the turn around time of the
application process and will aim to complete the application-to-approval process in one day.
• Various contracts necessary for the running of the Agency
- The budget allocation in this regard caters for the leasing of office accommodation including all the other related
costs such as security services, cleaning service charges and maintenance and repairs. The allocation also
includes the leasing of motor vehicles from the government garage, which forms part of the Agency’s fleet strategy.
Furthermore, there are Information Technology related contracts such as contracts for the VPN connectivity, SITA
contracts (for the SOCPEN) etc.
• ICT infrastructure deployment
- As SASSA acquires new office accommodation, there is a need to install the necessary ICT connectivity to these
premises. There is a specific allocation for this purpose.
22
Budgeted key priorities/cost drivers
• Medical assessment fees
– This allocation caters for the payment towards contracted medical doctors who perform medical assessments
on disability grant applicants on behalf of SASSA
• Improvement of local offices and pay point infrastructure
– The Agency strives to ensure that the conditions under which our grant beneficiaries are serviced are humane.
Specific allocation has been made available for the upgrade of local offices and the improvement of
infrastructure at the pay points
• Grant Fraud Investigations
– As part of combating fraud within our system the Agency will work in close collaboration with the law
enforcement agencies. A specific allocation has been made for this purpose
• Bulk Notification
– In terms of the law, the Agency must notify grant applicants of the outcome of their application by registered
mail. Also grant beneficiaries must be notified of the status. In this regard registered mail is used. The budget
allocation caters for this function
• Media Campaigns
– It is critical that citizens are informed about the services offered by the Agency and about any other matter
affecting the grant payments particularly given the new developments following the award of the new contract.
A specific allocation has been made for this purpose
23
Structure of the Agency
• The structure of the Agency is as follows:
 Branch 1: Grants Administration;
 Branch 2: Strategy and Business Development;
 Branch 3: Information and Communication Technology;
 Branch 4: Internal Audit and Risk Management;
 Branch 5: Corporate Services; and
 Branch 6: Finance.
24
Grants Administration Strategic Objective
Strategic
Objective
To improve the effectiveness and efficiency of the administration of the social
assistance programme.
Objective
Statement
To ensure that eligible beneficiaries
receive their benefits timeously
with respect to the Old Age Grant
(OAG), Disability Grant (DG), Care
Dependency Grant (CDG), Foster
Child Grant (FCG), Child Support
Grant (CSG), War Veteran Grant
(WVG) and Grant-in-Aid (GIA).
Objective
Statement
To provide quality
customer centred
services at all times.
25
Grants Administration: Performance Indicators and
Annual Targets for 2012/13 – 2014/15
Performance indicator Medium-term target
2012/13 2013/14 2014/15
1. Projected total number of grants in payment 16 069 007 16 489 577 16 756 905
2. Number of old age grants in payment 2 772 745 2 835 018 2 881 146
3. Number of war veteran’s grants in payment 706 621 551
4. Number of disability grants in payment 1 192 444 1 195 629 1 195 966
5. Number of grants-in-aid in payment 65 724 70 325 75 247
6. Number of foster child grants in payment 671 307 768 645 874 001
7. Number of care dependency grants in payment 131 246 140 965 146 658
8. Number of child support grants in payment 11 300 559 11 548 698 11 658 553
9. Percentage of Social Relief of Distress (SRD)
funds disbursed in accordance with the
approved guidelines
100% of SRD budget
spent annually in
accordance with the
approved guidelines
100% of SRD budget
spent annually in
accordance with the
approved guidelines
100% of SRD budget
spent annually in
accordance with the
approved guidelines
10. Percentage of new grant applications processed
within 21 days
90% of new grant
applications processed
within 21 days
100% of new grant
applications processed
within 21 days
100% of new grant
applications processed
within 21 days
11. Percentage of files sampled for quality
assurance post verification
5% of files sampled for
quality assurance post
verification
7% of files sampled for
quality assurance post
verification
10% of files sampled for
quality assurance post
verification 26
Grants Administration: Performance Indicators and
Annual Targets for 2012/13 – 2014/15 cont…
Performance indicator Medium-term target
2012/13 2013/14 2014/15
12. Percentage of administrative and
medical backlog reviews
completed
5% of administrative and
medical backlog reviews
completed
20% of administrative and medical
backlog reviews completed
20% of administrative and medical
backlog reviews completed
13. Percentage of foster child grant
backlog reviews completed
100% of foster child grant
backlog reviews completed
100% of foster child grant backlog
reviews completed
100% of foster child grant backlog
reviews completed
14. Percentage of current
administrative and medical reviews
completed
100% of current administrative
and medical reviews completed
100% of current administrative and
medical reviews completed
100% of current administrative and
medical reviews completed
15. Percentage of current foster child
grant reviews completed
20% of current foster child grant
reviews completed
100% of current foster child grant
reviews completed
100% of current foster child grant
reviews completed
16. Percentage of beneficiaries life-
certified
100% of beneficiaries life-
certified
100% of beneficiaries life-certified 100% of beneficiaries life- certified
17. Percentage of grants due for
lapsing lapsed
100% of
grants due for lapsing lapsed
100% of
grants due for lapsing lapsed
100% of
grants due for lapsing lapsed
18. Percentage implementation of file
management
100% of files transferred 100% of files transferred 100% of files transferred
100% of files destroyed 100% of files destroyed 100% of files destroyed
100% of missing files resolved 100% of missing files resolved 100% of missing files resolved
100% of loose and critical
correspondence filed
100% of loose and critical
correspondence filed
100% of loose and critical
correspondence filed 27
Grants Administration: Performance Indicators and
Annual Targets for 2012/13 – 2014/15 cont…
Performance indicator Medium-term target
2012/13 2013/14 2014/15
19. Number of beneficiary records
corrected
16 000 beneficiary records
corrected for identity numbers
5 000 beneficiary records
corrected for identity
numbers
5 000 beneficiary records
corrected for identity
numbers
500 Persal/SASSA employees
records corrected
500 Persal/SASSA
employees records
corrected
500 Persal/SASSA
employees records corrected
20. Percentage of disability assessments
quality-assured
20% of disability assessments
quality-assured
20% of disability
assessments quality-
assured
20% of disability assess-
ments quality-assured
21. Percentage implementation of the
prioritised elements of the disability
management model
100% implementation of the
prioritised elements of the
disability management model
100% implementation of
the prioritised elements of
the disability management
model
100% implementation of the
prioritised elements of the
disability management model
22. Percentage of backlog medical
review assessments completed
5 % of backlog medical review
assessments completed
20 % of backlog medical
review assessments
completed
20 % of backlog medical
review assessments
completed
23. Percentage of current medical review
assessments completed
20% current medical review
assessments completed
100% current medical
review assessments
completed
100% current medical review
assessments completed
24. Number of pay points improved 400 pay points improved 400 pay points improved 128 pay points improved 28
Grants Administration: Performance indicators and
annual targets for 2012/13–2014/15
Performance indicator Medium-term target
2012/13 2013/14 2014/15
1. Number of identified poverty wards targeted
through ICROP
40 identified poverty
wards targeted through
ICROP
40 identified poverty
wards targeted
through ICROP
81 identified poverty
wards targeted
through ICROP
2. Number of people accessing social assistance
services through ICROP
60 000 people
accessing social
assistance services
through ICROP
60 000 people
accessing social
assistance services
through ICROP
75 751 people
accessing social
assistance services
through ICROP
3. Percentage of ICROP special requests
responded to
100% of ICROP
special requests
responded to
100% of ICROP
special requests
responded to
100% of ICROP
special requests
responded to
29
Grants Administration: Performance indicators and
annual targets for 2012/13–2014/15
Performance indicator Medium-term target
2012/13 2013/14 2014/15
4. Number of identified railway stations targeted
for Phelophepha services
34 identified railway
stations targeted in 4
regions
- -
5. Percentage of Phelophepha special requests
attended to
100% of Phelophepha
special requests
attended to
100% of
Phelophepha
special requests
attended to
100% of Phelophepha
special requests
attended to
6. Percentage of Customer Care Charter
standards implemented with respect to
enquiries and complaints
100% of enquiries
attended to within 7
working days
100% of enquiries
attended to within 7
working days
100% of enquiries
attended to within 7
working days
100% of complaints
attended to within 5
days
100% of complaints
attended to within 5
days
100% of complaints
attended to within 5
days
30
Grants Administration: Performance indicators and
annual targets for 2012/13–2014/15 cont…
Performance indicator Medium-term target
2012/13 2013/14 2014/15
7. Percentage
implementation of
Tribunal decisions
100% implementation of
Tribunal decisions
100% implementation of
Tribunal decisions
100% implementation of
Tribunal decisions
8. Percentage of
applications for
internal
reconsideration
finalised within 90
days
100% of applications for
internal reconsideration
finalised within 90 days
100% of applications for
internal reconsideration
finalised within 90 days
100% of applications for
internal reconsideration
finalised within 90 days
31
Reconciling performance targets with the Budget and
MTEF
Grants Administration Expenditure estimates 2012/13 2013/14 2014/15
Compensation of employees 1 289 484 1 373 363 1 451 976
Use of goods and services 381 676 401 798 428 163
Interest, dividends and rent on land - - -
Transfers and subsidies - - -
Total 1 671 160 1 775 160 1 880 138
32
Strategy and Business Development Strategic Objectives
• Compliance with the planning framework
• Service delivery monitoring and consolidated evaluation
reports produced quarterly
• Social grant projection reports produced (2 per annum)
• Five institutional performance assessments reports
produced (1 Annual and 4 quarterly performance
reports)
33
Objective
Statement
To provide strategic direction for the effective
implementation of the social assistance programme.
Strategy and Business Development Strategic Objectives
• Strategy on future payment model for SASSA developed
– Advisory Committee established towards end of 2012
– Consultative document and Research report produced in 2012
– Design options developed and piloted 2013 and 2014
• Business Process Reengineering (BPR)
– Review and restructuring for finance branch completed in 2012,
– Plans for re-engineering of the Grant administration will
commence in 2012 and actual implementation will be effected in
2013.
34
Strategy & Business
Development Expenditure
estimates (R’000)
2012/13 2013/14 2014/15
Compensation of
employees
18 405 19 325 20 292
Use of goods and
services
29 354 30 821 32 362
Total 47 759 50 147 52 653
37
Information and Communication Technology Strategic
Objectives
Strategic
Objective
To improve the effectiveness and efficiency of the administration of the
social assistance programme
Objective
Statement
To achieve a fully secured, integrated and automated end- to-end system.
To improve operational efficiency and the quality of ICT service delivery to
our customers.
38
ICT: Performance indicators and annual targets for
2012/13–2014/15
Performance indicator Medium-term target
2012/13 2013/14 2014/15
1. Percentage automated
end-to-end solution for
grants application and
administration developed
40% of automated end-
to-end solution for grant
application and
administration developed
60% of automated
end-to-end solution
for grant application
and administration
developed
100% of automated
end-to-end solution for
grant application and
administration
developed
2. Grant beneficiary
biometric system
developed
Grant beneficiary
biometric system
developed
- -
3. Percentage of grant
system (Socpen) users
biometrically
authenticated
100% of grant system
users biometrically
authenticated
100% of grant
system users
biometrically
authenticated
100% of grant system
users biometrically
authenticated
39
ICT: Performance indicators and annual targets for
2012/13–2014/15
Performance indicator Medium-term target
2012/13 2013/14 2014/15
4
.
Number of internal grant
administration systems
integrated
Integration of 5 internal grant
administration systems
(SOCPEN, MIS (National
Registry, Eastern Cape, Free
State, MIS National IGAP,
Livelink)
- -
5
.
Real-time interfaces with
Department of Home
Affairs: Home Affairs
National Identification
System (HANIS) and
National Population
Real-time interface with
Department of Home Affairs
(HANIS), and NPR system
Real-time interface
with South African
Revenue Service
(SARS), Department
of Justice and
Constitutional
-
40
ICT performance indicators and annual targets for
2012/13–2014/15
Performance indicator Medium-term target
2012/13 2013/14 2014/15
1. Percentage availability of
systems to users
97% availability of
systems to users
97% availability of
systems to users
97% availability of
systems to users
2. Percentage accessibility of
systems by users
97% accessibility of
systems by users
97% accessibility
of systems by
users
97% accessibility of
systems by users
3. Percentage of grant officials
provided with workstations at
points of service delivery
100% of grant officials
provided with
workstations at points
of service delivery
100% of grant
officials provided
with workstations
at points of service
delivery
100% of grant
officials provided
with workstations at
points of service
delivery
41
ICT performance indicators and annual targets for
2012/13–2014/15
Performance indicator Medium-term target
2012/13 2013/14 2014/15
4. Percentage of the Agency’s
offices connected to the LAN
100% of the
Agency’s offices
connected to the
LAN
100% of the
Agency’s offices
connected to the
LAN
100% of the
Agency’s offices
connected to the
LAN
5. Percentage of the Agency’s
offices connected to the WAN
97% of the Agency’s
offices connected to
the WAN
97% of the
Agency’s offices
connected to the
WAN
97% of the
Agency’s offices
connected to the
WAN
42
Reconciling performance targets with the Budget and
MTEF
Information and Communication
Technology Expenditure estimates 2012/13 2013/14 2014/15
Compensation of employees 51 228 53 789 56 478
Use of goods and services 345 958 363 256 381 419
Other 49 269 51 733 54 319
Total 446 455 468 778 492 217
43
Internal Audit and Risk Management Strategic Objectives
Strategic
Objective
To promote good governance in the administration of the
Agency.
Objective
Statements
To provide independent assurance on the adequacy, effectiveness
and efficiency of management-implemented controls.
To facilitate and monitor the development and implementation of the
risk management strategy.
To entrench a culture of integrity in the Agency.
44
Internal Audit and Risk Management performance
indicators and annual targets for 2012/13–2014/15
Performance indicator Medium-term target
2012/13 2013/14 2014/15
1. Number of internal audit
reviews conducted on
high-risk areas
20 internal audit reviews
conducted on high-risk
areas
20 internal audit reviews
conducted
on high-risk areas
20 internal audit
reviews conducted
on high-risk areas
2. Number of Internal Audit
monitoring reports
produced
30 Internal Audit
monitoring reports
produced
30 Internal Audit
monitoring reports
produced
30 Internal Audit
monitoring reports
produced
3. Strategic and operational
risk register updated
annually
Strategic and operational
risk register updated
annually
Strategic and operational
risk register updated
annually
Strategic and
operational risk
register updated
annually 45
Internal Audit and Risk Management performance
indicators and annual targets for 2012/13–2014/15 cont..
Performance indicator Medium-term target
2012/13 2013/14 2014/15
4. Number of ethics
interventions
implemented
3 ethics interventions
implemented
3 ethics interventions
implemented
3 ethics interventions
implemented
5. Percentage of identified
fraud cases
investigated
50% of identified fraud
cases investigated
50% of identified fraud
cases investigated
50% of identified fraud
cases investigated
6. Percentage of
suspicious grants
identified and verified
for validity
50 % of suspicious grants
identified and verified for
validity
50 % of suspicious grants
identified and verified for
validity
50 % of suspicious
grants identified and
verified for validity
46
Internal Audit
Expenditure estimates
2012/13 2013/14 2014/15
Compensation of
employees
22 948 24 095 25 300
Use of goods and
services
48 000 50 400 52 920
Total 70 948 74 495 78 220
47
Corporate Services Objectives
Strategic
Objective
To improve the effectiveness and efficiency of the
administration of the social assistance programme.
Objective
Statements
To promote and ensure sound human capital
management systems.
To provide facilities and auxiliary support services that
enable the Agency to function optimally.
To provide efficient and effective legal services to the
Agency.
48
Human Capital Management performance indicators
and annual targets for 2012/13–2014/15
Performance
indicator
Medium-term target
2012/13 2013/14 2014/15
1. Prioritised
elements of
talent
management
strategy
implemented
Prioritised elements of talent management
strategy implemented:
•Capacity model for grant value chain
implemented
•Skills audit conducted for grant value chain
•Workplace skills plan for grants
•Reviewed Performance Management and
Development System rolled out
•Employee wellness
•EE Compliance Report developed
•HIV and AIDS programme implemented in all
Regions and Head Office
Prioritised
elements of
talent
managemen
t strategy
implemente
d
Prioritised
elements of
talent
managemen
t strategy
implemente
d
2. Number of
Human Capital
Management
(HCM)
compliance
audits conducted
20 HCM compliance audits conducted 40 HCM
compliance
audits
conducted
60 HCM
compliance
audits
conducted
49
Legal Services: Performance indicators and annual
targets for 2012/13–2014/15
50
Performance indicator Medium-term target
2012/13 2013/14 2014/15
1. Number of reports
produced on the
implementation of the
Legal Services Model
4 consolidated reports
produced on the
implementation of the
Legal Services Model
4 consolidated reports
produced on the
implementation of the
Legal Services Model
4 consolidated reports
produced on the
implementation of the
Legal Services Model
Auxiliary Support Services performance indicators and
annual targets for 2012/13–2014/15
Performance indicator Medium-term target
2012/13 2013/14 2014/15
1. User Asset Management Plan
for 2013/14 developed
User Asset
Management Plan for
2013/14 developed
User Asset
Management Plan
for 2014/15
developed
User Asset
Management Plan
for 2015/16
developed
2. Fixed asset register updated
and consolidated
Fixed asset register
updated and
consolidated
Fixed asset
register updated
and consolidated
Fixed asset
register updated
and consolidated
51
Auxiliary Support Services performance indicators and
annual targets for 2012/13–2014/15 cont…
Performance indicator Medium-term target
2012/13 2013/14 2014/15
3. Number of local offices
improved in line with new
model
72 local offices
improved in line with
new model
72 local offices
improved in line
with new model
72 local offices
improved in line
with new model
4. MIS Registries complying with
targeted elements of the
National Archives Act and
directives
MIS Registries
complying with targeted
elements of the
National Archives Act
MIS Registries
complying with
targeted elements
of the National
Archives Act
MIS Registries
complying with
targeted elements
of the National
Archives Act
5. Disposal guidelines for
SASSA records approved
Disposal guidelines for
SASSA records
approved
- -
52
Communication and Marketing
Strategic Objective
Strategic
Objectives
To provide effective and efficient integrated
marketing and communication services.
Objective
Statement
To market, inform and educate internal and
external stakeholders on the social assistance
programme.
Implement the Integrated Marketing and
Communication Strategy
Ensure all existing are informed about
development relating to their grants payments,
re-registration and reviews
Eligible beneficiaries are informed about
SASSA benefits and eligibility criteria 53
Corporate Services Expenditure
estimates
Corporate Services Expenditure estimates 2012/13 2013/14 2014/15
Compensation of employees 164 042 172 244 180 856
Use of goods and services 790 895 830 439 871 961
Interest, dividends and rent on land 1 983 2 083 2 187
Transfers and subsidies 20 487 21 613 22 694
Other 11 997 12 537 13 163
Total 989 404 1 038 917 1 090 862
54
Finance Objectives and targets
55
Objective
Statement
To provide an effective, efficient and
economical financial management services.
Finance: Performance indicators and annual targets for
2012/13 –2014/15
100%
Compliance
with financial
prescripts
• Estimates on National Expenditure document
developed in accordance with National
Treasury’s budget cycle
• All eligible suppliers paid within 30 days
• Expenditure monitoring including submission
on 12 in-year monitoring reports to National
Treasury and DSD
• Ensuring compliance to procurement
processes
Finance Objectives and
targets (cont…)
• Allocation of resources to strategic priorities;
• Unqualified audit opinion achieved for all the
years;
• Increase the percentage of social assistance
debts recovered; and
• 50% of staff debts recovered as per the terms of
AoDs.
56
Finance Expenditure estimates
Finance
Expenditure
estimates
2012/13 2013/14 2014/15
Compensation
of employees
216 326 227 142 238 839
Goods and
services
2 556 099 2 684 378 2 819 423
Total 2 772 425 2 911 520 3 058 262
57
Recommendations
• It is recommended that the Portfolio Committee
on Social development:
– Note SASSA’s plans and priorities; and
– Support the Agency’s
• Strategic Plan (2012/13 – 2016/17);
• Annual Performance Plan (2011/12 – 2013/14); and
• MTEF Budget for 2011/12 to 2013/14.
58
59

More Related Content

Similar to sassa.ppt

Investor meeting june 8 2015
Investor meeting june 8 2015Investor meeting june 8 2015
Investor meeting june 8 2015Internap
 
Strategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIStrategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIJo Balucanag - Bitonio
 
Trends and local challenges in Project Management
Trends and local challenges in Project ManagementTrends and local challenges in Project Management
Trends and local challenges in Project ManagementPMILebanonChapter
 
Digitisation-of-Wealth-Management-Final
Digitisation-of-Wealth-Management-FinalDigitisation-of-Wealth-Management-Final
Digitisation-of-Wealth-Management-FinalShannon Aw
 
Transaction Capital: 2012 Annual Results Presentation
Transaction Capital: 2012 Annual Results PresentationTransaction Capital: 2012 Annual Results Presentation
Transaction Capital: 2012 Annual Results PresentationTransaction Capital
 
20160310 finance controller applicant pack final
20160310 finance controller applicant pack final20160310 finance controller applicant pack final
20160310 finance controller applicant pack finalEdward Harvey
 
Amplio Group Introductory Presentation 2019
Amplio Group Introductory Presentation 2019Amplio Group Introductory Presentation 2019
Amplio Group Introductory Presentation 2019Michael Van Luven
 
Strategic Planning for Co_ops
Strategic Planning for Co_opsStrategic Planning for Co_ops
Strategic Planning for Co_opsjo bitonio
 
Aegon UK & Ireland Strategy Update
Aegon UK & Ireland Strategy UpdateAegon UK & Ireland Strategy Update
Aegon UK & Ireland Strategy UpdateAegon
 
Global Pharma CIO transforms IT into accountable, low risk business partner
Global Pharma CIO transforms IT into accountable, low risk business partnerGlobal Pharma CIO transforms IT into accountable, low risk business partner
Global Pharma CIO transforms IT into accountable, low risk business partnerUMT
 
Ronnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photoRonnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photoRonnie Ng
 
Quanta Services (PWR) Investor Deck May 18, 2020
Quanta Services (PWR) Investor Deck May 18, 2020Quanta Services (PWR) Investor Deck May 18, 2020
Quanta Services (PWR) Investor Deck May 18, 2020QuantaIR
 

Similar to sassa.ppt (20)

Resume
ResumeResume
Resume
 
Sridharan TP 2016
Sridharan TP 2016Sridharan TP 2016
Sridharan TP 2016
 
Investor meeting june 8 2015
Investor meeting june 8 2015Investor meeting june 8 2015
Investor meeting june 8 2015
 
Strategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIStrategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO III
 
080219landbank.ppt
080219landbank.ppt080219landbank.ppt
080219landbank.ppt
 
Trends and local challenges
Trends and local challengesTrends and local challenges
Trends and local challenges
 
Trends and local challenges in Project Management
Trends and local challenges in Project ManagementTrends and local challenges in Project Management
Trends and local challenges in Project Management
 
Computacenter Annual Report & Accounts 2014
Computacenter Annual Report & Accounts 2014Computacenter Annual Report & Accounts 2014
Computacenter Annual Report & Accounts 2014
 
Digitisation-of-Wealth-Management-Final
Digitisation-of-Wealth-Management-FinalDigitisation-of-Wealth-Management-Final
Digitisation-of-Wealth-Management-Final
 
2016-EY4
2016-EY42016-EY4
2016-EY4
 
Transaction Capital: 2012 Annual Results Presentation
Transaction Capital: 2012 Annual Results PresentationTransaction Capital: 2012 Annual Results Presentation
Transaction Capital: 2012 Annual Results Presentation
 
20160310 finance controller applicant pack final
20160310 finance controller applicant pack final20160310 finance controller applicant pack final
20160310 finance controller applicant pack final
 
Amplio Group Introductory Presentation 2019
Amplio Group Introductory Presentation 2019Amplio Group Introductory Presentation 2019
Amplio Group Introductory Presentation 2019
 
Strategic Planning for Co_ops
Strategic Planning for Co_opsStrategic Planning for Co_ops
Strategic Planning for Co_ops
 
Aegon UK & Ireland Strategy Update
Aegon UK & Ireland Strategy UpdateAegon UK & Ireland Strategy Update
Aegon UK & Ireland Strategy Update
 
PROFESSIONAL EXPERIENCE G4S
PROFESSIONAL EXPERIENCE G4SPROFESSIONAL EXPERIENCE G4S
PROFESSIONAL EXPERIENCE G4S
 
Global Pharma CIO transforms IT into accountable, low risk business partner
Global Pharma CIO transforms IT into accountable, low risk business partnerGlobal Pharma CIO transforms IT into accountable, low risk business partner
Global Pharma CIO transforms IT into accountable, low risk business partner
 
SG_CV
SG_CVSG_CV
SG_CV
 
Ronnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photoRonnie Ng_CV_2015_with photo
Ronnie Ng_CV_2015_with photo
 
Quanta Services (PWR) Investor Deck May 18, 2020
Quanta Services (PWR) Investor Deck May 18, 2020Quanta Services (PWR) Investor Deck May 18, 2020
Quanta Services (PWR) Investor Deck May 18, 2020
 

Recently uploaded

Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Recently uploaded (20)

Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

sassa.ppt

  • 1. Presentation on SASSA’s Strategic Plan for the fiscal Years 2012/13-2016/17 and Annual Performance Plan 2012/13-2014/15
  • 2. Outline of the presentation • Purpose of the presentation • Background • Strategic overview; – Key strategic challenges – Key priority for 2012/13 – 2016/17 – Strategic objectives for the next 5 years – Branch Strategic objectives and objective statement • Annual Performance Plan – Financial plan – Branch strategic objective & Performance Indicators • Recommendation 2
  • 3. Purpose of the presentation • To present to the Portfolio Committee on Social Development: – SASSA’s Strategic Plan for the financial Years 2012/13-2016/17; and – Annual Performance Plan 2012/13. 3
  • 4. Strategic Overview Mandate The mandate of SASSA is to ensure the provision of comprehensive social security services against vulnerability and poverty within the constitutional and legislative framework. Vision A leader in the delivery of social security services. Mission To administer quality customer centric social security services to eligible and potential beneficiaries. 4
  • 5. Values • Social cohesion; • Transparency; • Equity; • Integrity; • Confidentiality; and • Customer Care- centered 5
  • 6. Background • SASSA has been consistent in the provision of monthly income support to a significant number of South Africans. • As at end of March 2012, over 15.5 million South Africans are benefiting from social grants; These are as follows: – Child support – 10 927 731 – Older Persons – 2 750 857 – Disability – 1 198 131 – Foster Care Grant - 536 747 – Card Dependency - 114 993 – War Veteran - 753 These are figures as at 31 March 2012 6
  • 7. Situational Analysis • The Agency has over the last year intensified its efforts towards improving service delivery. Our initiative include: – Appointment of service provider to effect payment of social grants in all provinces. Through this initiative, • the Agency will re-register all beneficiaries by capturing biometrics, • issue all beneficiaries with SASSA smart card that can operate in formal banking environment and designated SASSA cash pay-points. • The Agency will also achieve a saving of R800m per annum 7
  • 8. Situational Analysis • Other initiatives include: – Standardisation of the Application process; – Improvement of Local offices and pay-point infrastructure; – Automation of services; – Improved management of reviews and life certification processes; and – Improvement in combating fraud and corruption. 8
  • 9. Situational Analysis cont.… • The following grant administration exceptions were noted during the 2010/11 FY and were the main reasons for DSD qualification: – There were about 545 508 files that could not be obtained; – There were 159 302 items of loose correspondence which still has to be placed on the files and captured on the Management Information System; – There were 209 302 files which were missing the critical documents; – There were 62 153 files which still needed to be transferred between regions; and – There were more than 2 million old inactive files that needed to be destroyed. • However, significant progress has been made in addressing the AG findings as indicated in the following slide: 9
  • 10. Progress Achieved Against Audit Action Plan Targets April 2011 to 29 February 2012 Areas of Concern Target Progress to Date Reviews 900 000 324 941 Life Certificates 700 000 989 762 Missing files 372 370 275 094 Missing Critical Documents 142 681 118 181 Transfer of Files 155 767 90 767 File Destruction 2.2m 1.2m 10
  • 11. Key priorities for 2012/13 - 2016/17 • To deliver quality social security services by focusing on the following: – Excellent customer care; – The automation of systems; – Improving organisational capacity; and – Promoting good governance. 11
  • 12. Strategic Objective • Strategic Objectives for SASSA over the next 5 Years are: – To ensure that eligible beneficiaries receive benefits due to them; – To improve the quality of service delivery to our customers; – To achieve a fully integrated and automated social assistance service; and – To ensure that the Agency is optimally capacitated for optimal service delivery. 12
  • 13. Strategic Objective 13 Strategic Objective To improve the effectiveness and efficiency of the administration of the social assistance programme. Objective Statement • To ensure that eligible beneficiaries receive their benefits timeously with respect to: OAG, DG, CDG, FCG, CSG, WVG and GIA • To provide quality customer- centric services at all times. Branch: Grants Administration
  • 14. Strategic Objective 14 Strategic Objective To improve the effectiveness and efficiency of the administration of the social assistance programme. Objective Statement • To provide strategic direction for the effective implementation of the social assistance programme. Branch: Strategy and Business Development
  • 15. Strategic Objective cont.. Branch: Information and Communication Technology Strategic Objective To improve the effectiveness and efficiency of the administration of the social assistance programme. Objective Statement To achieve a fully secured, integrated and automated end –to- end system. To improve operational efficiency and the quality of ICT service delivery to our customers. 15
  • 16. Strategic Objective cont… Branch: Internal Audit and Risk Management Strategic Objective To promote good governance in the administration of the Agency Objective Statement To provide independent assurance on the adequacy, effectiveness and efficiency of management implemented controls. To facilitate and monitor the development and implementation of the risk management strategy. To entrench a culture of integrity in the Agency. 16
  • 17. Strategic Objective cont… Branch: Corporate Services Strategic Objective To improve the effectiveness and efficiency of the administration of the social assistance programme. Objective Statement To promote and ensure sound human capital management systems. Provide efficient and effective legal services to the Agency To provide facilities and auxiliary support services that enable the Agency to function optimally. Security: To promote security risk management practices in the Agency. Communication: To market, inform and educate internal and external stakeholders on the social assistance programme. 17
  • 18. Strategic Objective cont… Branch: Finance Strategic Objective To provide financial management services to the Agency. Objective Statement To provide effective, efficient and economical financial management service. 18
  • 20. Overview of the 2012/13 budget and medium-term expenditure framework estimates Revised Audited outcome estimate Medium-term estimate R thousand 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 Executive Management 46,901 235,020 257,438 193,557 203,235 213,396 224,066 Corporate Services 618,214 739,288 699,370 941,442 989,404 1,038,917 1,090,862 Finance 3,096,964 2,770,030 2,539,350 2,941,084 2,772,425 2,911,520 3,058,262 Information Technology 443,102 472,505 347,396 425,195 446,455 468,778 492,217 Grants Administration and Customer Services 1,151,169 1,140,345 1,224,458 1,538,883 1,671,160 1,775,160 1,880,138 Strategy & Business Development 43,257 21,453 22,468 45,485 47,759 50,147 52,653 Internal Audit 81,130 86,818 85,840 67,575 70,948 74,495 78,220 Total expense 5,480,737 5,465,459 5,176,320 6,153,221 6,201,386 6,532,414 6,876,419 20 Medium Term Expenditure Estimates
  • 21. Overview of the 2012/13 budget • The Agency receives its administration budget transfers from the Department of Social Development and the transfers in respect of the grants disbursed to grant beneficiaries (referred to as the “big money”) is managed through the Department. • The bulk of the administration budget goes towards payments to cash contractors who are contracted to the Agency to disburse grant monies to beneficiaries. • The second largest allocation on the budget is on personnel expenditure while the remaining balance caters for other operational expenses, which include various contractual obligations. 21
  • 22. Budgeted key priorities/cost drivers • Compensation of Employees - The budget allocation for CoE caters for current posts, and critical additional posts (In particular level 5-8 posts at the regions to ensure the recruitment of sufficient and appropriately skilled human capital for improved and more efficient service delivery. • Cash Payment Contractors’ fees - Awarding of the new 5 year contract to service provider Cash Paymaster Services, which caps the cost per grant at R16.50 will assist in realising savings on this expenditure item. • Grants Process Automation - A specific ring-fenced allocation has been made available for the automation of the grant business process. The model aims to standardise a part of the application process by centralising the registry and decentralising the verification and approval of applications. This will introduce a substantial improvement to the turn around time of the application process and will aim to complete the application-to-approval process in one day. • Various contracts necessary for the running of the Agency - The budget allocation in this regard caters for the leasing of office accommodation including all the other related costs such as security services, cleaning service charges and maintenance and repairs. The allocation also includes the leasing of motor vehicles from the government garage, which forms part of the Agency’s fleet strategy. Furthermore, there are Information Technology related contracts such as contracts for the VPN connectivity, SITA contracts (for the SOCPEN) etc. • ICT infrastructure deployment - As SASSA acquires new office accommodation, there is a need to install the necessary ICT connectivity to these premises. There is a specific allocation for this purpose. 22
  • 23. Budgeted key priorities/cost drivers • Medical assessment fees – This allocation caters for the payment towards contracted medical doctors who perform medical assessments on disability grant applicants on behalf of SASSA • Improvement of local offices and pay point infrastructure – The Agency strives to ensure that the conditions under which our grant beneficiaries are serviced are humane. Specific allocation has been made available for the upgrade of local offices and the improvement of infrastructure at the pay points • Grant Fraud Investigations – As part of combating fraud within our system the Agency will work in close collaboration with the law enforcement agencies. A specific allocation has been made for this purpose • Bulk Notification – In terms of the law, the Agency must notify grant applicants of the outcome of their application by registered mail. Also grant beneficiaries must be notified of the status. In this regard registered mail is used. The budget allocation caters for this function • Media Campaigns – It is critical that citizens are informed about the services offered by the Agency and about any other matter affecting the grant payments particularly given the new developments following the award of the new contract. A specific allocation has been made for this purpose 23
  • 24. Structure of the Agency • The structure of the Agency is as follows:  Branch 1: Grants Administration;  Branch 2: Strategy and Business Development;  Branch 3: Information and Communication Technology;  Branch 4: Internal Audit and Risk Management;  Branch 5: Corporate Services; and  Branch 6: Finance. 24
  • 25. Grants Administration Strategic Objective Strategic Objective To improve the effectiveness and efficiency of the administration of the social assistance programme. Objective Statement To ensure that eligible beneficiaries receive their benefits timeously with respect to the Old Age Grant (OAG), Disability Grant (DG), Care Dependency Grant (CDG), Foster Child Grant (FCG), Child Support Grant (CSG), War Veteran Grant (WVG) and Grant-in-Aid (GIA). Objective Statement To provide quality customer centred services at all times. 25
  • 26. Grants Administration: Performance Indicators and Annual Targets for 2012/13 – 2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 1. Projected total number of grants in payment 16 069 007 16 489 577 16 756 905 2. Number of old age grants in payment 2 772 745 2 835 018 2 881 146 3. Number of war veteran’s grants in payment 706 621 551 4. Number of disability grants in payment 1 192 444 1 195 629 1 195 966 5. Number of grants-in-aid in payment 65 724 70 325 75 247 6. Number of foster child grants in payment 671 307 768 645 874 001 7. Number of care dependency grants in payment 131 246 140 965 146 658 8. Number of child support grants in payment 11 300 559 11 548 698 11 658 553 9. Percentage of Social Relief of Distress (SRD) funds disbursed in accordance with the approved guidelines 100% of SRD budget spent annually in accordance with the approved guidelines 100% of SRD budget spent annually in accordance with the approved guidelines 100% of SRD budget spent annually in accordance with the approved guidelines 10. Percentage of new grant applications processed within 21 days 90% of new grant applications processed within 21 days 100% of new grant applications processed within 21 days 100% of new grant applications processed within 21 days 11. Percentage of files sampled for quality assurance post verification 5% of files sampled for quality assurance post verification 7% of files sampled for quality assurance post verification 10% of files sampled for quality assurance post verification 26
  • 27. Grants Administration: Performance Indicators and Annual Targets for 2012/13 – 2014/15 cont… Performance indicator Medium-term target 2012/13 2013/14 2014/15 12. Percentage of administrative and medical backlog reviews completed 5% of administrative and medical backlog reviews completed 20% of administrative and medical backlog reviews completed 20% of administrative and medical backlog reviews completed 13. Percentage of foster child grant backlog reviews completed 100% of foster child grant backlog reviews completed 100% of foster child grant backlog reviews completed 100% of foster child grant backlog reviews completed 14. Percentage of current administrative and medical reviews completed 100% of current administrative and medical reviews completed 100% of current administrative and medical reviews completed 100% of current administrative and medical reviews completed 15. Percentage of current foster child grant reviews completed 20% of current foster child grant reviews completed 100% of current foster child grant reviews completed 100% of current foster child grant reviews completed 16. Percentage of beneficiaries life- certified 100% of beneficiaries life- certified 100% of beneficiaries life-certified 100% of beneficiaries life- certified 17. Percentage of grants due for lapsing lapsed 100% of grants due for lapsing lapsed 100% of grants due for lapsing lapsed 100% of grants due for lapsing lapsed 18. Percentage implementation of file management 100% of files transferred 100% of files transferred 100% of files transferred 100% of files destroyed 100% of files destroyed 100% of files destroyed 100% of missing files resolved 100% of missing files resolved 100% of missing files resolved 100% of loose and critical correspondence filed 100% of loose and critical correspondence filed 100% of loose and critical correspondence filed 27
  • 28. Grants Administration: Performance Indicators and Annual Targets for 2012/13 – 2014/15 cont… Performance indicator Medium-term target 2012/13 2013/14 2014/15 19. Number of beneficiary records corrected 16 000 beneficiary records corrected for identity numbers 5 000 beneficiary records corrected for identity numbers 5 000 beneficiary records corrected for identity numbers 500 Persal/SASSA employees records corrected 500 Persal/SASSA employees records corrected 500 Persal/SASSA employees records corrected 20. Percentage of disability assessments quality-assured 20% of disability assessments quality-assured 20% of disability assessments quality- assured 20% of disability assess- ments quality-assured 21. Percentage implementation of the prioritised elements of the disability management model 100% implementation of the prioritised elements of the disability management model 100% implementation of the prioritised elements of the disability management model 100% implementation of the prioritised elements of the disability management model 22. Percentage of backlog medical review assessments completed 5 % of backlog medical review assessments completed 20 % of backlog medical review assessments completed 20 % of backlog medical review assessments completed 23. Percentage of current medical review assessments completed 20% current medical review assessments completed 100% current medical review assessments completed 100% current medical review assessments completed 24. Number of pay points improved 400 pay points improved 400 pay points improved 128 pay points improved 28
  • 29. Grants Administration: Performance indicators and annual targets for 2012/13–2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 1. Number of identified poverty wards targeted through ICROP 40 identified poverty wards targeted through ICROP 40 identified poverty wards targeted through ICROP 81 identified poverty wards targeted through ICROP 2. Number of people accessing social assistance services through ICROP 60 000 people accessing social assistance services through ICROP 60 000 people accessing social assistance services through ICROP 75 751 people accessing social assistance services through ICROP 3. Percentage of ICROP special requests responded to 100% of ICROP special requests responded to 100% of ICROP special requests responded to 100% of ICROP special requests responded to 29
  • 30. Grants Administration: Performance indicators and annual targets for 2012/13–2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 4. Number of identified railway stations targeted for Phelophepha services 34 identified railway stations targeted in 4 regions - - 5. Percentage of Phelophepha special requests attended to 100% of Phelophepha special requests attended to 100% of Phelophepha special requests attended to 100% of Phelophepha special requests attended to 6. Percentage of Customer Care Charter standards implemented with respect to enquiries and complaints 100% of enquiries attended to within 7 working days 100% of enquiries attended to within 7 working days 100% of enquiries attended to within 7 working days 100% of complaints attended to within 5 days 100% of complaints attended to within 5 days 100% of complaints attended to within 5 days 30
  • 31. Grants Administration: Performance indicators and annual targets for 2012/13–2014/15 cont… Performance indicator Medium-term target 2012/13 2013/14 2014/15 7. Percentage implementation of Tribunal decisions 100% implementation of Tribunal decisions 100% implementation of Tribunal decisions 100% implementation of Tribunal decisions 8. Percentage of applications for internal reconsideration finalised within 90 days 100% of applications for internal reconsideration finalised within 90 days 100% of applications for internal reconsideration finalised within 90 days 100% of applications for internal reconsideration finalised within 90 days 31
  • 32. Reconciling performance targets with the Budget and MTEF Grants Administration Expenditure estimates 2012/13 2013/14 2014/15 Compensation of employees 1 289 484 1 373 363 1 451 976 Use of goods and services 381 676 401 798 428 163 Interest, dividends and rent on land - - - Transfers and subsidies - - - Total 1 671 160 1 775 160 1 880 138 32
  • 33. Strategy and Business Development Strategic Objectives • Compliance with the planning framework • Service delivery monitoring and consolidated evaluation reports produced quarterly • Social grant projection reports produced (2 per annum) • Five institutional performance assessments reports produced (1 Annual and 4 quarterly performance reports) 33 Objective Statement To provide strategic direction for the effective implementation of the social assistance programme.
  • 34. Strategy and Business Development Strategic Objectives • Strategy on future payment model for SASSA developed – Advisory Committee established towards end of 2012 – Consultative document and Research report produced in 2012 – Design options developed and piloted 2013 and 2014 • Business Process Reengineering (BPR) – Review and restructuring for finance branch completed in 2012, – Plans for re-engineering of the Grant administration will commence in 2012 and actual implementation will be effected in 2013. 34
  • 35. Strategy & Business Development Expenditure estimates (R’000) 2012/13 2013/14 2014/15 Compensation of employees 18 405 19 325 20 292 Use of goods and services 29 354 30 821 32 362 Total 47 759 50 147 52 653 37
  • 36. Information and Communication Technology Strategic Objectives Strategic Objective To improve the effectiveness and efficiency of the administration of the social assistance programme Objective Statement To achieve a fully secured, integrated and automated end- to-end system. To improve operational efficiency and the quality of ICT service delivery to our customers. 38
  • 37. ICT: Performance indicators and annual targets for 2012/13–2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 1. Percentage automated end-to-end solution for grants application and administration developed 40% of automated end- to-end solution for grant application and administration developed 60% of automated end-to-end solution for grant application and administration developed 100% of automated end-to-end solution for grant application and administration developed 2. Grant beneficiary biometric system developed Grant beneficiary biometric system developed - - 3. Percentage of grant system (Socpen) users biometrically authenticated 100% of grant system users biometrically authenticated 100% of grant system users biometrically authenticated 100% of grant system users biometrically authenticated 39
  • 38. ICT: Performance indicators and annual targets for 2012/13–2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 4 . Number of internal grant administration systems integrated Integration of 5 internal grant administration systems (SOCPEN, MIS (National Registry, Eastern Cape, Free State, MIS National IGAP, Livelink) - - 5 . Real-time interfaces with Department of Home Affairs: Home Affairs National Identification System (HANIS) and National Population Real-time interface with Department of Home Affairs (HANIS), and NPR system Real-time interface with South African Revenue Service (SARS), Department of Justice and Constitutional - 40
  • 39. ICT performance indicators and annual targets for 2012/13–2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 1. Percentage availability of systems to users 97% availability of systems to users 97% availability of systems to users 97% availability of systems to users 2. Percentage accessibility of systems by users 97% accessibility of systems by users 97% accessibility of systems by users 97% accessibility of systems by users 3. Percentage of grant officials provided with workstations at points of service delivery 100% of grant officials provided with workstations at points of service delivery 100% of grant officials provided with workstations at points of service delivery 100% of grant officials provided with workstations at points of service delivery 41
  • 40. ICT performance indicators and annual targets for 2012/13–2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 4. Percentage of the Agency’s offices connected to the LAN 100% of the Agency’s offices connected to the LAN 100% of the Agency’s offices connected to the LAN 100% of the Agency’s offices connected to the LAN 5. Percentage of the Agency’s offices connected to the WAN 97% of the Agency’s offices connected to the WAN 97% of the Agency’s offices connected to the WAN 97% of the Agency’s offices connected to the WAN 42
  • 41. Reconciling performance targets with the Budget and MTEF Information and Communication Technology Expenditure estimates 2012/13 2013/14 2014/15 Compensation of employees 51 228 53 789 56 478 Use of goods and services 345 958 363 256 381 419 Other 49 269 51 733 54 319 Total 446 455 468 778 492 217 43
  • 42. Internal Audit and Risk Management Strategic Objectives Strategic Objective To promote good governance in the administration of the Agency. Objective Statements To provide independent assurance on the adequacy, effectiveness and efficiency of management-implemented controls. To facilitate and monitor the development and implementation of the risk management strategy. To entrench a culture of integrity in the Agency. 44
  • 43. Internal Audit and Risk Management performance indicators and annual targets for 2012/13–2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 1. Number of internal audit reviews conducted on high-risk areas 20 internal audit reviews conducted on high-risk areas 20 internal audit reviews conducted on high-risk areas 20 internal audit reviews conducted on high-risk areas 2. Number of Internal Audit monitoring reports produced 30 Internal Audit monitoring reports produced 30 Internal Audit monitoring reports produced 30 Internal Audit monitoring reports produced 3. Strategic and operational risk register updated annually Strategic and operational risk register updated annually Strategic and operational risk register updated annually Strategic and operational risk register updated annually 45
  • 44. Internal Audit and Risk Management performance indicators and annual targets for 2012/13–2014/15 cont.. Performance indicator Medium-term target 2012/13 2013/14 2014/15 4. Number of ethics interventions implemented 3 ethics interventions implemented 3 ethics interventions implemented 3 ethics interventions implemented 5. Percentage of identified fraud cases investigated 50% of identified fraud cases investigated 50% of identified fraud cases investigated 50% of identified fraud cases investigated 6. Percentage of suspicious grants identified and verified for validity 50 % of suspicious grants identified and verified for validity 50 % of suspicious grants identified and verified for validity 50 % of suspicious grants identified and verified for validity 46
  • 45. Internal Audit Expenditure estimates 2012/13 2013/14 2014/15 Compensation of employees 22 948 24 095 25 300 Use of goods and services 48 000 50 400 52 920 Total 70 948 74 495 78 220 47
  • 46. Corporate Services Objectives Strategic Objective To improve the effectiveness and efficiency of the administration of the social assistance programme. Objective Statements To promote and ensure sound human capital management systems. To provide facilities and auxiliary support services that enable the Agency to function optimally. To provide efficient and effective legal services to the Agency. 48
  • 47. Human Capital Management performance indicators and annual targets for 2012/13–2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 1. Prioritised elements of talent management strategy implemented Prioritised elements of talent management strategy implemented: •Capacity model for grant value chain implemented •Skills audit conducted for grant value chain •Workplace skills plan for grants •Reviewed Performance Management and Development System rolled out •Employee wellness •EE Compliance Report developed •HIV and AIDS programme implemented in all Regions and Head Office Prioritised elements of talent managemen t strategy implemente d Prioritised elements of talent managemen t strategy implemente d 2. Number of Human Capital Management (HCM) compliance audits conducted 20 HCM compliance audits conducted 40 HCM compliance audits conducted 60 HCM compliance audits conducted 49
  • 48. Legal Services: Performance indicators and annual targets for 2012/13–2014/15 50 Performance indicator Medium-term target 2012/13 2013/14 2014/15 1. Number of reports produced on the implementation of the Legal Services Model 4 consolidated reports produced on the implementation of the Legal Services Model 4 consolidated reports produced on the implementation of the Legal Services Model 4 consolidated reports produced on the implementation of the Legal Services Model
  • 49. Auxiliary Support Services performance indicators and annual targets for 2012/13–2014/15 Performance indicator Medium-term target 2012/13 2013/14 2014/15 1. User Asset Management Plan for 2013/14 developed User Asset Management Plan for 2013/14 developed User Asset Management Plan for 2014/15 developed User Asset Management Plan for 2015/16 developed 2. Fixed asset register updated and consolidated Fixed asset register updated and consolidated Fixed asset register updated and consolidated Fixed asset register updated and consolidated 51
  • 50. Auxiliary Support Services performance indicators and annual targets for 2012/13–2014/15 cont… Performance indicator Medium-term target 2012/13 2013/14 2014/15 3. Number of local offices improved in line with new model 72 local offices improved in line with new model 72 local offices improved in line with new model 72 local offices improved in line with new model 4. MIS Registries complying with targeted elements of the National Archives Act and directives MIS Registries complying with targeted elements of the National Archives Act MIS Registries complying with targeted elements of the National Archives Act MIS Registries complying with targeted elements of the National Archives Act 5. Disposal guidelines for SASSA records approved Disposal guidelines for SASSA records approved - - 52
  • 51. Communication and Marketing Strategic Objective Strategic Objectives To provide effective and efficient integrated marketing and communication services. Objective Statement To market, inform and educate internal and external stakeholders on the social assistance programme. Implement the Integrated Marketing and Communication Strategy Ensure all existing are informed about development relating to their grants payments, re-registration and reviews Eligible beneficiaries are informed about SASSA benefits and eligibility criteria 53
  • 52. Corporate Services Expenditure estimates Corporate Services Expenditure estimates 2012/13 2013/14 2014/15 Compensation of employees 164 042 172 244 180 856 Use of goods and services 790 895 830 439 871 961 Interest, dividends and rent on land 1 983 2 083 2 187 Transfers and subsidies 20 487 21 613 22 694 Other 11 997 12 537 13 163 Total 989 404 1 038 917 1 090 862 54
  • 53. Finance Objectives and targets 55 Objective Statement To provide an effective, efficient and economical financial management services. Finance: Performance indicators and annual targets for 2012/13 –2014/15 100% Compliance with financial prescripts • Estimates on National Expenditure document developed in accordance with National Treasury’s budget cycle • All eligible suppliers paid within 30 days • Expenditure monitoring including submission on 12 in-year monitoring reports to National Treasury and DSD • Ensuring compliance to procurement processes
  • 54. Finance Objectives and targets (cont…) • Allocation of resources to strategic priorities; • Unqualified audit opinion achieved for all the years; • Increase the percentage of social assistance debts recovered; and • 50% of staff debts recovered as per the terms of AoDs. 56
  • 55. Finance Expenditure estimates Finance Expenditure estimates 2012/13 2013/14 2014/15 Compensation of employees 216 326 227 142 238 839 Goods and services 2 556 099 2 684 378 2 819 423 Total 2 772 425 2 911 520 3 058 262 57
  • 56. Recommendations • It is recommended that the Portfolio Committee on Social development: – Note SASSA’s plans and priorities; and – Support the Agency’s • Strategic Plan (2012/13 – 2016/17); • Annual Performance Plan (2011/12 – 2013/14); and • MTEF Budget for 2011/12 to 2013/14. 58
  • 57. 59